Orbiting Carbon Observatory - 2: Recovering from Mission Loss Eric Ianson Program Executive Science Mission Directorate
Introduction – Launch of the  Orbiting Carbon Observatory (OCO) February 24, 2009 1:59 AM PST Approximately 17 minutes later
Now What?  Do we rebuild and fly another OCO? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Immediate Actions (1-6 months following mission loss) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Seeking Support ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Funding Put in Place for OCO-2 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
OCO-2 Mission Development Plans and Objectives ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
OCO-2 Schedule Activities conducted during this 8-month Tailored Formulation Period are described in the following slides 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 FY2016 FY2017 FY2012 FY2013 FY2014 FY2015 FY2009 FY2010 FY2011 Proposed OCO-2 Schedule Conventional  Project Life-Cycle Pre-A (6 mo) Phase A (9 mo) Phase B (12 mo) Phase C (24 mo) Phase D (12 mo) Phase E (24 mo) 21 mo MCR MDR (PNAR) PDR (NAR) CDR SIR ORR LRD PLAR Pre-A (6 mo) TFP (8 mo) Phase C (16.5 mo) Phase D (11.5 mo) Phase E (24 mo) CDR (NAR) SIR ORR LRD PLAR 36 mo SRR 8 mo 28 mo Tailored Formulation Period (8 mo) CDR (NAR) Peer Reviews (w/SRB Participation)
Tailored Formulation Period Approach ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],At the conclusion of the TFP, OCO-2 would be ready to enter a standard Phase C/D
OCO-2 will complete all NPR 7120.5 Formulation Gate Products Prior to KDP-C NPR 7120.5 OCO2 Products Pre-A Phase A § Phase B KDP A KDP B KDP C HQ and Program Products 1. FAD Approved 2. Program Requirements on the Project Draft Baseline Update 3. ASM minutes Baseline 4. NEPA Compliance Documentation EA 5. Inter-Agency & International Agrmts Baseline 6. Mishap Control Plan Project Technical Products 1. Mission Concept Report Preliminary Baseline 2. System Level Requirements Preliminary Baseline 3. Preliminary Design Report Baseline 4. Missions Operations Concept Preliminary Baseline 5. Tech Readiness Assessment Rept Baseline 6. Missile Sys Pre-Launch Safety Pkg Preliminary 7. Detailed Design Report 8. As-built H/W & S/W Documentation 9. Verification and Validation Report 10. Operations Handbook 11. Orbital Debris Assessment Initial Preliminary 12. End of Mission Plan Initial Preliminary 13. Mission Report Proj. Planning, Cost, & Schedule Prod. 1. Work Agreements for Next Phase Baseline** Baseline 2. Management Baseline Draft Preliminary Baseline 3. Project Plan Preliminary Baseline 4. CADRe Preliminary Baseline 5. Planetary Protection Plan PPC Baseline 6. Nuclear Safety Launch Approval Plan Baseline 7. Bus. Case Analysis for Infrastructure Preliminary Baseline 8. Range Safety Risk Management Plan Preliminary 9. Sys Decommissioning/‌Disposal Plan KDP Readiness Products 1. SRB Report  Final Final Final 2. Project Manager Recommendation Final Final Final 3. CMC Recommendation Final Final Final 4. Program Manager Recommendation Final Final Final 5. MD-PMC Recommendation Final Final Final 6. Governing PMC Recommendation Final Final Final Products Pre-A TFP Kickoff KDP C HQ and Program Products 1. FAD Approved 2. Program Requirements on the Project Draft Baseline 3. ASM minutes Baseline 4. NEPA Compliance