SlideShare ist ein Scribd-Unternehmen logo
1 von 3
PARESH LAKHANI
C/o Irfan Bashir,
Vermundsgade 25A, 2 th, 2100 Copenhagen, Denmark.
Contact # 0092-333-2989487 / 0045-91705474
E-mail: lak.paresh@gmail.com
LinkedIn URL: dk.linkedin.com/in/pareshlakhani/
Summary Telecom Rollout, Preventive Maintenance, Microwave Transmission, On call, Site Acquisition
Process, Technical Documentation, Operation and Maintenance, Technical Site Survey,
Telecom Implementation, BSS, RF planning, Installation and Deployment etc.
Education
• Master of Science in Electrical Engineering with emphasis on Radio Communication
(RF) from BTH, Karlskrona Sweden, September 2013.
• Bachelor of Engineering in Telecommunication from Mehran UET, Jamshoro Pakistan,
May 2008.
Experience
1- Worked as “Base Station Subsystem Engineer (BSS)” at EPTSC (ORASCOM) on Mobilink
GSM and WiMAX Project Karachi, Pakistan from October 2010 to March 2011.
Job Description:
• Responsible for Operation and Maintenance (O&M) of Alcatel and Motorola BTS.
• Management of Preventive Maintenance (PM), Corrective Maintenance (CM) and On-Call
teams for site down issues.
• Handling of different alarms, taking Trouble Tickets (TT) from NOC, OMC and solve them in
prescribed time.
• Maintenance and troubleshooting of NEC Microwave Link.
• Verification of transmission path from BTS to BSC and reconnecting ABIS and OML.
• Configuration and alignment of MW Links i.e. NEC Pasolink, NEC NEO.
• Expansion in BTS rack, adding TREs and sectors etc.
• Documentation and provide daily reports to higher management.
• Supervise the maintenance of electrical equipments in ATS Panel and GEDP.
• Generating and clearing of alarms at DDF & BTS.
• Patching of Delta, Emerson and Eltec rectifier alarms.
• Coordination with customer in order to smooth running of network.
2- Worked as “Telecom Implementation Engineer (TI)” at NASCOM (Telecom Rollout) on
Motorola Wi-Tribe- WiMAX Project Karachi, Pakistan from September 2008 to September 2009.
Job Description:
• Responsible for site survey and to prepare Candidate Evaluation Report (CER).
• Lead Technical Site Survey (TSS) and Line of Sight (LoS) surveys on customer sites.
• Apply propagation theory and RF engineering tools to choose cell site locations and placement.
• Documentation of TSS, LoS and CER reports.
• Co-operation with site acquisition department during site selection & acquisition processes.
• Coordination with operator, vendor and subcontractors for different activities of sites.
• Supervise the delivery of equipments, verification of antenna heights and azimuth on sites.
• Deal with telecom shelters and towers, visit and coordinate the teams.
• Worked on Softwares Global Mapper, Google Earth, MapInfo and Mindmap.
• CPE testing for WiMAX network.
Majors
• RF and Mobile Networks (GSM, CDMA, LTE)
• Broad Band Digital Networks (WiMAX, Wi-Fi, DSL, ATM)
• Link Budget Calculation and Propagation Models Validation
• Digital Transmission, Signaling and Switching System
• Computer Communication and Networking
• Fiber Optics Communication System
• Modulations and Coding Schemes
• Signal Processing & Systems
• Digital Signal Processing (DSP)
• Wireless Communication
• Electromagnetic Theory
• Cognitive Radio
• Antenna Theory
• Capacity Analysis
Thesis & Projects
• Master’s thesis project “Optimization of Cognitive Radio in NLoS Backhauling of Small Cells
in LTE”.
• Bachelor’s thesis project “Performance Evaluation of WiMAX MIMO OFDM System for
Outdoor Environment using Matlab”.
• “BER Analysis of HIPERLAN/2 with BPSK, QPSK and QAM over Rician Channel using
Matlab”.
• “Designing of Microstrip Antenna and Analysis of its Radiation Pattern using Matlab”.
• “Designing of Website named Multi -Valley in HTML”.
Computer Skills
• Operating System
Windows XP/Windows 2007/ Windows-98
• Software Application
MS Office (MS Word, Power Point, Excel), Call Centre-Modeler, Global Mapper, Google
Earth, MapInfo, Alcatel BTS (B9 and B10), Microwave (NEC Pasolink) and Mindmap.
• Programming Applications
Matlab, HTML, Boson (Networking Software), Opnet IT Guru 9.1.A,
• Computer Networking
CCNA (640-802) preparation course completed from Almukeet Centre Karachi.
Personal Details
• Date of Birth : 12th
January 1985
• Marital Status : Single
• Nationality : Pakistani
• Work Visa Status : Danish Green Card (Open to Employers)

