SlideShare ist ein Scribd-Unternehmen logo
1 von 25
Downloaden Sie, um offline zu lesen
First Quarter Earnings Update
Friday, April 27, 2012
Cautionary Statement
 Cautionary Statement Regarding Forward Looking Statements, Including 2012 Outlook:
 This presentation contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934,
 as amended, which are intended to be covered by the safe harbor created by those sections and other applicable laws. Those forward-looking statements include (without limitation) estimates
 and expectations of, and statements regarding: (i) the Company’s strategy and plans; (ii) future equity gold and equity copper production; (iii) future operating, sales and other costs; (iv) future
 capital expenditures; (v) project returns; (vi) project start dates, ramp up, life, pipeline timelines, including commencement of mining, drilling and stage gate advancement and expansion
 opportunities; (vii) potential ounces or tons of reserves, NRM and potential resources; (viii) exploration pipeline, potential or upside, opportunities, growth and growth potential; (ix) dividend
 payments and increases; (x) future liquidity, cash and balance sheet expectations; and (xi) other financial outlook indicators relation to the Company’s operations and projects. Those forward-
 looking statements include (without limitation) statements that use forward-looking terminology such as “may”, “will”, “expect”, “predict”, “anticipate”, “believe”, “continue”, “potential”, “target”,
 “goal”, “opportunity”, “outlook”, or the negative or other variations of those terms or comparable terminology. Estimates or expectations of future events or results are based upon certain
 assumptions, which may prove to be incorrect. Those assumptions include (without limitation): (i) there being no significant change to current geotechnical, metallurgical, hydrological and other
 physical conditions; (ii) permitting, development, operations and expansion of the Company’s projects being consistent with current expectations and mine plans; (iii) political, social and legal
 developments in any jurisdiction in which the Company conducts business being consistent with its current expectations; (iv) certain exchange rate assumptions for the Australian dollar to the
 U.S. dollar, as well as the other exchange rates being approximately consistent with current levels; (v) certain price assumptions for gold, copper and oil; (vi) prices for key supplies being
 approximately consistent with current levels and such supplies otherwise being available on bases consistent with the Company’s current expectations; and (vii) the accuracy of our current
 mineral reserve and mineral resource estimates and exploration information. Where the Company expresses or implies an expectation or belief as to future events or results, that expectation
 or belief is expressed in good faith and is believed to have a reasonable basis. However, forward-looking statements are subject to risks, uncertainties and other factors that could cause actual
 results to differ materially from future results expressed, projected or implied by the “forward-looking statements”. Those risks, uncertainties and other factors include (without limitation): (i) gold
 and other metals price volatility; (ii) currency fluctuations; (iii) increased capital and operating costs, and scarcity of and competition for required labor and supplies; (iv) variances in oregrade or
 recovery rates from those assumed in mining plans; (v) operating or technical difficulties; (vi) political and operational risks; (vii) community relations, conflict resolution and outcome of projects
 or oppositions; and (viii) governmental regulation and judicial outcomes. For a more detailed discussion of such risks and other factors, see the Company’s 2011 Annual Report on Form 10-K,
 filed on February 24, 2012, with the Securities and Exchange Commission (“SEC”), as well as the Company’s other SEC filings. These forward-looking statements are not guarantees of future
 performance, given that they involve risks and uncertainties. The Company does not undertake any obligation to release publicly revisions to any forward-looking statement except as may be
 required under applicable securities laws. Investors should not assume that any lack of update to a previously issued forward-looking statement constitutes a reaffirmation of that statement.
 Continued reliance on forward-looking statements is at investors' own risk. In addition, some of the statements in this presentation are based on assumptions or methodologies (such as
 commodity prices) or subject to cautionary statements that are discussed in the notes found at the end of this presentation.




   Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                                                                                2                   April 27, 2012
Building on Strong Operating Performance
Newmont Offers a Compelling Combination of Growth, Returns and Exploration Upside
                                                                                  Attributable Basis

                              •    Gold production growth potential to ~ 6 - 7 Moz by 2017 1
Production Growth                  (Growth potential dependent on outcomes of Conga EIA review and the on-going dialogue with Peruvian government and communities)
                              •    Copper production to potentially double over same period


Project Returns               •    Competitive returns across the pipeline


                              •    Potential to add equivalent of 90 Moz Au and 9 Blbs Cu reserves
Exploration Upside
                                   between 2011 and 20202

Balance Sheet
                              •    Investment grade balance sheet and strong operating cash flows
Strength


Gold Price-Linked
                              •    Returning capital to shareholders through gold price-linked dividend
Dividend




  Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                                                  3                April 27, 2012
Growth Potential
                2012-2017 Projected Pipeline Growth, Net of Depletion
                                                                                                                                                      2017
                                                                                                                                                    Potential
                                                                                                                                         Africa:   Production
                                                                                                                                        ~0.8 Moz     (Moz)5
                      7.0
                                                                                                                                                   ~0.4          Akyem
                                                                                                                        APAC:
                                                                                                                       ~0.3 Moz                    ~0.2          Subika
                                                                                                         S America:                                ~0.2          Ahafo Mill
                      6.0                                                                                                                          ~0.1          APAC Other
                                                                                                          ~1.3 Moz
                                                                                                                                                   ~0.2          Aust. Exp.
                                        N America                                                                                                  ~0.3          Merian
                                        Depletion                                                                                                  ~0.2          Yan Exp.
                            ~5.2 Moz3                S America
                                                                                                                                                   ~0.3          Cerro
                      5.0     Africa                 Depletion                                                                                                   Quilish
                                                                                            N America:
                             ~0.6 Moz                              APAC
                                        (~0.3 Moz)                                           ~0.8 Moz                                              ~0.4          Conga
                                                                  Depletion
Au Production (Moz)




                                                                                Africa                                                             ~0.2          Long Canyon

                      4.0                                                      Depletion
                              APAC                   (~0.5 Moz)                                               Progress dependent on                ~0.6          NV Exp.
                             ~1.9 Moz                                                                         outcomes of Conga EIA
                                                                  (~0.4 Moz)                                  review and the on-going
                                                                               (~0.2 Moz)
                                                                                                              dialogue with Peruvian
                      3.0                                                                                     government and
                                                                                                              communities4
                            S America                                                                                                               Base:
                             ~0.7Moz                                                                                                                 ~3.6
                      2.0



                            N America
                      1.0   ~1.9 Moz


                              2011                                                                                                                   2017
                      0.0


                       Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                                  4               April 27, 2012
First Quarter Financial Highlights


                                                                                        Q1 2011 vs.
                                                                        Q1 2011 Q1 2012  Q1 2012
       Revenue ($M)                                                       $2,465     $2,683   9%
                                                 6
       Adjusted Net Income ($M)                                            $513      $578     13%
                                                          7
       Adjusted Net Income per Share                                       $1.04     $1.17    13%

       Net Income per Share                                                $1.04     $0.99    -5%

       Cash from Continuing Operations ($M)                                $989      $613     -38%

       Dividends per share                                                 $0.20     $0.35    75%




 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com            5      April 27, 2012
First Quarter Operating Highlights
Operating Margin Expands 29% on Gold Price Increase of 22%

                                                                                           Q1 2011 vs.
                                                                           Q1 2011 Q1 2012  Q1 2012
         Attributable Gold Production (Moz)                                    1.3    1.3         0%
         Attributable Copper Production (Mlbs)                                  54    35          -35%

         Average Realized Gold Price8($/oz)                                 $1,382   $1,684       22%
         Average Realized Copper Price ($/lb)                                $4.00   $4.01        0%
         Gold CAS ($/oz)                                                      $557   $620         11%
         Copper CAS ($/lb)                                                   $1.11   $1.98        78%
                                                         9
         Gold Operating Margin ($/oz)                                         $825   $1,064       29%

         Copper Operating Margin ($/lb)10                                    $4.00   $2.03        -30%




 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com            6          April 27, 2012
First Quarter Financial Highlights
Cash Flow from Continuing Operations

                      $1,500
                                      $407   $189


                      $1,250                         $377
         ($million)




                      $1,000
                               $989   $989
                                                              $65
                                                                        $50
                       $750                                                      $37      $25
                                                                       $715                        $20   $20
                                                                                 $678
                                                                                          $653
                                                                                                               $613
                       $500




                       $250




 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                        7           April 27, 2012
                                              Newmont Mining Corporation – Strictly Confidential
CAS - Gold
Q1 Cost Drivers

                           $700



                           $650

                                                                                               $7
                                                                                    $9
                                                                         $9                          $620
                           $600                               $10                             $613
                                                   $12                             $604
                                          $16                           $595
                                                              $585
              CAS ($/oz)




                                                   $573
                           $550   $557   $557



                           $500



                           $450



                           $400




 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                          8   April 27, 2012
                                                Newmont Mining Corporation – Strictly Confidential
Industry Leading Gold Price-Linked Dividend11
Up 75% from Prior Year Quarter
                                     $5.00                 Dividend increases /                       Dividend           Dividend increases / decreases
                                                         decreases by $0.20/share                    increases /         by $0.40/share for every $100/oz            $4.70

                                     $4.50               for every $100/oz change                   decreases by         change in the gold price
                                                              in the gold price                    $0.30/share for                                           $4.30
                                                                                                    every $100/oz
                                     $4.00                                                         change in gold                                    $3.90
                                                                                                        price
Annualized Dividend per Share ($)