Documentation EA 5. Inter-Agency & International Agrmts Baseline 6. Mishap Control Plan Project Technical Products 1. Mission Concept Report Baseline 2. System Level Requirements Baseline 3. Preliminary Design Report Baseline 4. Missions Operations Concept Baseline 5. Tech Readiness Assessment Rept Baseline 6. Missile Sys Pre-Launch Safety Pkg Preliminary 7. Detailed Design Report 8. As-built H/W & S/W Documentation 9. Verification and Validation Report 10. Operations Handbook 11. Orbital Debris Assessment Preliminary 12. End of Mission Plan Preliminary 13. Mission Report Proj. Planning, Cost, & Schedule Prod. 1. Work Agreements for Next Phase Baseline 2. Management Baseline Baseline 3. Project Plan Baseline 4. CADRe Baseline 5. Planetary Protection Plan N/A 6. Nuclear Safety Launch Approval Plan N/A 7. Bus. Case Analysis for Infrastructure Baseline 8. Range Safety Risk Management Plan Preliminary 9. Sys Decommissioning/‌Disposal Plan KDP Readiness Products 1. SRB Report  Final 2. Project Manager Recommendation Final 3. CMC Recommendation Final 4. Program Manager Recommendation Final 5. MD-PMC Recommendation Final Final 6. Governing PMC Recommendation Final Final
OCO-2 will complete all NPR 7120.5 Formulation Project Control Plans Prior to KDP-C NPR 7120.5 OCO-2 Project Plan – Control Plans Pre-Phase A Phase A Phase B KDP A KDP B KDP C 1. Technical, Schedule, and Cost Control Plan   Preliminary Baseline 2. Safety and Mission Assurance Plan   Preliminary Baseline 3. Risk Management Plan   Preliminary Baseline 4. Acquisition Plan   Preliminary Baseline 5. Technology Development Plan   Baseline   6. Systems Engineering Management Plan   Baseline   7. Software Management Plan   Preliminary Baseline 8. Review Plan   Preliminary Baseline 9. Missions Operations Plan     Preliminary 10. Environmental Management Plan   Baseline   11. Logistics Plan   Preliminary   12. Science Data Management Plan     Preliminary 13. Information and Configuration Management Plan   Preliminary Baseline 14. Security Plan   Preliminary Baseline 15. Export Control Plan   Preliminary Baseline Project Plan – Control Plans Pre-Phase A TFP Kickoff KDP C 1. Technical, Schedule, and Cost Control Plan   Baseline 2. Safety and Mission Assurance Plan   Baseline 3. Risk Management Plan   Baseline 4. Acquisition Plan   Baseline 5. Technology Development Plan     Baseline 6. Systems Engineering Management Plan     Baseline 7. Software Management Plan   Baseline 8. Review Plan   Baseline 9. Missions Operations Plan   Preliminary 10. Environmental Management Plan     Baseline 11. Logistics Plan   Preliminary  12. Science Data Management Plan   Preliminary 13. Information and Configuration Management Plan   Baseline 14. Security Plan   Baseline 15. Export Control Plan   Baseline
Tailored Formulation Events (1 of 2) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Tailored Formulation Events (2 of 2) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],At the conclusion of the TFP, OCO-2 was deemed ready to conduct a KDP-C and enter a standard Phase C/D
Other Issues Addressed During Tailored Formulation Period ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
NASA Commits to OCO-2 Mission ,[object Object],[object Object],[object Object]
Lessons from the OCO-2 Effort ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Questions?

