PETROSYNC’S OFFSHORE & MARINE SERIES
Build Solid Foundation of Requirements for Offshore Marine Operations
16 May 2016—20 May 2016
Kuala Lumpur, Malaysia
OFFSHORE MARINE
OPERATION
2
Our course is developed to to provide the solid foundation knowledge to your team in order
to maximize your learning benefits and it will helps you to improve your work efficiency and
efficiency.
OFFSHORE | OFFSHORE MARINE OPERATION
How Does This Course Benefits You?
LNG Terminal in UK is scheduled to receive the cargo of
LNG within a period of 10 days.
Do you know that by understanding the LNG Terminal and
Vessel Operation will help you to maximize the success and
minimize the failure?
Improve the Efficiency and Effectiveness in Daily Operation
Improve your work efficiency and effectiveness by understanding an in-depth knowledge on
offshore marine operation and design structure.
Enhance Your Planning Techniques
Enhance your planning techniques by employing proper planning techniques in the various
planning and transfer requirements for offshore marine operation in order to maximize
successful and minimize failures.
Enhance Risk Assessment Techniques
By employ proper qualitative and quantitative risk assessment techniques in offshore
operation in order to provide the safer practices and procedures during various operation.
General Properties Affecting Fire Hazards
Do you know that there is no way for personnel to detect
leaks unless the leak is sufficiently large to create a visible
condensation?
This training program, OFFSHORE MARINE OPERATION, is
developed to provide you a solid foundation of the requirements
for offshore marine operations personnel skill sets and knowledge
base.
general@petrosync.com | +65 6451 4500 | www.petrosync.com
Course Overview
Case History and Exercises
Past case history and several design exercise will be given during the exercise session, it will
helps you to understand in-depth about the offshore marine operation and the environmental
issues that might be impact to your construction design or built process .
Latest Design Techniques Content
Latest design techniques available to the industry are also covered such as lift point design,
barge transportation design stability etc. are also covered. IF you want to have someone with
practical background and knowledge on recent development in this field, then that is where
our instructor is the right fit.
3
OFFSHORE | OFFSHORE MARINE OPERATION
PetroSync Distinguished Instructor
Who Needs This Program
Practical & Consulting
 Master Mariner for BP Shipping from year 2002 - 2009
 17 years of experience in marine operation specialist
undertake marine survey and consultancy work relating to
Marine Engineering in offshore energy sectors.
 Responsible for safe LNG loading and discharge operation for
terminals in various country such as Far East, Middle East,
Europe, North, South America and so on.
 Previous experience was as Marine Superintendent for Wood
Group Engineering Company and his responsibility of marine
superintendent include manage marine department, monitor,
and control and operate the whole marine operations to
make sure project marine systems remain on schedule.
Training
 Effectively manage training and development of Angolan
Nationals
 Site delivery team for CLSICO (China LNG) new build LNG
Vessels
Christopher Mc Dade
International Consultant
 The course is designed for, but not limited to, vessel engineers, LNG terminal operators,
LNG engineers, marine engineers and HSE engineers, who are directly involved in vessel
operations. In addition, this program may be beneficial to commercial and management
staff who require a technical overview of vessel operations.
Job Titles Include:
Vessel Engineers
Vessel Operators
LNG Terminal Operators
LNG Engineers
XXX
HSE Engineers
Marine Engineers
Project Engineers
PetroSync Inhouse Solutions
PetroSync can tailor our courses to meet your specific
needs at your preferred location and schedule. Contact us
for more information at +65 6415 4500 or email to
general @petrosync.com
PetroSync Quality Assurance
All PetroSync courses are developed with top quality to
address all your training needs and purposes. Our courses
are vetted strictly to ensure that we always deliver the best
courses with the best industry expert.
general@petrosync.com | +65 6451 4500 | www.petrosync.com
08:00—09:00 Registration (Day 1) 13:00—14:00 Lunch
09:00—11:00 Session I 14:00—15:30 Session III
11:00—11.15 Refreshment Session I 15:30—15:45 Refreshment Session II
11:15—13:00 Session II 15:45—17:00 Session Iv (Last Session)
Course Schedule
4
OFFSHORE | OFFSHORE MARINE OPERATION
Course Agenda — 5 Days
general@petrosync.com | +65 6451 4500 | www.petrosync.com
DAY 1
Introduction to Marine Projects
Overview of the Course
Guideline Marine Projects
Loadout
 Planning of Operations
 Loads and Analysis
 Operational Requirements
 Classes of Loadout
 Site and Quay
 Barge
 Project Safety & Control
DAY 2
Offshore Facilities I
Towing of Offshore Facilities
 Towing of Jack-Ups
 Towing of Semi-submersibles
 Towing Other
 Multiple Towing
 Towing Vessel Selection & Approval l
 Voyage Planning
Lifting
 Planning of Marine Lifts
 Loads and Analysis
 Structures
 Requirements for Lifting Equipment
 Crane and Crane Vessels
 Load & Safety Factors
 Crane & Installation Vessel
 Lift Point Design
 Clearances
DAY 3
Offshore Facilities II
Steel Jackets
 Environmental Considerations
 Strength
 Transportation
 Installation & Launching
 Upending After Launch
 Installation Lifting
 Reserve Buoyancy, Seabed Clearances
 Jacket Positioning
 Project Safety & Control
 Installation
Barge Transportation
 Planning of Marine Operations
 Design and Environmental Condition
 Motion Response
 Loadings
 Design and Strength Stability
 Transport Vessel Selection
Gravity Base Structures (GBS)
 Stability and Motion Response
 Strength
 GBS Mooring Criteria
 Float Out of Base Structure
 Towing Criteria
 Water Ballets System
 Deck Mating
