Usually a material req1uirements planning system
generates frequent orders for relatively small
quantities. This is particularly true for components that
are ordered lot-for-lot.
 It is costly, inefficient and sometimes impossible to
issue a new purchase order for every weekly
requirement.
The alternative is to develop a a long-term contract
with supplier and to authorize releases against the
contract.
Contract Buying is efficient and cost-effective but
requires close coordination and communication with
supplier along with well management by
planner/buyer. 2
Contract management activities can be broadly grouped
into three areas :-
Delivery Management
Relationship Management
Contract Administration
3
Delivery Management ensures that whatever is ordered
is then delivered to the required level of quality and
performance as stated in the contract. Delivery
management may include checking the nature, quantity
and quality of:
 goods supplied – on delivery and also, when
appropriate, at the time of manufacture;
works carried out – including conformity with designs
and drawings, quality of workmanship and materials
services performed – including checking that required
services levels and timescales are met.
4
Relationship Management seeks to keep the
relationship between the economic operator (Vendor)
and the contracting authority open and constructive,
with the aim of resolving or easing tensions and
identifying potential problems at an early stage, while
also identifying opportunities for improvement.
Relationships must be wholly professional throughout
and must include a professional approach to managing
issues and dispute resolution.
5
Contract Administration covers the formal governance
of the contract and any permitted changes to
documentation during the life of the contract. This area
of contract management ensures that the everyday
aspects of making the contract run effectively and
efficiently are taken care of.
6
The best Contract Management practices include:-
Managing the Relationship
The inaugural or initial Meeting
Ongoing Contract Management
Issues Log
Review Meetings
Contract Performance Controls
Risk and Risk Management
7
Managing the Relationship: Contractual
arrangements create a relationship between the
contracting authority and the supplier . Inevitably this
involves a degree of dependency. It is in the contracting
authority’s own interest to make the relationship work
as the costs of early termination and the consequences
of poor performance and unplanned changes of
supplier are highly damaging. The three factors for
success are:
 Mutual trust and understanding
 Openness and excellence of communication
 A joint approach to managing delivery
8
The inaugural or initial meeting: For any major contract
it is good practice to have a formal inaugural or initial
meeting soon after the contract is officially awarded. This
meeting is where people from both the supplier and the
contracting authority meet for the first time within the
context of the agreed contract. At this meeting it is vital that
both sides move from a competitive to a cooperative
viewpoint – they will be working together for the life of the
contract as both will want a successful outcome. The
objectives of the meeting include:
Understanding the roles and responsibilities of everyone
present
Discussing the implementation and/or project plan
Discussing issues which impact on the operation of the
contract
Discussing control mechanisms
9
Ongoing contract management:
Ongoing contract management includes the
administration of a range of activities, including :-
Change control
Charges and cost monitoring
Ordering procedures
Receipt and acceptance procedures
Payment procedures
Budget procedures
Resource management and planning
Operational and management reporting
Asset management
Progress meetings
10
Issues log: An issues log is one useful mechanism for
recording and managing issues arising during contract
implementation. It records issues as they arise along
with the actions taken to attempt to address them. A
dispute resolution procedure must be provided within
the contract for issues that cannot be resolved in this
way.
11
Review meetings: Review meetings between the
parties to the contract are another practical means of
keeping control of a contract, particularly when it is
complex or runs over several years. The frequency and
coverage of the review meetings, if any, will depend on
the nature of the contract. Review meetings are a useful
means of communication between the parties to the
contract during its execution, and not having them can
have negative consequences. They must be well
prepared, focussed and not too time consuming.
12
Contract performance controls: Control is vital, but
cannot be had without measurement. Therefore, clear
and effective contract performance measurement is
essential. Controls must be:
Highly relevant to the essence of the contract
Understood and accepted by the supplier and the
contracting authority
Able to measure
Robust in their operation
Provide more value than costs
Able to reflect soft and hard measures
A source of useful information
13
Risk and risk management: Risk can be defined as
“uncertainty of outcome, whether positive opportunity
or negative threat.”
In the area of contract management, the term
‘management of risk’ incorporates all the activities
required to identify and control risks that may have an
impact on the fulfilment of a contract .
Many risks involved in contract management relate to
the economic operator being unable to deliver at all or
not delivering at a satisfactory level of quality.
14
These risks could include:
Lack of capacity
The supplier’s business focus moving to other areas after contract
award, reducing the added value for the contracting authority in the
arrangement or impacting on the timeliness of delivery of goods or
works.
The supplier’s financial standing deteriorating after contract award,
eventually endangering its ability to maintain agreed quality
requirements of goods purchased or levels of service.
Demand for the goods or services is much greater than expected and
the supplier is unable to cope.
Demand for a service is too low, meaning economies of scale are lost
and operational costs are disproportionately high .
Staff at the contracting authority with knowledge of the contract who
transfer or move on, weakening the relationship
Factors beyond the supplier’s control disrupt delivery of goods or
services, for example, premises cannot be accessed because of a natural
disaster.
The contracting authority’s inability to meet its obligations under the
contract . 15
Performance review is a comparison of the performance
of the goods, works, materials and services against the
quoted, specified and agreed criteria. As has already
been pointed out, measurement is a vital part of the
contracting process, yet it is sometimes forgotten once a
contract has been completed and contracting
authorities have moved on to another project. With a
large procurement, a post contract review is always an
appropriate tool.
16
Continuous improvement involves looking at the
procurement process and the goods, works, materials
and services bought, and identifying areas for
improvement which can be applied when making future
procurements. The purpose of a post contract review is
to assess whether the procurement has delivered the
benefits for which it was first conceived. It is also an
opportunity to record lessons learned, to capitalise on
best practices, and to record the performance of the
economic operator and of the whole project
management team for future reference when another
similar project may be undertaken.
17
18