Weitere ähnliche Inhalte

Was ist angesagt?

SpaceEd-ECLIPSE Design Proposal(1)
SpaceEd-ECLIPSE Design Proposal(1)SpaceEd-ECLIPSE Design Proposal(1)
SpaceEd-ECLIPSE Design Proposal(1)Anahita Yazdi
 
Chato refueling with in situ produced propellants 2014
Chato refueling with in situ produced propellants 2014Chato refueling with in situ produced propellants 2014
Chato refueling with in situ produced propellants 2014David Chato
 
Day 1 sanjay jayanarayanan, iitm, india, arrcc-carissa workshop
Day 1 sanjay jayanarayanan, iitm, india, arrcc-carissa workshopDay 1 sanjay jayanarayanan, iitm, india, arrcc-carissa workshop
Day 1 sanjay jayanarayanan, iitm, india, arrcc-carissa workshopICIMOD
 
Use of Wind Tunnel Refinements in the Dispersion Modeling Analysis of the Ala...
Use of Wind Tunnel Refinements in the Dispersion Modeling Analysis of the Ala...Use of Wind Tunnel Refinements in the Dispersion Modeling Analysis of the Ala...
Use of Wind Tunnel Refinements in the Dispersion Modeling Analysis of the Ala...Sergio A. Guerra
 
Atlas v-2015 Department of Energy (DOE) Carbon Storage Atlas Julio et al 2015
Atlas v-2015 Department of Energy (DOE) Carbon Storage Atlas Julio et al 2015Atlas v-2015 Department of Energy (DOE) Carbon Storage Atlas Julio et al 2015
Atlas v-2015 Department of Energy (DOE) Carbon Storage Atlas Julio et al 2015Steve Wittrig
 
Atlas v-2015 doe ccs co2 storage overview and details netl
Atlas v-2015 doe ccs co2 storage overview and details netlAtlas v-2015 doe ccs co2 storage overview and details netl
Atlas v-2015 doe ccs co2 storage overview and details netlSteve Wittrig
 
Andrew_Sitek_RESUME_FINAL
Andrew_Sitek_RESUME_FINALAndrew_Sitek_RESUME_FINAL
Andrew_Sitek_RESUME_FINALAndrew Sitek
 
APM Subcommmittee Update on PRIME2 Research Study
APM Subcommmittee Update on PRIME2 Research StudyAPM Subcommmittee Update on PRIME2 Research Study
APM Subcommmittee Update on PRIME2 Research StudySergio A. Guerra
 
HRSC Techniques: High-Resolution Hydrogeologic Characterization
HRSC Techniques: High-Resolution Hydrogeologic CharacterizationHRSC Techniques: High-Resolution Hydrogeologic Characterization
HRSC Techniques: High-Resolution Hydrogeologic CharacterizationASC-HRSC
 
HRSC Technologies: Using MiHpt for Rapid In-Situ Contaminant and Hydrostratig...
HRSC Technologies: Using MiHpt for Rapid In-Situ Contaminant and Hydrostratig...HRSC Technologies: Using MiHpt for Rapid In-Situ Contaminant and Hydrostratig...
HRSC Technologies: Using MiHpt for Rapid In-Situ Contaminant and Hydrostratig...ASC-HRSC
 
IEEE Young Professionals Webinar on 6/09/2016: NASA GSFC's WISM Radiometer wi...
IEEE Young Professionals Webinar on 6/09/2016: NASA GSFC's WISM Radiometer wi...IEEE Young Professionals Webinar on 6/09/2016: NASA GSFC's WISM Radiometer wi...
IEEE Young Professionals Webinar on 6/09/2016: NASA GSFC's WISM Radiometer wi...Quenton Bonds, PhD
 
Well identification and environmental management
Well identification and environmental managementWell identification and environmental management
Well identification and environmental managementJean-Michel Bergeon
 
Ambient Summer
Ambient SummerAmbient Summer
Ambient SummerHolli Sims
 

Was ist angesagt? (18)

SpaceEd-ECLIPSE Design Proposal(1)
SpaceEd-ECLIPSE Design Proposal(1)SpaceEd-ECLIPSE Design Proposal(1)
SpaceEd-ECLIPSE Design Proposal(1)
 
Chato refueling with in situ produced propellants 2014
Chato refueling with in situ produced propellants 2014Chato refueling with in situ produced propellants 2014
Chato refueling with in situ produced propellants 2014
 
Day 1 sanjay jayanarayanan, iitm, india, arrcc-carissa workshop
Day 1 sanjay jayanarayanan, iitm, india, arrcc-carissa workshopDay 1 sanjay jayanarayanan, iitm, india, arrcc-carissa workshop
Day 1 sanjay jayanarayanan, iitm, india, arrcc-carissa workshop
 
PGP-intro
PGP-introPGP-intro
PGP-intro
 
Use of Wind Tunnel Refinements in the Dispersion Modeling Analysis of the Ala...
Use of Wind Tunnel Refinements in the Dispersion Modeling Analysis of the Ala...Use of Wind Tunnel Refinements in the Dispersion Modeling Analysis of the Ala...
Use of Wind Tunnel Refinements in the Dispersion Modeling Analysis of the Ala...
 