 Installation at Offshore Location
5
OFFSHORE | OFFSHORE MARINE OPERATION
general@petrosync.com | +65 6451 4500 | www.petrosync.com
DAY 4
Transportation and Inshore
Lift-Off, Transportation and Inshore Mating of Topsides
 Stability and Motion Response
 Structural Analysis
 Equipment
 Lift-Off
 Towing Criteria
 Deck Mating
Offshore Pipeline
 Documentation
 Warranty Surveyor Attendance
 Environmental Considerations
 Surveys and Route Preparation
 Pipeline Construction
 Towed Pipeline Installation
 Pipelines Crossings
 Freespan Rectification
 Trenching and Backfilling
 Tie-Ins
 Shore Approach and Landfall
 Testing and Commissioning
DAY 5
Marine Operation Overview
Barge Transportation
 Towing
 Moorings and Anchors
 Handling Heavy Loads at Sea
 Personnel Transfer at Sea
 Underwater Intervention, Diving, Underwater Work
Systems, ROVs and Manipulators
 Underwater Concreting and Grouting
 Offshore Surveying, Navigation and Sea Floor Surveys
 Temporary Buoyancy Augmentation
Register For This Course Now!
You Might Also Be Interested In:
Kindly fill up your particulars in the
registration form placed at the end of this
brochure, and send it to us or email to
registration@petrosync.com
Offshore Marine Operation
Kuala Lumpur, Malaysia
Fixed Platform Design
Kuala Lumpur, Malaysia
Decommissioning and Abandonment
Kuala Lumpur, Malaysia
6
By Credit Card:
Please debit my credit card: Visa MasterCard AMEX Security Code:
Card Number: Expiry Date:
Name Printed on Card:
By Direct Transfer: Please quote invoice number(s) on remittance advice
PetroSync Global Pte Ltd Bank Details:
Account Name: PetroSync Global Pte Ltd
Bank Name: DBS Bank Ltd
Bank Code: 7171—Bank Swift Code: DBSSSGSGXXX—Branch Code: 288
Account No: SGD: 288-901898-0 USD: 0288-002682-01-6
Bank Address: 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982.
All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced
amount.
Title : Offshore Marine Operation
Date : 16-20 May 2016
Location : Kuala Lumpur, Malaysia
COURSE DETAILS
INVESTMENT PACKAGE DEADLINE FULL MASTERCLASS
Standard Price 13 May 2016 USD 4,295
Early Bird Offer 15 April 2016 USD 4,095
Group Discount
(3 or more Delegates)
13 May 2016
Enjoy 10% discount for
groups of 3
INVESTMENT PACKAGES (Please Circle)
Group Discount is based on Standard Price
*To enjoy the promotion & discount offer, payment must be made before dateline
* For 7 or more delegates, please inquire for more attractive package.
* Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other
promotional offers.
* Important: Please note that registration without payment will incur a SGD 200 administration fee.
COURSE CONSULTANT
Name : Cay Aagen
Email : registration@petrosync.com
Phone : +65 6415 4500
Fax : +65 6415 4322
TERMS AND CONDITIONS
DISCLAIMER
Please note that trainers and topics were confirmed at
the time of publishing; however, PetroSync may
necessitate substitutions, alterations or cancellations
of the trainers or topics. As such, PetroSync reserves
the right to change or cancel any part of its published
courseme due to unforeseen circumstances. Any
substitutions or alterations will be updated on our web
page as soon as possible.
DATA PROTECTION
The information you provide will be safeguarded by
PetroSync that may be used to keep you informed of
relevant products and services. As an international
group we may transfer your data on a global basis for
the purpose indicated above. If you do not want us to
share your information with other reputable
companies, please tick this box
CANCELLATION POLICY
You may substitute delegates at any time as long as
reasonable advance notice is given to PetroSync. For
any cancellation received in writing not less than
fourteen (14) working days prior to the training
course, you will receive credit voucher less a SGD $200
administration fee and any related bank or credit card
charges.
Delegates who cancel less than fourteen (14) working
days of the training course, or who do not attend the
course, are liable to pay the full course fee and no
refunds will be granted.
In the event that PetroSync cancels or postpones an
event for any reason and that the delegate is unable or
unwilling to attend in on the rescheduled date, you will
receive a credit voucher for 100% of the contract fee
paid. You may use this credit voucher for another
PetroSync to be mutually agreed with PetroSync,
which must occur within a year from the date of
postponement.
PetroSync is not responsible for any loss or damage as
a result of the cancellation policy. PetroSync will
assume no liability whatsoever in the event this event
is cancelled, rescheduled or postponed due to any Act
of God, fire, act of government or state, war, civil
commotion, insurrection, embargo, industrial action,
or any other reason beyond management control.
CERTIFICATE OF ATTENDANCE
70% attendance is required for PetroSync’s Certificate
of Attendance
DETAILS
Please accept our apologies for mail or email that is
incorrectly addressed.
Please email us at registration@petrosync.com and
inform us of any incorrect details. We will amend them
accordingly.
CHARGES & FEE(S)
- For Payment by Direct Telegraphic Transfer, client
has to bear both local and oversea bank charges.
- For credit card payment, there is additional 4%
credit card processing fee.
1st Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
2nd Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
3rd Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
Attention Invoice to:
Direct Line Number: Fax:
Company: Industry:
Address: Postcode:
Country: Email:
Please note:
- Indicate if you have already registered by Phone Fax Email Web
- If you have not received an acknowledgement before the training, please call us to confirm your booking.
CONFIRMATION
I agree to PetroSync’s terms & conditions, payment terms and cancellation policy.
Authorized Signature:
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.
PAYMENT METHOD
INVOICE DETAILS
DELEGATES DETAILS