Weitere ähnliche Inhalte

Was ist angesagt?

Contract Administration Presentation
Contract Administration PresentationContract Administration Presentation
Contract Administration PresentationYanet Ormeno
 
contract administration PPT
 contract administration PPT contract administration PPT
contract administration PPTKEVINMISTRY8
 
Contract Management - Generating Real Value from your Contracts
Contract Management - Generating Real Value from your ContractsContract Management - Generating Real Value from your Contracts
Contract Management - Generating Real Value from your ContractsTejari
 
Project management procurement
Project management  procurementProject management  procurement
Project management procurementMalcolm Peart
 
Introduction to contract management
Introduction to contract managementIntroduction to contract management
Introduction to contract managementBerkman Solutions
 
Project Procurement Management PMBOK 5
Project Procurement Management PMBOK 5Project Procurement Management PMBOK 5
Project Procurement Management PMBOK 5pankajsh10
 
Contract management.ppt
Contract management.pptContract management.ppt
Contract management.pptMUST
 
Project Procurement Management
 Project Procurement Management  Project Procurement Management
Project Procurement Management Serdar Temiz
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16Arvind Solanki
 
Contract Management
Contract ManagementContract Management
Contract ManagementGaravi Mehta
 
Lecture 1 Introduction to Procurement and contract Management Management - Co...
Lecture 1 Introduction to Procurement and contract Management Management - Co...Lecture 1 Introduction to Procurement and contract Management Management - Co...
Lecture 1 Introduction to Procurement and contract Management Management - Co...axmedbaasaay
 
12.0 Project Procurement Management Overview
12.0 Project Procurement Management Overview12.0 Project Procurement Management Overview
12.0 Project Procurement Management OverviewDavidMcLachlan1
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in constructionMahSobeh
 
Project Management-Project procurement Management
Project Management-Project procurement ManagementProject Management-Project procurement Management
Project Management-Project procurement ManagementYogender Singh Rana
 

Was ist angesagt? (20)

Contract Management
Contract Management Contract Management
Contract Management
 
Contract Administration Presentation
Contract Administration PresentationContract Administration Presentation
Contract Administration Presentation
 
contract administration PPT
 contract administration PPT contract administration PPT
contract administration PPT
 
Procurement- Contract Management
Procurement- Contract ManagementProcurement- Contract Management
Procurement- Contract Management
 