Atlas v-2015 Department of Energy (DOE) Carbon Storage Atlas Julio et al 2015
Atlas v-2015 Department of Energy (DOE) Carbon Storage Atlas Julio et al 2015Atlas v-2015 Department of Energy (DOE) Carbon Storage Atlas Julio et al 2015
Atlas v-2015 Department of Energy (DOE) Carbon Storage Atlas Julio et al 2015
 
Atlas v-2015 doe ccs co2 storage overview and details netl
Atlas v-2015 doe ccs co2 storage overview and details netlAtlas v-2015 doe ccs co2 storage overview and details netl
Atlas v-2015 doe ccs co2 storage overview and details netl
 
Andrew_Sitek_RESUME_FINAL
Andrew_Sitek_RESUME_FINALAndrew_Sitek_RESUME_FINAL
Andrew_Sitek_RESUME_FINAL
 
Bitten
BittenBitten
Bitten
 
Fundamentals aquatic-web
Fundamentals aquatic-webFundamentals aquatic-web
Fundamentals aquatic-web
 
HDF-EOS at NOAA/NESDIS
HDF-EOS at NOAA/NESDISHDF-EOS at NOAA/NESDIS
HDF-EOS at NOAA/NESDIS
 
APM Subcommmittee Update on PRIME2 Research Study
APM Subcommmittee Update on PRIME2 Research StudyAPM Subcommmittee Update on PRIME2 Research Study
APM Subcommmittee Update on PRIME2 Research Study
 
HRSC Techniques: High-Resolution Hydrogeologic Characterization
HRSC Techniques: High-Resolution Hydrogeologic CharacterizationHRSC Techniques: High-Resolution Hydrogeologic Characterization
HRSC Techniques: High-Resolution Hydrogeologic Characterization
 
HRSC Technologies: Using MiHpt for Rapid In-Situ Contaminant and Hydrostratig...
HRSC Technologies: Using MiHpt for Rapid In-Situ Contaminant and Hydrostratig...HRSC Technologies: Using MiHpt for Rapid In-Situ Contaminant and Hydrostratig...
HRSC Technologies: Using MiHpt for Rapid In-Situ Contaminant and Hydrostratig...
 
IEEE Young Professionals Webinar on 6/09/2016: NASA GSFC's WISM Radiometer wi...
IEEE Young Professionals Webinar on 6/09/2016: NASA GSFC's WISM Radiometer wi...IEEE Young Professionals Webinar on 6/09/2016: NASA GSFC's WISM Radiometer wi...
IEEE Young Professionals Webinar on 6/09/2016: NASA GSFC's WISM Radiometer wi...
 
moscow
moscowmoscow
moscow
 
Well identification and environmental management
Well identification and environmental managementWell identification and environmental management
Well identification and environmental management
 
Ambient Summer
Ambient SummerAmbient Summer
Ambient Summer
 

Andere mochten auch

Bryan.moser
Bryan.moserBryan.moser
Bryan.moserNASAPMC
 
Gaskins.tom
Gaskins.tomGaskins.tom
Gaskins.tomNASAPMC
 
Inter approach to_spaceprogmgmt
Inter approach to_spaceprogmgmtInter approach to_spaceprogmgmt
Inter approach to_spaceprogmgmtNASAPMC
 
