SlideShare a Scribd company logo
1 of 6
Omar Diaa Hassan Contact Information »
Graduated in Mechanical Engineering Address: 25 Mogama3
Elmasane3 st.
Department, Power section Elzawyaa, Cairo, Egypt
Refrigeration and Air Conditioning Branch Phone: +971 522175920
+20 1112643990
E-Mail: omardiaahassan@yahoo.com
3omar2008@live.com
Personal Information▼
Name: Omar Diaa Hassan Ali
Nationality: Egyptian
Birth date: 28 Feb. 1988
Gender: Male
Marital Status: Engaged
Military Status: Exempted
Education▼
College: Benha Higher Institute of Technology (BHIT), Faculty of Engineering ”Now”
University: Benha University
Address: Benha, Qalubeya, Egypt
Degree: Bachelor of Science (B.Sc.) July. 2009
Department of: Mechanical Engineering Technology (Power section)
Grade: - Bachelor stage is Very Good “76.6%”
- Total is Good “72.48%”
Work Position▼
HVAC Design Engineer and BIM Engineer
Academic Experiences ▼
Institution: Benha Higher Institute of Technology (BHIT)
•Summer training in the institute shops:
(Turning, milling, arc welding, metal casting, Wood working, Forging, Sheet metal working…)
July,2005 – Aug.2005
• Third year project: (Solar Absorption Ice Maker) Oct.2006‫ـــ‬ June,2007
Project Grade: Excellent
• Fifth year project: (HVAC DESIGN of Sheikh Jassem Storey Office Building,
Qatar) Feb.2009 – July,2009
Project Grade: Excellent
Industrial Experiences ▼
• Institution: Alexandria for Refrigeration company
Address: Ghamra, Cairo, Egypt
Job: Summer trainee
1
Activities: Using Refrigeration for Preservation of Cheese.
July 2006 – Aug. 2006
• Institution: Cement Egyptian Factory (ASEC Company)
Address: Tebbin, Helwan, Egypt
Job: Summer trainee
Activities: Steps of Cement manufacturing
July,2008 – Aug.2008
• Institution: Ministry of Finance
Address: Abassia, Cairo, Egypt
Job: Visitor
Activities: Central Air Conditioning System Components (Chillers, Pumps & Piping)
Feb. 2009
• Institution: Tanta University Hospital
Address: Tanta, Egypt
Job: Visitor
Activities: Central Air Conditioning System Components (Chillers, Boilers, Pumps,
Piping, Duct…)
May,2009
English Language ▼
My language is very good and i have got the third level at the Army Forces Institute for
Languages. Sep.2007
Computer Courses▼
1) AutoCAD 2D, at the Information System Institute “Army Forces Institute for Computer”
Aug.2006
2) AutoCAD 3D, at the Information System Institute “Army Forces Institute for Computer”
Aug.2006
Computer skills▼
AutoCAD (2D&3D), Revit MEP, HVAC software, Word, Excel and PowerPoint
WORK EXPERIENCE ▼
 Working for Selim International for Pumps "Agent of VIKING Company"
FROM SEP.2009 until March,2010
 Working for Egyptian Group for Engineering Consultation “EGEC"
FROM March 2010 until Feb.2012
 Working for Kemet Virtual Projects (VP) as a BIM Engineer
FROM Feb.2012 until July,2012
 Working for Saudi Diyar Consultant (SDC)
FROM Aug.2012 until Aug.2014
2
 Working for Naga Architects and Engineers (UAE)
FROM Sep.2014 until Now
Projects▼
 Al Faridah Hospital, New Cairo, Egypt: consists of five floors: basement, lower
ground, upper ground, first, second and roof floors constructed on a total built-up area
of 11,756 m2
. The scope of work is detailed design of HVAC system. March,2010
 Extension of Wady El-Nile Hospital, Cairo, Egypt: The hospital consists of main
building of 14 floors and services building of 3 floors with built up area of 90,700 m2
.
The scope of work is HVAC Design Review, April 2010
 School Models “three schools”, UAE: Schools projects are a Secondary schools
models to be repeated all over the United Arab Emirates (UAE) governments (Sharjah,
Fujairah and Ras Al Khaima). The scope of work is detailed design of HVAC system,
May,2010 to October,2011
 School Models, UAE: Are two schools “Kindergarten school and Primary school “at
Ras Al Khaima and Sharjah”. The scope of work is detailed design of HVAC system,
August,2010
 Multi Purpose Building, Suez Petrol: The building consists of four floors: ground,
first, second and third floors, and cafeteria and conference hall in outside of building,
constructed on a total built-up area of 20,000 m2
). The scope of work is detailed design
of HVAC system, February,2011
 Cultural ADNEC Souk, Abu Dhabi, UAE: it has a built up area about 176,100 m2
(75,000 above ground & 101,100 services floors). The project consists two parking
basement floors, 5 VIP villas, 4 residential buildings, two 5-star hotels, trade, offices,
arts and crafts, theater, mosque, library, food & beverage, wellness, falconry center and
education buildings. The scope of work is detailed design of HVAC system,
September,2010
 Alhatemi Hotel, Doha, Qatar: is a hotel consisting of 2 basements floors, ground floor,
mezzanine floor, service floor, 10 typical floors, roof deck floor and upper roof deck
floor, and two swimming pools. The scope of work is detailed design of HVAC system,
April,2011
 Royal Commission (Task# 5), Gubail, KSA: it consists of Training center building that
consists of 6 storey; its total area about 25,275 m2
, Auditorium that consists of 2 storey;
its total area about 3,780 m2
, Mosque where its total area is about 600 m2
, A block of
commercial buildings where its total area about 2,600 m2
. The scope of work is
detailed design of HVAC system, from September,2010 to May,2011
 Suzanne Mubarak Center for Science Exploratory, Suez, Egypt: is an educational
center which consists of ground, first, second, and roof floors with total built up area