Contract management
Contract managementContract management
Contract management
 
Contract Management - Generating Real Value from your Contracts
Contract Management - Generating Real Value from your ContractsContract Management - Generating Real Value from your Contracts
Contract Management - Generating Real Value from your Contracts
 
Project management procurement
Project management  procurementProject management  procurement
Project management procurement
 
Introduction to contract management
Introduction to contract managementIntroduction to contract management
Introduction to contract management
 
Project Procurement Management PMBOK 5
Project Procurement Management PMBOK 5Project Procurement Management PMBOK 5
Project Procurement Management PMBOK 5
 
Contract management sys
Contract management sysContract management sys
Contract management sys
 
Contract management.ppt
Contract management.pptContract management.ppt
Contract management.ppt
 
Project Procurement Management
 Project Procurement Management  Project Procurement Management
Project Procurement Management
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
 
Contract Management
Contract ManagementContract Management
Contract Management
 
Lecture 1 Introduction to Procurement and contract Management Management - Co...
Lecture 1 Introduction to Procurement and contract Management Management - Co...Lecture 1 Introduction to Procurement and contract Management Management - Co...
Lecture 1 Introduction to Procurement and contract Management Management - Co...
 
12.0 Project Procurement Management Overview
12.0 Project Procurement Management Overview12.0 Project Procurement Management Overview
12.0 Project Procurement Management Overview
 
9. project procurement management
9. project procurement management9. project procurement management
9. project procurement management
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
Project Management-Project procurement Management
Project Management-Project procurement ManagementProject Management-Project procurement Management
Project Management-Project procurement Management
 
Project Procurement Management
Project Procurement ManagementProject Procurement Management
Project Procurement Management
 

Andere mochten auch

Detailed Project Report
Detailed Project ReportDetailed Project Report
Detailed Project ReportMir Mehboob
 
SDPM - Lecture 9 - Managing people and organizing teams
SDPM - Lecture 9 - Managing people and organizing teamsSDPM - Lecture 9 - Managing people and organizing teams
SDPM - Lecture 9 - Managing people and organizing teamsOpenLearningLab
 
Types of contract in Project management
Types of contract in Project managementTypes of contract in Project management
Types of contract in Project managementAli Heydari
 
Enterprise Resource Planning- BEST PPT
Enterprise Resource Planning- BEST PPTEnterprise Resource Planning- BEST PPT
Enterprise Resource Planning- BEST PPTSiddharth Modi
 
Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process
 

Andere mochten auch (8)

Detailed Project Report
Detailed Project ReportDetailed Project Report
Detailed Project Report
 
SDPM - Lecture 9 - Managing people and organizing teams
SDPM - Lecture 9 - Managing people and organizing teamsSDPM - Lecture 9 - Managing people and organizing teams
SDPM - Lecture 9 - Managing people and organizing teams
 
Detailed project report
Detailed project reportDetailed project report
Detailed project report
 
Types of contract in Project management
Types of contract in Project managementTypes of contract in Project management
Types of contract in Project management
 
Spm unit 4
Spm unit 4Spm unit 4
Spm unit 4
 
Enterprise Resource Planning- BEST PPT
Enterprise Resource Planning- BEST PPTEnterprise Resource Planning- BEST PPT
Enterprise Resource Planning- BEST PPT
 
Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement Guide
 
Standardization
StandardizationStandardization
Standardization
 

Ähnlich wie Contract management

Chapter 5.1 Contracts Management - Contract Administration-owners perspective...
Chapter 5.1 Contracts Management - Contract Administration-owners perspective...Chapter 5.1 Contracts Management - Contract Administration-owners perspective...
Chapter 5.1 Contracts Management - Contract Administration-owners perspective...ChandanLawrence
 
Contracting process paper cpmgt302september 21, 2015
Contracting process paper cpmgt302september 21, 2015Contracting process paper cpmgt302september 21, 2015
Contracting process paper cpmgt302september 21, 2015SONU61709
 
Best Practices To Improve Contract Management Process
Best Practices To Improve Contract Management Process Best Practices To Improve Contract Management Process
Best Practices To Improve Contract Management Process Benny Henson
 