Stetter.michael
Stetter.michaelStetter.michael
Stetter.michaelNASAPMC
 
Diffoot fayful
Diffoot fayfulDiffoot fayful
Diffoot fayfulNASAPMC
 
Turner.john
Turner.johnTurner.john
Turner.johnNASAPMC
 
University of Maryland System MOST Pilot
University of Maryland System MOST PilotUniversity of Maryland System MOST Pilot
University of Maryland System MOST PilotKim Thanos
 
Kotnour tim
Kotnour timKotnour tim
Kotnour timNASAPMC
 
Choi nasa pmc_2012
Choi nasa pmc_2012Choi nasa pmc_2012
Choi nasa pmc_2012NASAPMC
 
Lindley.johnson.pe
Lindley.johnson.peLindley.johnson.pe
Lindley.johnson.peNASAPMC
 
Bell.michael
Bell.michaelBell.michael
Bell.michaelNASAPMC
 
Glenn.counts
Glenn.countsGlenn.counts
Glenn.countsNASAPMC
 
Ryan.richard
Ryan.richardRyan.richard
Ryan.richardNASAPMC
 
One hundred rules for nasa project managers
One hundred rules for nasa project managersOne hundred rules for nasa project managers
One hundred rules for nasa project managersAndreea Mocanu
 

Andere mochten auch (14)

Bryan.moser
Bryan.moserBryan.moser
Bryan.moser
 
Gaskins.tom
Gaskins.tomGaskins.tom
Gaskins.tom
 
Inter approach to_spaceprogmgmt
Inter approach to_spaceprogmgmtInter approach to_spaceprogmgmt
Inter approach to_spaceprogmgmt
 
Stetter.michael
Stetter.michaelStetter.michael
Stetter.michael
 
Diffoot fayful
Diffoot fayfulDiffoot fayful
Diffoot fayful
 
Turner.john
Turner.johnTurner.john
Turner.john
 
University of Maryland System MOST Pilot
University of Maryland System MOST PilotUniversity of Maryland System MOST Pilot
University of Maryland System MOST Pilot
 
Kotnour tim
Kotnour timKotnour tim
Kotnour tim
 
Choi nasa pmc_2012
Choi nasa pmc_2012Choi nasa pmc_2012
Choi nasa pmc_2012
 
Lindley.johnson.pe
Lindley.johnson.peLindley.johnson.pe
Lindley.johnson.pe
 
Bell.michael
Bell.michaelBell.michael
Bell.michael
 
Glenn.counts
Glenn.countsGlenn.counts
Glenn.counts
 
Ryan.richard
Ryan.richardRyan.richard
Ryan.richard
 
One hundred rules for nasa project managers
One hundred rules for nasa project managersOne hundred rules for nasa project managers
One hundred rules for nasa project managers
 

Ähnlich wie Ianson

COTS_lessons learned_2013_nov_13
COTS_lessons learned_2013_nov_13COTS_lessons learned_2013_nov_13
COTS_lessons learned_2013_nov_13Dmitry Tseitlin
 
COTS lessons learned_2013_nov13
COTS lessons learned_2013_nov13COTS lessons learned_2013_nov13
COTS lessons learned_2013_nov13Dmitry Tseitlin
 
Applying the Systems Engineering Process to a Conceptual Merucry CubeSat Mission
Applying the Systems Engineering Process to a Conceptual Merucry CubeSat MissionApplying the Systems Engineering Process to a Conceptual Merucry CubeSat Mission
Applying the Systems Engineering Process to a Conceptual Merucry CubeSat MissionKaren Grothe
 
WE2.L10 - NASA's Evolving Approaches to Maximizing Applications Return from o...
WE2.L10 - NASA's Evolving Approaches to Maximizing Applications Return from o...WE2.L10 - NASA's Evolving Approaches to Maximizing Applications Return from o...
WE2.L10 - NASA's Evolving Approaches to Maximizing Applications Return from o...grssieee
 
Ray.ronald
Ray.ronaldRay.ronald
Ray.ronaldNASAPMC
 
Inter approach to_spaceprogmgmt
Inter approach to_spaceprogmgmtInter approach to_spaceprogmgmt
Inter approach to_spaceprogmgmtNASAPMC
 
