1. Omar Diaa Hassan Contact Information »
Graduated in Mechanical Engineering Address: 25 Mogama3
Elmasane3 st.
Department, Power section Elzawyaa, Cairo, Egypt
Refrigeration and Air Conditioning Branch Phone: +971 522175920
+20 1112643990
E-Mail: omardiaahassan@yahoo.com
3omar2008@live.com
Personal Information▼
Name: Omar Diaa Hassan Ali
Nationality: Egyptian
Birth date: 28 Feb. 1988
Gender: Male
Marital Status: Engaged
Military Status: Exempted
Education▼
College: Benha Higher Institute of Technology (BHIT), Faculty of Engineering ”Now”
University: Benha University
Address: Benha, Qalubeya, Egypt
Degree: Bachelor of Science (B.Sc.) July. 2009
Department of: Mechanical Engineering Technology (Power section)
Grade: - Bachelor stage is Very Good “76.6%”
- Total is Good “72.48%”
Work Position▼
HVAC Design Engineer and BIM Engineer
Academic Experiences ▼
Institution: Benha Higher Institute of Technology (BHIT)
•Summer training in the institute shops:
(Turning, milling, arc welding, metal casting, Wood working, Forging, Sheet metal working…)
July,2005 – Aug.2005
• Third year project: (Solar Absorption Ice Maker) Oct.2006ـــ June,2007
Project Grade: Excellent
• Fifth year project: (HVAC DESIGN of Sheikh Jassem Storey Office Building,
Qatar) Feb.2009 – July,2009
Project Grade: Excellent
Industrial Experiences ▼
• Institution: Alexandria for Refrigeration company
Address: Ghamra, Cairo, Egypt
Job: Summer trainee
1
2. Activities: Using Refrigeration for Preservation of Cheese.
July 2006 – Aug. 2006
• Institution: Cement Egyptian Factory (ASEC Company)
Address: Tebbin, Helwan, Egypt
Job: Summer trainee
Activities: Steps of Cement manufacturing
July,2008 – Aug.2008
• Institution: Ministry of Finance
Address: Abassia, Cairo, Egypt
Job: Visitor
Activities: Central Air Conditioning System Components (Chillers, Pumps & Piping)
Feb. 2009
• Institution: Tanta University Hospital
Address: Tanta, Egypt
Job: Visitor
Activities: Central Air Conditioning System Components (Chillers, Boilers, Pumps,
Piping, Duct…)
May,2009
English Language ▼
My language is very good and i have got the third level at the Army Forces Institute for
Languages. Sep.2007
Computer Courses▼
1) AutoCAD 2D, at the Information System Institute “Army Forces Institute for Computer”
Aug.2006
2) AutoCAD 3D, at the Information System Institute “Army Forces Institute for Computer”
Aug.2006
Computer skills▼
AutoCAD (2D&3D), Revit MEP, HVAC software, Word, Excel and PowerPoint
WORK EXPERIENCE ▼
Working for Selim International for Pumps "Agent of VIKING Company"
FROM SEP.2009 until March,2010
Working for Egyptian Group for Engineering Consultation “EGEC"
FROM March 2010 until Feb.2012
Working for Kemet Virtual Projects (VP) as a BIM Engineer
FROM Feb.2012 until July,2012
Working for Saudi Diyar Consultant (SDC)
FROM Aug.2012 until Aug.2014
2
3. Working for Naga Architects and Engineers (UAE)
FROM Sep.2014 until Now
Projects▼
Al Faridah Hospital, New Cairo, Egypt: consists of five floors: basement, lower
ground, upper ground, first, second and roof floors constructed on a total built-up area
of 11,756 m2
. The scope of work is detailed design of HVAC system. March,2010
Extension of Wady El-Nile Hospital, Cairo, Egypt: The hospital consists of main
building of 14 floors and services building of 3 floors with built up area of 90,700 m2
.
The scope of work is HVAC Design Review, April 2010
School Models “three schools”, UAE: Schools projects are a Secondary schools
models to be repeated all over the United Arab Emirates (UAE) governments (Sharjah,
Fujairah and Ras Al Khaima). The scope of work is detailed design of HVAC system,
May,2010 to October,2011
School Models, UAE: Are two schools “Kindergarten school and Primary school “at
Ras Al Khaima and Sharjah”. The scope of work is detailed design of HVAC system,
August,2010
Multi Purpose Building, Suez Petrol: The building consists of four floors: ground,
first, second and third floors, and cafeteria and conference hall in outside of building,
constructed on a total built-up area of 20,000 m2
). The scope of work is detailed design
of HVAC system, February,2011
Cultural ADNEC Souk, Abu Dhabi, UAE: it has a built up area about 176,100 m2
(75,000 above ground & 101,100 services floors). The project consists two parking
basement floors, 5 VIP villas, 4 residential buildings, two 5-star hotels, trade, offices,
arts and crafts, theater, mosque, library, food & beverage, wellness, falconry center and
education buildings. The scope of work is detailed design of HVAC system,
September,2010
Alhatemi Hotel, Doha, Qatar: is a hotel consisting of 2 basements floors, ground floor,
mezzanine floor, service floor, 10 typical floors, roof deck floor and upper roof deck
floor, and two swimming pools. The scope of work is detailed design of HVAC system,
April,2011
Royal Commission (Task# 5), Gubail, KSA: it consists of Training center building that
consists of 6 storey; its total area about 25,275 m2
, Auditorium that consists of 2 storey;
its total area about 3,780 m2
, Mosque where its total area is about 600 m2
, A block of
commercial buildings where its total area about 2,600 m2
. The scope of work is
detailed design of HVAC system, from September,2010 to May,2011
Suzanne Mubarak Center for Science Exploratory, Suez, Egypt: is an educational
center which consists of ground, first, second, and roof floors with total built up area
about 4,000 m2
. The scope of work is detailed design of HVAC system, October,2010
3
4. French Cardiovascular and Egyptian German Orthopedic Hospitals, Cairo, Egypt:
consists of six floors: basement 2, basement 1, ground, first, second and roof
constructed on a total built-up area of 34,000 m2
. The scope of work is detailed design
of HVAC system, September,2011
Residential Tower, Damam, KSA: Consists of Basement, Ground, Mezzanine, first
and fourteen typical floors and roof constructed on a total built-up area of 10,400 m2
.