Weitere ähnliche Inhalte

Was ist angesagt?

Kain Dillon Resume 1
Kain Dillon Resume 1Kain Dillon Resume 1
Kain Dillon Resume 1kain dillon
 
PD179 Bunker Quality Claims
PD179 Bunker Quality ClaimsPD179 Bunker Quality Claims
PD179 Bunker Quality ClaimspetroEDGE
 
Gagecal Resume
Gagecal ResumeGagecal Resume
Gagecal ResumeGeorge Admire
 
FPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas ProductionFPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas ProductionWalter Lee
 
Ahmed Bahloul C.V.
Ahmed Bahloul C.V.Ahmed Bahloul C.V.
Ahmed Bahloul C.V.Ahmed A.Moula
 
Stephen Drayton
Stephen DraytonStephen Drayton
Stephen DraytonSteve Drayton
 
Scott Donaldson CV - Copy - for merge
Scott Donaldson CV - Copy - for mergeScott Donaldson CV - Copy - for merge
Scott Donaldson CV - Copy - for mergeScott Donaldson
 
Gavin Donnelly Resume
Gavin Donnelly ResumeGavin Donnelly Resume
Gavin Donnelly Resumegavin donnelly
 
Fundamentals of Dynamic Positioning
Fundamentals of Dynamic PositioningFundamentals of Dynamic Positioning
Fundamentals of Dynamic Positioningrockporshe
 
EllisSkoglundJr
EllisSkoglundJrEllisSkoglundJr
EllisSkoglundJrJug Head
 
Teer December 15
Teer December 15Teer December 15
Teer December 15Albin Teer
 
Duncan's cv february, 2020
Duncan's cv    february, 2020 Duncan's cv    february, 2020
Duncan's cv february, 2020 Samuel Duncan Ampah
 
Delwar Hossain CV.
Delwar Hossain CV.Delwar Hossain CV.
Delwar Hossain CV.Delwar Hossain
 
KAVI SELVAN CV-2015
KAVI SELVAN CV-2015KAVI SELVAN CV-2015
KAVI SELVAN CV-2015Selvaa AG
 
PD185 LNG Terminal Operations
PD185 LNG Terminal OperationsPD185 LNG Terminal Operations
PD185 LNG Terminal OperationspetroEDGE
 
PetroSync - Geology for Non-Geologist
PetroSync - Geology for Non-GeologistPetroSync - Geology for Non-Geologist
PetroSync - Geology for Non-GeologistPetroSync
 

Was ist angesagt? (20)

CV_Sudhir_ 2015
CV_Sudhir_ 2015CV_Sudhir_ 2015
CV_Sudhir_ 2015
 
Kain Dillon Resume 1
Kain Dillon Resume 1Kain Dillon Resume 1
Kain Dillon Resume 1
 
PD179 Bunker Quality Claims
PD179 Bunker Quality ClaimsPD179 Bunker Quality Claims
PD179 Bunker Quality Claims
 
Gagecal Resume
Gagecal ResumeGagecal Resume
Gagecal Resume
 
FPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas ProductionFPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas Production
 
Ahmed Bahloul C.V.
Ahmed Bahloul C.V.Ahmed Bahloul C.V.
Ahmed Bahloul C.V.
 