                                                                                                                                             $3.50
                                     $3.50                    Q2 2012 Dividend
                                                               Declared: $0.35
                                                                                                                                     $3.10
                                     $3.00
                                                                                                                         $2.70

                                     $2.50
                                                                                                                 $2.30

                                                                                                         $2.00
                                     $2.00
                                                                                                 $1.70

                                     $1.50                                               $1.40
                                                                               $1.20
                                                                      $1.00
                                     $1.00
                                                              $0.80
                                                      $0.60
                                     $0.50   $0.40


                                     $0.00
                                              $1,100 $1,200 $1,300 $1,400 $1,500 $1,600 $1,700 $1,800 $1,900 $2,000- $2,100- $2,200- $2,300- $2,400- $2,500
                                             -$1,199 -$1,299 -$1,399 -$1,499 -$1,599 -$1,699 -$1,799 -$1,899 -$1,999 $2,099 $2,199 $2,299 $2,399 $2,499 -$2,599
                                                                                       Trailing Quarter Realized Gold Price ($/oz)

                                    Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                                9           April 27, 2012
Q1 2012 Operational Performance
1.3Moz at CAS of $620/oz
      Q1 2011 Attributable Gold Production                                            Q1 2012 Attributable Gold Production

                Africa                                                                         Africa
               ~190Koz                                                                        ~180Koz
               (14%)                                                                           (14%)
                                  N America
                                                                 N America                                     N America
                                   ~480Koz
                                                                                                                ~490Koz
                                   (36%)         ~1.3Moz         S America                                        (37%)           ~1.3Moz
                                                                 APAC                      APAC
               APAC                                                                       ~440Koz
              ~510Koz                                            Africa                    (34%)
               (39%)         S America                                                                     S America
                              ~150Koz                                                                       ~200Koz
                              (11%)                                                                          (15%)


  Consolidated
                            N America             S America                APAC                     Africa           Total Newmont
 Gold CAS ($/oz)
       Q1 2011                  $617                  $583                   $527                   $451                   $557


       Q1 2012                  $613                  $458                   $774                   $568                   $620


  Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                             10          April 27, 2012
North America Operating Highlights
    Attributable Production (Koz)                                                    Twin Creeks
 Q1 2011                                     482
 Q1 2012                                     489
           Consolidated CAS ($/oz)
 Q1 2011                                     $617
 Q1 2012                                     $613
Q1 Attributable Gold Production (Koz)
     600             La Herradura   Nevada

     500                                                         Q1 2012 gold production increased due to
     400
                                                                  higher leach placement at Soledad-Dipolos at
                                                                  La Herradura, and first production at Noche
     300                                                          Bueno
     200                                                         Q1 2012 gold CAS decreased as higher
     100
                                                                  underground mining and milling costs were
                                                                  more than offset by an inventory build in 2012,
       0                                                          compared to a drawdown of inventory in 2011
                Q1 2011              Q1 2012


 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                 11    April 27, 2012
Recent Developments in North America12
Tangible Steps in Advancing the Project Portfolio

               Emigrant                                          Vista                      Phoenix Copper Leach
     Average annual production                     Oxide layback that will                Average annual production
      (1st 5 years): ~80 - 90 Koz                    provide leach ore and feed to           (1st 5 years): ~10 - 20 Mlb;
      gold                                           Juniper mill                           Initial production expected
     Commercial production                         Average annual production of            ~2014
      expected ~2013 with startup                    ~100koz                                By-product credit to NV CAS
      in 2012                                                                               Ore placement begun on
                                                                                             leach pad




    Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                 12        April 27, 2012
Long Canyon
Continuing Confidence in Original Investment Thesis
Trend Potential of >3-4X Fronteer’s Stated Resource Estimate13
(1.4Moz M&I + 0.8Moz Inferred; No ounces currently in reserves or NRM; Expected to
declare first NRM in 2012)




 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com   13   April 27, 2012
South America Operating Highlights
    Attributable Production (Koz)                                                    Yanacocha, Peru

 Q1 2011                                  160
 Q1 2012                                  201
         Consolidated CAS ($/oz)
 Q1 2011                                  $583
 Q1 2012                                  $458
Q1 Attributable Gold Production (Koz)



                                                                    Q1 2012 gold production increased due to
                                                                     higher mill throughput, recovery and grade,
                                                                     partly offset by lower leach production

                                                                    Q1 2012 CAS decreased due to higher
                                                                     production, partially offset by higher labor,
                                                                     diesel, and workers’ participation costs and
                                                                     lower silver by-product credits

 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                14       April 27, 2012
Asia Pacific Operating Highlights
    Attributable Gold                    Consolidated                       Q1 2012 gold production lower due to
    Production (Koz)                    Gold CAS ($/oz)                      waste stripping at Batu Hijau and mill
Q1 2011       510                               $527                         maintenance at Kalgoorlie and Waihi,
                                                                             partially offset by higher grade at
Q1 2012       442                               $774
                                                                             Tanami
   Attributable Copper                   Consolidated
    Production (Mlb)                   Copper CAS ($/lb)                    Q1 2012 gold CAS increased due to
Q1 2011         57                              $1.11                        higher milling costs and a stronger
                                                                             Australian dollar
Q1 2012         35                              $1.98
          Q1 Attributable Gold Production (Koz)                                      Q1 Attributable Copper Production (Mlb)




 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                          15         April 27, 2012
Africa Operating Highlights
    Attributable Production (Koz)                                                     Ahafo
 Q1 2011                                  186
 Q1 2012                                  175
         Consolidated CAS ($/oz)
 Q1 2011                                  $451
 Q1 2012                                  $568
 Q1 Attributable Gold Production (Koz)


                                                                   Q1 2012 gold production decreased due to
                                                                    lower throughput and grade, partly offset by
                                                                    a reduction of in-process inventory and
                                                                    higher recovery
                                                                   Q1 2012 gold CAS higher due to lower
                                                                    production and higher labor, diesel, and
                                                                    royalty costs


 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com              16       April 27, 2012
Ball Mill and SAG Mill Construction at Akyem




 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com   17   April 27, 2012
Building on Strong Operating Performance
Newmont Offers a Compelling Combination of Growth, Returns and Exploration Upside
                                                                                  Attributable Basis

                              •    Gold production growth potential to ~ 6 - 7 Moz by 2017 1
Production Growth                  (Growth potential dependent on outcomes of Conga EIA review and the on-going dialogue with Peruvian government and communities)
                              •    Copper production to potentially double over same period


Project Returns               •    Competitive returns across the pipeline


                              •    Potential to add equivalent of 90 Moz Au and 9 Blbs Cu reserves
Exploration Upside
                                   between 2011 and 20202

Balance Sheet
                              •    Investment grade balance sheet and strong operating cash flows
Strength


Gold Price-Linked
                              •    Returning capital to shareholders through gold price-linked dividend
Dividend




  Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                                                  18               April 27, 2012
Questions?
Appendix
2012 Outlook14
                                 Attributable Production        Consolidated CAS         Consolidated Capital    Attributable Capital
Region                                 (Kozs, Mlbs)                ($/oz, $/lb)            Expenditures ($M)     Expenditures ($M)

Nevada                                 1,725 - 1,800                $575 - $625                $650 - $750            $650 - $750
La Herradura                             200 - 240                  $460 - $510                $80 - $130             $80 - $130
    North America                      1,900 - 2,000                $570 - $630                $780 - $830           $780 - $830
Yanacocha                                650 - 700                  $480 - $530                $530 - $580            $270 - $310
La Zanja                                  40 - 50                       n/a                         -                      -
Conga a                                      -                           -                   $1,150 - $1,250          $600 - $650
    South America                        700 - 750                  $480 - $530             $1,750 - $1,950          $800 - $900
Boddington                               750 - 800                  $800 - $850                $215 - $245            $215 - $245
Other Australia/NZ                      980 - 1,030                 $810 - $860                $375 - $400            $375 - $400
Batu Hijau e                              45 - 55                   $800 - $850                $200 - $230            $95 - $105
    Asia Pacific                       1,775 - 1,885                $800 - $850                $800 - $900           $700 - $800                                        Consolidated Expenses   Attributable Expenses
                                                                                                                                         Description                             ($M)                    ($M)
Ahafo                                    570 - 600                  $500 - $550                $240 - $270            $240 - $270
                                                                                                                                             General & Administrative         $210 - $230            $210 - $230
Akyem                                        -                           -                     $370 - $420            $370 - $420
                                                                                                                                             Interest Expense                 $240 - $260            $230 - $250
  Africa                                  570 - 600                    $500 - $550                  $600 - $700              $600 - $700     DD&A                           $1,050 - $1,080          $890 - $920
Corporate/Other                                -                             -                       $60 - $70                $60 - $70      Exploration Expense              $400 - $430            $360 - $390
Total Gold                              5,000 - 5,200                $625 - $675 b,c             $4,000 - $4,300 d         $3,000 - $3,300   Advanced Projects & R&D          $475 - $525            $430 - $480
                                                                                                                                             Tax Rate                         28% - 32%              28% - 32%
Boddington                                  70 - 80                   $2.00 - $2.25                       -                       -
                                                                                                                                             Assumptions
            e
Batu Hijau                                  80 - 90                   $1.80 - $2.20                       -                       -          Gold Price ($/ounce)               $1,500                 $1,500
Total Copper                              150 - 170                   $1.80 - $2.20                                                          Copper Price ($/pound)              $3.50                  $3.50
a
  The above 2012 capital expenditures outlook for the Conga project assumes development as initially anticipated by management when          Oil Price ($/barrel)                 $90                    $90
the Company announced its original 2012 outlook on January 17, 2012 and it is not being reaffirmed at this time. As previously disclosed, AUD Exchange Rate                      1.00                   1.00
development of the Conga project was temporarily suspended in November, 2011 and future development remains subject to certain risk s,
including political and social unrest risk s, and uncertainties, including those relating to the evaluation of the recommendations resulting
from the Conga project EIA review. Accordingly, investors are cautioned not to place undue reliance on this future look ing statement. The
Company will reevaluate its capital expenditure outlook after the development schedule of Conga is more clearly defined. Should the
Company be unable to continue with the current development plan at Conga, it may reprioritize and reallocate capital to development
alternatives in Nevada, Australia, Ghana, and Indonesia.
b
    2012 Attributable CAS Outlook is $640 - $690 per ounce.
c
    2012 Net Attributable CAS Outlook (inclusive of by-product credits) is $600 - $650 per ounce.
d
    Includes capitalized interest of approximately $140 million.
e
    Assumes Batu Hijau economic interest of 44.5625% for 2012, subject to final divestiture obligations.




        Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                                                                                         21              April 27, 2012
Reconciliation – Adjusted Net Income to GAAP Net Income
    Non-GAAP Financial Measures

    Non-GAAP financial measures are intended to provide additional information only and do not have any standard meaning prescribed by Generally Accepted Accounting
    Principles (“GAAP”). These measures should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP.

    Reconciliation of Adjusted Net Income to GAAP Net Income

    Management uses the non-GAAP financial measure Adjusted net income to evaluate the Company’s operating performance, and for planning and forecasting future business
    operations. The Company believes the use of Adjusted net income allows investors and analysts to compare the results of the continuing operations of the Company and its
    direct and indirect subsidiaries relating to the production and sale of minerals to similar operating results of other mining companies, by excluding exceptional or unusual items,
    income or loss from discontinued operations and the permanent impairment of assets, including marketable securities and goodwill. Management’s determination of the
    components of Adjusted net income are evaluated periodically and based, in part, on a review of non-GAAP financial measures used by mining industry analysts.

    Net income attributable to Newmont stockholders is reconciled to Adjusted net income as follows:


                                                                                    Three months ended
                                                                                         March 31,
      (in millions except per share, after-tax)                                         2012         2011
      GAAP Net income (1)                                                       $         490 $       514
      Other impairments/asset sales                                                        17           (1)
      Loss from discontinued operations                                                    71         -
      Adjusted net income                                                       $         578 $       513
      Net income per share, basic                                               $        0.99 $      1.04
      Adjusted net income per share, basic                                      $        1.17 $      1.04
      Adjusted net income per share, diluted                                    $        1.15 $      1.02
      (1) Attributable to Newmont stockholders.




 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                                                                         22                 April 27, 2012
Attributable and Net Attributable CAS
    Costs Applicable to Sales per Ounce/Pound

    Costs applicable to sales per ounce/pound are non-GAAP financial measures. These measures are calculated by dividing the costs applicable to sales of gold and copper by gold ounces or copper pounds
    sold, respectively. These measures are calculated on a consistent basis for the periods presented on both a consolidated and attributable to Newmont basis. Attributable costs applicable to sales are based
    on our economic interest in production from our mines. For operations where we hold less than a 100% economic share in the production, we exclude the share of gold or copper production attributable to
    the non-controlling interest. We include attributable costs applicable to sales per ounce/pound to provide management, investors and analysts with information with which to compare our performance to
    other gold producers. Costs applicable to sales per ounce/pound statistics are intended to provide additional information only and do not have any standardized meaning prescribed by GAAP and should
    not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. The measures are not necessarily indicative of operating profit or cash flow from
    operations as determined under GAAP. Other companies may calculate these measures differently.

    Net attributable costs applicable to sales per ounce measures the benefit of copper produced in conjunction with gold, as a credit against the cost of producing gold. A number of other gold producers
    present their costs net of the contribution from copper and other non-gold sales. We believe that including a measure of this basis provides management, investors and analysts with information with which
    to compare our performance to other gold producers, and to better assess the overall performance of our business. In addition, this measure provides information to enable investors and analysts to
    understand the importance of non-gold revenues to our cost structure.                                        Gold                                       Copper
                                                                                                      Three Months Ended,                        Three Months Ended,
                                                                                                    2012              2011                     2012              2011
                                      Costs applicable to sales:
                                         Consolidated                                        $           902      $            823     $            115      $            117
                                         Noncontrolling interests (1)                                    (91)                  (94)                 (44)                  (46)
                                         Attributable to Newmont                             $           811      $            729     $             71      $             71

                                      Gold/Copper sold (000 ounces/million lbs):
                                         Consolidated                                                   1,455                1,478                    58                  105
                                         Noncontrolling interests (1)                                    (181)                (182)                  (22)                 (48)
                                         Attributable to Newmont                                        1,274                1,296                    36                   57

                                      Costs applicable to sales per ounce/pound:
                                         Consolidated                                        $           620      $            557     $            1.98     $           1.11
                                         Attributable to Newmont                             $           637      $            562     $            1.97     $           1.23




                                      Net attributable costs applicable to sales per ounce
                                                                                                      Three Months Ended,
                                                                                                    2012              2011
                                      Attributable costs applicable to sales:
                                          Gold                                               $           811      $            729
                                          Copper                                                          71                    71
                                                                                             $           882      $            800

                                      Copper revenue:
                                         Consolidated                                        $           (233)    $           (422)
                                         Noncontrolling interests (1)                                      89                  190
                                                                                                         (144)                (232)
                                      Net attributable costs applicable to sales             $            738     $            568

                                      Attributable gold ounces sold (thousands)                         1,274                1,296

                                      Net attributable costs applicable to sales per ounce   $           580      $            438

                                      (1) Relates to partners' interests in Batu Hijau and Yanacocha.



 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                                                                                              23                 April 27, 2012
Increased Gold Price-Linked Dividend11
Indicative Payout Table
                                                                                              Q1’2012 Avg. Realized Gold
                                                                                                   Price $1,684/oz



Gold Price           $1,100-     $1,200-     $1,300-     $1,400-     $1,500-     $1,600-       $1,700-   $1,800-   $1,900-       $2,000-
($/oz)               $1,199      $1,299      $1,399      $1,499      $1,599      $1,699        $1,799    $1,899    $1,999        $2,199
Dividend per
Share ($/qtr)         $0.10       $0.15       $0.20       $0.25        $0.30          $0.35    $0.425     $0.50    $0.575        $0.675

Dividend per
Share ($/yr)          $0.40       $0.60       $0.80       $1.00        $1.20          $1.40     $1.70     $2.00     $2.30         $2.70

Dividend Yield:
                      0.7%         1.0%        1.3%        1.7%        2.0%           2.3%      2.8%      3.3%      3.8%          4.5%
NEM @ $60/sh
Dividend Yield:
                      0.6%         0.9%        1.1%        1.4%        1.7%           2.0%      2.4%      2.9%      3.3%          3.9%
NEM @ $70/sh
Dividend Yield:
                      0.5%         0.8%        1.0%        1.3%        1.5%           1.8%      2.1%      2.5%      2.9%          3.4%
NEM @ $80/sh




  Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                          24            April 27, 2012
Endnotes
Investors are encouraged to read the information contained in this presentation in conjunction with the following notes footnotes, the Cautionary Statement on slide 2 and the factors described under the “Risk
Factors” section of the Company’s most recent Form 10-K, filed with the SEC on February 24, 2012.
1.    2017 potential production metrics are targets and should be considered forward-looking statements. See the cautionary statement on slide 2 of this presentations and footnotes 4 and 5 below.
2.    Estimated mineralization “potential” and “exploration upside” refer to mineralization that are additional to current Reserves and Non-Reserve Mineralization (“NRM”). Conversion of such mineralization to Reserves or
      NRM is subject to substantive risks inherent in the mining industry, and no assurance can be given that such inventory will be converted to Reserves or NRM or of the timing or terms of any such conversion. Even if
      significant mineralization is discovered and converted to Reserves, it will likely take many years from the initial phases of exploration to development and to production, during which time the economic feasibility of
      production may change. As a result, there is greater uncertainty of the conversion of such inventory to production than in the case of Reserves or NRM. For additional information on Newmont’s Reserves and NRM, see
      our Year-End Reserve Report (as of 12/31/11) available at www.newmont.com/our-investors/reserves-and-resources. For a description of the key assumptions, parameters and methods used to estimate mineral
      reserves and mineralized material, as well as a general discussion of the extent to which the estimates may be affected by any known environmental, permitting, legal, title, taxation, socio-political, metals prices or other
      relevant factors, please see Newmont’s Form 10-K.Newmont’s 2011 attributable gold production was 5,185Koz. 2011 attributable copper production was 206 Mlbs.
3.    Newmont’s attributable gold production was 5,185Koz. 2011 attributable copper production was 206 Mlbs.
4.    The ability to deliver the production potential indicated in the gold box on slide 4 remain subject to certain risks and uncertainties and are based upon certain assumptions, including gold price, CAS and that Due to local
      political and community protests, construction and development activities at the Conga project were largely suspended in November 2011 and recommencement remains subject to certain risks and uncertainties,
      including those relating to the Environmental Impact Assessment (“EIA”) review. The Conga project’s EIA, which was previously approved by the central government of Peru in October 2010 following an extensive
      public engagement process, was subject to a review by independent experts during the first quarter at the request of the central government. The results of the independent review were released on April 17, 2012 and
      confirmed that the EIA met Peruvian and international standards. The Company is currently in the process of evaluating the recommendations contained in the independent report, and additional recommendations from
      the central government related to the report, to assess the impact on the project economics. For additional information, see Newmont’s most recent Form 10-K filed with the SEC, under the heading “Risk Factors - Our
      operations at Yanacocha and the development of our Conga Project in Peru are subject to political and social unrest risks, which have resulted most recently in the suspension of construction activities in our Conga
      project.”
5.    When used in this presentation, the phrase “potential production” represents the sum for all projects of the current estimated average annual production targets for 2017 for each such project anticipated to be
           .
      commissioned by 2017. Additionally, unless otherwise indicated, references to potential production used in this presentation mean that portion that is attributable to Newmont's ownership or economic interest. Such
      estimates are subject to change based upon risks, future events and potential modifications to the business plan as indicated on slide 2. Newmont currently forecasts 2017 attributable gold and copper production of
      approximately 7Moz and 400 Mlbs, respectively.
6.    Refer to slide 22 for reconciliation to GAAP net income attributable to Newmont stockholders.
7.    Refer to slide 22 for reconciliation to GAAP net income attributable to Newmont stockholders.
8.    Average realized gold price is determined for each preceding quarter net of applicable treatment and refining costs incurred during the quarter and provisional pricing mark-to-market adjustments, if any.
9.    Gold operating margin calculated as average realized gold price per ounce, less gold cost applicable to sales per ounce.
10.   Copper operating margin calculated as average realized copper price per pound, less copper cost applicable to sales per pound.
11.   Newmont has established a gold price-linked dividend policy that serves as a non-binding guideline for Newmont’s Board of Directors (the “Board”). The Board reserves all powers related to the declaration and payment
      of dividends. In addition, the declaration and payment of future dividends remain at the discretion of the Board and will be determined based on Newmont’s financial results, cash and liquidity requirements, future
      prospects and other factors deemed relevant by the Board. In determining the dividend to be declared and paid on the common stock of the Company, the Board may revise or terminate such policy at any time without
      prior notice.
12.   The future project estimates on slide 12 are represented on an attributable basis and should be considered forward looking statements. See the cautionary statement on slide 2.
13.   In January 2011, Fronteer Gold released an interim resource estimate for Long Canyon, which reported Measured and Indicated resources of approximately 0.071 and 1.324 million gold ounces, respectively, and an
      additional Inferred resource of approximately 0.8 million gold ounces. U.S. investors are cautioned that Fronteer Gold provided its public disclosures at the time of acquisition in the terms of "Measured resources",
      “Indicated resources” and "Inferred resource.” While these terms are recognized and required by Canadian regulations, these terms are not defined terms under the SEC’s Industry Guide 7. U.S. Investors are cautioned
      not to assume that any part or all of mineral deposits in the "Measured resources” and “Indicated resources" categories will ever be converted into Reserves. Additionally, "Inferred resources" have a great amount of
      uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category.
      Under Canadian rules, estimates of Inferred resources may not form the basis of a feasibility study or prefeasibility studies, except in rare cases. Accordingly, U.S. Investors are cautioned not to assume that any part or
      all of an Inferred resource exists or is economically or legally minable. No ounces are currently in the Company’s Reserves or NRM for Long Canyon. Additionally, drill results illustrated on slide 13 are not necessarily
      indicative of future drill results, NRM, Reserves or production.
14.   2012 Outlook projections used in this presentation are considered “forward-looking statements” and represent management’s good faith estimates or expectations of future production results as of February 24, 2012
      and is based upon certain assumptions, including, without limitation, those described on slide 21 under the heading “Assumptions” and noted on slide 2. Consequently, Outlook cannot be guaranteed. Investors are
      cautioned that the Company does not undertake to subsequently reaffirm, provide comfort or otherwise update Outlook to reflect events or circumstances after the date hereof or to reflect the occurrence of
      unanticipated events. Investors should not assume that any lack of update constitutes a current reaffirmation of Outlook.




      Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com                                                                                                   25                   April 27, 2012

Weitere ähnliche Inhalte

Was ist angesagt?

South American Silver Q1, 2011 Corporate Presentation
South American Silver Q1, 2011 Corporate PresentationSouth American Silver Q1, 2011 Corporate Presentation
South American Silver Q1, 2011 Corporate Presentationsoamsilver
 
Triple Gold Summer Conference-Strategic Metals & Rare Earths
Triple Gold Summer Conference-Strategic Metals & Rare EarthsTriple Gold Summer Conference-Strategic Metals & Rare Earths
Triple Gold Summer Conference-Strategic Metals & Rare Earthssoamsilver
 
South American Silver Q1, 2011 Corporate Presenation
South American Silver Q1, 2011 Corporate PresenationSouth American Silver Q1, 2011 Corporate Presenation
South American Silver Q1, 2011 Corporate Presenationsoamsilver
 
Nap investor presentation january 15, 2013
Nap investor presentation january 15, 2013Nap investor presentation january 15, 2013
Nap investor presentation january 15, 2013North American Palladium
 
Primero mackie research presentation upload
Primero mackie research presentation uploadPrimero mackie research presentation upload
Primero mackie research presentation uploadPrimero Mining Corp.
 
Rmi presentation may 2020
Rmi presentation  may 2020Rmi presentation  may 2020
Rmi presentation may 2020ChadLevesque1
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentationprimero_mining
 
Corporate Presentation January 04, 2012
Corporate Presentation January 04, 2012Corporate Presentation January 04, 2012
Corporate Presentation January 04, 2012Mogul_ventures
 
Dahlman Rose Global Metals Mining and Materials Conference
Dahlman Rose Global Metals Mining and Materials ConferenceDahlman Rose Global Metals Mining and Materials Conference
Dahlman Rose Global Metals Mining and Materials ConferenceNewmont Mining Corporation
 
Scotiabank 2012 Global Banking & Markets Mining Conference
Scotiabank 2012 Global Banking & Markets Mining ConferenceScotiabank 2012 Global Banking & Markets Mining Conference
Scotiabank 2012 Global Banking & Markets Mining Conferenceprimero_mining
 
Stifel Nicolaus Conference Call Russell Ball, EVP and CFO
Stifel Nicolaus Conference Call Russell Ball, EVP and CFOStifel Nicolaus Conference Call Russell Ball, EVP and CFO
Stifel Nicolaus Conference Call Russell Ball, EVP and CFONewmont Mining Corporation
 
Marango Mining- Resources & Energy Symposium 2012
Marango Mining- Resources & Energy Symposium 2012Marango Mining- Resources & Energy Symposium 2012
Marango Mining- Resources & Energy Symposium 2012Symposium
 

Was ist angesagt? (19)

South American Silver Q1, 2011 Corporate Presentation
South American Silver Q1, 2011 Corporate PresentationSouth American Silver Q1, 2011 Corporate Presentation
South American Silver Q1, 2011 Corporate Presentation
 
06 13 2012 db industrials conference final
06 13 2012 db industrials conference final06 13 2012 db industrials conference final
06 13 2012 db industrials conference final
 
Triple Gold Summer Conference-Strategic Metals & Rare Earths
Triple Gold Summer Conference-Strategic Metals & Rare EarthsTriple Gold Summer Conference-Strategic Metals & Rare Earths
Triple Gold Summer Conference-Strategic Metals & Rare Earths
 
South American Silver Q1, 2011 Corporate Presenation
South American Silver Q1, 2011 Corporate PresenationSouth American Silver Q1, 2011 Corporate Presenation
South American Silver Q1, 2011 Corporate Presenation
 
Investor Presentation January 2013
Investor Presentation January 2013Investor Presentation January 2013
Investor Presentation January 2013
 
Nap investor presentation january 15, 2013
Nap investor presentation january 15, 2013Nap investor presentation january 15, 2013
Nap investor presentation january 15, 2013
 
Primero mackie research presentation upload
Primero mackie research presentation uploadPrimero mackie research presentation upload
Primero mackie research presentation upload
 
Rmi presentation may 2020
Rmi presentation  may 2020Rmi presentation  may 2020
Rmi presentation may 2020
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation January 04, 2012
Corporate Presentation January 04, 2012Corporate Presentation January 04, 2012
Corporate Presentation January 04, 2012
 
Dacha, Corporate Presentation
Dacha, Corporate PresentationDacha, Corporate Presentation
Dacha, Corporate Presentation
 
Nap investor presentation march 2013
Nap investor presentation march 2013Nap investor presentation march 2013
Nap investor presentation march 2013
 