about 4,000 m2
. The scope of work is detailed design of HVAC system, October,2010
3
 French Cardiovascular and Egyptian German Orthopedic Hospitals, Cairo, Egypt:
consists of six floors: basement 2, basement 1, ground, first, second and roof
constructed on a total built-up area of 34,000 m2
. The scope of work is detailed design
of HVAC system, September,2011
 Residential Tower, Damam, KSA: Consists of Basement, Ground, Mezzanine, first
and fourteen typical floors and roof constructed on a total built-up area of 10,400 m2
.
The scope of work is detailed design of HVAC system, September,2011
 Two Bank models “Al Rajhi Bank” : The first model is in Al madinah El monawarah
and Abha in KSA and the second model is in Al Bisha in KSA. The scope of work is
detailed design of HVAC system, October,2011
 Private Village, Al Khobar, KSA: it is a village which consists of basement, ground,
first, roof floor plans, it contains bedroom, Gym, Majles, Kitchen, Living, etc. The scope
of work is detailed design of HVAC system, December,2011
 King Abdullah Petroleum Studies and Research Center (KAPSARC), Riyadh, KSA: The
scope of work is Coordination of all services using RevitMEP 2012 Modeling,
March,2012
 Grand Egyptian Museum (GEM): The scope of work is Modeling, Shop drawings and
Coordination by RevitMEP 2012, June,2012
 Al-Shamiya Project (New Horizon for the Holy Sanctuary of Mecca), Mecca, KSA:
The project covers an area of one million five hundred thousand square meters, almost
Ranging from parties to the Haram al-Sharif after the second ring road north and east,
the Grand Mosque Street, the road to the west of Jabal Kaaba, the outline includes
Shamia and Grol and Qarara and Anaka and the area intended for development of
three million square meters. The Scope of Work is modeling and Coordination of MEP
Services by Revit MEP 2012, June, 2012
 During the period of two years:- BIM Specialist for HVAC Department in (SDC)
besiding design and modeling of some projects using Revit 2013 and 2014.
 KAP03 (Saudi Arabia Ministry of Interior):- It is about huge number of Prototypes
that are found in all Suburbs of KSA. These Prototypes are about Detention, Barracks,
Administration, Offices,..etc. The scope of work is detailed design of HVAC system and
Coordination with other Disciplines “Structure, Plumbing, FF and Electrical” by using
Revit MEP 2014. From Aug,2012 till now
 KAMC (King Abdullah Medical City):- Detailed design of HVAC Systems of Non
Medical Buildings “Clusters”. May,2013 to Aug.,2013
 Zero+ Villa (Green Building):- It consists of two buildings (Villa and Office Building).
Scope of work is a detailed design for HVAC System and to get a LEED Silver.
From Aug,2013 till now
 Saudi Diyar Consultants (Revit Library):- for Developing BIM in Diyar Company, I
have already created HVAC Revit Library which included a suitable HVAC Template
and complete with standard Families matching with Suppliers Catalogues.
From Sep,2012 till Oct,2013
4
 NAGA:- I am working a BIM Coordinator for Mechanical team. I built the mechancial
library beside mecganical template, schedules,….etc
Also, I gave support for all the team in many villas in United Arab Emirates and also
Towers.
 BIM Support in Omnyat Tower (Dubai) :- Supported mechancial team in the
modeling of Omnyt tower, it was about 50 floors.
 SOHO Tower (Dubai):- it was appartments tower had more than 20 floors.i worked in
HVAC design and modeling with the mechanical team
 SOL Properties Tower (Dubai):- it was appartments tower had more than 20 floors.
My scope was BIM Support also.
 Sawari Hotel (KSA, AlKhobar):- it was consisting of two towers has about 14 floors
and its base was about 4 floors Bodium that base for those towers. My scope was BIM
Support with mechaniacal team and worked also on modeling with HVAC team.
 The Department of Tourism and Commerce Marketing (DTCM) (Dubai):- it was
very important project in Sheikh Zaied road and also had a complicated architecture.
My scope was BIM Supporting and worked also on modeling with HVAC Team and
created more new families for complicated shapes in the building.
Professional Membership▼
Egyptian Syndicate of Engineers, 2009
5
 NAGA:- I am working a BIM Coordinator for Mechanical team. I built the mechancial
library beside mecganical template, schedules,….etc
Also, I gave support for all the team in many villas in United Arab Emirates and also
Towers.
 BIM Support in Omnyat Tower (Dubai) :- Supported mechancial team in the
modeling of Omnyt tower, it was about 50 floors.
 SOHO Tower (Dubai):- it was appartments tower had more than 20 floors.i worked in
HVAC design and modeling with the mechanical team
 SOL Properties Tower (Dubai):- it was appartments tower had more than 20 floors.
My scope was BIM Support also.
 Sawari Hotel (KSA, AlKhobar):- it was consisting of two towers has about 14 floors
and its base was about 4 floors Bodium that base for those towers. My scope was BIM
Support with mechaniacal team and worked also on modeling with HVAC team.
 The Department of Tourism and Commerce Marketing (DTCM) (Dubai):- it was
very important project in Sheikh Zaied road and also had a complicated architecture.
My scope was BIM Supporting and worked also on modeling with HVAC Team and
created more new families for complicated shapes in the building.
Professional Membership▼
Egyptian Syndicate of Engineers, 2009
5

