Constellation Space Transportation Planning Office




                                                           Operability

                                                     Program Management Challenge
                                                             February 2010




                                                                            Carol Scott
                                                                            Constellation Space Transportation
                                                                            Planning Office (CSTP)
                                                                   1                                 Used with Permission
Operability for Constellation System
Constellation Space Transportation Planning Office



                                                        Constellation Program has made progress toward operability during
                                                         the early design phase of life cycle
                                                        Constellation Space Transportation Planning office developed
                                                         Constellation Operability Advocacy Assessment.
                                                          Current State
                                                          Operability – Definition
                                                          Current Approaches
                                                          New Operability Efforts




                                                                                       2
Scope - Operability
Constellation Space Transportation Planning Office



                                                        To have successful, safe, and cost effective mission execution:
                                                          “Performance” must be balanced with “Operability” in the
                                                           system engineering design process
                                                          Therefore design engineers must consider:
                                                            How one part of the design solution effects the safe processing
                                                              and operations of the system and the other portions of the total
                                                              system engineering solution
                                                            How a design decision must be incorporated into the
                                                              hardware/software through the stages of the lifecycle
                                                            How trades are made between technical design, design
                                                              cost/schedule considerations, and operations cost/schedule
                                                              considerations




                                                                                         3
Design Solution Example: Upper Stage Helium Bottle
Constellation Space Transportation Planning Office



                                                        Performance vs. Operability
                                                            I can gain performance by placing helium bottles inside cryogenic hydrogen tank,
                                                             taking advantage of cold hydrogen, leading to smaller helium bottle.
                                                        How one part of the design solution effects the safe processing and operations of
                                                         the system and the other portions of the total system engineering solution
                                                            Design Solution for helium bottle location for Upper Stage
                                                                Can the Upper Stage hydrogen cryogenic system operate sufficiently with helium bottles in
                                                                 Upper Stage, leaks?
                                                                What are production issues, ground processing issues, special flight operation procedures?
                                                                Added complexity to maintaining ullage pressure during flight?
                                                        How a design decision must be incorporated into the hardware/software through
                                                         the stages of the lifecycle
                                                            Design solution evolution from PDR/CDR/ Production Operations and Sustaining
                                                        How trades are made between technical design, design cost/schedule
                                                         considerations, and operations cost/schedule considerations
                                                          Helium bottle location in hydrogen tank vs. tank major structure
                                                             Structural loads for tank position
                                                             Design cost and schedule for each option
                                                             Operations sustaining cost and schedule for production, ground and flight


                                                                                                         4
Current State
Constellation Space Transportation Planning Office



                                                        Operability – no common agency/program definition
                                                        Initial design trade studies focus on performance first.
                                                          Operability becomes a focus after vehicle performance
                                                           requirements are established
                                                        Operability consequences of utilizing heritage hardware and
                                                         infrastructure
                                                          Heritage facilities bring fixed constants affecting operability
                                                            Clean sheet will usually have fewer facilities
                                                            Heritage facilities have fixed capacities, may be more than CxP
                                                              needs
                                                          Heritage facilities must concurrently accommodate CSTP
                                                           production & operations and CxP modifications for lunar phase
                                                        Estimated Constellation production, sustaining and operations
                                                         (Phase D&E of life cycle) costs are too high

                                                                                        5
Operability – Definition
Constellation Space Transportation Planning Office


                                                        Operability is the summation the system characteristics (Producibility, Reliability, Interoperability,
                                                         Sustainability, Maintainability) to ensure safe flight while minimizing fixed and variable costs during
                                                         the Production, Operating and Sustaining Phases (Phase D & E) of the life cycle.

                                                                                                                        Producibility is the ease and economy with which a
                                                                                                                         completed design can be fabricated, manufactured or coded
                                                                                                                         into hardware/software products. (SP-6105 Dec 2007)

                                                                                                                        Reliability is robustness of system to be fault tolerant during
                                                        Producibility                                Op                  its operating parameters and environment to safely achieve the
                                                          Reliability                                   erab             mission
                                                     Interoperability                                       ilit         (SP-6105 Dec 2007)
                                                                                                                 y
                                                       Sustainability                                                   Interoperability is the ease of exchanging data between
                                                     Maintainability                                                     design and operations tools for reduced human error and
                                                                                                                         complexity of the integration tasks (SP-6105 Dec 2007)
                                                                             P + R SummationM = O
                                                                                   +I+S+
                                                                                                                        Sustainability is upholding and supporting the configuration
                                                                                                                         of the system through the operating life cycle.