L8_PROJECT CONTRACT Management.ppt
L8_PROJECT CONTRACT Management.pptL8_PROJECT CONTRACT Management.ppt
L8_PROJECT CONTRACT Management.pptMUST
 
Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701Peter Soetevent
 
A GUIDE TO BEST PRACTICES FOR CONTRACT ADMINISTRATION .docx
A GUIDE TO BEST PRACTICES FOR CONTRACT ADMINISTRATION .docxA GUIDE TO BEST PRACTICES FOR CONTRACT ADMINISTRATION .docx
A GUIDE TO BEST PRACTICES FOR CONTRACT ADMINISTRATION .docxransayo
 
Contracting Process Paper CPMGT_302.docx
Contracting Process Paper CPMGT_302.docxContracting Process Paper CPMGT_302.docx
Contracting Process Paper CPMGT_302.docxRebeccaEdwards88
 
White Paper : It Is Time To Switch Outsourcing Vendor
White Paper : It Is Time To Switch Outsourcing VendorWhite Paper : It Is Time To Switch Outsourcing Vendor
White Paper : It Is Time To Switch Outsourcing VendorISHIR
 
Basics of Contract Management
Basics of Contract ManagementBasics of Contract Management
Basics of Contract ManagementSHAZEBALIKHAN1
 
Contracts and Compliance White Paper
Contracts and Compliance White PaperContracts and Compliance White Paper
Contracts and Compliance White PaperBerkman Solutions
 
ProjectManagementDocs.comProcurement Management Plan Temp.docx
ProjectManagementDocs.comProcurement Management Plan Temp.docxProjectManagementDocs.comProcurement Management Plan Temp.docx
ProjectManagementDocs.comProcurement Management Plan Temp.docxtienmixon
 
ProjectManagementDocs.comProcurement Management Plan Temp.docx
 ProjectManagementDocs.comProcurement Management Plan Temp.docx ProjectManagementDocs.comProcurement Management Plan Temp.docx
ProjectManagementDocs.comProcurement Management Plan Temp.docxgertrudebellgrove
 
Getting ML Contracting and procurement right!
Getting ML Contracting and procurement right!Getting ML Contracting and procurement right!
Getting ML Contracting and procurement right!Tarun Philip
 
A Quick Guide to Contract Mangement Services
A Quick Guide to Contract Mangement  ServicesA Quick Guide to Contract Mangement  Services
A Quick Guide to Contract Mangement ServicesCogneesol
 
Maximizing value through vendor mgt july, lagos
Maximizing value through vendor mgt july, lagosMaximizing value through vendor mgt july, lagos
Maximizing value through vendor mgt july, lagosPetro Nomics
 
Contract Management
Contract ManagementContract Management
Contract Managementadvsharma
 
L7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfL7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfMUST
 

Ähnlich wie Contract management (20)

Chapter 5.1 Contracts Management - Contract Administration-owners perspective...
Chapter 5.1 Contracts Management - Contract Administration-owners perspective...Chapter 5.1 Contracts Management - Contract Administration-owners perspective...
Chapter 5.1 Contracts Management - Contract Administration-owners perspective...
 
Contracting process paper cpmgt302september 21, 2015
Contracting process paper cpmgt302september 21, 2015Contracting process paper cpmgt302september 21, 2015
Contracting process paper cpmgt302september 21, 2015
 
Contract Management
Contract ManagementContract Management
Contract Management
 
Best Practices To Improve Contract Management Process
Best Practices To Improve Contract Management Process Best Practices To Improve Contract Management Process
Best Practices To Improve Contract Management Process
 
L8_PROJECT CONTRACT Management.ppt
L8_PROJECT CONTRACT Management.pptL8_PROJECT CONTRACT Management.ppt
L8_PROJECT CONTRACT Management.ppt
 
Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701Post Award Contract Management for IT Suppliers v1.0 20200701
Post Award Contract Management for IT Suppliers v1.0 20200701
 
Procurement Management
Procurement ManagementProcurement Management
Procurement Management
 
