“The Changing World
of Configuration
Management”

Presented by: Debbie Dusterwald
Computer Sciences Corporation
February 2008
OBJECTIVES
 Define change and how change affects
 Project Management
 Define NASA and Goddard
 Requirements for Configuration
 Management
 Define what are the In-House and Out-of-
 House Projects at Goddard and how they
 are organized
OBJECTIVES (Cont’d)

  Define the four principles of Configuration
  Management

  Emphasize the affects of Change Control

  Discuss if Configuration Management
  just happens
What is Change?

Make or become different
Something put or taken in place of
something else
To substitute
How does change affect any
type of Project with NASA?

  Successful integration, testing and
  launch
  Correct technical errors
  More effective performance
  More cost effective
  Accommodate new requirements
  Ensure the objectives of any type of
  Project are met
NASA Requirements


NASA Procedural Requirements (NPR) 7120.5C
NASA Program and Project Management Processes
and Requirements (Non Space Flight Project
Management)


NPR 7120.5D NASA Program and Project
Management Processes and Requirements (Space
Flight Project Management)
Center Requirements

GPR 1410.2 Configuration Management

GPR 5330.1 Product Processing
Inspection and Test

500-PG-8700.2.5 GSFC Engineering
Drawing Standards
In-House Project


What is an In-House project?

A spacecraft and/or instrument built on-
site at Goddard with an understanding
between subsystems. The responsibility
of authority is with the designated Project
Office.
Out-of-House Project

What is an Out-of-House Project?

 A spacecraft and/or instrument built off-
 site through the contracting office. The
 responsibility of authority is the Project
 office or System Engineering.
GSFC In-house Projects
Formulation/Development
  Lunar Reconnaissance Orbiter (LRO)
  Solar Dynamic Observatory (SDO)
  Space Environmental Testbeds (SET)-1
  Global Precipitation Measurement (GPM) (part of the
  project)
  Solar Terrestrial Relations Orbiter (STEREO) (part of
  the project)
  Magnetospheric Multiscale (MMS)
  Instruments: MSL/SAM, MMS/FPI, GLAST/ACD,
  LRO/LOLA, SAC-D/AQUARIUS
GSFC Out-of-House Projects
Formulation/ Development
  Gamma Ray Large Area Space            Intersellar Boundary Explorer
  Telescope (GLAST)                     (IBEX)
                                        Global Precipitation Mission (GPM)
  Geostationary Environmental Opera-
  tional Satellite Series-R (GOES)-R    Solar Terrestrial Relations
                                        Observatory (STEREO)
  Hubble Space Telescope (HST)-DEV
                                        James Webb Space Telescope
  National Polar-Orbiting Operational
                                        (JWST)
  Environmental Satellite System
  (NPOESS) Preparatory Project (NPP)    Aeronomy of Ice in the
                                        Metrosphere (AIM)
  Constellation-X (CON)
                                        GLORY
  Polar Operational Environmental
  Satellites (POES - NOAA-N)            STP Hinode (used to be SOLAR-B)
  Landsat Data Continuity Mission       Geostationary Environmental
  (LDCM)                                Operational Satellite Series-O,P
                                        (GOES)
  Two Wide-Angle Imaging Neutral-
  Atom Spectrometers (TWINS)            Laser Interferometer Space
                                        Antenna (LISA)
  Wide-field Infrared Survey Explorer
  (WISE)                                Thermal Emission Imaging System
                                        (THEMIS)
  Terrestrial Planet Finder-C (TPF)-C
Project Organization

How is an In-House Project organized?