                                                                                                                        Maintainability is the inherent characteristics of a design that
                                                                                                                         contribute to the ease and economy to assemble, integrate,
                                                                                                                         retain or restore the hardware/software to specified conditions
                                                                                                                         safely and accurately (SP-6105 Dec 2007)




                                                          OPhase D&E = OProduction + OGround + OFlight + OManagement Systems
                                                                                                            6                            SP-6105: NASA System Engineering Handbook Dec 2007
Current Approaches
Constellation Space Transportation Planning Office



                                                     CxP Operability Evolution
                                                      Constellation Architecture Requirements Document (CARD): high level
                                                       operability requirements
                                                      Constellation Operability Optimization List
                                                          Numerous examples for operability derived between Ground Operations and
                                                            Flight Design projects
                                                      Ares Operability Assessment Team Established
                                                          Dozens of operability changes incorporated between Ares and Ground
                                                            Operations projects during PDR cycle collaboration
                                                      Software and data architecture emphasizes moving from document management
                                                       to data management
                                                      Cx program operations engineer position added to help identify key operations
                                                       engineering activities throughout 2007 to present
                                                      Orion’s PDR included operability as emphasis area




                                                                                           7
Operability Successes
Constellation Space Transportation Planning Office


                                                        Ares I/ Ground Ops
                                                          Adoption of mono-propellant systems for RoCS, ReCS and FS TVC
                                                                Commonality of commodity reduces processing hazards/loading timelines/maintenance cost
                                                           ReCS service panel relocation to OML for access ease
                                                          RoCS service panel relocation to I/S door area eliminates access arm
                                                          Interstage door relocation aligns for ReCS service panel and eliminates 2 separate
                                                            access arms
                                                        Orion Production
                                                          Developed segmented Crew Module (CM) concept
                                                             Saves four months of AI&P schedule in the O&C
                                                                     Top half the CM is welded after outfitting (Previous to this design the only access was via
                                                                      the hatch)
                                                          Implement cable harness wire identification
                                                        Ground Ops
                                                          VAB Platforms
                                                             New platforms selected over modified Shuttle allowing for optimal access
                                                             Separate VAB platform levels, not ganged platform assemblies, allow for individual
                                                              platform operations reducing operational constraints between task
                                                             Platform inserts at vehicle interfaces providing flexibility for future vehicle changes




                                                                                                                    8
New Operability Efforts
Constellation Space Transportation Planning Office


                                                        Agency establishes CSTPO:
                                                          Production, Operations, and Sustaining counterpart to the Constellation Program’s DDT&E role.
                                                          Cx Associate Program Manager for Operations and Sustaining


                                                                           Constellation Program      Constellation Space
                                                                                                      Transportation Program
                                                         LEO


                                                                   Lunar


                                                                                      Mars




                                                                                                     9
New Operability Efforts
Constellation Space Transportation Planning Office



                                                        CSTP Organization
                                                          Establishing interfaces between CxP and CSTP (ESMD and SOMD)
                                                          Interfacing with CxP boards and panels
                                                          Embedding into design centers’ processes
                                                          Evaluating cost drivers during the next two PPBE cycles
                                                          Evaluate mechanisms for funding operability opportunities


                                                        CSTP Technical Authority Support
                                                          Engineering
                                                            Co-located 24 Flight Program System Engineers (FPSE) w/ designers
                                                            Evaluating operability opportunities during design (PDR-CDR)
                                                          Safety & Mission Assurance
                                                            Defining flight hardware safety organization structure and interfaces with
                                                             JSC and MSFC S&MA




                                                                                              10
Summary
Constellation Space Transportation Planning Office


                                                        Define Operability for Constellation phase D & E
                                                        Address operability of production, ground operations, flight operations, management
                                                         systems and lessons for the next Architecture Cycle (Lunar)



                                                                    To have successful, safe, and cost effective mission execution;
                                                                       “Performance” must be balanced with “Operability”
                                                                            in the System Engineering Design Process
                                                                  Performance + Operability = Mission Success

                                                                                             Producibility                       Op
                                                                                               Reliability                          erab
                                                                                          Maintainability                               ilit
                                                                                                                                             y
                                                                                          Interoperability
                                                                                            Sustainability
                                                                                                                  Optimization