A GUIDE TO BEST PRACTICES FOR CONTRACT ADMINISTRATION .docx
A GUIDE TO BEST PRACTICES FOR CONTRACT ADMINISTRATION .docxA GUIDE TO BEST PRACTICES FOR CONTRACT ADMINISTRATION .docx
A GUIDE TO BEST PRACTICES FOR CONTRACT ADMINISTRATION .docx
 
Contracting Process Paper CPMGT_302.docx
Contracting Process Paper CPMGT_302.docxContracting Process Paper CPMGT_302.docx
Contracting Process Paper CPMGT_302.docx
 
White Paper : It Is Time To Switch Outsourcing Vendor
White Paper : It Is Time To Switch Outsourcing VendorWhite Paper : It Is Time To Switch Outsourcing Vendor
White Paper : It Is Time To Switch Outsourcing Vendor
 
Basics of Contract Management
Basics of Contract ManagementBasics of Contract Management
Basics of Contract Management
 
Contracts and Compliance White Paper
Contracts and Compliance White PaperContracts and Compliance White Paper
Contracts and Compliance White Paper
 
ProjectManagementDocs.comProcurement Management Plan Temp.docx
ProjectManagementDocs.comProcurement Management Plan Temp.docxProjectManagementDocs.comProcurement Management Plan Temp.docx
ProjectManagementDocs.comProcurement Management Plan Temp.docx
 
ProjectManagementDocs.comProcurement Management Plan Temp.docx
 ProjectManagementDocs.comProcurement Management Plan Temp.docx ProjectManagementDocs.comProcurement Management Plan Temp.docx
ProjectManagementDocs.comProcurement Management Plan Temp.docx
 
12 procurement
12 procurement12 procurement
12 procurement
 
Getting ML Contracting and procurement right!
Getting ML Contracting and procurement right!Getting ML Contracting and procurement right!
Getting ML Contracting and procurement right!
 
A Quick Guide to Contract Mangement Services
A Quick Guide to Contract Mangement  ServicesA Quick Guide to Contract Mangement  Services
A Quick Guide to Contract Mangement Services
 
Maximizing value through vendor mgt july, lagos
Maximizing value through vendor mgt july, lagosMaximizing value through vendor mgt july, lagos
Maximizing value through vendor mgt july, lagos
 
Contract Management
Contract ManagementContract Management
Contract Management
 
L7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfL7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdf
 

Kürzlich hochgeladen

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 

Kürzlich hochgeladen (20)