How is an Out-of-House Project
organized?
Project Scientist                                        LRO Project Manager                                              Contracting                  431-REF-000223
                               G. Chin                                                   C. Tooley                                                     Officer
                                               600                                                                                           200
                               Deputy                                                                                                                  J. Janus
                                                                                   Deputy Project Manager
                               J. Keller
                                                                                         C. Peddie                         Public Affairs
                              Science Data Mgmt.                                   Deputy Project Manager /                   Officer
                                                                                                                100
                              S. Scott                                                    Resources                        N. Neal-Jones
                          System Assurance                                                B. Sluder
                              Manager                                                Admin. - P. Gregory                     EPO Lead
                              R. Kolecki
                                           300                                                              400
                                                                                                                600         S. Stockman                                Lunar
                                                                    Financial
                              Deputy SAM
                              L. Lee                                Manager
                                                                  D. Adamczyk
                                                                                     400
                                                                                                             Mission System
                                                                                                                                                          Reconnaissance
                              Safety                                                                            Engineer
                              J. Rezac                               Mission Business Mgr.
                                                                                                               D. Everett
                              Quality Assurance
                                                                     J. Smith                        500
                                                                                                              Deputy MSE                                     Orbiter (LRO)
                              A. Lacks                               Resource Analysts                        M. Houghton
                                                                     V. Martinez/L. Morales
                              S/W Quality Assurance
                              C. Taylor                          Project Support                           Orbiter Systems             SW/HW Systems
                                                                                                                                                                     Project
                              Manufacturing                         Manager                                M. Pryzby                   C. Wildermann
                              N. Virmani                         K. Opperhauser      400                                                                               Code 451
                                                                                                           Flight Dynamics             Safing
                              Materials                                                                    M. Beckman                  S. Andrews
                                                                     General Business
                              P. Joy                                 J. Reid                               Avionics Systems            Contamination Ctrl.
                                                                     Scheduling                            P. Luers                    C. Lorentson
                              Risk Management
                              C. Peddie/K. Safdie                    A. Eaker/M. Campbell                  GN&C Systems                   Systems Analysis
                                                                     EVM                                   E. Holmes                      L. Hartz
                              Reliability
                                                                     R. Hesenperger                        S/C Bus & LV Systems           Mech./Thermal Sys.
                              L. Lee
                                                                     MIS                                   T. Ajluni                      S. Wasserzug
                             EEE Parts                               A. Hess/J. Brill
                             R. Williams
                                                                     CM/DM
                                                                     D. Dusterwald/D. Hall/
                                                                     W. Schultzaberger

                               Spacecraft                     Orbiter                  Launch Vehicle              Ground Systems                  Payload Systems
                                   Bus                      I & T Lead                    Manager                   & Operations                      Manager
                                T. Ajluni 500                 J. Baker 500                T. Jones 400                R. Saylor 400                   A. Bartels 400

                                                                                                                       MOT Lead
                                                     Laser Ranging                                                     J. Murphy                       Payload Systems
             Power                Electrical
             T. Spitzer           P. Luers           R. Zellar                                                                                            Engineers
                                                                                                                       GS&O System Engr.                            500
             ACS                  Mechanical         Communications                                                    J. Clapsadle                       M. Reden
             J. Simpson           G. Rosanova        A. Rodriguez-Arroyo                                                                                  L. Hartz
             Propulsion           C&DH               Thermal
             C. Zakrzwski         Q. Nguyen          W. Ousley/C. Baker                                                CRaTER                  Diviner                LAMP
                                                                                                                      H. Spence                D. Paige            R. Gladstone
             Software
                                                                                                                   Boston University            UCLA                   SWRI
             M. Blau
                                                         Original Signed By:
                                                                                                               LEND                 LOLA                   LROC              Mini - RF
                                            Craig Tooley                                Date               I. Mitrofanov           D. Smith             M. Robinson          S. Nozette
11/15/2007                                  Lunar Reconnaissance Orbiter (LRO)                              ISR, Moscow             GSFC             Arizona State Univ.        ACT
                                            Project Manager
Project Manager
                                                                  Project Manager
                                                                   Nick Chrissotimos
                                                                    Nick Chrissotimos
                                                             Deputy Project Manager
     Contracting Officer / /Julie Janus                       Deputy Project Manager                                       STP Program Support Office
      Contracting Officer Julie Janus                                  Jim Adams                                            STP Program Support Office
                                                                        Jim Adams                          Configuration Management / /Debbie Dusterwald-CSC, Linda Hepler-CSC
                                                   Deputy Project Manager/Instruments                       Configuration Management Debbie Dusterwald-CSC, Linda Hepler-CSC
                                                    Deputy Project Manager/Instruments                                 Planning / /Dennis Wicks-CSC, Jim Rogers-CSC
                                                                                                                        Planning Dennis Wicks-CSC, Jim Rogers-CSC
                                                                      Mike Delmont
                                                                       Mike Delmont                                        Project Support / /Mandy Tatum-SGT
                                                                                                                            Project Support Mandy Tatum-SGT
            Business Support
             Business Support                          Deputy Project Manager/Resources
                                                        Deputy Project Manager/Resources
                                                                       Rich Ryan
                                                                        Rich Ryan
                 Financial Manager                                     Secretary
                 Tracy Felton (acting)                                  Secretary
                                                                       Paula Wood
                                                                        Paula Wood
                 Resource Analyst
                   Linnette Morales                                                                       Mission Systems Engineering
                                                                                                          Mission Systems Engineering
                                                                                                        Systems Engineer / /Shane Hynes-Swales
                                                                                                         Systems Engineer Shane Hynes-Swales
                            General Business Support                                      Instrument Systems Engineer / /Steve Aloezos, Steve Wasserzug-Swales,
                                                                                           Instrument Systems Engineer Steve Aloezos, Steve Wasserzug-Swales,
           B. Power-SGT, J. Arrison-OSC, D. Paugh-SGT, L. Wyatt-CSC                                               Katie Barthelme-OMI
                                                                                                                   Katie Barthelme-OMI
                                                                                                       Systems Engineering / /Joe Cerullo-ASRC
                                                                                                        Systems Engineering Joe Cerullo-ASRC
              Project Support Manager                                                                 Contamination Engineering / / TereseErrigo
                                                                                                       Contamination Engineering Terese Errigo
                 Kim Higgins-El -SGT                                                               S/W Systems Engineering / /Jerry Hengemihle-MTEL
                                                                                                    S/W Systems Engineering Jerry Hengemihle-MTEL
                                          Project Scientist
                                           Project Scientist                                     Mission Director / Steve Odendahl
                                           Michael Kaiser
                                            Michael Kaiser                                   Mission Operations Engineer / Clay Deyarmin
                      Deputy Proj. Scientist    STEREO Science Center
                         Terry Kucera                  Bill Thompson-EITI