                                                                                                             11
Constellation Space Transportation Planning Office
Constellation Space Transportation Planning Office


                                                        NASA has established CSTP in late 2008 to be the Operations and Sustaining counterpart
                                                         to the Constellation DDT&E Program
                                                        CSTP is embedded into the CxP processes to prepare the Constellation Ares I/ Orion block
                                                         I for the Operations and Sustaining phase of the life cycle.
                                                           Includes Production, Ground Processing, Flight Ops and Recovery

                                                        Charter:
                                                          Lay the groundwork for the Constellation Space Transportation Program
                                                             Work within the agency governance structure
                                                             Establish in program/project activities and processes the
                                                                   Engineering Technical Authority
                                                                   Safety Technical Authority
                                                                   Health and Medical Technical Authority
                                                               Work with the Cx program and projects to establish collaborative relationships
                                                               Work closely with the Mission Operations Directorate at JSC
                                                                   Flight rule development, planning, ascent, on orbit, and reentry/landing support

                                                        Constellation Space Transportation Program
                                                          Charter:
                                                             Manage the production, sustaining engineering, launch preparations, on-orbit and
                                                              recovery of the Ares I/Orion vehicle configuration that will transport crew safely
                                                              to/from the ISS

Weitere ähnliche Inhalte

Was ist angesagt?

D brown gbezos_shirshorn
D brown gbezos_shirshornD brown gbezos_shirshorn
D brown gbezos_shirshornNASAPMC
 
Carsile.azarbain
Carsile.azarbainCarsile.azarbain
Carsile.azarbainNASAPMC
 
David.oberhettinger
David.oberhettingerDavid.oberhettinger
David.oberhettingerNASAPMC
 
Vince.bilardo
Vince.bilardoVince.bilardo
Vince.bilardoNASAPMC
 
Saltzman.john
Saltzman.johnSaltzman.john
Saltzman.johnNASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Mitskevich amanda
Mitskevich amandaMitskevich amanda
Mitskevich amandaNASAPMC
 
Armstrong
ArmstrongArmstrong
ArmstrongNASAPMC
 
Friedenthal.sandford
Friedenthal.sandfordFriedenthal.sandford
Friedenthal.sandfordNASAPMC
 
Dittemore.gary
Dittemore.garyDittemore.gary
Dittemore.garyNASAPMC
 
Thomas.diegelman
Thomas.diegelmanThomas.diegelman
Thomas.diegelmanNASAPMC
 
Strassner retherford
Strassner retherfordStrassner retherford
Strassner retherfordNASAPMC
 
Skibsmotorer reducerer brændselsforbruget (IBM Rational)
Skibsmotorer reducerer brændselsforbruget (IBM Rational)Skibsmotorer reducerer brændselsforbruget (IBM Rational)
Skibsmotorer reducerer brændselsforbruget (IBM Rational)IBM Danmark
 
Hazen michael
Hazen michaelHazen michael
Hazen michaelNASAPMC
 
Hanley jeff
Hanley jeffHanley jeff
Hanley jeffNASAPMC
 
Gonzalez.matthew
Gonzalez.matthewGonzalez.matthew
Gonzalez.matthewNASAPMC
 

Was ist angesagt? (17)

D brown gbezos_shirshorn
D brown gbezos_shirshornD brown gbezos_shirshorn
D brown gbezos_shirshorn
 
Carsile.azarbain
Carsile.azarbainCarsile.azarbain
Carsile.azarbain
 
Krishen
KrishenKrishen
Krishen
 
David.oberhettinger
David.oberhettingerDavid.oberhettinger
David.oberhettinger
 
Vince.bilardo
Vince.bilardoVince.bilardo
Vince.bilardo
 
Saltzman.john
Saltzman.johnSaltzman.john
Saltzman.john
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Mitskevich amanda
Mitskevich amandaMitskevich amanda
Mitskevich amanda
 
Armstrong
ArmstrongArmstrong
Armstrong
 
Friedenthal.sandford
Friedenthal.sandfordFriedenthal.sandford
Friedenthal.sandford
 
Dittemore.gary
Dittemore.garyDittemore.gary
Dittemore.gary
 
Thomas.diegelman
Thomas.diegelmanThomas.diegelman
Thomas.diegelman
 
Strassner retherford
Strassner retherfordStrassner retherford
Strassner retherford
 
Skibsmotorer reducerer brændselsforbruget (IBM Rational)
Skibsmotorer reducerer brændselsforbruget (IBM Rational)Skibsmotorer reducerer brændselsforbruget (IBM Rational)
Skibsmotorer reducerer brændselsforbruget (IBM Rational)
 