Robertson.brent
Robertson.brentRobertson.brent
Robertson.brentNASAPMC
 
Cots lessons learned_2013_nov13
Cots lessons learned_2013_nov13Cots lessons learned_2013_nov13
Cots lessons learned_2013_nov13Dmitry Tseitlin
 
Patrick.guske.update
Patrick.guske.updatePatrick.guske.update
Patrick.guske.updateNASAPMC
 
Ralph.basilio
Ralph.basilioRalph.basilio
Ralph.basilioNASAPMC
 
Ralph.basilio
Ralph.basilioRalph.basilio
Ralph.basilioNASAPMC
 
Carsile.azarbain
Carsile.azarbainCarsile.azarbain
Carsile.azarbainNASAPMC
 
Mercury CubeSat Presentation for ASAT2016
Mercury CubeSat Presentation for ASAT2016Mercury CubeSat Presentation for ASAT2016
Mercury CubeSat Presentation for ASAT2016Karen Grothe
 
Ott, Lesley: Low latency flux and concentration datasets in support of greenh...
Ott, Lesley: Low latency flux and concentration datasets in support of greenh...Ott, Lesley: Low latency flux and concentration datasets in support of greenh...
Ott, Lesley: Low latency flux and concentration datasets in support of greenh...Integrated Carbon Observation System (ICOS)
 
Armstrong
ArmstrongArmstrong
ArmstrongNASAPMC
 
NASA_CCO_status-2013 update
NASA_CCO_status-2013 updateNASA_CCO_status-2013 update
NASA_CCO_status-2013 updateDmitry Tseitlin
 
KGrothe Capstone Project Final Presentation
KGrothe Capstone Project Final PresentationKGrothe Capstone Project Final Presentation
KGrothe Capstone Project Final PresentationKaren Grothe
 
Project management @ bec doms
Project management @ bec domsProject management @ bec doms
Project management @ bec domsBabasab Patil
 

Ähnlich wie Ianson (20)

COTS_lessons learned_2013_nov_13
COTS_lessons learned_2013_nov_13COTS_lessons learned_2013_nov_13
COTS_lessons learned_2013_nov_13
 
COTS lessons learned_2013_nov13
COTS lessons learned_2013_nov13COTS lessons learned_2013_nov13
COTS lessons learned_2013_nov13
 
Applying the Systems Engineering Process to a Conceptual Merucry CubeSat Mission
Applying the Systems Engineering Process to a Conceptual Merucry CubeSat MissionApplying the Systems Engineering Process to a Conceptual Merucry CubeSat Mission
Applying the Systems Engineering Process to a Conceptual Merucry CubeSat Mission
 
WE2.L10 - NASA's Evolving Approaches to Maximizing Applications Return from o...
WE2.L10 - NASA's Evolving Approaches to Maximizing Applications Return from o...WE2.L10 - NASA's Evolving Approaches to Maximizing Applications Return from o...
WE2.L10 - NASA's Evolving Approaches to Maximizing Applications Return from o...
 
Ray.ronald
Ray.ronaldRay.ronald
Ray.ronald
 
Inter approach to_spaceprogmgmt
Inter approach to_spaceprogmgmtInter approach to_spaceprogmgmt
Inter approach to_spaceprogmgmt
 
Robertson.brent
Robertson.brentRobertson.brent
Robertson.brent
 
Cots lessons learned_2013_nov13
Cots lessons learned_2013_nov13Cots lessons learned_2013_nov13
Cots lessons learned_2013_nov13
 
Patrick.guske.update
Patrick.guske.updatePatrick.guske.update
Patrick.guske.update
 
AAS National Conference 2008: Gary Davis
AAS National Conference 2008: Gary DavisAAS National Conference 2008: Gary Davis
AAS National Conference 2008: Gary Davis
 