Stephen Drayton
Stephen DraytonStephen Drayton
Stephen Drayton
 
Scott Donaldson CV - Copy - for merge
Scott Donaldson CV - Copy - for mergeScott Donaldson CV - Copy - for merge
Scott Donaldson CV - Copy - for merge
 
Gavin Donnelly Resume
Gavin Donnelly ResumeGavin Donnelly Resume
Gavin Donnelly Resume
 
carls cv 2017B
carls cv 2017Bcarls cv 2017B
carls cv 2017B
 
Fundamentals of Dynamic Positioning
Fundamentals of Dynamic PositioningFundamentals of Dynamic Positioning
Fundamentals of Dynamic Positioning
 
EllisSkoglundJr
EllisSkoglundJrEllisSkoglundJr
EllisSkoglundJr
 
Teer December 15
Teer December 15Teer December 15
Teer December 15
 
Capt. Dilip Goel
Capt. Dilip GoelCapt. Dilip Goel
Capt. Dilip Goel
 
Duncan's cv february, 2020
Duncan's cv    february, 2020 Duncan's cv    february, 2020
Duncan's cv february, 2020
 
Delwar Hossain CV.
Delwar Hossain CV.Delwar Hossain CV.
Delwar Hossain CV.
 
KAVI SELVAN CV-2015
KAVI SELVAN CV-2015KAVI SELVAN CV-2015
KAVI SELVAN CV-2015
 
PD185 LNG Terminal Operations
PD185 LNG Terminal OperationsPD185 LNG Terminal Operations
PD185 LNG Terminal Operations
 
PetroSync - Geology for Non-Geologist
PetroSync - Geology for Non-GeologistPetroSync - Geology for Non-Geologist
PetroSync - Geology for Non-Geologist
 
CV Shore.au
CV Shore.auCV Shore.au
CV Shore.au
 

Andere mochten auch

Inshore Opportunities
Inshore OpportunitiesInshore Opportunities
Inshore Opportunitiescmurden
 
Offshore and inshore patrol vessels for africa 0
Offshore and inshore patrol vessels for africa 0Offshore and inshore patrol vessels for africa 0
Offshore and inshore patrol vessels for africa 0Mouefak Trabelsi
 
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync
 
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync
 
PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4
PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4
PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4PetroSync
 
PetroSync - Cost Engineering Risk Management-Earned Value Management
PetroSync - Cost Engineering Risk Management-Earned Value ManagementPetroSync - Cost Engineering Risk Management-Earned Value Management
PetroSync - Cost Engineering Risk Management-Earned Value ManagementPetroSync
 
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync
 
PetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync
 
PetroSync Wellsite and Operations Geology
PetroSync Wellsite and Operations GeologyPetroSync Wellsite and Operations Geology
PetroSync Wellsite and Operations GeologyPetroSync
 
PetroSync - Mastering Production Sharing Contracts
PetroSync - Mastering Production Sharing ContractsPetroSync - Mastering Production Sharing Contracts
PetroSync - Mastering Production Sharing ContractsPetroSync
 
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync
 
PetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure AnalysisPetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure AnalysisPetroSync
 
PetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync
 
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing Review
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing ReviewPetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing Review
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing ReviewPetroSync
 
PetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync
 
PetroSync - Natural Gas Geochemistry
PetroSync - Natural Gas GeochemistryPetroSync - Natural Gas Geochemistry
PetroSync - Natural Gas GeochemistryPetroSync
 
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync
 
PetroSync - Drilling Engineering for Non-Drilling Engineers
PetroSync - Drilling Engineering for Non-Drilling EngineersPetroSync - Drilling Engineering for Non-Drilling Engineers
PetroSync - Drilling Engineering for Non-Drilling EngineersPetroSync
 
PetroSync - Advanced Financial Modelling for Oil and Gas
PetroSync - Advanced Financial Modelling for Oil and GasPetroSync - Advanced Financial Modelling for Oil and Gas
PetroSync - Advanced Financial Modelling for Oil and GasPetroSync
 

Andere mochten auch (20)

Inshore Opportunities
Inshore OpportunitiesInshore Opportunities
Inshore Opportunities
 
Offshore and inshore patrol vessels for africa 0
Offshore and inshore patrol vessels for africa 0Offshore and inshore patrol vessels for africa 0
Offshore and inshore patrol vessels for africa 0
 
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
 
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
 
PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4
PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4
PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4
 
PetroSync - Cost Engineering Risk Management-Earned Value Management
PetroSync - Cost Engineering Risk Management-Earned Value ManagementPetroSync - Cost Engineering Risk Management-Earned Value Management
PetroSync - Cost Engineering Risk Management-Earned Value Management
 
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling Optimisation
 
PetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production Accounting
 
PetroSync Wellsite and Operations Geology
PetroSync Wellsite and Operations GeologyPetroSync Wellsite and Operations Geology
PetroSync Wellsite and Operations Geology
 