More Related Content

What's hot

Ayman akef cv 2019
Ayman akef cv 2019Ayman akef cv 2019
Ayman akef cv 2019aymanakef
 
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )Ahmed Naeim
 
السيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترالسيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترibrahim shukri el-eter
 
C V Eng.Youssef ELTehawy 2016 - Full Profile
C V   Eng.Youssef ELTehawy 2016 - Full ProfileC V   Eng.Youssef ELTehawy 2016 - Full Profile
C V Eng.Youssef ELTehawy 2016 - Full ProfileYoussef ELTehawy
 
Hossam resume 12 2016
Hossam resume 12 2016Hossam resume 12 2016
Hossam resume 12 2016Hossam A.Aziz
 
hytham hashem sheta2
hytham hashem sheta2hytham hashem sheta2
hytham hashem sheta2hytham sheta
 
Samir_Eweida_Hakim-CV-new
Samir_Eweida_Hakim-CV-newSamir_Eweida_Hakim-CV-new
Samir_Eweida_Hakim-CV-newSamir Eweida
 
Building economics final assignment report
Building economics final assignment reportBuilding economics final assignment report
Building economics final assignment reportlucaschinsheng
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years expsameh todary
 
Building Economics Presentation
Building Economics PresentationBuilding Economics Presentation
Building Economics PresentationLin Hui
 
Ahmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-BakyAhmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-BakyAhmed Kamal
 
160805 haad civil-e2
160805 haad civil-e2160805 haad civil-e2
160805 haad civil-e2HAADGROUP
 

What's hot (20)

Eng.Youssef ELTehawy 2016
Eng.Youssef ELTehawy 2016Eng.Youssef ELTehawy 2016
Eng.Youssef ELTehawy 2016
 
