SlideShare a Scribd company logo
1 of 7
Curriculum vitae 1
Post for the Senior Land surveyor
Mumtaz Ahmad
Mob # 00966-501848538 ,580016658
Date of Birth 15th
October1977
Nationality Pakistani
Languages Known Urdu, English &. Arabic
Marital Status Married
Iqma status valid . Transferable
Email zainmumtaz@yahoo.com
Driving Lincse Valid K.S.A
___________________________________________________________________________________
Carrier Objective
To secure a challenging and relative position in Land Surveyor Organization that provides platform for
my skills to scaffold and contribute to the growth of the organization in an environment conductive to
continual advancement of knowledge and skills to prove inherent creativeness innovationness and
natural leadership qualities.
Personal Profile
Attitude to work hard with dedication and involvement, ability to learn new skills and thirst for the new
emerging technologies.
___________________________________________________________________________________
Academic Qualification: Secondary School Certificate (with Science 1994)
Technical Qualification Diploma of Associate Engineer Civil Technology(D.A.E) Passed 1999
from the Institute of Engineering and Technology Lahore Board (Pakistan)
Short Courses of Basic Computer Knowledge Excel , word ,auto cad,auto
desk,traverse measreurment & recorede data download .
Instruments Used Instruments
SOKKIA 510 & 610
Leica , Ts 02 , 1203 G.P.S
All kinds of Simple Theodlite
All kinds of Level
Page 1
Curriculum vitae 2
Total Experience 16 Years in Relevant Field
Work Experience in Saudi Arabia
Duration May 2011 to Present .
Company Dar Al Riyadh ( E & A Consultant )
Project ITCC(information Technology &communication complex &K A F D
King Abdullah financial district .)
A Construction project High rise Buildings ,world class Hotel .
Position Senior Surveyor :
Responsibility:
 Perform survey work under the direction and guidance of the Assistant Resident Engineer.
 Report discrepancies or technical problems to the Assistant Resident Engineer.
 Coordinate with the Contractor’s surveyor on work priorities and schedules.
 Coordinate work assignments with the schedule of the contractor to ensure timely completion of
projects.
 Perform regular checks of the Contractor’s setting out to verify proper execution and accuracy.
 Check completed work for conformance to the line and grade required by the project plans in
coordination with the Inspector assigned to the item of work.
 Check all work by completing traverse closures and bench mark circuits .
 Prepare relocation, verification, accomplishment, and survey findings report
 Plan, coordinate and supervise the work of several field survey crews.
 Supervise survey party staff.
 Arrange joint survey with contractor collect details from site for grading and preparation of new
design.
 Complete all surveying assignments on time as per schedule.
 Maintain equipment in proper condition and perform frequent calibration checks.
 Monitor and assure compliance with procedures and quality assurance / control standards.
 Perform periodic QA/QC review of the project work .
 Check the primary horizontal and vertical control points including reference ties for re- establishing
the points in the field.
 Record all measurements, rod readings and calculations neatly and accurately in field books as the
work progresses.
 Keep detailed and accurate records of crew activities, survey data.
Detail study of drawing for avoiding any mistake during work .
 Review and analyze work methods to increase efficiency and productivity and provide input into the
Writing of performance stander .
 Review of As built drawings & verify/ coordinate the shop drawings with other MEP services.
 Review the submittal ( G. arrangement ,Setting out , Section ) and approve shop drawings.
 Supervise Structural work of contractor horizontal .vertical element like ( core wall share wall
, ratting wall , mass wall, ramp of basement , slab ,beams . setting out of columns .planted columns
,Racking columns. Raft and footing .
Supervise the survey work of architectural setting out curve stone wheel stopper ,block work ,lintel
beam, stiffener columns , stair case step & landing.ect.
Page 2
Curriculum vitae 3
Duration 22Feb 2011 To 11 April 2011 .
Company Seder Group.
Project Rcc structure
Position Surveyor & site Supervisor.
Responsibility:
responsible survey work completion of project with in time .
responsible for overall site management of material, equipment
Quantity surveying preparation of project completion report .
responsible survey work overall the project excavation up to final
handover. detail studies of design drawing avoid any mistake prepared
setting out plan lean concrete ,footing columns .columns neck ,grad
beams. roof slab .beams & up stand .
supervise the survey party staff (structure & architectural )
contribute completion of project as per Project manger instruction final as built .
Duration 1st June 2009 To 10Th
Jan 2011
Company Technical United Works Company Ltd
Project RCC Car scanning Building of Saudi Custom
Position Site Supervisor / Surveyor
Responsibility:
 Setting out axis of building .traversing closed ,adjustment coordinates.
 Setting out of building Excavation footing & raft .
 Setting out of footing & raft foundation .
 Setting out planted columns , beams ,slab ratting wall .
 As built and prepared red line drawings.
 Visits the job-site for the purpose of clarifying of structural plans and to inspect structural
works prior to consultant inspection & concrete pouring.
 Plan, coordinate and supervise the work of several field survey crews.