Hazen michael
Hazen michaelHazen michael
Hazen michael
 
Hanley jeff
Hanley jeffHanley jeff
Hanley jeff
 
Gonzalez.matthew
Gonzalez.matthewGonzalez.matthew
Gonzalez.matthew
 

Ähnlich wie Carol.scott

Value Engineering for Roads & Highways Project
Value Engineering for Roads & Highways ProjectValue Engineering for Roads & Highways Project
Value Engineering for Roads & Highways Projectajmal4
 
Dickey.alan
Dickey.alanDickey.alan
Dickey.alanNASAPMC
 
Chen.tim
Chen.timChen.tim
Chen.timNASAPMC
 
Geyer.m.sasaki.c
Geyer.m.sasaki.cGeyer.m.sasaki.c
Geyer.m.sasaki.cNASAPMC
 
D.mathieson agile software_development_using_scrum
D.mathieson agile software_development_using_scrumD.mathieson agile software_development_using_scrum
D.mathieson agile software_development_using_scrumRamkumar Sundarakalatharan
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.yNASAPMC
 
Harvey elliott
Harvey elliottHarvey elliott
Harvey elliottNASAPMC
 
An Introduction to Software Performance Engineering
An Introduction to Software Performance EngineeringAn Introduction to Software Performance Engineering
An Introduction to Software Performance EngineeringCorrelsense
 
Dec 2012 Evening Talk - Managing Complex Project
Dec 2012 Evening Talk - Managing Complex ProjectDec 2012 Evening Talk - Managing Complex Project
Dec 2012 Evening Talk - Managing Complex ProjectZulkefle Idris
 
Reed simpson
Reed simpsonReed simpson
Reed simpsonNASAPMC
 
Strassner retherford
Strassner retherfordStrassner retherford
Strassner retherfordNASAPMC
 
Are good SharePoint solutions only a myth?
Are good SharePoint solutions only a myth?Are good SharePoint solutions only a myth?
Are good SharePoint solutions only a myth?Adis Jugo
 
Ed.mango
Ed.mangoEd.mango
Ed.mangoNASAPMC
 
Behavior Driven Development (BDD)
Behavior Driven Development (BDD)Behavior Driven Development (BDD)
Behavior Driven Development (BDD)Ajay Danait
 
Dassian Program Plans and Controls (PPC)
Dassian Program Plans and Controls (PPC)Dassian Program Plans and Controls (PPC)
Dassian Program Plans and Controls (PPC)Dassian Inc.
 
Aras Innovator PLM Deployment Methodology
Aras Innovator PLM Deployment MethodologyAras Innovator PLM Deployment Methodology
Aras Innovator PLM Deployment MethodologyAras
 
Majerowicz
MajerowiczMajerowicz
MajerowiczNASAPMC
 
Team management presentation3
Team management presentation3Team management presentation3
Team management presentation3John Martin
 
Optimize your Application Delivery
Optimize your Application DeliveryOptimize your Application Delivery
Optimize your Application DeliveryXebiaLabs
 

Ähnlich wie Carol.scott (20)

Value Engineering for Roads & Highways Project
Value Engineering for Roads & Highways ProjectValue Engineering for Roads & Highways Project
Value Engineering for Roads & Highways Project
 
Dickey.alan
Dickey.alanDickey.alan
Dickey.alan
 
Chen.tim
Chen.timChen.tim
Chen.tim
 
Geyer.m.sasaki.c
Geyer.m.sasaki.cGeyer.m.sasaki.c
Geyer.m.sasaki.c
 
D.mathieson agile software_development_using_scrum
D.mathieson agile software_development_using_scrumD.mathieson agile software_development_using_scrum
D.mathieson agile software_development_using_scrum
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.y
 
Harvey elliott
Harvey elliottHarvey elliott
Harvey elliott
 
An Introduction to Software Performance Engineering
An Introduction to Software Performance EngineeringAn Introduction to Software Performance Engineering
An Introduction to Software Performance Engineering
 
Dec 2012 Evening Talk - Managing Complex Project
Dec 2012 Evening Talk - Managing Complex ProjectDec 2012 Evening Talk - Managing Complex Project
Dec 2012 Evening Talk - Managing Complex Project
 
Reed simpson
Reed simpsonReed simpson
Reed simpson
 
Strassner retherford
Strassner retherfordStrassner retherford
Strassner retherford
 
Are good SharePoint solutions only a myth?
Are good SharePoint solutions only a myth?Are good SharePoint solutions only a myth?
Are good SharePoint solutions only a myth?
 
