Work Breakdown Structure
Subtitle
WBS Characteristics:
▪ The Work Breakdown Structure is a hierarchy which specifies the list
of tasks involved in a project – down to the finest detail.
▪ The WBS splits the task list up into major ‘packages’
▪ On the following slide, is the WBS for the project to outsource these
Learning Materials.
Packages:
▪ The split of the task list into different packages should be logical, and also
compatible with regards to cost control and reporting.
▪ For each Package, it should be possible to test whether the entire package is
completed or not.
▪ You will see 5 different packages in the previous example.
Lowest Level:
▪ The lowest level of each activity on a WBS should be an individual task
▪ This task should be possible to complete by an individual, or team, within a
reasonable defined period of time.
▪ For example, delegating the task of drawing up action lists could be completed by
an individual within a defined period of time, such as one afternoon.
Limitations to the WBS:
▪ No consideration for the order in which tasks should be carried out, and whether a
task is dependant on another.
▪ No representation of how long each task might take.
▪ Does not show you who, or what resources are involved in each task.
Alternatives to WBS:
1. Product Breakdown Structure

2. Cost Breakdown Structure – Completed AFTER the Work
Breakdown Structure and Product Breakdown Structure
Product Breakdown Structure:
• This is a tool for dealing with complex
products, such as the motorcycle in the
opposite example.
• The PBS provides a means for identifying all
the components that make up a particular
product.
• It is worth noting the Project Management
methodology PRINCE uses the PBS as an
alternative to the WBS.
Cost Breakdown Structure:

• The CBS can only be
completed after the WBS
and PBS (if any). This is
because, for example, the
costs of labour should be
possible to cross reference
with the WBS.
• This is a tool for identifying
each cost category
associated with a project
Sources and Further Reading:
▪ Field, M. and Keller, M. (1998), Croatia: Thomson Learning
– Chapter 2.1

▪ Servello, M. and Evans, M. W. (2002) Work Breakdown Structure.
Encyclopedia of Software Engineering.

Weitere ähnliche Inhalte

Was ist angesagt?

Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structureCOEPD HR
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structureNicola2903
 
Projectcontrol
ProjectcontrolProjectcontrol
ProjectcontrolRaj Sampat
 
What is a Work Breakdown Structure?
What is a Work Breakdown Structure?What is a Work Breakdown Structure?
What is a Work Breakdown Structure?Kenny Hirschmann
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1Anand Bobade
 
project time management
 project time management project time management
project time managementHira Atiq
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Agus Suhanto
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration ManagementBhuWan Khadka
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management A Makwana
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management pptRajeshPV12
 
Work breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jWork breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jIIT delhi
 
Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Agus Suhanto
 
Project Management 101 Primer
Project Management 101   PrimerProject Management 101   Primer
Project Management 101 PrimerGary Drumm
 

Was ist angesagt? (20)

Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
7.3 Determine Budget
7.3 Determine Budget7.3 Determine Budget
7.3 Determine Budget
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Projectcontrol
ProjectcontrolProjectcontrol
Projectcontrol
 
Project Charter Guide
Project Charter GuideProject Charter Guide
Project Charter Guide
 
Cost plan
Cost planCost plan
Cost plan
 
What is a Work Breakdown Structure?
What is a Work Breakdown Structure?What is a Work Breakdown Structure?
What is a Work Breakdown Structure?
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1
 
project time management
 project time management project time management
project time management
 
Project cost control
Project cost controlProject cost control
Project cost control
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management ppt
 
Work breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jWork breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran j
 
Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Project Scope Management - PMBOK6
Project Scope Management - PMBOK6
 
Project Management 101 Primer
Project Management 101   PrimerProject Management 101   Primer
Project Management 101 Primer
 

Ähnlich wie Work breakdown Structure

WBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptxWBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptxFillHackjack
 
Work breakdown structure
Work breakdown structure Work breakdown structure
Work breakdown structure RaoZaid1
 
The Work Breakdown StructureAwork breakdown structure (WBS) brea.docx
The Work Breakdown StructureAwork breakdown structure (WBS) brea.docxThe Work Breakdown StructureAwork breakdown structure (WBS) brea.docx
The Work Breakdown StructureAwork breakdown structure (WBS) brea.docxssusera34210
 
Untitled document (24).pdf
Untitled document (24).pdfUntitled document (24).pdf
Untitled document (24).pdfAsadUllah174251
 