Symons
SymonsSymons
Symons
 
Ralph.basilio
Ralph.basilioRalph.basilio
Ralph.basilio
 
Ralph.basilio
Ralph.basilioRalph.basilio
Ralph.basilio
 
Carsile.azarbain
Carsile.azarbainCarsile.azarbain
Carsile.azarbain
 
Mercury CubeSat Presentation for ASAT2016
Mercury CubeSat Presentation for ASAT2016Mercury CubeSat Presentation for ASAT2016
Mercury CubeSat Presentation for ASAT2016
 
Ott, Lesley: Low latency flux and concentration datasets in support of greenh...
Ott, Lesley: Low latency flux and concentration datasets in support of greenh...Ott, Lesley: Low latency flux and concentration datasets in support of greenh...
Ott, Lesley: Low latency flux and concentration datasets in support of greenh...
 
Armstrong
ArmstrongArmstrong
Armstrong
 
NASA_CCO_status-2013 update
NASA_CCO_status-2013 updateNASA_CCO_status-2013 update
NASA_CCO_status-2013 update
 
KGrothe Capstone Project Final Presentation
KGrothe Capstone Project Final PresentationKGrothe Capstone Project Final Presentation
KGrothe Capstone Project Final Presentation
 
Project management @ bec doms
Project management @ bec domsProject management @ bec doms
Project management @ bec doms
 

Mehr von NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 

Mehr von NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 

Kürzlich hochgeladen

Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesBoston Institute of Analytics
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Principled Technologies
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024SynarionITSolutions
 

Kürzlich hochgeladen (20)

Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 

Ianson

  • 1. Orbiting Carbon Observatory - 2: Recovering from Mission Loss Eric Ianson Program Executive Science Mission Directorate
  • 2. Introduction – Launch of the Orbiting Carbon Observatory (OCO) February 24, 2009 1:59 AM PST Approximately 17 minutes later
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8. OCO-2 Schedule Activities conducted during this 8-month Tailored Formulation Period are described in the following slides 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 01 02 03 04 FY2016 FY2017 FY2012 FY2013 FY2014 FY2015 FY2009 FY2010 FY2011 Proposed OCO-2 Schedule Conventional Project Life-Cycle Pre-A (6 mo) Phase A (9 mo) Phase B (12 mo) Phase C (24 mo) Phase D (12 mo) Phase E (24 mo) 21 mo MCR MDR (PNAR) PDR (NAR) CDR SIR ORR LRD PLAR Pre-A (6 mo) TFP (8 mo) Phase C (16.5 mo) Phase D (11.5 mo) Phase E (24 mo) CDR (NAR) SIR ORR LRD PLAR 36 mo SRR 8 mo 28 mo Tailored Formulation Period (8 mo) CDR (NAR) Peer Reviews (w/SRB Participation)
  • 9.
  • 10. OCO-2 will complete all NPR 7120.5 Formulation Gate Products Prior to KDP-C NPR 7120.5 OCO2 Products Pre-A Phase A § Phase B KDP A KDP B KDP C HQ and Program Products 1. FAD Approved 2. Program Requirements on the Project Draft Baseline Update 3. ASM minutes Baseline 4. NEPA Compliance Documentation EA 5. Inter-Agency & International Agrmts Baseline 6. Mishap Control Plan Project Technical Products 1. Mission Concept Report Preliminary Baseline 2. System Level Requirements Preliminary Baseline 3. Preliminary Design Report Baseline 4. Missions Operations Concept Preliminary Baseline 5. Tech Readiness Assessment Rept Baseline 6. Missile Sys Pre-Launch Safety Pkg Preliminary 7. Detailed Design Report 8. As-built H/W & S/W Documentation 9. Verification and Validation Report 10. Operations Handbook 11. Orbital Debris Assessment Initial Preliminary 12. End of Mission Plan Initial Preliminary 13. Mission Report Proj. Planning, Cost, & Schedule Prod. 1. Work Agreements for Next Phase Baseline** Baseline 2. Management Baseline Draft Preliminary Baseline 3. Project Plan Preliminary Baseline 4. CADRe Preliminary Baseline 5. Planetary Protection Plan PPC Baseline 6. Nuclear Safety Launch Approval Plan Baseline 7. Bus. Case Analysis for Infrastructure Preliminary Baseline 8. Range Safety Risk Management Plan Preliminary 9. Sys Decommissioning/‌Disposal Plan KDP Readiness Products 1. SRB Report Final Final Final 2. Project Manager Recommendation Final Final Final 3. CMC Recommendation Final Final Final 4. Program Manager Recommendation Final Final Final 5. MD-PMC Recommendation Final Final Final 6. Governing PMC Recommendation Final Final Final Products Pre-A TFP Kickoff KDP C HQ and Program Products 1. FAD Approved 2. Program Requirements on the Project Draft Baseline 3. ASM minutes Baseline 4. NEPA Compliance Documentation EA 5. Inter-Agency & International Agrmts Baseline 6. Mishap Control Plan Project Technical Products 1. Mission Concept Report Baseline 2. System Level Requirements Baseline 3. Preliminary Design Report Baseline 4. Missions Operations Concept Baseline 5. Tech Readiness Assessment Rept Baseline 6. Missile Sys Pre-Launch Safety Pkg Preliminary 7. Detailed Design Report 8. As-built H/W & S/W Documentation 9. Verification and Validation Report 10. Operations Handbook 11. Orbital Debris Assessment Preliminary 12. End of Mission Plan Preliminary 13. Mission Report Proj. Planning, Cost, & Schedule Prod. 1. Work Agreements for Next Phase Baseline 2. Management Baseline Baseline 3. Project Plan Baseline 4. CADRe Baseline 5. Planetary Protection Plan N/A 6. Nuclear Safety Launch Approval Plan N/A 7. Bus. Case Analysis for Infrastructure Baseline 8. Range Safety Risk Management Plan Preliminary 9. Sys Decommissioning/‌Disposal Plan KDP Readiness Products 1. SRB Report Final 2. Project Manager Recommendation Final 3. CMC Recommendation Final 4. Program Manager Recommendation Final 5. MD-PMC Recommendation Final Final 6. Governing PMC Recommendation Final Final
  • 11. OCO-2 will complete all NPR 7120.5 Formulation Project Control Plans Prior to KDP-C NPR 7120.5 OCO-2 Project Plan – Control Plans Pre-Phase A Phase A Phase B KDP A KDP B KDP C 1. Technical, Schedule, and Cost Control Plan   Preliminary Baseline 2. Safety and Mission Assurance Plan   Preliminary Baseline 3. Risk Management Plan   Preliminary Baseline 4. Acquisition Plan   Preliminary Baseline 5. Technology Development Plan   Baseline   6. Systems Engineering Management Plan   Baseline   7. Software Management Plan   Preliminary Baseline 8. Review Plan   Preliminary Baseline 9. Missions Operations Plan     Preliminary 10. Environmental Management Plan   Baseline   11. Logistics Plan   Preliminary   12. Science Data Management Plan     Preliminary 13. Information and Configuration Management Plan   Preliminary Baseline 14. Security Plan   Preliminary Baseline 15. Export Control Plan   Preliminary Baseline Project Plan – Control Plans Pre-Phase A TFP Kickoff KDP C 1. Technical, Schedule, and Cost Control Plan   Baseline 2. Safety and Mission Assurance Plan   Baseline 3. Risk Management Plan   Baseline 4. Acquisition Plan   Baseline 5. Technology Development Plan     Baseline 6. Systems Engineering Management Plan     Baseline 7. Software Management Plan   Baseline 8. Review Plan   Baseline 9. Missions Operations Plan   Preliminary 10. Environmental Management Plan     Baseline 11. Logistics Plan   Preliminary  12. Science Data Management Plan   Preliminary 13. Information and Configuration Management Plan   Baseline 14. Security Plan   Baseline 15. Export Control Plan   Baseline