Weitere ähnliche Inhalte

Andere mochten auch

Tqm in telecom
Tqm in telecomTqm in telecom
Tqm in telecomJinto Cv
 
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...Thorne & Derrick International
 
Delta Telecom O&m presentation
Delta Telecom O&m presentationDelta Telecom O&m presentation
Delta Telecom O&m presentationengramjadislam78
 
Improving efficiency in a water distribution system
Improving efficiency in a water distribution systemImproving efficiency in a water distribution system
Improving efficiency in a water distribution systemBrian Gongol
 
O&M Doc for Telecom Sites
O&M Doc  for Telecom Sites       O&M Doc  for Telecom Sites
O&M Doc for Telecom Sites Muhmmad Javed
 
Prepare electrical supplies 2
Prepare electrical supplies 2Prepare electrical supplies 2
Prepare electrical supplies 2tessil23
 
Proconsultores Telecommunication Presentation
Proconsultores Telecommunication PresentationProconsultores Telecommunication Presentation
Proconsultores Telecommunication Presentationguest080219
 
Electrical Assurance Presentation 2010
Electrical Assurance Presentation 2010Electrical Assurance Presentation 2010
Electrical Assurance Presentation 2010mseaborn
 
Electrical Power Distribution System (ArnabNandi_WBSEDCL)
Electrical Power Distribution System (ArnabNandi_WBSEDCL)Electrical Power Distribution System (ArnabNandi_WBSEDCL)
Electrical Power Distribution System (ArnabNandi_WBSEDCL)Arnab Nandi
 
Why you should conduct electrical preventive maintenance
Why you should conduct electrical preventive maintenanceWhy you should conduct electrical preventive maintenance
Why you should conduct electrical preventive maintenanceHeather Jarmusz
 
Power cables
Power cablesPower cables
Power cablescollege
 

Andere mochten auch (13)

Tqm in telecom
Tqm in telecomTqm in telecom
Tqm in telecom
 
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...
IEEE 848 Standard Procedure For The Determination Of Tthe Ampacity Derating o...
 
Delta Telecom O&m presentation
Delta Telecom O&m presentationDelta Telecom O&m presentation
Delta Telecom O&m presentation
 
Improving efficiency in a water distribution system
Improving efficiency in a water distribution systemImproving efficiency in a water distribution system
Improving efficiency in a water distribution system
 
O&M Doc for Telecom Sites
O&M Doc  for Telecom Sites       O&M Doc  for Telecom Sites
O&M Doc for Telecom Sites
 
Prepare electrical supplies 2
Prepare electrical supplies 2Prepare electrical supplies 2
Prepare electrical supplies 2
 
Proconsultores Telecommunication Presentation
Proconsultores Telecommunication PresentationProconsultores Telecommunication Presentation
Proconsultores Telecommunication Presentation
 
Electrical Assurance Presentation 2010
Electrical Assurance Presentation 2010Electrical Assurance Presentation 2010
Electrical Assurance Presentation 2010
 
Electrical Power Distribution System (ArnabNandi_WBSEDCL)
Electrical Power Distribution System (ArnabNandi_WBSEDCL)Electrical Power Distribution System (ArnabNandi_WBSEDCL)
Electrical Power Distribution System (ArnabNandi_WBSEDCL)
 
Why you should conduct electrical preventive maintenance
Why you should conduct electrical preventive maintenanceWhy you should conduct electrical preventive maintenance
Why you should conduct electrical preventive maintenance
 
Choosing Electrical Panels
Choosing Electrical PanelsChoosing Electrical Panels
Choosing Electrical Panels
 