Ayman akef cv 2019
Ayman akef cv 2019Ayman akef cv 2019
Ayman akef cv 2019
 
CV MZ
CV MZCV MZ
CV MZ
 
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
 
amir cv
amir cvamir cv
amir cv
 
السيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترالسيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العتر
 
ebrahimarchitect
ebrahimarchitectebrahimarchitect
ebrahimarchitect
 
Mohamed_Abd.Elkader
Mohamed_Abd.ElkaderMohamed_Abd.Elkader
Mohamed_Abd.Elkader
 
C V Eng.Youssef ELTehawy 2016 - Full Profile
C V   Eng.Youssef ELTehawy 2016 - Full ProfileC V   Eng.Youssef ELTehawy 2016 - Full Profile
C V Eng.Youssef ELTehawy 2016 - Full Profile
 
Hossam resume 12 2016
Hossam resume 12 2016Hossam resume 12 2016
Hossam resume 12 2016
 
hytham hashem sheta2
hytham hashem sheta2hytham hashem sheta2
hytham hashem sheta2
 
Samir_Eweida_Hakim-CV-new
Samir_Eweida_Hakim-CV-newSamir_Eweida_Hakim-CV-new
Samir_Eweida_Hakim-CV-new
 
Srinivasan - CV
Srinivasan - CVSrinivasan - CV
Srinivasan - CV
 
Building economics final assignment report
Building economics final assignment reportBuilding economics final assignment report
Building economics final assignment report
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exp
 
Building Economics Presentation
Building Economics PresentationBuilding Economics Presentation
Building Economics Presentation
 
Ahmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-BakyAhmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-Baky
 
160805 haad civil-e2
160805 haad civil-e2160805 haad civil-e2
160805 haad civil-e2
 
OMRAN CV
OMRAN CVOMRAN CV
OMRAN CV
 
Moin Resume
Moin ResumeMoin Resume
Moin Resume
 

Viewers also liked

Final presentation-PR Campaigns (MRL)
Final presentation-PR Campaigns (MRL)Final presentation-PR Campaigns (MRL)
Final presentation-PR Campaigns (MRL)Breonna Riddick
 
งานคอม
งานคอมงานคอม
งานคอมthanaluhk
 
Wa44 ab+exhibits
Wa44 ab+exhibitsWa44 ab+exhibits
Wa44 ab+exhibitsB S K RAO
 
銘傳
銘傳銘傳
銘傳family
 
Agile Training March 2015
Agile Training March 2015Agile Training March 2015
Agile Training March 2015David Phipps
 
RDAP 16 Poster: Diving into Data: Implementing a Data Repository at the Texas...
RDAP 16 Poster: Diving into Data: Implementing a Data Repository at the Texas...RDAP 16 Poster: Diving into Data: Implementing a Data Repository at the Texas...
RDAP 16 Poster: Diving into Data: Implementing a Data Repository at the Texas...ASIS&T
 
Lekts presentation10
Lekts presentation10Lekts presentation10
Lekts presentation10ganzorigb
 
Game Design 2 - Theory of Fun
Game Design 2 - Theory of FunGame Design 2 - Theory of Fun
Game Design 2 - Theory of FunJay Crossler
 
PROGRAMACION DE UNIDAD II EDUCACION FISICA
PROGRAMACION DE UNIDAD II  EDUCACION FISICAPROGRAMACION DE UNIDAD II  EDUCACION FISICA
PROGRAMACION DE UNIDAD II EDUCACION FISICAEsel GASTELO GASTELO
 
Live from LinkedIn: The Secret Sauce to Marketing on LinkedIn
Live from LinkedIn: The Secret Sauce to Marketing on LinkedInLive from LinkedIn: The Secret Sauce to Marketing on LinkedIn
Live from LinkedIn: The Secret Sauce to Marketing on LinkedInLinkedIn
 
Clase dispositivos
Clase dispositivosClase dispositivos
Clase dispositivosmigarate1
 

Viewers also liked (20)

Publisher
PublisherPublisher
Publisher
 
El abc de la bioestadistica
El abc de la bioestadisticaEl abc de la bioestadistica
El abc de la bioestadistica
 
Final presentation-PR Campaigns (MRL)
Final presentation-PR Campaigns (MRL)Final presentation-PR Campaigns (MRL)
Final presentation-PR Campaigns (MRL)
 