             System Assurance
              System Assurance                                     Observatory Management                                   Instrument Management
                                                                   Observatory Management                                    Instrument Management
Systems Assurance Mgr. / /Laurie Kleppin (acting)
 Systems Assurance Mgr. Laurie Kleppin (acting)                 Observatory Manager / /Mark Jarosz
     Manuf. & Process. Mgr / Mike Jones/OSC
                                                                 Observatory Manager Mark Jarosz
      Manuf. & Process. Mgr / Mike Jones/OSC
             QAE / Larry Gibb-SRSTE
              QAE / Larry Gibb-SRSTE
                                                                             JHU/APL                                                     IMPACT/ UCB
          Parts Assurance                                             Ed Reynolds, Project Mgr.                                 Instrument Mgr. / Lil Reichenthal
        Antonio Reyes-OSC
                                                                                                                                         SWAVES/ UMN
               Safety                                                                                                           Instrument Mgr. / Paul Buchanan
           Brian Smolnick
                                                                                                                                       SECCHI/ NRL
             Reliability
                                                                                                                                Instrument Mgr. / Bernie Klein
        Matt Samuel-MUNIZ

     Software Quality Assurance                                                                                                          PLASTIC/ UNH
              Vacant                                                                                                            Instrument Mgr. / Paul Buchanan
                                                                                                                                                                    23 March 2006
CONFIGURATION
MANAGEMENT (CM)
 CM is a formal process of identification, control,
 verification and accountability of requirements
 to meet the overall objectives.

  A process for the control of baselined
  documents and drawings.

  A process for the control of all proposed
  changes to baselined documents and
  drawings that may affect form, fit,
  function, cost and schedule.
IN-HOUSE vs. OUT-OF-HOUSE


Requirements      In-House    Out-of-House
  Project CCB        Yes          Yes
Mission/Sys Eng      Yes          Yes
      CCB
SC/Subsys CCB        Yes         SOW
  Instrument/     Yes / SOW    Yes / SOW
   Payloads
Drawing Control     Yes          SOW
  Work Order        Yes          SOW
PRINCIPLES OF CM

  Configuration Identification

  Configuration Control

  Configuration Status Accounting

  Configuration Verification
CONFIGURATION
IDENTIFICATION


 Process of identifying Configured Items

 Designating technical documentation

 Naming and numbering the Configured
 Items
LRO SPACECRAFT
LRO PROPULSION MODULE
LRO COMMAND & DATA
  HANDLING SYSTEM
DOCUMENT TREE