 Keep detailed and accurate records of crew activities, survey data.
Prepared bar banding schedule as per steel drawing ,supervise Steel work installation .
 Prepares evaluation or site inspection reports.
 Responsible for material deliveries, inventory, stockpile, unloading and selection.
Direct reporting to Project Manager to coordinate about the project problem.
Monitored and pro-actively identified and corrected technical, schedule and financial issues through
effective communication with the Project Manager and other management staff.
 Participated in preparation of engineering services proposals, including the calculation/estimation of
time schedules and costs of the proposed work.
 Independently communicated on technical matters with the consultant .
Collect date from the site prepared proposal change of design .
Check setting out Electro mechanical work, Safety fair ,
Security Camera. All cables related electrical work installation .finishing
Page 3
Curriculum vitae 4
Work ,marble Ceramic tiles ,door ,windows, paints & aluminum
cladding . bathroom setting & sewer system Installation .
Supervise landscaping work cement tiles curve stones & irrigation system .
Duration 9th
June 2008 to 25may 2009
Company Geo Reference Consultant(surveying &mapping)
Project Road Design Survey & Topography survey
Position Senior Surveyor .
Responsibility :
 Handling the survey works setting out & level Making Traverse control
points.(traverse calculate by manual & computer )
 Plan, coordinate and supervise the work of several field survey crews.
All (field ) data recorded in the total station & download via Pro link total station to computer .
 Triangulation surveys to fix survey control point along the roads Bridge Sit surveys producing plans
of various surveys. Calculates heights, depths, relative positions, boundary lines, and other
characteristics of terrains and structures.
 Conducted and supervised research of public records in connection with land surveys.
 Performed and supervised various surveying functions including topography surveys .
 Topography survey supervision & management of site
 Supervise survey party staff.
All land surveying activities as well as coordination with Engineers and Project Managers clients,
and others concerned with projects.
Duration 12th
June 2004 to 28th
may 2008
Company Al Marafik Construction Co.
Project Main Sewer Line Riyadh North Sewerage Project. RCC &
VCP pipe dia 1600mm to 700mm &Sewerage treatment
plant and building, Road Works.
Position Senior Surveyor .
Responsibility:
Head of Land Surveying department, preparing surveying data coordinates, drawing for layout.
 Setting out of Pipe Line survey calculating surveying data. Preparing surveying inspections.
 Detail study of drawing for avoiding any mistake during work.
Responsible the overall construction site work check the Quantity of material as per requirement .
Plan actives of manpower give instruction assistant get the more progress .
Prepared bar banding schedule supervise Reinforcement installation & concrete pouring program .
Direct reporting to Project Manager to coordinate about the project problem
Prepared Daily Weekly Monthly Progress report.
 Provide data and prepare documents for Project Billing Collection.
 Any change the design drawing submit to engineer prepared new layout as comments consultant and
project manager .
 prepared design of pipe in term of slop and invert levels & profile ,survey sheet .
Page 4
Curriculum vitae 5
Duration 2nd
April 2003 to 30th
May 2004
Company Al Alwan Contracting Est.
Project Main Sewer Line Dirryah City. RCCP pipe dia 1700mm to
s1100mm.
Position Surveyor .
Responsibility:
Setting out center line of Excavation .
Shift Bench mark working area with total station .
Setting out of main hole.
calculate the quantity of Excavation & back filling ,concrete .
 Prepared bar banding should submit to consultant for the approval.
 Team member of Engineers to carryout day to day work as per specifications.
Prepared the daily progress report submit to project manager .
Co-ordination with the consultant staff.
Work Experience in Pakistan
Duration 4th
March 1998 to 12th
November 1998
Company ECHO West Const. Group
Project Mid Country Oil Refinery Project
Position Site supervisor.
Responsibility: Setting out Rcc tank , footing & supervised steel ,concrete ,finishing work.
Supervise substation building excavation up to finishing .
Duration 17th
December 1998 to 22nd
March 1999
Company Descon Engineering Ltd.
Project PARCO Project .
Position Supervisor .
Responsibility: Supervising the construction work, checking the excavation, backfilling &
compaction, leveling and reinforcement works and concreting of different
reinforced concrete structures in accordance with the drawings and
specification. Columns, foundation, paving, floor slab ,calculation
paving slope. Installation electrical erathing pit ,layout heavy voltage cable
location ,cable trench .installation mechanical salve ,boxes .
Duration 15th
April 1999 to 22nd
March 2000
Company Habib Rafiq Ltd.
Project PARCO Project at Sub-Station and Housing .
Position Site supervisor.
Responsibility: Rcc based transformer foundation .check setting out, steel rebar, concrete
Pouring . Housing project inspection all steel & concrete work.
Finishing work check marble ,ceramic ,paint bath room setting .water
Supply ,hot & cold line.
Reference
Available on demand
Finally, all the data given above is true and correct to the best of my personal knowledge and belief.
Page 5
Curriculum vitae 6
Copies of my testimonials are available on demand.
Page 6
Curriculum vitae 6
Copies of my testimonials are available on demand.
Page 6