งานคอม
งานคอมงานคอม
งานคอม
 
Wa44 ab+exhibits
Wa44 ab+exhibitsWa44 ab+exhibits
Wa44 ab+exhibits
 
Brian
BrianBrian
Brian
 
liga española
liga españolaliga española
liga española
 
monografía
monografíamonografía
monografía
 
銘傳
銘傳銘傳
銘傳
 
Agile Training March 2015
Agile Training March 2015Agile Training March 2015
Agile Training March 2015
 
RDAP 16 Poster: Diving into Data: Implementing a Data Repository at the Texas...
RDAP 16 Poster: Diving into Data: Implementing a Data Repository at the Texas...RDAP 16 Poster: Diving into Data: Implementing a Data Repository at the Texas...
RDAP 16 Poster: Diving into Data: Implementing a Data Repository at the Texas...
 
Lekts presentation10
Lekts presentation10Lekts presentation10
Lekts presentation10
 
Game Design 2 - Theory of Fun
Game Design 2 - Theory of FunGame Design 2 - Theory of Fun
Game Design 2 - Theory of Fun
 
ITU 01/2017
ITU 01/2017ITU 01/2017
ITU 01/2017
 
PROGRAMACION DE UNIDAD II EDUCACION FISICA
PROGRAMACION DE UNIDAD II  EDUCACION FISICAPROGRAMACION DE UNIDAD II  EDUCACION FISICA
PROGRAMACION DE UNIDAD II EDUCACION FISICA
 
NIVEA MARKETING CASE STUDY
NIVEA MARKETING CASE STUDYNIVEA MARKETING CASE STUDY
NIVEA MARKETING CASE STUDY
 
Quality in information_security
Quality in information_securityQuality in information_security
Quality in information_security
 
Live from LinkedIn: The Secret Sauce to Marketing on LinkedIn
Live from LinkedIn: The Secret Sauce to Marketing on LinkedInLive from LinkedIn: The Secret Sauce to Marketing on LinkedIn
Live from LinkedIn: The Secret Sauce to Marketing on LinkedIn
 
Diseño curricular nacional
Diseño curricular nacionalDiseño curricular nacional
Diseño curricular nacional
 
Clase dispositivos
Clase dispositivosClase dispositivos
Clase dispositivos
 

Similar to CV_Omar Diaa

Eng.Yahya Ayesh C.V
Eng.Yahya Ayesh C.VEng.Yahya Ayesh C.V
Eng.Yahya Ayesh C.VYahya Ayesh
 
Structural engineer (7 year experience)
Structural engineer (7 year experience)Structural engineer (7 year experience)
Structural engineer (7 year experience)Ahmed Shalaby
 
Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed Ahmed
 
Ahmed Adel EL-HENNAWY summary CV V1.0
Ahmed Adel EL-HENNAWY summary CV V1.0Ahmed Adel EL-HENNAWY summary CV V1.0
Ahmed Adel EL-HENNAWY summary CV V1.0Ahmed El-Hennawy
 
CV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _AbdelmoneamCV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _AbdelmoneamEhab Abdelmoneam
 
M.Salah-Senior Architect CV -
M.Salah-Senior Architect CV -M.Salah-Senior Architect CV -
M.Salah-Senior Architect CV -Mohamed Salah
 
Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingHazem Mahdy
 
eng. Amr Mousa CV full
eng. Amr Mousa  CV fulleng. Amr Mousa  CV full
eng. Amr Mousa CV fullAmr Moussa
 
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab
 
Mahmoud-Mostafa-Khairy-cv (1)
Mahmoud-Mostafa-Khairy-cv (1)Mahmoud-Mostafa-Khairy-cv (1)
Mahmoud-Mostafa-Khairy-cv (1)Mahmoud M.Khairy
 
gomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.Draftsmangomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.DraftsmanGomaa Tawfik
 
Personal Profile April 2015
Personal Profile April 2015Personal Profile April 2015
Personal Profile April 2015Khaled Elagroudy
 
M. Elsawey CV CIVIL ENGINEER
M. Elsawey CV CIVIL ENGINEERM. Elsawey CV CIVIL ENGINEER
M. Elsawey CV CIVIL ENGINEERMohammed El Sawey
 

Similar to CV_Omar Diaa (20)