 Documents that define all aspects of a
 project
DRAWINGS

 Defines all mechanical and electrical
 aspects for a spacecraft and subsystems

 Defines all interfaces
CONFIGURATION
CONTROL
 Systematic coordination, evaluation, approval,
 and release of changes

 Ensure changes are properly and completely
 defined

 Evaluate the cost, schedule, and performance
 impacts of a proposed change
CHANGE CONTROL


Configuration Control Boards (CCBs)
    Project (Level 2)
    Systems (Level 3)
    Subsystems (Level 4)
Configuration Status
Accounting
   Recording and reporting of all project
   documents and drawings
   - Approved List of Configured Items
   - Status of Proposed Changes
CONFIGURATION
VERIFICATION

 Ensure all requirements are in
 compliance for Configuration
 Management

 Ensure all proposed changes
 have been implemented
 and/or resolved
CONFIGURATION
MANAGEMENT
WORKING FOR A PROJECT

  Does Configuration Management just
  happen?
  Central focus point for any project
  To be or not to be…
LRO LAUNCH VEHICLE
   SECOND STAGE
LAUNCH!




Success!

Weitere ähnliche Inhalte

Andere mochten auch

Michael.aucoin
Michael.aucoinMichael.aucoin
Michael.aucoinNASAPMC
 
Mc nally
Mc nallyMc nally
Mc nallyNASAPMC
 
Patrick.guske.update
Patrick.guske.updatePatrick.guske.update
Patrick.guske.updateNASAPMC
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frankNASAPMC
 
Stacy.cusack
Stacy.cusackStacy.cusack
Stacy.cusackNASAPMC
 
Wienkoop.glenn
Wienkoop.glennWienkoop.glenn
Wienkoop.glennNASAPMC
 
C null 01-17-2011
C null 01-17-2011C null 01-17-2011
C null 01-17-2011NASAPMC
 
Diffoot fayful
Diffoot fayfulDiffoot fayful
Diffoot fayfulNASAPMC
 
Coonce.tom
Coonce.tomCoonce.tom
Coonce.tomNASAPMC
 
Dillon.r.tinsley.c.rogers.e
Dillon.r.tinsley.c.rogers.eDillon.r.tinsley.c.rogers.e
Dillon.r.tinsley.c.rogers.eNASAPMC
 
Brockhurst.lane
Brockhurst.laneBrockhurst.lane
Brockhurst.laneNASAPMC
 
Battista barlowpmc conference 2012 rev. 2
Battista barlowpmc conference 2012 rev. 2Battista barlowpmc conference 2012 rev. 2
Battista barlowpmc conference 2012 rev. 2NASAPMC
 
Barth simpkins
Barth simpkinsBarth simpkins
Barth simpkinsNASAPMC
 
Serrato.be be
Serrato.be beSerrato.be be
Serrato.be beNASAPMC
 
Grubbs teams and digital collaboration pmc2012
Grubbs teams and digital collaboration pmc2012Grubbs teams and digital collaboration pmc2012
Grubbs teams and digital collaboration pmc2012NASAPMC
 
Inter pech bounds
Inter pech boundsInter pech bounds
Inter pech boundsNASAPMC
 
Harrison.g.poole.k
Harrison.g.poole.kHarrison.g.poole.k
Harrison.g.poole.kNASAPMC
 
Backup norm.smith
Backup norm.smithBackup norm.smith
Backup norm.smithNASAPMC
 

Andere mochten auch (20)

Michael.aucoin
Michael.aucoinMichael.aucoin
Michael.aucoin
 
Mc nally
Mc nallyMc nally
Mc nally
 
Heard
HeardHeard
Heard
 
Hulett
HulettHulett
Hulett
 
Patrick.guske.update
Patrick.guske.updatePatrick.guske.update
Patrick.guske.update
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frank
 