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 

Contract management

  • 1. 1 Presented By: Nishant Rai Materials Management Division Central electronics Limited
  • 2. Usually a material req1uirements planning system generates frequent orders for relatively small quantities. This is particularly true for components that are ordered lot-for-lot.  It is costly, inefficient and sometimes impossible to issue a new purchase order for every weekly requirement. The alternative is to develop a a long-term contract with supplier and to authorize releases against the contract. Contract Buying is efficient and cost-effective but requires close coordination and communication with supplier along with well management by planner/buyer. 2
  • 3. Contract management activities can be broadly grouped into three areas :- Delivery Management Relationship Management Contract Administration 3
  • 4. Delivery Management ensures that whatever is ordered is then delivered to the required level of quality and performance as stated in the contract. Delivery management may include checking the nature, quantity and quality of:  goods supplied – on delivery and also, when appropriate, at the time of manufacture; works carried out – including conformity with designs and drawings, quality of workmanship and materials services performed – including checking that required services levels and timescales are met. 4
  • 5. Relationship Management seeks to keep the relationship between the economic operator (Vendor) and the contracting authority open and constructive, with the aim of resolving or easing tensions and identifying potential problems at an early stage, while also identifying opportunities for improvement. Relationships must be wholly professional throughout and must include a professional approach to managing issues and dispute resolution. 5
  • 6. Contract Administration covers the formal governance of the contract and any permitted changes to documentation during the life of the contract. This area of contract management ensures that the everyday aspects of making the contract run effectively and efficiently are taken care of. 6
  • 7. The best Contract Management practices include:- Managing the Relationship The inaugural or initial Meeting Ongoing Contract Management Issues Log Review Meetings Contract Performance Controls Risk and Risk Management 7
  • 8. Managing the Relationship: Contractual arrangements create a relationship between the contracting authority and the supplier . Inevitably this involves a degree of dependency. It is in the contracting authority’s own interest to make the relationship work as the costs of early termination and the consequences of poor performance and unplanned changes of supplier are highly damaging. The three factors for success are:  Mutual trust and understanding  Openness and excellence of communication  A joint approach to managing delivery 8
  • 9. The inaugural or initial meeting: For any major contract it is good practice to have a formal inaugural or initial meeting soon after the contract is officially awarded. This meeting is where people from both the supplier and the contracting authority meet for the first time within the context of the agreed contract. At this meeting it is vital that both sides move from a competitive to a cooperative viewpoint – they will be working together for the life of the contract as both will want a successful outcome. The objectives of the meeting include: Understanding the roles and responsibilities of everyone present Discussing the implementation and/or project plan Discussing issues which impact on the operation of the contract Discussing control mechanisms 9
  • 10. Ongoing contract management: Ongoing contract management includes the administration of a range of activities, including :- Change control Charges and cost monitoring Ordering procedures Receipt and acceptance procedures Payment procedures Budget procedures Resource management and planning Operational and management reporting Asset management Progress meetings 10
  • 11. Issues log: An issues log is one useful mechanism for recording and managing issues arising during contract implementation. It records issues as they arise along with the actions taken to attempt to address them. A dispute resolution procedure must be provided within the contract for issues that cannot be resolved in this way. 11
  • 12. Review meetings: Review meetings between the parties to the contract are another practical means of keeping control of a contract, particularly when it is complex or runs over several years. The frequency and coverage of the review meetings, if any, will depend on the nature of the contract. Review meetings are a useful means of communication between the parties to the contract during its execution, and not having them can have negative consequences. They must be well prepared, focussed and not too time consuming. 12
  • 13. Contract performance controls: Control is vital, but cannot be had without measurement. Therefore, clear and effective contract performance measurement is essential. Controls must be: Highly relevant to the essence of the contract Understood and accepted by the supplier and the contracting authority Able to measure Robust in their operation Provide more value than costs Able to reflect soft and hard measures A source of useful information 13
  • 14. Risk and risk management: Risk can be defined as “uncertainty of outcome, whether positive opportunity or negative threat.” In the area of contract management, the term ‘management of risk’ incorporates all the activities required to identify and control risks that may have an impact on the fulfilment of a contract . Many risks involved in contract management relate to the economic operator being unable to deliver at all or not delivering at a satisfactory level of quality. 14
  • 15. These risks could include: Lack of capacity The supplier’s business focus moving to other areas after contract award, reducing the added value for the contracting authority in the arrangement or impacting on the timeliness of delivery of goods or works. The supplier’s financial standing deteriorating after contract award, eventually endangering its ability to maintain agreed quality requirements of goods purchased or levels of service. Demand for the goods or services is much greater than expected and the supplier is unable to cope. Demand for a service is too low, meaning economies of scale are lost and operational costs are disproportionately high . Staff at the contracting authority with knowledge of the contract who transfer or move on, weakening the relationship Factors beyond the supplier’s control disrupt delivery of goods or services, for example, premises cannot be accessed because of a natural disaster. The contracting authority’s inability to meet its obligations under the contract . 15
  • 16. Performance review is a comparison of the performance of the goods, works, materials and services against the quoted, specified and agreed criteria. As has already been pointed out, measurement is a vital part of the contracting process, yet it is sometimes forgotten once a contract has been completed and contracting authorities have moved on to another project. With a large procurement, a post contract review is always an appropriate tool. 16
  • 17. Continuous improvement involves looking at the procurement process and the goods, works, materials and services bought, and identifying areas for improvement which can be applied when making future procurements. The purpose of a post contract review is to assess whether the procurement has delivered the benefits for which it was first conceived. It is also an opportunity to record lessons learned, to capitalise on best practices, and to record the performance of the economic operator and of the whole project management team for future reference when another similar project may be undertaken. 17
  • 18. 18