Eng.Yahya Ayesh C.V
Eng.Yahya Ayesh C.VEng.Yahya Ayesh C.V
Eng.Yahya Ayesh C.V
 
ENG Gamal CV
ENG Gamal CVENG Gamal CV
ENG Gamal CV
 
Structural engineer (7 year experience)
Structural engineer (7 year experience)Structural engineer (7 year experience)
Structural engineer (7 year experience)
 
CV Sheren
CV SherenCV Sheren
CV Sheren
 
Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)
 
amr lashen
amr lashenamr lashen
amr lashen
 
Ahmed Adel EL-HENNAWY summary CV V1.0
Ahmed Adel EL-HENNAWY summary CV V1.0Ahmed Adel EL-HENNAWY summary CV V1.0
Ahmed Adel EL-HENNAWY summary CV V1.0
 
CV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _AbdelmoneamCV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _Abdelmoneam
 
M.Salah-Senior Architect CV -
M.Salah-Senior Architect CV -M.Salah-Senior Architect CV -
M.Salah-Senior Architect CV -
 
Mohamed Magdy
Mohamed MagdyMohamed Magdy
Mohamed Magdy
 
Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire Fighting
 
Mahmoud Abdelrehim_CV
Mahmoud Abdelrehim_CVMahmoud Abdelrehim_CV
Mahmoud Abdelrehim_CV
 
eng. Amr Mousa CV full
eng. Amr Mousa  CV fulleng. Amr Mousa  CV full
eng. Amr Mousa CV full
 
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CV
 
Mahmoud-Mostafa-Khairy-cv (1)
Mahmoud-Mostafa-Khairy-cv (1)Mahmoud-Mostafa-Khairy-cv (1)
Mahmoud-Mostafa-Khairy-cv (1)
 
gomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.Draftsmangomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.Draftsman
 
Ahmed.Hassan_CV
Ahmed.Hassan_CVAhmed.Hassan_CV
Ahmed.Hassan_CV
 
Personal Profile April 2015
Personal Profile April 2015Personal Profile April 2015
Personal Profile April 2015
 