The scope of work is detailed design of HVAC system, September,2011
Two Bank models “Al Rajhi Bank” : The first model is in Al madinah El monawarah
and Abha in KSA and the second model is in Al Bisha in KSA. The scope of work is
detailed design of HVAC system, October,2011
Private Village, Al Khobar, KSA: it is a village which consists of basement, ground,
first, roof floor plans, it contains bedroom, Gym, Majles, Kitchen, Living, etc. The scope
of work is detailed design of HVAC system, December,2011
King Abdullah Petroleum Studies and Research Center (KAPSARC), Riyadh, KSA: The
scope of work is Coordination of all services using RevitMEP 2012 Modeling,
March,2012
Grand Egyptian Museum (GEM): The scope of work is Modeling, Shop drawings and
Coordination by RevitMEP 2012, June,2012
Al-Shamiya Project (New Horizon for the Holy Sanctuary of Mecca), Mecca, KSA:
The project covers an area of one million five hundred thousand square meters, almost
Ranging from parties to the Haram al-Sharif after the second ring road north and east,
the Grand Mosque Street, the road to the west of Jabal Kaaba, the outline includes
Shamia and Grol and Qarara and Anaka and the area intended for development of
three million square meters. The Scope of Work is modeling and Coordination of MEP
Services by Revit MEP 2012, June, 2012
During the period of two years:- BIM Specialist for HVAC Department in (SDC)
besiding design and modeling of some projects using Revit 2013 and 2014.
KAP03 (Saudi Arabia Ministry of Interior):- It is about huge number of Prototypes
that are found in all Suburbs of KSA. These Prototypes are about Detention, Barracks,
Administration, Offices,..etc. The scope of work is detailed design of HVAC system and
Coordination with other Disciplines “Structure, Plumbing, FF and Electrical” by using
Revit MEP 2014. From Aug,2012 till now
KAMC (King Abdullah Medical City):- Detailed design of HVAC Systems of Non
Medical Buildings “Clusters”. May,2013 to Aug.,2013
Zero+ Villa (Green Building):- It consists of two buildings (Villa and Office Building).
Scope of work is a detailed design for HVAC System and to get a LEED Silver.
From Aug,2013 till now
Saudi Diyar Consultants (Revit Library):- for Developing BIM in Diyar Company, I
have already created HVAC Revit Library which included a suitable HVAC Template
and complete with standard Families matching with Suppliers Catalogues.
From Sep,2012 till Oct,2013
4
5. NAGA:- I am working a BIM Coordinator for Mechanical team. I built the mechancial
library beside mecganical template, schedules,….etc
Also, I gave support for all the team in many villas in United Arab Emirates and also
Towers.
BIM Support in Omnyat Tower (Dubai) :- Supported mechancial team in the
modeling of Omnyt tower, it was about 50 floors.
SOHO Tower (Dubai):- it was appartments tower had more than 20 floors.i worked in
HVAC design and modeling with the mechanical team
SOL Properties Tower (Dubai):- it was appartments tower had more than 20 floors.
My scope was BIM Support also.
Sawari Hotel (KSA, AlKhobar):- it was consisting of two towers has about 14 floors
and its base was about 4 floors Bodium that base for those towers. My scope was BIM
Support with mechaniacal team and worked also on modeling with HVAC team.
The Department of Tourism and Commerce Marketing (DTCM) (Dubai):- it was
very important project in Sheikh Zaied road and also had a complicated architecture.
My scope was BIM Supporting and worked also on modeling with HVAC Team and
created more new families for complicated shapes in the building.
Professional Membership▼
Egyptian Syndicate of Engineers, 2009
5
6. NAGA:- I am working a BIM Coordinator for Mechanical team. I built the mechancial
library beside mecganical template, schedules,….etc
Also, I gave support for all the team in many villas in United Arab Emirates and also
Towers.
BIM Support in Omnyat Tower (Dubai) :- Supported mechancial team in the
modeling of Omnyt tower, it was about 50 floors.
SOHO Tower (Dubai):- it was appartments tower had more than 20 floors.i worked in
HVAC design and modeling with the mechanical team
SOL Properties Tower (Dubai):- it was appartments tower had more than 20 floors.
My scope was BIM Support also.
Sawari Hotel (KSA, AlKhobar):- it was consisting of two towers has about 14 floors
and its base was about 4 floors Bodium that base for those towers. My scope was BIM
Support with mechaniacal team and worked also on modeling with HVAC team.
The Department of Tourism and Commerce Marketing (DTCM) (Dubai):- it was
very important project in Sheikh Zaied road and also had a complicated architecture.
My scope was BIM Supporting and worked also on modeling with HVAC Team and
created more new families for complicated shapes in the building.
Professional Membership▼
Egyptian Syndicate of Engineers, 2009
5