Copyright © 2000 Artemis Management SystemsCreating The Wo.docx
Copyright © 2000 Artemis Management SystemsCreating The Wo.docxCopyright © 2000 Artemis Management SystemsCreating The Wo.docx
Copyright © 2000 Artemis Management SystemsCreating The Wo.docxvanesaburnand
 
Work breakdown structure (WBS) PRESENTATION.pptx
Work breakdown structure (WBS) PRESENTATION.pptxWork breakdown structure (WBS) PRESENTATION.pptx
Work breakdown structure (WBS) PRESENTATION.pptxErzaScarlet64
 
PositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxPositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxChantellPantoja184
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectNirtiSingla
 
Unit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementUnit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementtanishkagupta907
 
LAB - Materi ProjectLibre Topik 6.pptx
LAB - Materi ProjectLibre Topik 6.pptxLAB - Materi ProjectLibre Topik 6.pptx
LAB - Materi ProjectLibre Topik 6.pptxSiskaSeptiani6
 
TTP-3 Project Schedule with Task Dependency Links (Team projec.docx
TTP-3 Project Schedule with Task Dependency Links (Team projec.docxTTP-3 Project Schedule with Task Dependency Links (Team projec.docx
TTP-3 Project Schedule with Task Dependency Links (Team projec.docxjuliennehar
 
WBSssssssssssssssssssssssssssssssssssss.pptx
WBSssssssssssssssssssssssssssssssssssss.pptxWBSssssssssssssssssssssssssssssssssssss.pptx
WBSssssssssssssssssssssssssssssssssssss.pptxRedhaElhuni
 
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docxevonnehoggarth79783
 
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
 SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docxaryan532920
 

Ähnlich wie Work breakdown Structure (20)

WBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptxWBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptx
 
Lect 3 wbs&obs
Lect 3 wbs&obs Lect 3 wbs&obs
Lect 3 wbs&obs
 
Babu 143
Babu 143Babu 143
Babu 143
 
Work breakdown structure
Work breakdown structure Work breakdown structure
Work breakdown structure
 
The Work Breakdown StructureAwork breakdown structure (WBS) brea.docx
The Work Breakdown StructureAwork breakdown structure (WBS) brea.docxThe Work Breakdown StructureAwork breakdown structure (WBS) brea.docx
The Work Breakdown StructureAwork breakdown structure (WBS) brea.docx
 
Untitled document (24).pdf
Untitled document (24).pdfUntitled document (24).pdf
Untitled document (24).pdf
 
Copyright © 2000 Artemis Management SystemsCreating The Wo.docx
Copyright © 2000 Artemis Management SystemsCreating The Wo.docxCopyright © 2000 Artemis Management SystemsCreating The Wo.docx
Copyright © 2000 Artemis Management SystemsCreating The Wo.docx
 
Work breakdown structure (WBS) PRESENTATION.pptx
Work breakdown structure (WBS) PRESENTATION.pptxWork breakdown structure (WBS) PRESENTATION.pptx
Work breakdown structure (WBS) PRESENTATION.pptx
 
PositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxPositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docx
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft project
 
Unit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementUnit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project management
 
LAB - Materi ProjectLibre Topik 6.pptx
LAB - Materi ProjectLibre Topik 6.pptxLAB - Materi ProjectLibre Topik 6.pptx
LAB - Materi ProjectLibre Topik 6.pptx
 
TTP-3 Project Schedule with Task Dependency Links (Team projec.docx
TTP-3 Project Schedule with Task Dependency Links (Team projec.docxTTP-3 Project Schedule with Task Dependency Links (Team projec.docx
TTP-3 Project Schedule with Task Dependency Links (Team projec.docx
 
WBSssssssssssssssssssssssssssssssssssss.pptx
WBSssssssssssssssssssssssssssssssssssss.pptxWBSssssssssssssssssssssssssssssssssssss.pptx
WBSssssssssssssssssssssssssssssssssssss.pptx
 
SEN-22413 - UNIT - V.pptx
SEN-22413 -  UNIT - V.pptxSEN-22413 -  UNIT - V.pptx
SEN-22413 - UNIT - V.pptx
 
Wbs
WbsWbs
Wbs
 
Final_Module_2.ppt
Final_Module_2.pptFinal_Module_2.ppt
Final_Module_2.ppt
 
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
 
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
 SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
 