Dahlman Rose Global Metals Mining and Materials Conference
Dahlman Rose Global Metals Mining and Materials ConferenceDahlman Rose Global Metals Mining and Materials Conference
Dahlman Rose Global Metals Mining and Materials Conference
 
Nap investor presentation_june_2012
Nap investor presentation_june_2012Nap investor presentation_june_2012
Nap investor presentation_june_2012
 
Nap investor presentation_may_2012
Nap investor presentation_may_2012Nap investor presentation_may_2012
Nap investor presentation_may_2012
 
Scotiabank 2012 Global Banking & Markets Mining Conference
Scotiabank 2012 Global Banking & Markets Mining ConferenceScotiabank 2012 Global Banking & Markets Mining Conference
Scotiabank 2012 Global Banking & Markets Mining Conference
 
20120315 m&m hk v0
20120315 m&m hk v020120315 m&m hk v0
20120315 m&m hk v0
 
Stifel Nicolaus Conference Call Russell Ball, EVP and CFO
Stifel Nicolaus Conference Call Russell Ball, EVP and CFOStifel Nicolaus Conference Call Russell Ball, EVP and CFO
Stifel Nicolaus Conference Call Russell Ball, EVP and CFO
 
Marango Mining- Resources & Energy Symposium 2012
Marango Mining- Resources & Energy Symposium 2012Marango Mining- Resources & Energy Symposium 2012
Marango Mining- Resources & Energy Symposium 2012
 

Andere mochten auch

1 31 2014 preliminary operations release presentation final
1 31 2014 preliminary operations release presentation final1 31 2014 preliminary operations release presentation final
1 31 2014 preliminary operations release presentation finalNewmont Mining Corporation
 
Bank of America Merrill Lynch Global Metals, Mining and Steel Conference
Bank of America Merrill Lynch Global Metals, Mining and Steel ConferenceBank of America Merrill Lynch Global Metals, Mining and Steel Conference
Bank of America Merrill Lynch Global Metals, Mining and Steel ConferenceNewmont Mining Corporation
 

Andere mochten auch (20)

Q3 earningspresentation oct2014 103014_final
Q3 earningspresentation oct2014 103014_finalQ3 earningspresentation oct2014 103014_final
Q3 earningspresentation oct2014 103014_final
 
African mining indaba 2012
African mining indaba 2012African mining indaba 2012
African mining indaba 2012
 
Denver goldforum goldberg 22sept2015 final v1
Denver goldforum goldberg 22sept2015 final v1Denver goldforum goldberg 22sept2015 final v1
Denver goldforum goldberg 22sept2015 final v1
 
Q3 Earnings Presentation
Q3 Earnings PresentationQ3 Earnings Presentation
Q3 Earnings Presentation
 
Investor Day 2012
Investor Day 2012Investor Day 2012
Investor Day 2012
 
Cibc presentation jan 2016v final.01.12.16
Cibc presentation jan 2016v final.01.12.16Cibc presentation jan 2016v final.01.12.16
Cibc presentation jan 2016v final.01.12.16
 
4.18.12 european gold forum final
4.18.12 european gold forum final4.18.12 european gold forum final
4.18.12 european gold forum final
 
Bmo presentation 20 feb2015 final
Bmo presentation 20 feb2015 finalBmo presentation 20 feb2015 final
Bmo presentation 20 feb2015 final
 
1 31 2014 preliminary operations release presentation final
1 31 2014 preliminary operations release presentation final1 31 2014 preliminary operations release presentation final
1 31 2014 preliminary operations release presentation final
 
Q1 2013 presentation final v001 v2g6k8
Q1 2013 presentation final v001 v2g6k8Q1 2013 presentation final v001 v2g6k8
Q1 2013 presentation final v001 v2g6k8
 
2 27 12 bmo final publish
2 27 12  bmo final publish2 27 12  bmo final publish
2 27 12 bmo final publish
 
05 14 2014 baml presentation v final to post
05 14 2014 baml presentation v final to post05 14 2014 baml presentation v final to post
05 14 2014 baml presentation v final to post
 
2012 Denver Gold Forum
2012 Denver Gold Forum2012 Denver Gold Forum
2012 Denver Gold Forum
 
Bank of America Merrill Lynch Global Metals, Mining and Steel Conference
Bank of America Merrill Lynch Global Metals, Mining and Steel ConferenceBank of America Merrill Lynch Global Metals, Mining and Steel Conference
Bank of America Merrill Lynch Global Metals, Mining and Steel Conference
 
07 30 2014 q2 earnings presentation final
07 30 2014 q2 earnings presentation final07 30 2014 q2 earnings presentation final
07 30 2014 q2 earnings presentation final
 
02252013 bmo presentationupdated
02252013 bmo presentationupdated02252013 bmo presentationupdated
02252013 bmo presentationupdated
 
08.09.12 jeffries presentation_final
08.09.12 jeffries presentation_final08.09.12 jeffries presentation_final
08.09.12 jeffries presentation_final
 
3 19 2014 barclays conference v001
3 19 2014 barclays conference v0013 19 2014 barclays conference v001
3 19 2014 barclays conference v001
 
Bmo presentation 20 feb2015 final.v1
Bmo presentation 20 feb2015 final.v1Bmo presentation 20 feb2015 final.v1
Bmo presentation 20 feb2015 final.v1
 
Diggers and Dealers Presentation
Diggers and Dealers PresentationDiggers and Dealers Presentation
Diggers and Dealers Presentation
 

Mehr von Newmont Mining Corporation

Q2 2018 newmont mining earnings presentation final
Q2 2018 newmont mining earnings presentation finalQ2 2018 newmont mining earnings presentation final
Q2 2018 newmont mining earnings presentation finalNewmont Mining Corporation
 
Newmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont Mining Corporation
 

Mehr von Newmont Mining Corporation (20)

August investor presentation final
August investor presentation finalAugust investor presentation final
August investor presentation final
 
Q2 2018 newmont mining earnings presentation final
Q2 2018 newmont mining earnings presentation finalQ2 2018 newmont mining earnings presentation final
Q2 2018 newmont mining earnings presentation final
 
2018 esg briefing slides 21 may2018_final
2018 esg briefing slides 21 may2018_final2018 esg briefing slides 21 may2018_final
2018 esg briefing slides 21 may2018_final
 
2018 baml conference presentation print final
2018 baml conference presentation print final2018 baml conference presentation print final
2018 baml conference presentation print final
 
2018 may investor presentation final (1)
2018 may investor presentation final (1)2018 may investor presentation final (1)
2018 may investor presentation final (1)
 
Q12018 earnings-presentation final
Q12018 earnings-presentation finalQ12018 earnings-presentation final
Q12018 earnings-presentation final
 
2018 march investor presentation final (2)
2018 march investor presentation final (2)2018 march investor presentation final (2)
2018 march investor presentation final (2)
 
2018 february investor presentation final
2018 february investor presentation final2018 february investor presentation final
2018 february investor presentation final
 
Investor Presentation February 2018
Investor Presentation February 2018Investor Presentation February 2018
Investor Presentation February 2018
 
Newmont q4 and fy 2017 results presentation
Newmont q4 and fy 2017 results presentationNewmont q4 and fy 2017 results presentation
Newmont q4 and fy 2017 results presentation
 
January 2018 investor presentation final
January 2018 investor presentation finalJanuary 2018 investor presentation final
January 2018 investor presentation final
 
2017 newmont investor day presentation
2017 newmont investor day presentation2017 newmont investor day presentation
2017 newmont investor day presentation
 
Newmont november 2017 investor presentation final
Newmont november 2017 investor presentation finalNewmont november 2017 investor presentation final
Newmont november 2017 investor presentation final
 
Q3 2017 results presentation_final
Q3 2017 results presentation_finalQ3 2017 results presentation_final
Q3 2017 results presentation_final
 
2017 nevada site tour
2017 nevada site tour2017 nevada site tour
2017 nevada site tour
 
2017 denver gold forum presentation
2017 denver gold forum presentation2017 denver gold forum presentation
2017 denver gold forum presentation
 
2017 Denver Gold Forum Presentation
2017 Denver Gold Forum Presentation2017 Denver Gold Forum Presentation
2017 Denver Gold Forum Presentation
 
2017 nevada site tour
2017 nevada site tour2017 nevada site tour
2017 nevada site tour
 
September 2017 investor presentation
September 2017 investor presentationSeptember 2017 investor presentation
September 2017 investor presentation
 
August 2017 investor presentation
August 2017 investor presentationAugust 2017 investor presentation
August 2017 investor presentation
 

Kürzlich hochgeladen

Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书Fir La
 
the 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfthe 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfFrancenel Paul
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书Fir La
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024Hector Del Castillo, CPM, CPMM
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfsansanir
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdftaxlinkcpa
 
Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfProbe Gold
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityJohanAspro
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书Fir La
 

Kürzlich hochgeladen (20)

Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
 
the 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfthe 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdf
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024
 
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdf
 
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Serviceyoung Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdf
 
Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdf
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanity
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
 
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Serviceyoung call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Serviceyoung  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
 