M. Elsawey CV CIVIL ENGINEER
M. Elsawey CV CIVIL ENGINEERM. Elsawey CV CIVIL ENGINEER
M. Elsawey CV CIVIL ENGINEER
 
CV
CVCV
CV
 

CV_Omar Diaa

  • 1. Omar Diaa Hassan Contact Information » Graduated in Mechanical Engineering Address: 25 Mogama3 Elmasane3 st. Department, Power section Elzawyaa, Cairo, Egypt Refrigeration and Air Conditioning Branch Phone: +971 522175920 +20 1112643990 E-Mail: omardiaahassan@yahoo.com 3omar2008@live.com Personal Information▼ Name: Omar Diaa Hassan Ali Nationality: Egyptian Birth date: 28 Feb. 1988 Gender: Male Marital Status: Engaged Military Status: Exempted Education▼ College: Benha Higher Institute of Technology (BHIT), Faculty of Engineering ”Now” University: Benha University Address: Benha, Qalubeya, Egypt Degree: Bachelor of Science (B.Sc.) July. 2009 Department of: Mechanical Engineering Technology (Power section) Grade: - Bachelor stage is Very Good “76.6%” - Total is Good “72.48%” Work Position▼ HVAC Design Engineer and BIM Engineer Academic Experiences ▼ Institution: Benha Higher Institute of Technology (BHIT) •Summer training in the institute shops: (Turning, milling, arc welding, metal casting, Wood working, Forging, Sheet metal working…) July,2005 – Aug.2005 • Third year project: (Solar Absorption Ice Maker) Oct.2006‫ـــ‬ June,2007 Project Grade: Excellent • Fifth year project: (HVAC DESIGN of Sheikh Jassem Storey Office Building, Qatar) Feb.2009 – July,2009 Project Grade: Excellent Industrial Experiences ▼ • Institution: Alexandria for Refrigeration company Address: Ghamra, Cairo, Egypt Job: Summer trainee 1
  • 2. Activities: Using Refrigeration for Preservation of Cheese. July 2006 – Aug. 2006 • Institution: Cement Egyptian Factory (ASEC Company) Address: Tebbin, Helwan, Egypt Job: Summer trainee Activities: Steps of Cement manufacturing July,2008 – Aug.2008 • Institution: Ministry of Finance Address: Abassia, Cairo, Egypt Job: Visitor Activities: Central Air Conditioning System Components (Chillers, Pumps & Piping) Feb. 2009 • Institution: Tanta University Hospital Address: Tanta, Egypt Job: Visitor Activities: Central Air Conditioning System Components (Chillers, Boilers, Pumps, Piping, Duct…) May,2009 English Language ▼ My language is very good and i have got the third level at the Army Forces Institute for Languages. Sep.2007 Computer Courses▼ 1) AutoCAD 2D, at the Information System Institute “Army Forces Institute for Computer” Aug.2006 2) AutoCAD 3D, at the Information System Institute “Army Forces Institute for Computer” Aug.2006 Computer skills▼ AutoCAD (2D&3D), Revit MEP, HVAC software, Word, Excel and PowerPoint WORK EXPERIENCE ▼  Working for Selim International for Pumps "Agent of VIKING Company" FROM SEP.2009 until March,2010  Working for Egyptian Group for Engineering Consultation “EGEC" FROM March 2010 until Feb.2012  Working for Kemet Virtual Projects (VP) as a BIM Engineer FROM Feb.2012 until July,2012  Working for Saudi Diyar Consultant (SDC) FROM Aug.2012 until Aug.2014 2
  • 3.  Working for Naga Architects and Engineers (UAE) FROM Sep.2014 until Now Projects▼  Al Faridah Hospital, New Cairo, Egypt: consists of five floors: basement, lower ground, upper ground, first, second and roof floors constructed on a total built-up area of 11,756 m2 . The scope of work is detailed design of HVAC system. March,2010  Extension of Wady El-Nile Hospital, Cairo, Egypt: The hospital consists of main building of 14 floors and services building of 3 floors with built up area of 90,700 m2 . The scope of work is HVAC Design Review, April 2010  School Models “three schools”, UAE: Schools projects are a Secondary schools models to be repeated all over the United Arab Emirates (UAE) governments (Sharjah, Fujairah and Ras Al Khaima). The scope of work is detailed design of HVAC system, May,2010 to October,2011  School Models, UAE: Are two schools “Kindergarten school and Primary school “at Ras Al Khaima and Sharjah”. The scope of work is detailed design of HVAC system, August,2010  Multi Purpose Building, Suez Petrol: The building consists of four floors: ground, first, second and third floors, and cafeteria and conference hall in outside of building, constructed on a total built-up area of 20,000 m2 ). The scope of work is detailed design of HVAC system, February,2011  Cultural ADNEC Souk, Abu Dhabi, UAE: it has a built up area about 176,100 m2 (75,000 above ground & 101,100 services floors). The project consists two parking basement floors, 5 VIP villas, 4 residential buildings, two 5-star hotels, trade, offices, arts and crafts, theater, mosque, library, food & beverage, wellness, falconry center and education buildings. The scope of work is detailed design of HVAC system, September,2010  Alhatemi Hotel, Doha, Qatar: is a hotel consisting of 2 basements floors, ground floor, mezzanine floor, service floor, 10 typical floors, roof deck floor and upper roof deck floor, and two swimming pools. The scope of work is detailed design of HVAC system, April,2011  Royal Commission (Task# 5), Gubail, KSA: it consists of Training center building that consists of 6 storey; its total area about 25,275 m2 , Auditorium that consists of 2 storey; its total area about 3,780 m2 , Mosque where its total area is about 600 m2 , A block of commercial buildings where its total area about 2,600 m2 . The scope of work is detailed design of HVAC system, from September,2010 to May,2011  Suzanne Mubarak Center for Science Exploratory, Suez, Egypt: is an educational center which consists of ground, first, second, and roof floors with total built up area about 4,000 m2 . The scope of work is detailed design of HVAC system, October,2010 3