Wbs, gant charts
Wbs, gant chartsWbs, gant charts
Wbs, gant charts
 

Mehr von Nicola2903

Network diagrams
Network diagramsNetwork diagrams
Network diagramsNicola2903
 
Critical path method
Critical path methodCritical path method
Critical path methodNicola2903
 
The gantt Chart
The gantt Chart The gantt Chart
The gantt Chart Nicola2903
 
Resource Scheduling
Resource Scheduling  Resource Scheduling
Resource Scheduling Nicola2903
 
Network Diagrams
Network DiagramsNetwork Diagrams
Network DiagramsNicola2903
 
Estimating in Project Scheduling
Estimating in Project SchedulingEstimating in Project Scheduling
Estimating in Project SchedulingNicola2903
 
The Critical Path Method
The Critical Path MethodThe Critical Path Method
The Critical Path MethodNicola2903
 
The Critical Path Method
The Critical Path MethodThe Critical Path Method
The Critical Path MethodNicola2903
 
Resource Scheduling
Resource SchedulingResource Scheduling
Resource SchedulingNicola2903
 
The Gantt Chart
The Gantt ChartThe Gantt Chart
The Gantt ChartNicola2903
 

Mehr von Nicola2903 (12)

Network diagrams
Network diagramsNetwork diagrams
Network diagrams
 
Estimating
EstimatingEstimating
Estimating
 
Critical path method
Critical path methodCritical path method
Critical path method
 
The gantt Chart
The gantt Chart The gantt Chart
The gantt Chart
 
Resource Scheduling
Resource Scheduling  Resource Scheduling
Resource Scheduling
 
Network Diagrams
Network DiagramsNetwork Diagrams
Network Diagrams
 
Estimating
EstimatingEstimating
Estimating
 
Estimating in Project Scheduling
Estimating in Project SchedulingEstimating in Project Scheduling
Estimating in Project Scheduling
 
The Critical Path Method
The Critical Path MethodThe Critical Path Method
The Critical Path Method
 
The Critical Path Method
The Critical Path MethodThe Critical Path Method
The Critical Path Method
 
Resource Scheduling
Resource SchedulingResource Scheduling
Resource Scheduling
 
The Gantt Chart
The Gantt ChartThe Gantt Chart
The Gantt Chart
 

Kürzlich hochgeladen

Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 

Kürzlich hochgeladen (20)

Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 

Work breakdown Structure

  • 2. WBS Characteristics: ▪ The Work Breakdown Structure is a hierarchy which specifies the list of tasks involved in a project – down to the finest detail. ▪ The WBS splits the task list up into major ‘packages’ ▪ On the following slide, is the WBS for the project to outsource these Learning Materials.
  • 3.
  • 4. Packages: ▪ The split of the task list into different packages should be logical, and also compatible with regards to cost control and reporting. ▪ For each Package, it should be possible to test whether the entire package is completed or not. ▪ You will see 5 different packages in the previous example.
  • 5. Lowest Level: ▪ The lowest level of each activity on a WBS should be an individual task ▪ This task should be possible to complete by an individual, or team, within a reasonable defined period of time. ▪ For example, delegating the task of drawing up action lists could be completed by an individual within a defined period of time, such as one afternoon.
  • 6. Limitations to the WBS: ▪ No consideration for the order in which tasks should be carried out, and whether a task is dependant on another. ▪ No representation of how long each task might take. ▪ Does not show you who, or what resources are involved in each task.
  • 7. Alternatives to WBS: 1. Product Breakdown Structure 2. Cost Breakdown Structure – Completed AFTER the Work Breakdown Structure and Product Breakdown Structure
  • 8. Product Breakdown Structure: • This is a tool for dealing with complex products, such as the motorcycle in the opposite example. • The PBS provides a means for identifying all the components that make up a particular product. • It is worth noting the Project Management methodology PRINCE uses the PBS as an alternative to the WBS.
  • 9. Cost Breakdown Structure: • The CBS can only be completed after the WBS and PBS (if any). This is because, for example, the costs of labour should be possible to cross reference with the WBS. • This is a tool for identifying each cost category associated with a project
  • 10. Sources and Further Reading: ▪ Field, M. and Keller, M. (1998), Croatia: Thomson Learning – Chapter 2.1 ▪ Servello, M. and Evans, M. W. (2002) Work Breakdown Structure. Encyclopedia of Software Engineering.