First Quarter Earnings Update

  • 1. First Quarter Earnings Update Friday, April 27, 2012
  • 2. Cautionary Statement Cautionary Statement Regarding Forward Looking Statements, Including 2012 Outlook: This presentation contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, which are intended to be covered by the safe harbor created by those sections and other applicable laws. Those forward-looking statements include (without limitation) estimates and expectations of, and statements regarding: (i) the Company’s strategy and plans; (ii) future equity gold and equity copper production; (iii) future operating, sales and other costs; (iv) future capital expenditures; (v) project returns; (vi) project start dates, ramp up, life, pipeline timelines, including commencement of mining, drilling and stage gate advancement and expansion opportunities; (vii) potential ounces or tons of reserves, NRM and potential resources; (viii) exploration pipeline, potential or upside, opportunities, growth and growth potential; (ix) dividend payments and increases; (x) future liquidity, cash and balance sheet expectations; and (xi) other financial outlook indicators relation to the Company’s operations and projects. Those forward- looking statements include (without limitation) statements that use forward-looking terminology such as “may”, “will”, “expect”, “predict”, “anticipate”, “believe”, “continue”, “potential”, “target”, “goal”, “opportunity”, “outlook”, or the negative or other variations of those terms or comparable terminology. Estimates or expectations of future events or results are based upon certain assumptions, which may prove to be incorrect. Those assumptions include (without limitation): (i) there being no significant change to current geotechnical, metallurgical, hydrological and other physical conditions; (ii) permitting, development, operations and expansion of the Company’s projects being consistent with current expectations and mine plans; (iii) political, social and legal developments in any jurisdiction in which the Company conducts business being consistent with its current expectations; (iv) certain exchange rate assumptions for the Australian dollar to the U.S. dollar, as well as the other exchange rates being approximately consistent with current levels; (v) certain price assumptions for gold, copper and oil; (vi) prices for key supplies being approximately consistent with current levels and such supplies otherwise being available on bases consistent with the Company’s current expectations; and (vii) the accuracy of our current mineral reserve and mineral resource estimates and exploration information. Where the Company expresses or implies an expectation or belief as to future events or results, that expectation or belief is expressed in good faith and is believed to have a reasonable basis. However, forward-looking statements are subject to risks, uncertainties and other factors that could cause actual results to differ materially from future results expressed, projected or implied by the “forward-looking statements”. Those risks, uncertainties and other factors include (without limitation): (i) gold and other metals price volatility; (ii) currency fluctuations; (iii) increased capital and operating costs, and scarcity of and competition for required labor and supplies; (iv) variances in oregrade or recovery rates from those assumed in mining plans; (v) operating or technical difficulties; (vi) political and operational risks; (vii) community relations, conflict resolution and outcome of projects or oppositions; and (viii) governmental regulation and judicial outcomes. For a more detailed discussion of such risks and other factors, see the Company’s 2011 Annual Report on Form 10-K, filed on February 24, 2012, with the Securities and Exchange Commission (“SEC”), as well as the Company’s other SEC filings. These forward-looking statements are not guarantees of future performance, given that they involve risks and uncertainties. The Company does not undertake any obligation to release publicly revisions to any forward-looking statement except as may be required under applicable securities laws. Investors should not assume that any lack of update to a previously issued forward-looking statement constitutes a reaffirmation of that statement. Continued reliance on forward-looking statements is at investors' own risk. In addition, some of the statements in this presentation are based on assumptions or methodologies (such as commodity prices) or subject to cautionary statements that are discussed in the notes found at the end of this presentation. Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 2 April 27, 2012
  • 3. Building on Strong Operating Performance Newmont Offers a Compelling Combination of Growth, Returns and Exploration Upside Attributable Basis • Gold production growth potential to ~ 6 - 7 Moz by 2017 1 Production Growth (Growth potential dependent on outcomes of Conga EIA review and the on-going dialogue with Peruvian government and communities) • Copper production to potentially double over same period Project Returns • Competitive returns across the pipeline • Potential to add equivalent of 90 Moz Au and 9 Blbs Cu reserves Exploration Upside between 2011 and 20202 Balance Sheet • Investment grade balance sheet and strong operating cash flows Strength Gold Price-Linked • Returning capital to shareholders through gold price-linked dividend Dividend Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 3 April 27, 2012
  • 4. Growth Potential 2012-2017 Projected Pipeline Growth, Net of Depletion 2017 Potential Africa: Production ~0.8 Moz (Moz)5 7.0 ~0.4 Akyem APAC: ~0.3 Moz ~0.2 Subika S America: ~0.2 Ahafo Mill 6.0 ~0.1 APAC Other ~1.3 Moz ~0.2 Aust. Exp. N America ~0.3 Merian Depletion ~0.2 Yan Exp. ~5.2 Moz3 S America ~0.3 Cerro 5.0 Africa Depletion Quilish N America: ~0.6 Moz APAC (~0.3 Moz) ~0.8 Moz ~0.4 Conga Depletion Au Production (Moz) Africa ~0.2 Long Canyon 4.0 Depletion APAC (~0.5 Moz) Progress dependent on ~0.6 NV Exp. ~1.9 Moz outcomes of Conga EIA (~0.4 Moz) review and the on-going (~0.2 Moz) dialogue with Peruvian 3.0 government and communities4 S America Base: ~0.7Moz ~3.6 2.0 N America 1.0 ~1.9 Moz 2011 2017 0.0 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 4 April 27, 2012
  • 5. First Quarter Financial Highlights Q1 2011 vs. Q1 2011 Q1 2012 Q1 2012 Revenue ($M) $2,465 $2,683 9% 6 Adjusted Net Income ($M) $513 $578 13% 7 Adjusted Net Income per Share $1.04 $1.17 13% Net Income per Share $1.04 $0.99 -5% Cash from Continuing Operations ($M) $989 $613 -38% Dividends per share $0.20 $0.35 75% Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 5 April 27, 2012
  • 6. First Quarter Operating Highlights Operating Margin Expands 29% on Gold Price Increase of 22% Q1 2011 vs. Q1 2011 Q1 2012 Q1 2012 Attributable Gold Production (Moz) 1.3 1.3 0% Attributable Copper Production (Mlbs) 54 35 -35% Average Realized Gold Price8($/oz) $1,382 $1,684 22% Average Realized Copper Price ($/lb) $4.00 $4.01 0% Gold CAS ($/oz) $557 $620 11% Copper CAS ($/lb) $1.11 $1.98 78% 9 Gold Operating Margin ($/oz) $825 $1,064 29% Copper Operating Margin ($/lb)10 $4.00 $2.03 -30% Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 6 April 27, 2012
  • 7. First Quarter Financial Highlights Cash Flow from Continuing Operations $1,500 $407 $189 $1,250 $377 ($million) $1,000 $989 $989 $65 $50 $750 $37 $25 $715 $20 $20 $678 $653 $613 $500 $250 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 7 April 27, 2012 Newmont Mining Corporation – Strictly Confidential
  • 8. CAS - Gold Q1 Cost Drivers $700 $650 $7 $9 $9 $620 $600 $10 $613 $12 $604 $16 $595 $585 CAS ($/oz) $573 $550 $557 $557 $500 $450 $400 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 8 April 27, 2012 Newmont Mining Corporation – Strictly Confidential
  • 9. Industry Leading Gold Price-Linked Dividend11 Up 75% from Prior Year Quarter $5.00 Dividend increases / Dividend Dividend increases / decreases decreases by $0.20/share increases / by $0.40/share for every $100/oz $4.70 $4.50 for every $100/oz change decreases by change in the gold price in the gold price $0.30/share for $4.30 every $100/oz $4.00 change in gold $3.90 price Annualized Dividend per Share ($) $3.50 $3.50 Q2 2012 Dividend Declared: $0.35 $3.10 $3.00 $2.70 $2.50 $2.30 $2.00 $2.00 $1.70 $1.50 $1.40 $1.20 $1.00 $1.00 $0.80 $0.60 $0.50 $0.40 $0.00 $1,100 $1,200 $1,300 $1,400 $1,500 $1,600 $1,700 $1,800 $1,900 $2,000- $2,100- $2,200- $2,300- $2,400- $2,500 -$1,199 -$1,299 -$1,399 -$1,499 -$1,599 -$1,699 -$1,799 -$1,899 -$1,999 $2,099 $2,199 $2,299 $2,399 $2,499 -$2,599 Trailing Quarter Realized Gold Price ($/oz) Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 9 April 27, 2012
  • 10. Q1 2012 Operational Performance 1.3Moz at CAS of $620/oz Q1 2011 Attributable Gold Production Q1 2012 Attributable Gold Production Africa Africa ~190Koz ~180Koz (14%) (14%) N America N America N America ~480Koz ~490Koz (36%) ~1.3Moz S America (37%) ~1.3Moz APAC APAC APAC ~440Koz ~510Koz Africa (34%) (39%) S America S America ~150Koz ~200Koz (11%) (15%) Consolidated N America S America APAC Africa Total Newmont Gold CAS ($/oz) Q1 2011 $617 $583 $527 $451 $557 Q1 2012 $613 $458 $774 $568 $620 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 10 April 27, 2012
  • 11. North America Operating Highlights Attributable Production (Koz) Twin Creeks Q1 2011 482 Q1 2012 489 Consolidated CAS ($/oz) Q1 2011 $617 Q1 2012 $613 Q1 Attributable Gold Production (Koz) 600 La Herradura Nevada 500  Q1 2012 gold production increased due to 400 higher leach placement at Soledad-Dipolos at La Herradura, and first production at Noche 300 Bueno 200  Q1 2012 gold CAS decreased as higher 100 underground mining and milling costs were more than offset by an inventory build in 2012, 0 compared to a drawdown of inventory in 2011 Q1 2011 Q1 2012 Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 11 April 27, 2012