Ed.mango
Ed.mangoEd.mango
Ed.mango
 
Behavior Driven Development (BDD)
Behavior Driven Development (BDD)Behavior Driven Development (BDD)
Behavior Driven Development (BDD)
 
10.1.1.85.7969
10.1.1.85.796910.1.1.85.7969
10.1.1.85.7969
 
Dassian Program Plans and Controls (PPC)
Dassian Program Plans and Controls (PPC)Dassian Program Plans and Controls (PPC)
Dassian Program Plans and Controls (PPC)
 
Aras Innovator PLM Deployment Methodology
Aras Innovator PLM Deployment MethodologyAras Innovator PLM Deployment Methodology
Aras Innovator PLM Deployment Methodology
 
Majerowicz
MajerowiczMajerowicz
Majerowicz
 
Team management presentation3
Team management presentation3Team management presentation3
Team management presentation3
 
Optimize your Application Delivery
Optimize your Application DeliveryOptimize your Application Delivery
Optimize your Application Delivery
 

Mehr von NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerryNASAPMC
 

Mehr von NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerry
 

Kürzlich hochgeladen

GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 

Kürzlich hochgeladen (20)

GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 

Carol.scott

  • 1. Constellation Space Transportation Planning Office Operability Program Management Challenge February 2010 Carol Scott Constellation Space Transportation Planning Office (CSTP) 1 Used with Permission
  • 2. Operability for Constellation System Constellation Space Transportation Planning Office  Constellation Program has made progress toward operability during the early design phase of life cycle  Constellation Space Transportation Planning office developed Constellation Operability Advocacy Assessment.  Current State  Operability – Definition  Current Approaches  New Operability Efforts 2
  • 3. Scope - Operability Constellation Space Transportation Planning Office  To have successful, safe, and cost effective mission execution:  “Performance” must be balanced with “Operability” in the system engineering design process  Therefore design engineers must consider:  How one part of the design solution effects the safe processing and operations of the system and the other portions of the total system engineering solution  How a design decision must be incorporated into the hardware/software through the stages of the lifecycle  How trades are made between technical design, design cost/schedule considerations, and operations cost/schedule considerations 3
  • 4. Design Solution Example: Upper Stage Helium Bottle Constellation Space Transportation Planning Office  Performance vs. Operability  I can gain performance by placing helium bottles inside cryogenic hydrogen tank, taking advantage of cold hydrogen, leading to smaller helium bottle.  How one part of the design solution effects the safe processing and operations of the system and the other portions of the total system engineering solution  Design Solution for helium bottle location for Upper Stage  Can the Upper Stage hydrogen cryogenic system operate sufficiently with helium bottles in Upper Stage, leaks?  What are production issues, ground processing issues, special flight operation procedures?  Added complexity to maintaining ullage pressure during flight?  How a design decision must be incorporated into the hardware/software through the stages of the lifecycle  Design solution evolution from PDR/CDR/ Production Operations and Sustaining  How trades are made between technical design, design cost/schedule considerations, and operations cost/schedule considerations  Helium bottle location in hydrogen tank vs. tank major structure  Structural loads for tank position  Design cost and schedule for each option  Operations sustaining cost and schedule for production, ground and flight 4
  • 5. Current State Constellation Space Transportation Planning Office  Operability – no common agency/program definition  Initial design trade studies focus on performance first.  Operability becomes a focus after vehicle performance requirements are established  Operability consequences of utilizing heritage hardware and infrastructure  Heritage facilities bring fixed constants affecting operability  Clean sheet will usually have fewer facilities  Heritage facilities have fixed capacities, may be more than CxP needs  Heritage facilities must concurrently accommodate CSTP production & operations and CxP modifications for lunar phase  Estimated Constellation production, sustaining and operations (Phase D&E of life cycle) costs are too high 5
  • 6. Operability – Definition Constellation Space Transportation Planning Office  Operability is the summation the system characteristics (Producibility, Reliability, Interoperability, Sustainability, Maintainability) to ensure safe flight while minimizing fixed and variable costs during the Production, Operating and Sustaining Phases (Phase D & E) of the life cycle.  Producibility is the ease and economy with which a completed design can be fabricated, manufactured or coded into hardware/software products. (SP-6105 Dec 2007)  Reliability is robustness of system to be fault tolerant during Producibility Op its operating parameters and environment to safely achieve the Reliability erab mission Interoperability ilit (SP-6105 Dec 2007) y Sustainability  Interoperability is the ease of exchanging data between Maintainability design and operations tools for reduced human error and complexity of the integration tasks (SP-6105 Dec 2007) P + R SummationM = O +I+S+  Sustainability is upholding and supporting the configuration of the system through the operating life cycle.  Maintainability is the inherent characteristics of a design that contribute to the ease and economy to assemble, integrate, retain or restore the hardware/software to specified conditions safely and accurately (SP-6105 Dec 2007) OPhase D&E = OProduction + OGround + OFlight + OManagement Systems 6 SP-6105: NASA System Engineering Handbook Dec 2007