Eat 105 Chapter 3
Eat 105  Chapter 3Eat 105  Chapter 3
Eat 105 Chapter 3
 
Power cables
Power cablesPower cables
Power cables
 

Paresh Lakhani_CV Telecom_Exp2

  • 1. PARESH LAKHANI C/o Irfan Bashir, Vermundsgade 25A, 2 th, 2100 Copenhagen, Denmark. Contact # 0092-333-2989487 / 0045-91705474 E-mail: lak.paresh@gmail.com LinkedIn URL: dk.linkedin.com/in/pareshlakhani/ Summary Telecom Rollout, Preventive Maintenance, Microwave Transmission, On call, Site Acquisition Process, Technical Documentation, Operation and Maintenance, Technical Site Survey, Telecom Implementation, BSS, RF planning, Installation and Deployment etc. Education • Master of Science in Electrical Engineering with emphasis on Radio Communication (RF) from BTH, Karlskrona Sweden, September 2013. • Bachelor of Engineering in Telecommunication from Mehran UET, Jamshoro Pakistan, May 2008. Experience 1- Worked as “Base Station Subsystem Engineer (BSS)” at EPTSC (ORASCOM) on Mobilink GSM and WiMAX Project Karachi, Pakistan from October 2010 to March 2011. Job Description: • Responsible for Operation and Maintenance (O&M) of Alcatel and Motorola BTS. • Management of Preventive Maintenance (PM), Corrective Maintenance (CM) and On-Call teams for site down issues. • Handling of different alarms, taking Trouble Tickets (TT) from NOC, OMC and solve them in prescribed time. • Maintenance and troubleshooting of NEC Microwave Link. • Verification of transmission path from BTS to BSC and reconnecting ABIS and OML. • Configuration and alignment of MW Links i.e. NEC Pasolink, NEC NEO. • Expansion in BTS rack, adding TREs and sectors etc. • Documentation and provide daily reports to higher management. • Supervise the maintenance of electrical equipments in ATS Panel and GEDP. • Generating and clearing of alarms at DDF & BTS. • Patching of Delta, Emerson and Eltec rectifier alarms. • Coordination with customer in order to smooth running of network. 2- Worked as “Telecom Implementation Engineer (TI)” at NASCOM (Telecom Rollout) on Motorola Wi-Tribe- WiMAX Project Karachi, Pakistan from September 2008 to September 2009. Job Description: • Responsible for site survey and to prepare Candidate Evaluation Report (CER). • Lead Technical Site Survey (TSS) and Line of Sight (LoS) surveys on customer sites. • Apply propagation theory and RF engineering tools to choose cell site locations and placement. • Documentation of TSS, LoS and CER reports. • Co-operation with site acquisition department during site selection & acquisition processes. • Coordination with operator, vendor and subcontractors for different activities of sites. • Supervise the delivery of equipments, verification of antenna heights and azimuth on sites. • Deal with telecom shelters and towers, visit and coordinate the teams. • Worked on Softwares Global Mapper, Google Earth, MapInfo and Mindmap.
  • 2. • CPE testing for WiMAX network. Majors • RF and Mobile Networks (GSM, CDMA, LTE) • Broad Band Digital Networks (WiMAX, Wi-Fi, DSL, ATM) • Link Budget Calculation and Propagation Models Validation • Digital Transmission, Signaling and Switching System • Computer Communication and Networking • Fiber Optics Communication System • Modulations and Coding Schemes • Signal Processing & Systems • Digital Signal Processing (DSP) • Wireless Communication • Electromagnetic Theory • Cognitive Radio • Antenna Theory • Capacity Analysis Thesis & Projects • Master’s thesis project “Optimization of Cognitive Radio in NLoS Backhauling of Small Cells in LTE”. • Bachelor’s thesis project “Performance Evaluation of WiMAX MIMO OFDM System for Outdoor Environment using Matlab”. • “BER Analysis of HIPERLAN/2 with BPSK, QPSK and QAM over Rician Channel using Matlab”. • “Designing of Microstrip Antenna and Analysis of its Radiation Pattern using Matlab”. • “Designing of Website named Multi -Valley in HTML”. Computer Skills • Operating System Windows XP/Windows 2007/ Windows-98 • Software Application MS Office (MS Word, Power Point, Excel), Call Centre-Modeler, Global Mapper, Google Earth, MapInfo, Alcatel BTS (B9 and B10), Microwave (NEC Pasolink) and Mindmap. • Programming Applications Matlab, HTML, Boson (Networking Software), Opnet IT Guru 9.1.A, • Computer Networking CCNA (640-802) preparation course completed from Almukeet Centre Karachi. Personal Details • Date of Birth : 12th January 1985 • Marital Status : Single • Nationality : Pakistani
  • 3. • Work Visa Status : Danish Green Card (Open to Employers)