  • 12. Recent Developments in North America12 Tangible Steps in Advancing the Project Portfolio Emigrant Vista Phoenix Copper Leach  Average annual production  Oxide layback that will  Average annual production (1st 5 years): ~80 - 90 Koz provide leach ore and feed to (1st 5 years): ~10 - 20 Mlb; gold Juniper mill  Initial production expected  Commercial production  Average annual production of ~2014 expected ~2013 with startup ~100koz  By-product credit to NV CAS in 2012  Ore placement begun on leach pad Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 12 April 27, 2012
  • 13. Long Canyon Continuing Confidence in Original Investment Thesis Trend Potential of >3-4X Fronteer’s Stated Resource Estimate13 (1.4Moz M&I + 0.8Moz Inferred; No ounces currently in reserves or NRM; Expected to declare first NRM in 2012) Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 13 April 27, 2012
  • 14. South America Operating Highlights Attributable Production (Koz) Yanacocha, Peru Q1 2011 160 Q1 2012 201 Consolidated CAS ($/oz) Q1 2011 $583 Q1 2012 $458 Q1 Attributable Gold Production (Koz)  Q1 2012 gold production increased due to higher mill throughput, recovery and grade, partly offset by lower leach production  Q1 2012 CAS decreased due to higher production, partially offset by higher labor, diesel, and workers’ participation costs and lower silver by-product credits Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 14 April 27, 2012
  • 15. Asia Pacific Operating Highlights Attributable Gold Consolidated  Q1 2012 gold production lower due to Production (Koz) Gold CAS ($/oz) waste stripping at Batu Hijau and mill Q1 2011 510 $527 maintenance at Kalgoorlie and Waihi, partially offset by higher grade at Q1 2012 442 $774 Tanami Attributable Copper Consolidated Production (Mlb) Copper CAS ($/lb)  Q1 2012 gold CAS increased due to Q1 2011 57 $1.11 higher milling costs and a stronger Australian dollar Q1 2012 35 $1.98 Q1 Attributable Gold Production (Koz) Q1 Attributable Copper Production (Mlb) Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 15 April 27, 2012
  • 16. Africa Operating Highlights Attributable Production (Koz) Ahafo Q1 2011 186 Q1 2012 175 Consolidated CAS ($/oz) Q1 2011 $451 Q1 2012 $568 Q1 Attributable Gold Production (Koz)  Q1 2012 gold production decreased due to lower throughput and grade, partly offset by a reduction of in-process inventory and higher recovery  Q1 2012 gold CAS higher due to lower production and higher labor, diesel, and royalty costs Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 16 April 27, 2012
  • 17. Ball Mill and SAG Mill Construction at Akyem Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 17 April 27, 2012
  • 18. Building on Strong Operating Performance Newmont Offers a Compelling Combination of Growth, Returns and Exploration Upside Attributable Basis • Gold production growth potential to ~ 6 - 7 Moz by 2017 1 Production Growth (Growth potential dependent on outcomes of Conga EIA review and the on-going dialogue with Peruvian government and communities) • Copper production to potentially double over same period Project Returns • Competitive returns across the pipeline • Potential to add equivalent of 90 Moz Au and 9 Blbs Cu reserves Exploration Upside between 2011 and 20202 Balance Sheet • Investment grade balance sheet and strong operating cash flows Strength Gold Price-Linked • Returning capital to shareholders through gold price-linked dividend Dividend Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 18 April 27, 2012
  • 21. 2012 Outlook14 Attributable Production Consolidated CAS Consolidated Capital Attributable Capital Region (Kozs, Mlbs) ($/oz, $/lb) Expenditures ($M) Expenditures ($M) Nevada 1,725 - 1,800 $575 - $625 $650 - $750 $650 - $750 La Herradura 200 - 240 $460 - $510 $80 - $130 $80 - $130 North America 1,900 - 2,000 $570 - $630 $780 - $830 $780 - $830 Yanacocha 650 - 700 $480 - $530 $530 - $580 $270 - $310 La Zanja 40 - 50 n/a - - Conga a - - $1,150 - $1,250 $600 - $650 South America 700 - 750 $480 - $530 $1,750 - $1,950 $800 - $900 Boddington 750 - 800 $800 - $850 $215 - $245 $215 - $245 Other Australia/NZ 980 - 1,030 $810 - $860 $375 - $400 $375 - $400 Batu Hijau e 45 - 55 $800 - $850 $200 - $230 $95 - $105 Asia Pacific 1,775 - 1,885 $800 - $850 $800 - $900 $700 - $800 Consolidated Expenses Attributable Expenses Description ($M) ($M) Ahafo 570 - 600 $500 - $550 $240 - $270 $240 - $270 General & Administrative $210 - $230 $210 - $230 Akyem - - $370 - $420 $370 - $420 Interest Expense $240 - $260 $230 - $250 Africa 570 - 600 $500 - $550 $600 - $700 $600 - $700 DD&A $1,050 - $1,080 $890 - $920 Corporate/Other - - $60 - $70 $60 - $70 Exploration Expense $400 - $430 $360 - $390 Total Gold 5,000 - 5,200 $625 - $675 b,c $4,000 - $4,300 d $3,000 - $3,300 Advanced Projects & R&D $475 - $525 $430 - $480 Tax Rate 28% - 32% 28% - 32% Boddington 70 - 80 $2.00 - $2.25 - - Assumptions e Batu Hijau 80 - 90 $1.80 - $2.20 - - Gold Price ($/ounce) $1,500 $1,500 Total Copper 150 - 170 $1.80 - $2.20 Copper Price ($/pound) $3.50 $3.50 a The above 2012 capital expenditures outlook for the Conga project assumes development as initially anticipated by management when Oil Price ($/barrel) $90 $90 the Company announced its original 2012 outlook on January 17, 2012 and it is not being reaffirmed at this time. As previously disclosed, AUD Exchange Rate 1.00 1.00 development of the Conga project was temporarily suspended in November, 2011 and future development remains subject to certain risk s, including political and social unrest risk s, and uncertainties, including those relating to the evaluation of the recommendations resulting from the Conga project EIA review. Accordingly, investors are cautioned not to place undue reliance on this future look ing statement. The Company will reevaluate its capital expenditure outlook after the development schedule of Conga is more clearly defined. Should the Company be unable to continue with the current development plan at Conga, it may reprioritize and reallocate capital to development alternatives in Nevada, Australia, Ghana, and Indonesia. b 2012 Attributable CAS Outlook is $640 - $690 per ounce. c 2012 Net Attributable CAS Outlook (inclusive of by-product credits) is $600 - $650 per ounce. d Includes capitalized interest of approximately $140 million. e Assumes Batu Hijau economic interest of 44.5625% for 2012, subject to final divestiture obligations. Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 21 April 27, 2012
  • 22. Reconciliation – Adjusted Net Income to GAAP Net Income Non-GAAP Financial Measures Non-GAAP financial measures are intended to provide additional information only and do not have any standard meaning prescribed by Generally Accepted Accounting Principles (“GAAP”). These measures should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. Reconciliation of Adjusted Net Income to GAAP Net Income Management uses the non-GAAP financial measure Adjusted net income to evaluate the Company’s operating performance, and for planning and forecasting future business operations. The Company believes the use of Adjusted net income allows investors and analysts to compare the results of the continuing operations of the Company and its direct and indirect subsidiaries relating to the production and sale of minerals to similar operating results of other mining companies, by excluding exceptional or unusual items, income or loss from discontinued operations and the permanent impairment of assets, including marketable securities and goodwill. Management’s determination of the components of Adjusted net income are evaluated periodically and based, in part, on a review of non-GAAP financial measures used by mining industry analysts. Net income attributable to Newmont stockholders is reconciled to Adjusted net income as follows: Three months ended March 31, (in millions except per share, after-tax) 2012 2011 GAAP Net income (1) $ 490 $ 514 Other impairments/asset sales 17 (1) Loss from discontinued operations 71 - Adjusted net income $ 578 $ 513 Net income per share, basic $ 0.99 $ 1.04 Adjusted net income per share, basic $ 1.17 $ 1.04 Adjusted net income per share, diluted $ 1.15 $ 1.02 (1) Attributable to Newmont stockholders. Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 22 April 27, 2012
  • 23. Attributable and Net Attributable CAS Costs Applicable to Sales per Ounce/Pound Costs applicable to sales per ounce/pound are non-GAAP financial measures. These measures are calculated by dividing the costs applicable to sales of gold and copper by gold ounces or copper pounds sold, respectively. These measures are calculated on a consistent basis for the periods presented on both a consolidated and attributable to Newmont basis. Attributable costs applicable to sales are based on our economic interest in production from our mines. For operations where we hold less than a 100% economic share in the production, we exclude the share of gold or copper production attributable to the non-controlling interest. We include attributable costs applicable to sales per ounce/pound to provide management, investors and analysts with information with which to compare our performance to other gold producers. Costs applicable to sales per ounce/pound statistics are intended to provide additional information only and do not have any standardized meaning prescribed by GAAP and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. The measures are not necessarily indicative of operating profit or cash flow from operations as determined under GAAP. Other companies may calculate these measures differently. Net attributable costs applicable to sales per ounce measures the benefit of copper produced in conjunction with gold, as a credit against the cost of producing gold. A number of other gold producers present their costs net of the contribution from copper and other non-gold sales. We believe that including a measure of this basis provides management, investors and analysts with information with which to compare our performance to other gold producers, and to better assess the overall performance of our business. In addition, this measure provides information to enable investors and analysts to understand the importance of non-gold revenues to our cost structure. Gold Copper Three Months Ended, Three Months Ended, 2012 2011 2012 2011 Costs applicable to sales: Consolidated $ 902 $ 823 $ 115 $ 117 Noncontrolling interests (1) (91) (94) (44) (46) Attributable to Newmont $ 811 $ 729 $ 71 $ 71 Gold/Copper sold (000 ounces/million lbs): Consolidated 1,455 1,478 58 105 Noncontrolling interests (1) (181) (182) (22) (48) Attributable to Newmont 1,274 1,296 36 57 Costs applicable to sales per ounce/pound: Consolidated $ 620 $ 557 $ 1.98 $ 1.11 Attributable to Newmont $ 637 $ 562 $ 1.97 $ 1.23 Net attributable costs applicable to sales per ounce Three Months Ended, 2012 2011 Attributable costs applicable to sales: Gold $ 811 $ 729 Copper 71 71 $ 882 $ 800 Copper revenue: Consolidated $ (233) $ (422) Noncontrolling interests (1) 89 190 (144) (232) Net attributable costs applicable to sales $ 738 $ 568 Attributable gold ounces sold (thousands) 1,274 1,296 Net attributable costs applicable to sales per ounce $ 580 $ 438 (1) Relates to partners' interests in Batu Hijau and Yanacocha. Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 23 April 27, 2012