PetroSync - Mastering Production Sharing Contracts
PetroSync - Mastering Production Sharing ContractsPetroSync - Mastering Production Sharing Contracts
PetroSync - Mastering Production Sharing Contracts
 
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
 
PetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure AnalysisPetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure Analysis
 
PetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced Vibration
 
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing Review
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing ReviewPetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing Review
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing Review
 
PetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and Gas
 
PetroSync - Natural Gas Geochemistry
PetroSync - Natural Gas GeochemistryPetroSync - Natural Gas Geochemistry
PetroSync - Natural Gas Geochemistry
 
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
 
PetroSync - Drilling Engineering for Non-Drilling Engineers
PetroSync - Drilling Engineering for Non-Drilling EngineersPetroSync - Drilling Engineering for Non-Drilling Engineers
PetroSync - Drilling Engineering for Non-Drilling Engineers
 
PetroSync - Advanced Financial Modelling for Oil and Gas
PetroSync - Advanced Financial Modelling for Oil and GasPetroSync - Advanced Financial Modelling for Oil and Gas
PetroSync - Advanced Financial Modelling for Oil and Gas
 

Ă„hnlich wie PetroSync - Offshore Marine Operation

Shipyard Management - Design, Planning & Operations
Shipyard Management - Design, Planning & OperationsShipyard Management - Design, Planning & Operations
Shipyard Management - Design, Planning & OperationsJune Tan
 
Shipyard Management Design, Planning & Operations
Shipyard Management Design, Planning & OperationsShipyard Management Design, Planning & Operations
Shipyard Management Design, Planning & Operationsrockporshe
 
PetroSync - Basin Analysis - Level 3
PetroSync - Basin Analysis - Level 3PetroSync - Basin Analysis - Level 3
PetroSync - Basin Analysis - Level 3PetroSync
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync
 
PetroSync - Advance Wireline Intervention Operation
PetroSync - Advance Wireline Intervention OperationPetroSync - Advance Wireline Intervention Operation
PetroSync - Advance Wireline Intervention OperationPetroSync
 
FSRU Technology & Project Development
FSRU Technology & Project DevelopmentFSRU Technology & Project Development
FSRU Technology & Project DevelopmentWalter Lee
 
Introduction to Ship Design and Naval Architecture
Introduction to Ship Design and Naval ArchitectureIntroduction to Ship Design and Naval Architecture
Introduction to Ship Design and Naval Architecturerockporshe
 
Deepwater Completions Operations
Deepwater Completions OperationsDeepwater Completions Operations
Deepwater Completions OperationspetroEDGE
 
Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)petroEDGE
 
LNG Shipping Brochure
LNG Shipping BrochureLNG Shipping Brochure
LNG Shipping BrochureBeth Cook
 
Superyacht Refit Brochure
Superyacht Refit BrochureSuperyacht Refit Brochure
Superyacht Refit BrochureBeth Cook
 
ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)petroEDGE
 
PetroEdge Training Directory - Oil & Gas Training
PetroEdge Training Directory - Oil & Gas TrainingPetroEdge Training Directory - Oil & Gas Training
PetroEdge Training Directory - Oil & Gas TrainingpetroEDGE
 
Introduction to Ship Design and Naval Architecture
Introduction to Ship Design and Naval ArchitectureIntroduction to Ship Design and Naval Architecture
Introduction to Ship Design and Naval ArchitectureJune Tan
 
Port State Control Sales Brochure (1)
Port State Control Sales Brochure (1)Port State Control Sales Brochure (1)
Port State Control Sales Brochure (1)Beth Cook
 
Offshore Support Vessels
Offshore Support VesselsOffshore Support Vessels
Offshore Support VesselsJune Tan
 
PetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync
 
CV- NARASIMHA offshore Fleet (latest)
CV- NARASIMHA offshore Fleet (latest)CV- NARASIMHA offshore Fleet (latest)
CV- NARASIMHA offshore Fleet (latest)Narasimha Swamy
 
Nationally Recognised Courses Offered By Gold Training
Nationally Recognised Courses Offered By Gold TrainingNationally Recognised Courses Offered By Gold Training
Nationally Recognised Courses Offered By Gold Traininggoldrto
 
PD183 LNG Bunkering
PD183 LNG BunkeringPD183 LNG Bunkering
PD183 LNG BunkeringpetroEDGE
 

Ă„hnlich wie PetroSync - Offshore Marine Operation (20)

Shipyard Management - Design, Planning & Operations
Shipyard Management - Design, Planning & OperationsShipyard Management - Design, Planning & Operations
Shipyard Management - Design, Planning & Operations
 
Shipyard Management Design, Planning & Operations
Shipyard Management Design, Planning & OperationsShipyard Management Design, Planning & Operations
Shipyard Management Design, Planning & Operations
 
PetroSync - Basin Analysis - Level 3
PetroSync - Basin Analysis - Level 3PetroSync - Basin Analysis - Level 3
PetroSync - Basin Analysis - Level 3
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and Workover
 