  • 7. Current Approaches Constellation Space Transportation Planning Office CxP Operability Evolution  Constellation Architecture Requirements Document (CARD): high level operability requirements  Constellation Operability Optimization List  Numerous examples for operability derived between Ground Operations and Flight Design projects  Ares Operability Assessment Team Established  Dozens of operability changes incorporated between Ares and Ground Operations projects during PDR cycle collaboration  Software and data architecture emphasizes moving from document management to data management  Cx program operations engineer position added to help identify key operations engineering activities throughout 2007 to present  Orion’s PDR included operability as emphasis area 7
  • 8. Operability Successes Constellation Space Transportation Planning Office  Ares I/ Ground Ops  Adoption of mono-propellant systems for RoCS, ReCS and FS TVC  Commonality of commodity reduces processing hazards/loading timelines/maintenance cost  ReCS service panel relocation to OML for access ease  RoCS service panel relocation to I/S door area eliminates access arm  Interstage door relocation aligns for ReCS service panel and eliminates 2 separate access arms  Orion Production  Developed segmented Crew Module (CM) concept  Saves four months of AI&P schedule in the O&C  Top half the CM is welded after outfitting (Previous to this design the only access was via the hatch)  Implement cable harness wire identification  Ground Ops  VAB Platforms  New platforms selected over modified Shuttle allowing for optimal access  Separate VAB platform levels, not ganged platform assemblies, allow for individual platform operations reducing operational constraints between task  Platform inserts at vehicle interfaces providing flexibility for future vehicle changes 8
  • 9. New Operability Efforts Constellation Space Transportation Planning Office  Agency establishes CSTPO:  Production, Operations, and Sustaining counterpart to the Constellation Program’s DDT&E role.  Cx Associate Program Manager for Operations and Sustaining Constellation Program Constellation Space Transportation Program LEO Lunar Mars 9
  • 10. New Operability Efforts Constellation Space Transportation Planning Office  CSTP Organization  Establishing interfaces between CxP and CSTP (ESMD and SOMD)  Interfacing with CxP boards and panels  Embedding into design centers’ processes  Evaluating cost drivers during the next two PPBE cycles  Evaluate mechanisms for funding operability opportunities  CSTP Technical Authority Support  Engineering  Co-located 24 Flight Program System Engineers (FPSE) w/ designers  Evaluating operability opportunities during design (PDR-CDR)  Safety & Mission Assurance  Defining flight hardware safety organization structure and interfaces with JSC and MSFC S&MA 10
  • 11. Summary Constellation Space Transportation Planning Office  Define Operability for Constellation phase D & E  Address operability of production, ground operations, flight operations, management systems and lessons for the next Architecture Cycle (Lunar) To have successful, safe, and cost effective mission execution; “Performance” must be balanced with “Operability” in the System Engineering Design Process Performance + Operability = Mission Success Producibility Op Reliability erab Maintainability ilit y Interoperability Sustainability Optimization 11
  • 12. Constellation Space Transportation Planning Office Constellation Space Transportation Planning Office  NASA has established CSTP in late 2008 to be the Operations and Sustaining counterpart to the Constellation DDT&E Program  CSTP is embedded into the CxP processes to prepare the Constellation Ares I/ Orion block I for the Operations and Sustaining phase of the life cycle.  Includes Production, Ground Processing, Flight Ops and Recovery  Charter:  Lay the groundwork for the Constellation Space Transportation Program  Work within the agency governance structure  Establish in program/project activities and processes the  Engineering Technical Authority  Safety Technical Authority  Health and Medical Technical Authority  Work with the Cx program and projects to establish collaborative relationships  Work closely with the Mission Operations Directorate at JSC  Flight rule development, planning, ascent, on orbit, and reentry/landing support  Constellation Space Transportation Program  Charter:  Manage the production, sustaining engineering, launch preparations, on-orbit and recovery of the Ares I/Orion vehicle configuration that will transport crew safely to/from the ISS