  • 24. Increased Gold Price-Linked Dividend11 Indicative Payout Table Q1’2012 Avg. Realized Gold Price $1,684/oz Gold Price $1,100- $1,200- $1,300- $1,400- $1,500- $1,600- $1,700- $1,800- $1,900- $2,000- ($/oz) $1,199 $1,299 $1,399 $1,499 $1,599 $1,699 $1,799 $1,899 $1,999 $2,199 Dividend per Share ($/qtr) $0.10 $0.15 $0.20 $0.25 $0.30 $0.35 $0.425 $0.50 $0.575 $0.675 Dividend per Share ($/yr) $0.40 $0.60 $0.80 $1.00 $1.20 $1.40 $1.70 $2.00 $2.30 $2.70 Dividend Yield: 0.7% 1.0% 1.3% 1.7% 2.0% 2.3% 2.8% 3.3% 3.8% 4.5% NEM @ $60/sh Dividend Yield: 0.6% 0.9% 1.1% 1.4% 1.7% 2.0% 2.4% 2.9% 3.3% 3.9% NEM @ $70/sh Dividend Yield: 0.5% 0.8% 1.0% 1.3% 1.5% 1.8% 2.1% 2.5% 2.9% 3.4% NEM @ $80/sh Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 24 April 27, 2012
  • 25. Endnotes Investors are encouraged to read the information contained in this presentation in conjunction with the following notes footnotes, the Cautionary Statement on slide 2 and the factors described under the “Risk Factors” section of the Company’s most recent Form 10-K, filed with the SEC on February 24, 2012. 1. 2017 potential production metrics are targets and should be considered forward-looking statements. See the cautionary statement on slide 2 of this presentations and footnotes 4 and 5 below. 2. Estimated mineralization “potential” and “exploration upside” refer to mineralization that are additional to current Reserves and Non-Reserve Mineralization (“NRM”). Conversion of such mineralization to Reserves or NRM is subject to substantive risks inherent in the mining industry, and no assurance can be given that such inventory will be converted to Reserves or NRM or of the timing or terms of any such conversion. Even if significant mineralization is discovered and converted to Reserves, it will likely take many years from the initial phases of exploration to development and to production, during which time the economic feasibility of production may change. As a result, there is greater uncertainty of the conversion of such inventory to production than in the case of Reserves or NRM. For additional information on Newmont’s Reserves and NRM, see our Year-End Reserve Report (as of 12/31/11) available at www.newmont.com/our-investors/reserves-and-resources. For a description of the key assumptions, parameters and methods used to estimate mineral reserves and mineralized material, as well as a general discussion of the extent to which the estimates may be affected by any known environmental, permitting, legal, title, taxation, socio-political, metals prices or other relevant factors, please see Newmont’s Form 10-K.Newmont’s 2011 attributable gold production was 5,185Koz. 2011 attributable copper production was 206 Mlbs. 3. Newmont’s attributable gold production was 5,185Koz. 2011 attributable copper production was 206 Mlbs. 4. The ability to deliver the production potential indicated in the gold box on slide 4 remain subject to certain risks and uncertainties and are based upon certain assumptions, including gold price, CAS and that Due to local political and community protests, construction and development activities at the Conga project were largely suspended in November 2011 and recommencement remains subject to certain risks and uncertainties, including those relating to the Environmental Impact Assessment (“EIA”) review. The Conga project’s EIA, which was previously approved by the central government of Peru in October 2010 following an extensive public engagement process, was subject to a review by independent experts during the first quarter at the request of the central government. The results of the independent review were released on April 17, 2012 and confirmed that the EIA met Peruvian and international standards. The Company is currently in the process of evaluating the recommendations contained in the independent report, and additional recommendations from the central government related to the report, to assess the impact on the project economics. For additional information, see Newmont’s most recent Form 10-K filed with the SEC, under the heading “Risk Factors - Our operations at Yanacocha and the development of our Conga Project in Peru are subject to political and social unrest risks, which have resulted most recently in the suspension of construction activities in our Conga project.” 5. When used in this presentation, the phrase “potential production” represents the sum for all projects of the current estimated average annual production targets for 2017 for each such project anticipated to be . commissioned by 2017. Additionally, unless otherwise indicated, references to potential production used in this presentation mean that portion that is attributable to Newmont's ownership or economic interest. Such estimates are subject to change based upon risks, future events and potential modifications to the business plan as indicated on slide 2. Newmont currently forecasts 2017 attributable gold and copper production of approximately 7Moz and 400 Mlbs, respectively. 6. Refer to slide 22 for reconciliation to GAAP net income attributable to Newmont stockholders. 7. Refer to slide 22 for reconciliation to GAAP net income attributable to Newmont stockholders. 8. Average realized gold price is determined for each preceding quarter net of applicable treatment and refining costs incurred during the quarter and provisional pricing mark-to-market adjustments, if any. 9. Gold operating margin calculated as average realized gold price per ounce, less gold cost applicable to sales per ounce. 10. Copper operating margin calculated as average realized copper price per pound, less copper cost applicable to sales per pound. 11. Newmont has established a gold price-linked dividend policy that serves as a non-binding guideline for Newmont’s Board of Directors (the “Board”). The Board reserves all powers related to the declaration and payment of dividends. In addition, the declaration and payment of future dividends remain at the discretion of the Board and will be determined based on Newmont’s financial results, cash and liquidity requirements, future prospects and other factors deemed relevant by the Board. In determining the dividend to be declared and paid on the common stock of the Company, the Board may revise or terminate such policy at any time without prior notice. 12. The future project estimates on slide 12 are represented on an attributable basis and should be considered forward looking statements. See the cautionary statement on slide 2. 13. In January 2011, Fronteer Gold released an interim resource estimate for Long Canyon, which reported Measured and Indicated resources of approximately 0.071 and 1.324 million gold ounces, respectively, and an additional Inferred resource of approximately 0.8 million gold ounces. U.S. investors are cautioned that Fronteer Gold provided its public disclosures at the time of acquisition in the terms of "Measured resources", “Indicated resources” and "Inferred resource.” While these terms are recognized and required by Canadian regulations, these terms are not defined terms under the SEC’s Industry Guide 7. U.S. Investors are cautioned not to assume that any part or all of mineral deposits in the "Measured resources” and “Indicated resources" categories will ever be converted into Reserves. Additionally, "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred resources may not form the basis of a feasibility study or prefeasibility studies, except in rare cases. Accordingly, U.S. Investors are cautioned not to assume that any part or all of an Inferred resource exists or is economically or legally minable. No ounces are currently in the Company’s Reserves or NRM for Long Canyon. Additionally, drill results illustrated on slide 13 are not necessarily indicative of future drill results, NRM, Reserves or production. 14. 2012 Outlook projections used in this presentation are considered “forward-looking statements” and represent management’s good faith estimates or expectations of future production results as of February 24, 2012 and is based upon certain assumptions, including, without limitation, those described on slide 21 under the heading “Assumptions” and noted on slide 2. Consequently, Outlook cannot be guaranteed. Investors are cautioned that the Company does not undertake to subsequently reaffirm, provide comfort or otherwise update Outlook to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events. Investors should not assume that any lack of update constitutes a current reaffirmation of Outlook. Newmont Mining Corporation | First Quarter 2012 Earnings Update | www.newmont.com 25 April 27, 2012