PetroSync - Advance Wireline Intervention Operation
PetroSync - Advance Wireline Intervention OperationPetroSync - Advance Wireline Intervention Operation
PetroSync - Advance Wireline Intervention Operation
 
FSRU Technology & Project Development
FSRU Technology & Project DevelopmentFSRU Technology & Project Development
FSRU Technology & Project Development
 
Introduction to Ship Design and Naval Architecture
Introduction to Ship Design and Naval ArchitectureIntroduction to Ship Design and Naval Architecture
Introduction to Ship Design and Naval Architecture
 
Deepwater Completions Operations
Deepwater Completions OperationsDeepwater Completions Operations
Deepwater Completions Operations
 
Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)
 
LNG Shipping Brochure
LNG Shipping BrochureLNG Shipping Brochure
LNG Shipping Brochure
 
Superyacht Refit Brochure
Superyacht Refit BrochureSuperyacht Refit Brochure
Superyacht Refit Brochure
 
ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)
 
PetroEdge Training Directory - Oil & Gas Training
PetroEdge Training Directory - Oil & Gas TrainingPetroEdge Training Directory - Oil & Gas Training
PetroEdge Training Directory - Oil & Gas Training
 
Introduction to Ship Design and Naval Architecture
Introduction to Ship Design and Naval ArchitectureIntroduction to Ship Design and Naval Architecture
Introduction to Ship Design and Naval Architecture
 
Port State Control Sales Brochure (1)
Port State Control Sales Brochure (1)Port State Control Sales Brochure (1)
Port State Control Sales Brochure (1)
 
Offshore Support Vessels
Offshore Support VesselsOffshore Support Vessels
Offshore Support Vessels
 
PetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating Gas
 
CV- NARASIMHA offshore Fleet (latest)
CV- NARASIMHA offshore Fleet (latest)CV- NARASIMHA offshore Fleet (latest)
CV- NARASIMHA offshore Fleet (latest)
 
Nationally Recognised Courses Offered By Gold Training
Nationally Recognised Courses Offered By Gold TrainingNationally Recognised Courses Offered By Gold Training
Nationally Recognised Courses Offered By Gold Training
 
PD183 LNG Bunkering
PD183 LNG BunkeringPD183 LNG Bunkering
PD183 LNG Bunkering
 

Mehr von PetroSync

PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync
 
PetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync
 
PetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync
 
PetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync
 
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync
 
PetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync
 
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync
 
PetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync
 
PetroSync - Play Fairways Analysis & Prospect Evaluation
PetroSync - Play Fairways Analysis & Prospect EvaluationPetroSync - Play Fairways Analysis & Prospect Evaluation
PetroSync - Play Fairways Analysis & Prospect EvaluationPetroSync
 
PetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling OperationPetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling OperationPetroSync
 

Mehr von PetroSync (11)

PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
 
PetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well Logs
 
PetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling Engineer
 
PetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir Characterization
 
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for Service
 
PetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir Engineering
 
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
 
PetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & Gas
 
PetroSync - Play Fairways Analysis & Prospect Evaluation
PetroSync - Play Fairways Analysis & Prospect EvaluationPetroSync - Play Fairways Analysis & Prospect Evaluation
PetroSync - Play Fairways Analysis & Prospect Evaluation
 
PetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling OperationPetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling Operation
 

KĂĽrzlich hochgeladen

🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 

KĂĽrzlich hochgeladen (20)

🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 

PetroSync - Offshore Marine Operation

  • 1. Supported By PETROSYNC’S OFFSHORE & MARINE SERIES Build Solid Foundation of Requirements for Offshore Marine Operations 16 May 2016—20 May 2016 Kuala Lumpur, Malaysia OFFSHORE MARINE OPERATION
  • 2. 2 Our course is developed to to provide the solid foundation knowledge to your team in order to maximize your learning benefits and it will helps you to improve your work efficiency and efficiency. OFFSHORE | OFFSHORE MARINE OPERATION How Does This Course Benefits You? LNG Terminal in UK is scheduled to receive the cargo of LNG within a period of 10 days. Do you know that by understanding the LNG Terminal and Vessel Operation will help you to maximize the success and minimize the failure? Improve the Efficiency and Effectiveness in Daily Operation Improve your work efficiency and effectiveness by understanding an in-depth knowledge on offshore marine operation and design structure. Enhance Your Planning Techniques Enhance your planning techniques by employing proper planning techniques in the various planning and transfer requirements for offshore marine operation in order to maximize successful and minimize failures. Enhance Risk Assessment Techniques By employ proper qualitative and quantitative risk assessment techniques in offshore operation in order to provide the safer practices and procedures during various operation. General Properties Affecting Fire Hazards Do you know that there is no way for personnel to detect leaks unless the leak is sufficiently large to create a visible condensation? This training program, OFFSHORE MARINE OPERATION, is developed to provide you a solid foundation of the requirements for offshore marine operations personnel skill sets and knowledge base. general@petrosync.com | +65 6451 4500 | www.petrosync.com Course Overview Case History and Exercises Past case history and several design exercise will be given during the exercise session, it will helps you to understand in-depth about the offshore marine operation and the environmental issues that might be impact to your construction design or built process . Latest Design Techniques Content Latest design techniques available to the industry are also covered such as lift point design, barge transportation design stability etc. are also covered. IF you want to have someone with practical background and knowledge on recent development in this field, then that is where our instructor is the right fit.
  • 3. 3 OFFSHORE | OFFSHORE MARINE OPERATION PetroSync Distinguished Instructor Who Needs This Program Practical & Consulting  Master Mariner for BP Shipping from year 2002 - 2009  17 years of experience in marine operation specialist undertake marine survey and consultancy work relating to Marine Engineering in offshore energy sectors.  Responsible for safe LNG loading and discharge operation for terminals in various country such as Far East, Middle East, Europe, North, South America and so on.  Previous experience was as Marine Superintendent for Wood Group Engineering Company and his responsibility of marine superintendent include manage marine department, monitor, and control and operate the whole marine operations to make sure project marine systems remain on schedule. Training  Effectively manage training and development of Angolan Nationals  Site delivery team for CLSICO (China LNG) new build LNG Vessels Christopher Mc Dade International Consultant  The course is designed for, but not limited to, vessel engineers, LNG terminal operators, LNG engineers, marine engineers and HSE engineers, who are directly involved in vessel operations. In addition, this program may be beneficial to commercial and management staff who require a technical overview of vessel operations. Job Titles Include: Vessel Engineers Vessel Operators LNG Terminal Operators LNG Engineers XXX HSE Engineers Marine Engineers Project Engineers PetroSync Inhouse Solutions PetroSync can tailor our courses to meet your specific needs at your preferred location and schedule. Contact us for more information at +65 6415 4500 or email to general @petrosync.com PetroSync Quality Assurance All PetroSync courses are developed with top quality to address all your training needs and purposes. Our courses are vetted strictly to ensure that we always deliver the best courses with the best industry expert. general@petrosync.com | +65 6451 4500 | www.petrosync.com 08:00—09:00 Registration (Day 1) 13:00—14:00 Lunch 09:00—11:00 Session I 14:00—15:30 Session III 11:00—11.15 Refreshment Session I 15:30—15:45 Refreshment Session II 11:15—13:00 Session II 15:45—17:00 Session Iv (Last Session) Course Schedule
  • 4. 4 OFFSHORE | OFFSHORE MARINE OPERATION Course Agenda — 5 Days general@petrosync.com | +65 6451 4500 | www.petrosync.com DAY 1 Introduction to Marine Projects Overview of the Course Guideline Marine Projects Loadout  Planning of Operations  Loads and Analysis  Operational Requirements  Classes of Loadout  Site and Quay  Barge  Project Safety & Control DAY 2 Offshore Facilities I Towing of Offshore Facilities  Towing of Jack-Ups  Towing of Semi-submersibles  Towing Other  Multiple Towing  Towing Vessel Selection & Approval l  Voyage Planning Lifting  Planning of Marine Lifts  Loads and Analysis  Structures  Requirements for Lifting Equipment  Crane and Crane Vessels  Load & Safety Factors  Crane & Installation Vessel  Lift Point Design  Clearances DAY 3 Offshore Facilities II Steel Jackets  Environmental Considerations  Strength  Transportation  Installation & Launching  Upending After Launch  Installation Lifting  Reserve Buoyancy, Seabed Clearances  Jacket Positioning  Project Safety & Control  Installation Barge Transportation  Planning of Marine Operations  Design and Environmental Condition  Motion Response  Loadings  Design and Strength Stability  Transport Vessel Selection Gravity Base Structures (GBS)  Stability and Motion Response  Strength  GBS Mooring Criteria  Float Out of Base Structure  Towing Criteria  Water Ballets System  Deck Mating  Installation at Offshore Location