Stacy.cusack
Stacy.cusackStacy.cusack
Stacy.cusack
 
Wienkoop.glenn
Wienkoop.glennWienkoop.glenn
Wienkoop.glenn
 
C null 01-17-2011
C null 01-17-2011C null 01-17-2011
C null 01-17-2011
 
Diffoot fayful
Diffoot fayfulDiffoot fayful
Diffoot fayful
 
Coonce.tom
Coonce.tomCoonce.tom
Coonce.tom
 
Dillon.r.tinsley.c.rogers.e
Dillon.r.tinsley.c.rogers.eDillon.r.tinsley.c.rogers.e
Dillon.r.tinsley.c.rogers.e
 
Brockhurst.lane
Brockhurst.laneBrockhurst.lane
Brockhurst.lane
 
Battista barlowpmc conference 2012 rev. 2
Battista barlowpmc conference 2012 rev. 2Battista barlowpmc conference 2012 rev. 2
Battista barlowpmc conference 2012 rev. 2
 
Barth simpkins
Barth simpkinsBarth simpkins
Barth simpkins
 
Serrato.be be
Serrato.be beSerrato.be be
Serrato.be be
 
Grubbs teams and digital collaboration pmc2012
Grubbs teams and digital collaboration pmc2012Grubbs teams and digital collaboration pmc2012
Grubbs teams and digital collaboration pmc2012
 
Inter pech bounds
Inter pech boundsInter pech bounds
Inter pech bounds
 
Harrison.g.poole.k
Harrison.g.poole.kHarrison.g.poole.k
Harrison.g.poole.k
 
Backup norm.smith
Backup norm.smithBackup norm.smith
Backup norm.smith
 

Mehr von NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 

Mehr von NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 

Kürzlich hochgeladen

Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 

Kürzlich hochgeladen (20)

Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 

Debbie.dusterwald

  • 1. “The Changing World of Configuration Management” Presented by: Debbie Dusterwald Computer Sciences Corporation February 2008
  • 2. OBJECTIVES Define change and how change affects Project Management Define NASA and Goddard Requirements for Configuration Management Define what are the In-House and Out-of- House Projects at Goddard and how they are organized
  • 3. OBJECTIVES (Cont’d) Define the four principles of Configuration Management Emphasize the affects of Change Control Discuss if Configuration Management just happens
  • 4. What is Change? Make or become different Something put or taken in place of something else To substitute
  • 5. How does change affect any type of Project with NASA? Successful integration, testing and launch Correct technical errors More effective performance More cost effective Accommodate new requirements Ensure the objectives of any type of Project are met
  • 6. NASA Requirements NASA Procedural Requirements (NPR) 7120.5C NASA Program and Project Management Processes and Requirements (Non Space Flight Project Management) NPR 7120.5D NASA Program and Project Management Processes and Requirements (Space Flight Project Management)
  • 7. Center Requirements GPR 1410.2 Configuration Management GPR 5330.1 Product Processing Inspection and Test 500-PG-8700.2.5 GSFC Engineering Drawing Standards
  • 8. In-House Project What is an In-House project? A spacecraft and/or instrument built on- site at Goddard with an understanding between subsystems. The responsibility of authority is with the designated Project Office.
  • 9. Out-of-House Project What is an Out-of-House Project? A spacecraft and/or instrument built off- site through the contracting office. The responsibility of authority is the Project office or System Engineering.
  • 10. GSFC In-house Projects Formulation/Development Lunar Reconnaissance Orbiter (LRO) Solar Dynamic Observatory (SDO) Space Environmental Testbeds (SET)-1 Global Precipitation Measurement (GPM) (part of the project) Solar Terrestrial Relations Orbiter (STEREO) (part of the project) Magnetospheric Multiscale (MMS) Instruments: MSL/SAM, MMS/FPI, GLAST/ACD, LRO/LOLA, SAC-D/AQUARIUS
  • 11. GSFC Out-of-House Projects Formulation/ Development Gamma Ray Large Area Space Intersellar Boundary Explorer Telescope (GLAST) (IBEX) Global Precipitation Mission (GPM) Geostationary Environmental Opera- tional Satellite Series-R (GOES)-R Solar Terrestrial Relations Observatory (STEREO) Hubble Space Telescope (HST)-DEV James Webb Space Telescope National Polar-Orbiting Operational (JWST) Environmental Satellite System (NPOESS) Preparatory Project (NPP) Aeronomy of Ice in the Metrosphere (AIM) Constellation-X (CON) GLORY Polar Operational Environmental Satellites (POES - NOAA-N) STP Hinode (used to be SOLAR-B) Landsat Data Continuity Mission Geostationary Environmental (LDCM) Operational Satellite Series-O,P (GOES) Two Wide-Angle Imaging Neutral- Atom Spectrometers (TWINS) Laser Interferometer Space Antenna (LISA) Wide-field Infrared Survey Explorer (WISE) Thermal Emission Imaging System (THEMIS) Terrestrial Planet Finder-C (TPF)-C
  • 12. Project Organization How is an In-House Project organized? How is an Out-of-House Project organized?
  • 13. Project Scientist LRO Project Manager Contracting 431-REF-000223 G. Chin C. Tooley Officer 600 200 Deputy J. Janus Deputy Project Manager J. Keller C. Peddie Public Affairs Science Data Mgmt. Deputy Project Manager / Officer 100 S. Scott Resources N. Neal-Jones System Assurance B. Sluder Manager Admin. - P. Gregory EPO Lead R. Kolecki 300 400 600 S. Stockman Lunar Financial Deputy SAM L. Lee Manager D. Adamczyk 400 Mission System Reconnaissance Safety Engineer J. Rezac Mission Business Mgr. D. Everett Quality Assurance J. Smith 500 Deputy MSE Orbiter (LRO) A. Lacks Resource Analysts M. Houghton V. Martinez/L. Morales S/W Quality Assurance C. Taylor Project Support Orbiter Systems SW/HW Systems Project Manufacturing Manager M. Pryzby C. Wildermann N. Virmani K. Opperhauser 400 Code 451 Flight Dynamics Safing Materials M. Beckman S. Andrews General Business P. Joy J. Reid Avionics Systems Contamination Ctrl. Scheduling P. Luers C. Lorentson Risk Management C. Peddie/K. Safdie A. Eaker/M. Campbell GN&C Systems Systems Analysis EVM E. Holmes L. Hartz Reliability R. Hesenperger S/C Bus & LV Systems Mech./Thermal Sys. L. Lee MIS T. Ajluni S. Wasserzug EEE Parts A. Hess/J. Brill R. Williams CM/DM D. Dusterwald/D. Hall/ W. Schultzaberger Spacecraft Orbiter Launch Vehicle Ground Systems Payload Systems Bus I & T Lead Manager & Operations Manager T. Ajluni 500 J. Baker 500 T. Jones 400 R. Saylor 400 A. Bartels 400 MOT Lead Laser Ranging J. Murphy Payload Systems Power Electrical T. Spitzer P. Luers R. Zellar Engineers GS&O System Engr. 500 ACS Mechanical Communications J. Clapsadle M. Reden J. Simpson G. Rosanova A. Rodriguez-Arroyo L. Hartz Propulsion C&DH Thermal C. Zakrzwski Q. Nguyen W. Ousley/C. Baker CRaTER Diviner LAMP H. Spence D. Paige R. Gladstone Software Boston University UCLA SWRI M. Blau Original Signed By: LEND LOLA LROC Mini - RF Craig Tooley Date I. Mitrofanov D. Smith M. Robinson S. Nozette 11/15/2007 Lunar Reconnaissance Orbiter (LRO) ISR, Moscow GSFC Arizona State Univ. ACT Project Manager
