Church Building Grants To Assist With New Construction, Additions, And Restor...
Cce Long Brief
1. Two Decades of Performance for Governments and Industry Global Expertise Local Knowledge
2. Essential Services Communications & IT Support Base Operations & Life Support Supply Chain Management Transportation & Aviation Support Maintenance Support Design & Construction Integrated Logistics Support Solutions
3. Global Expertise - Current Offices Corporate Headquarters: Annapolis, MD, USA Regional Offices: Bogota, Colombia London, UK Dubai, UAE Current Operational Sites: Iraq, Afghanistan, Indonesia, Pakistan, Kenya, Brazil, Peru, Ecuador, Venezuela, Costa Rica, Haiti, Honduras, Brunei, Colombia, Mexico, Turkey, Saudi Arabia
4. Company Overview Organizational Chart – Executive Level *John is also the CEO of The Diplomat Group of Companies to include Diplomat Freight Services in Annapolis, MD and the UK, DFS Middle East FZE, and 3Di Technologies.
8. IDIQ (Indefinite Quantity/Indefinite DeliveryOne single POC = Successful Performance CCE embeds value in every project by tailoring the best solution, through the studies and analysis methodology
15. Architectural /Concept DefinitionS&A SUBJECT MATTER : Support the client in the preliminary phases through professional architecture, engineering and construction planning services S&A OUTPUT :Documented Technical justification of project requirements. INTEGRATED SOLUTION
19. Engineering RequirementsCompile Investigate Assemble, catalog & register studies information Research, Site Inspection, Technical Surveys and Inquiries
20.
21. Lower Project Cost as a result of the shorter Project duration and cost efficiencies achieved through integrating design, procurement and construction activities
22. Lower Risk Exposure for the Owner through having a single point responsibility for design and construction, and less claims between several parties
23. Less Change Ordersthrough having the Design-Build contractor have responsibility for both design and construction
24. Less surprises for the Owner through having the cost and schedule established in advance of starting the detail design
25. Lower Owner Costsfor administering less contracts and coordinating fewer parties
26. Improved Quality and Warranty Servicesince the constructor is also the designer, and has capability to address the technical aspects of the work
27. Improved Constructability and overall project implementation, since the contractor is intimately involved during the early design of the work
42. High Complexity FacilitiesPermanent Facilities A combined solution may constitute the best approach
43. Camp Dublin - IraqUS DoD / Coalition Provisional Authority Temporary Facilities Rapid mobilization Fast track, turnkey, design-build delivery Temporary to semi permanent facilities Facilities maintenance & operation support programs Provision of rapid mobilization to establish Iraqi Police special operations training campbase life support services for up to 1000 personnel at the Baghdad International Airport in Iraq. Fast track design and construction of both temporary and permanent facilities with on-going operations and maintenance programs.
45. Temporary Facilities Personnel Camp - DubaiPalm Island Jumeirah Fast track construction of a 10,000 man camp to support the Villa Recovery program. Follow on life support provided to camp residents. Part-labor Camp Accommodation & Ablutions 4,000 Man Ship-Based Accommodation Day 30 Day 7 Day 1 Day 20 Day 4 Kitchen & Dining Facilities DFSL Operations Center
46. Temporary Facilities Personnel Camp - DubaiPalm Island Jumeirah Fast track construction of a 10,000 man camp to support the Villa Recovery program. Follow on life support provided to camp residents.
47. Temporary Facilities Training Support Camp Camp WatanKabul, Afghanistan Fast track construction of Antiterrorism Assistance training camp. Occupancy within 6 weeks after notice to proceed. CCE provided full Life Support, O&M and Logistics for 5+ years between 2002 and 2007
66. May apply for expedited construction permits due to non-permanent condition - Pre engineered steel structures – Precast concrete panels – Tilt up
67.
68. High Complexity FacilitiesDFAC Fast track, design-build construction (6 months from NTP) of accommodation facilities for NCOs, squadrons, crew, pilots and enlisted men, logistics facilities, compound dining hall, utilities and connections, engineering works and systems, accommodation facilities and admin facilities. Squadron Barracks Extreme Climate, Sustainable Design Solution Accommodation and Logistic Facilities – Santa Marta, Colombia
78. Permanent Facilities Accommodation Fast track, design-build construction (15 months from NTP) of a new compound including a Police Academy and Base and supporting U.S. Gov facilities. The program and requirements were also planned by CCE and the USG through a Studies and Analysis task order. Formation Yard Classrooms Police Academy and Base – Ayacucho, Peru
90. Selected Design-Build Experience FFP, Fast track, design-build construction of a complete rotary wing airbase capable of supporting 12 helicopters, associated offices, workshops, warehouses, and 3 accommodation facilities for 120 personnel in rebel-controlled territory. Rotary Wing Airfield Jet 1A Fueling System Hangar Forward Operation Army Aviation Base – Saravena, Colombia
105. Support Container CampForward Operation Army Aviation Base – Saravena, Colombia
106. Selected Design-Build Experience Hangar Bay Warehouse The aviation facilities were completed in 10 months after NTP followed by the remaining facilities 4 months later. Fuel Tanks Forward Operation Army Aviation Base – Saravena, Colombia
108. Selected Design-Build Experience Simulator Building Rotary Wing Simulator Building Design, construction and installation (6 months after NTP, phase I, 6 Months after NTP second building) of two UH-1 simulator buildings, within Melgar Air Force Compound, Colombia. Simulator Bay Admin / Classrooms
113. Backup Power Generator, UPS & Special Power Regulation
114. Landscaping, Walkways and Parking AreasDesign Drawings Notice of Final Acceptance Rotary Wing Simulator Building
115. Worldwide Experience Current Operational Sites: Iraq, Afghanistan, Indonesia, Pakistan, Kenya, Brazil, Peru, Ecuador, Venezuela, Costa Rica, Haiti, Honduras, Brunei, Colombia, Mexico, Turkey, Saudi Arabia Countries of Performance 1992 - 2009
116. Local Knowledge A culturally aware and sensitive company Experienced in diverse geographic locations With a rich diversity of staff Focused on customers needs and rapid response Always prioritize local materials, construction methods and labor where possible
117. Essential Services Communications & IT Support Base Operations & Life Support Transportation & Aviation Support Program Management Design & Construction Security Integrated Logistics Support Solutions
124. Logistics (2003 – 2008) ATA -Indonesia ATA - Pakistan ATA Program: Colombia, Indonesia & Pakistan Simultaneous fast track construction and essential services in 3 countries to support indigenous police training. Multi-faceted program requiring innovative approaches for project success. ATA- Colombia
182. Related Companies Diplomat Freight Services, Ltd. United Kingdom www.diplomatfreight.co.uk DFS Middle East FZE Dubai, United Arab Emirates www.dfsmiddleeast.com Diplomat Freight Services, Inc. Annapolis, Maryland USA www.diplomatfreight.com 3Di Technologies Annapolis, Maryland USA www.3diTech.com
183. CONTACT: Pete Phelan, (Colonel, USA Ret) Position: Senior Vice President International Business Development Office: 410-263-6422 Cell: 817-706-0255 Email: pphelan@cceinc.com petephelan@1scom.net 25 Shaw Street, Annapolis, Maryland 21401 Web-site: www.cceinc.com Member: Society of American Military Engineers Global Experience & Local Knowledge