  • 5. 5 OFFSHORE | OFFSHORE MARINE OPERATION general@petrosync.com | +65 6451 4500 | www.petrosync.com DAY 4 Transportation and Inshore Lift-Off, Transportation and Inshore Mating of Topsides  Stability and Motion Response  Structural Analysis  Equipment  Lift-Off  Towing Criteria  Deck Mating Offshore Pipeline  Documentation  Warranty Surveyor Attendance  Environmental Considerations  Surveys and Route Preparation  Pipeline Construction  Towed Pipeline Installation  Pipelines Crossings  Freespan Rectification  Trenching and Backfilling  Tie-Ins  Shore Approach and Landfall  Testing and Commissioning DAY 5 Marine Operation Overview Barge Transportation  Towing  Moorings and Anchors  Handling Heavy Loads at Sea  Personnel Transfer at Sea  Underwater Intervention, Diving, Underwater Work Systems, ROVs and Manipulators  Underwater Concreting and Grouting  Offshore Surveying, Navigation and Sea Floor Surveys  Temporary Buoyancy Augmentation Register For This Course Now! You Might Also Be Interested In: Kindly fill up your particulars in the registration form placed at the end of this brochure, and send it to us or email to registration@petrosync.com Offshore Marine Operation Kuala Lumpur, Malaysia Fixed Platform Design Kuala Lumpur, Malaysia Decommissioning and Abandonment Kuala Lumpur, Malaysia
  • 6. 6 By Credit Card: Please debit my credit card: Visa MasterCard AMEX Security Code: Card Number: Expiry Date: Name Printed on Card: By Direct Transfer: Please quote invoice number(s) on remittance advice PetroSync Global Pte Ltd Bank Details: Account Name: PetroSync Global Pte Ltd Bank Name: DBS Bank Ltd Bank Code: 7171—Bank Swift Code: DBSSSGSGXXX—Branch Code: 288 Account No: SGD: 288-901898-0 USD: 0288-002682-01-6 Bank Address: 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982. All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced amount. Title : Offshore Marine Operation Date : 16-20 May 2016 Location : Kuala Lumpur, Malaysia COURSE DETAILS INVESTMENT PACKAGE DEADLINE FULL MASTERCLASS Standard Price 13 May 2016 USD 4,295 Early Bird Offer 15 April 2016 USD 4,095 Group Discount (3 or more Delegates) 13 May 2016 Enjoy 10% discount for groups of 3 INVESTMENT PACKAGES (Please Circle) Group Discount is based on Standard Price *To enjoy the promotion & discount offer, payment must be made before dateline * For 7 or more delegates, please inquire for more attractive package. * Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other promotional offers. * Important: Please note that registration without payment will incur a SGD 200 administration fee. COURSE CONSULTANT Name : Cay Aagen Email : registration@petrosync.com Phone : +65 6415 4500 Fax : +65 6415 4322 TERMS AND CONDITIONS DISCLAIMER Please note that trainers and topics were confirmed at the time of publishing; however, PetroSync may necessitate substitutions, alterations or cancellations of the trainers or topics. As such, PetroSync reserves the right to change or cancel any part of its published courseme due to unforeseen circumstances. Any substitutions or alterations will be updated on our web page as soon as possible. DATA PROTECTION The information you provide will be safeguarded by PetroSync that may be used to keep you informed of relevant products and services. As an international group we may transfer your data on a global basis for the purpose indicated above. If you do not want us to share your information with other reputable companies, please tick this box CANCELLATION POLICY You may substitute delegates at any time as long as reasonable advance notice is given to PetroSync. For any cancellation received in writing not less than fourteen (14) working days prior to the training course, you will receive credit voucher less a SGD $200 administration fee and any related bank or credit card charges. Delegates who cancel less than fourteen (14) working days of the training course, or who do not attend the course, are liable to pay the full course fee and no refunds will be granted. In the event that PetroSync cancels or postpones an event for any reason and that the delegate is unable or unwilling to attend in on the rescheduled date, you will receive a credit voucher for 100% of the contract fee paid. You may use this credit voucher for another PetroSync to be mutually agreed with PetroSync, which must occur within a year from the date of postponement. PetroSync is not responsible for any loss or damage as a result of the cancellation policy. PetroSync will assume no liability whatsoever in the event this event is cancelled, rescheduled or postponed due to any Act of God, fire, act of government or state, war, civil commotion, insurrection, embargo, industrial action, or any other reason beyond management control. CERTIFICATE OF ATTENDANCE 70% attendance is required for PetroSync’s Certificate of Attendance DETAILS Please accept our apologies for mail or email that is incorrectly addressed. Please email us at registration@petrosync.com and inform us of any incorrect details. We will amend them accordingly. CHARGES & FEE(S) - For Payment by Direct Telegraphic Transfer, client has to bear both local and oversea bank charges. - For credit card payment, there is additional 4% credit card processing fee. 1st Delegate Name: Direct Line Number: Email: Job Title: Department: Head of Department: Mr Mrs Ms Dr Others 2nd Delegate Name: Direct Line Number: Email: Job Title: Department: Head of Department: Mr Mrs Ms Dr Others 3rd Delegate Name: Direct Line Number: Email: Job Title: Department: Head of Department: Mr Mrs Ms Dr Others Attention Invoice to: Direct Line Number: Fax: Company: Industry: Address: Postcode: Country: Email: Please note: - Indicate if you have already registered by Phone Fax Email Web - If you have not received an acknowledgement before the training, please call us to confirm your booking. CONFIRMATION I agree to PetroSync’s terms & conditions, payment terms and cancellation policy. Authorized Signature: PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance. PAYMENT METHOD INVOICE DETAILS DELEGATES DETAILS