  • 14. Project Manager Project Manager Nick Chrissotimos Nick Chrissotimos Deputy Project Manager Contracting Officer / /Julie Janus Deputy Project Manager STP Program Support Office Contracting Officer Julie Janus Jim Adams STP Program Support Office Jim Adams Configuration Management / /Debbie Dusterwald-CSC, Linda Hepler-CSC Deputy Project Manager/Instruments Configuration Management Debbie Dusterwald-CSC, Linda Hepler-CSC Deputy Project Manager/Instruments Planning / /Dennis Wicks-CSC, Jim Rogers-CSC Planning Dennis Wicks-CSC, Jim Rogers-CSC Mike Delmont Mike Delmont Project Support / /Mandy Tatum-SGT Project Support Mandy Tatum-SGT Business Support Business Support Deputy Project Manager/Resources Deputy Project Manager/Resources Rich Ryan Rich Ryan Financial Manager Secretary Tracy Felton (acting) Secretary Paula Wood Paula Wood Resource Analyst Linnette Morales Mission Systems Engineering Mission Systems Engineering Systems Engineer / /Shane Hynes-Swales Systems Engineer Shane Hynes-Swales General Business Support Instrument Systems Engineer / /Steve Aloezos, Steve Wasserzug-Swales, Instrument Systems Engineer Steve Aloezos, Steve Wasserzug-Swales, B. Power-SGT, J. Arrison-OSC, D. Paugh-SGT, L. Wyatt-CSC Katie Barthelme-OMI Katie Barthelme-OMI Systems Engineering / /Joe Cerullo-ASRC Systems Engineering Joe Cerullo-ASRC Project Support Manager Contamination Engineering / / TereseErrigo Contamination Engineering Terese Errigo Kim Higgins-El -SGT S/W Systems Engineering / /Jerry Hengemihle-MTEL S/W Systems Engineering Jerry Hengemihle-MTEL Project Scientist Project Scientist Mission Director / Steve Odendahl Michael Kaiser Michael Kaiser Mission Operations Engineer / Clay Deyarmin Deputy Proj. Scientist STEREO Science Center Terry Kucera Bill Thompson-EITI System Assurance System Assurance Observatory Management Instrument Management Observatory Management Instrument Management Systems Assurance Mgr. / /Laurie Kleppin (acting) Systems Assurance Mgr. Laurie Kleppin (acting) Observatory Manager / /Mark Jarosz Manuf. & Process. Mgr / Mike Jones/OSC Observatory Manager Mark Jarosz Manuf. & Process. Mgr / Mike Jones/OSC QAE / Larry Gibb-SRSTE QAE / Larry Gibb-SRSTE JHU/APL IMPACT/ UCB Parts Assurance Ed Reynolds, Project Mgr. Instrument Mgr. / Lil Reichenthal Antonio Reyes-OSC SWAVES/ UMN Safety Instrument Mgr. / Paul Buchanan Brian Smolnick SECCHI/ NRL Reliability Instrument Mgr. / Bernie Klein Matt Samuel-MUNIZ Software Quality Assurance PLASTIC/ UNH Vacant Instrument Mgr. / Paul Buchanan 23 March 2006
  • 15. CONFIGURATION MANAGEMENT (CM) CM is a formal process of identification, control, verification and accountability of requirements to meet the overall objectives. A process for the control of baselined documents and drawings. A process for the control of all proposed changes to baselined documents and drawings that may affect form, fit, function, cost and schedule.
  • 16. IN-HOUSE vs. OUT-OF-HOUSE Requirements In-House Out-of-House Project CCB Yes Yes Mission/Sys Eng Yes Yes CCB SC/Subsys CCB Yes SOW Instrument/ Yes / SOW Yes / SOW Payloads Drawing Control Yes SOW Work Order Yes SOW
  • 17. PRINCIPLES OF CM Configuration Identification Configuration Control Configuration Status Accounting Configuration Verification
  • 18. CONFIGURATION IDENTIFICATION Process of identifying Configured Items Designating technical documentation Naming and numbering the Configured Items
  • 21. LRO COMMAND & DATA HANDLING SYSTEM
  • 22. DOCUMENT TREE Documents that define all aspects of a project
  • 23. DRAWINGS Defines all mechanical and electrical aspects for a spacecraft and subsystems Defines all interfaces
  • 24. CONFIGURATION CONTROL Systematic coordination, evaluation, approval, and release of changes Ensure changes are properly and completely defined Evaluate the cost, schedule, and performance impacts of a proposed change
  • 25. CHANGE CONTROL Configuration Control Boards (CCBs) Project (Level 2) Systems (Level 3) Subsystems (Level 4)
  • 26. Configuration Status Accounting Recording and reporting of all project documents and drawings - Approved List of Configured Items - Status of Proposed Changes
  • 27. CONFIGURATION VERIFICATION Ensure all requirements are in compliance for Configuration Management Ensure all proposed changes have been implemented and/or resolved
  • 28. CONFIGURATION MANAGEMENT WORKING FOR A PROJECT Does Configuration Management just happen? Central focus point for any project To be or not to be…
  • 29. LRO LAUNCH VEHICLE SECOND STAGE