  • 4.  French Cardiovascular and Egyptian German Orthopedic Hospitals, Cairo, Egypt: consists of six floors: basement 2, basement 1, ground, first, second and roof constructed on a total built-up area of 34,000 m2 . The scope of work is detailed design of HVAC system, September,2011  Residential Tower, Damam, KSA: Consists of Basement, Ground, Mezzanine, first and fourteen typical floors and roof constructed on a total built-up area of 10,400 m2 . The scope of work is detailed design of HVAC system, September,2011  Two Bank models “Al Rajhi Bank” : The first model is in Al madinah El monawarah and Abha in KSA and the second model is in Al Bisha in KSA. The scope of work is detailed design of HVAC system, October,2011  Private Village, Al Khobar, KSA: it is a village which consists of basement, ground, first, roof floor plans, it contains bedroom, Gym, Majles, Kitchen, Living, etc. The scope of work is detailed design of HVAC system, December,2011  King Abdullah Petroleum Studies and Research Center (KAPSARC), Riyadh, KSA: The scope of work is Coordination of all services using RevitMEP 2012 Modeling, March,2012  Grand Egyptian Museum (GEM): The scope of work is Modeling, Shop drawings and Coordination by RevitMEP 2012, June,2012  Al-Shamiya Project (New Horizon for the Holy Sanctuary of Mecca), Mecca, KSA: The project covers an area of one million five hundred thousand square meters, almost Ranging from parties to the Haram al-Sharif after the second ring road north and east, the Grand Mosque Street, the road to the west of Jabal Kaaba, the outline includes Shamia and Grol and Qarara and Anaka and the area intended for development of three million square meters. The Scope of Work is modeling and Coordination of MEP Services by Revit MEP 2012, June, 2012  During the period of two years:- BIM Specialist for HVAC Department in (SDC) besiding design and modeling of some projects using Revit 2013 and 2014.  KAP03 (Saudi Arabia Ministry of Interior):- It is about huge number of Prototypes that are found in all Suburbs of KSA. These Prototypes are about Detention, Barracks, Administration, Offices,..etc. The scope of work is detailed design of HVAC system and Coordination with other Disciplines “Structure, Plumbing, FF and Electrical” by using Revit MEP 2014. From Aug,2012 till now  KAMC (King Abdullah Medical City):- Detailed design of HVAC Systems of Non Medical Buildings “Clusters”. May,2013 to Aug.,2013  Zero+ Villa (Green Building):- It consists of two buildings (Villa and Office Building). Scope of work is a detailed design for HVAC System and to get a LEED Silver. From Aug,2013 till now  Saudi Diyar Consultants (Revit Library):- for Developing BIM in Diyar Company, I have already created HVAC Revit Library which included a suitable HVAC Template and complete with standard Families matching with Suppliers Catalogues. From Sep,2012 till Oct,2013 4
  • 5.  NAGA:- I am working a BIM Coordinator for Mechanical team. I built the mechancial library beside mecganical template, schedules,….etc Also, I gave support for all the team in many villas in United Arab Emirates and also Towers.  BIM Support in Omnyat Tower (Dubai) :- Supported mechancial team in the modeling of Omnyt tower, it was about 50 floors.  SOHO Tower (Dubai):- it was appartments tower had more than 20 floors.i worked in HVAC design and modeling with the mechanical team  SOL Properties Tower (Dubai):- it was appartments tower had more than 20 floors. My scope was BIM Support also.  Sawari Hotel (KSA, AlKhobar):- it was consisting of two towers has about 14 floors and its base was about 4 floors Bodium that base for those towers. My scope was BIM Support with mechaniacal team and worked also on modeling with HVAC team.  The Department of Tourism and Commerce Marketing (DTCM) (Dubai):- it was very important project in Sheikh Zaied road and also had a complicated architecture. My scope was BIM Supporting and worked also on modeling with HVAC Team and created more new families for complicated shapes in the building. Professional Membership▼ Egyptian Syndicate of Engineers, 2009 5
  • 6.  NAGA:- I am working a BIM Coordinator for Mechanical team. I built the mechancial library beside mecganical template, schedules,….etc Also, I gave support for all the team in many villas in United Arab Emirates and also Towers.  BIM Support in Omnyat Tower (Dubai) :- Supported mechancial team in the modeling of Omnyt tower, it was about 50 floors.  SOHO Tower (Dubai):- it was appartments tower had more than 20 floors.i worked in HVAC design and modeling with the mechanical team  SOL Properties Tower (Dubai):- it was appartments tower had more than 20 floors. My scope was BIM Support also.  Sawari Hotel (KSA, AlKhobar):- it was consisting of two towers has about 14 floors and its base was about 4 floors Bodium that base for those towers. My scope was BIM Support with mechaniacal team and worked also on modeling with HVAC team.  The Department of Tourism and Commerce Marketing (DTCM) (Dubai):- it was very important project in Sheikh Zaied road and also had a complicated architecture. My scope was BIM Supporting and worked also on modeling with HVAC Team and created more new families for complicated shapes in the building. Professional Membership▼ Egyptian Syndicate of Engineers, 2009 5