More Related Content

What's hot

Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CV
Rameez K
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
ahmed elazazy
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
SOHAIL SHAH
 
MUHAMMAD BILAL CV For Surveyor
MUHAMMAD BILAL CV For SurveyorMUHAMMAD BILAL CV For Surveyor
MUHAMMAD BILAL CV For Surveyor
Malik Bilal Awan
 
Resume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC Inspector
M.ZUBAIR KHAN
 
CV for AutoCAD Draftsman ( civil & Arch.)
CV for AutoCAD Draftsman ( civil & Arch.)CV for AutoCAD Draftsman ( civil & Arch.)
CV for AutoCAD Draftsman ( civil & Arch.)
Murshid Alam
 
Civil Engineer CV
Civil Engineer CVCivil Engineer CV
Civil Engineer CV
Afzal Khan
 
LAND SURVEYOR Resume 2013 legat
LAND SURVEYOR Resume 2013 legatLAND SURVEYOR Resume 2013 legat
LAND SURVEYOR Resume 2013 legat
Sylvain Legat
 
civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer Cv
Rinu Chacko
 
CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15
Sajan Vijayan
 

What's hot (20)

Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
 
Rameez - Site Engineer - CV
Rameez - Site Engineer - CVRameez - Site Engineer - CV
Rameez - Site Engineer - CV
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
MUHAMMAD BILAL CV For Surveyor
MUHAMMAD BILAL CV For SurveyorMUHAMMAD BILAL CV For Surveyor
MUHAMMAD BILAL CV For Surveyor
 
HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
Site civil engineer fiazuddin
Site civil engineer fiazuddinSite civil engineer fiazuddin
Site civil engineer fiazuddin
 
Resume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC Inspector
 
CV for AutoCAD Draftsman ( civil & Arch.)
CV for AutoCAD Draftsman ( civil & Arch.)CV for AutoCAD Draftsman ( civil & Arch.)
CV for AutoCAD Draftsman ( civil & Arch.)
 
Civil Engineer CV
Civil Engineer CVCivil Engineer CV
Civil Engineer CV
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
LAND SURVEYOR Resume 2013 legat
LAND SURVEYOR Resume 2013 legatLAND SURVEYOR Resume 2013 legat
LAND SURVEYOR Resume 2013 legat
 
civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer Cv
 
Vipin mv civil engineer cv and coverletter
Vipin mv civil engineer cv and coverletterVipin mv civil engineer cv and coverletter
Vipin mv civil engineer cv and coverletter
 
CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15
 
Resume of Civil Engineer - BoQ
Resume of Civil Engineer - BoQResume of Civil Engineer - BoQ
Resume of Civil Engineer - BoQ
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
 
Civil Engineer Resume
 Civil Engineer Resume Civil Engineer Resume
Civil Engineer Resume
 

Viewers also liked

Rami Hani Resume April 2016
Rami Hani Resume April 2016Rami Hani Resume April 2016
Rami Hani Resume April 2016
rami qashta
 
Hany Mohammed mahmoud Amer new1
Hany Mohammed mahmoud Amer new1Hany Mohammed mahmoud Amer new1
Hany Mohammed mahmoud Amer new1
hany amer
 
Detailed (C.V) 8814
Detailed (C.V) 8814 Detailed (C.V) 8814
Detailed (C.V) 8814
loai hany
 
Hani Nasif Resume 2014
Hani Nasif Resume 2014Hani Nasif Resume 2014
Hani Nasif Resume 2014
Hani Nasif
 
CV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-KumaranCV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-Kumaran
kumaraguru paran
 
Hani Farraj CV Final
Hani Farraj CV FinalHani Farraj CV Final
Hani Farraj CV Final
HANI FARRAJ
 
mohamed AWAD SHERIF CV
mohamed AWAD SHERIF CVmohamed AWAD SHERIF CV
mohamed AWAD SHERIF CV
mohamed awad
 
DR NOREEN JAWAD CV PDF
DR NOREEN JAWAD CV PDFDR NOREEN JAWAD CV PDF
DR NOREEN JAWAD CV PDF
Noreen Jawad
 
C.V. Eng. Abdulqader 10-8-2015
C.V. Eng. Abdulqader 10-8-2015C.V. Eng. Abdulqader 10-8-2015
C.V. Eng. Abdulqader 10-8-2015
Abdulqader Khaled
 
Curriculum vitae CV date 13-1-2016
Curriculum vitae CV date 13-1-2016Curriculum vitae CV date 13-1-2016
Curriculum vitae CV date 13-1-2016
Maitham Al Miskeen
 
Hani El Jamal Jan 2015 resume
Hani El Jamal Jan 2015 resumeHani El Jamal Jan 2015 resume
Hani El Jamal Jan 2015 resume
Hani Al Jamal
 

Viewers also liked (20)

Rami Hani Resume April 2016
Rami Hani Resume April 2016Rami Hani Resume April 2016
Rami Hani Resume April 2016
 
Hany Mohammed mahmoud Amer new1
Hany Mohammed mahmoud Amer new1Hany Mohammed mahmoud Amer new1
Hany Mohammed mahmoud Amer new1
 
M. Darwish CV 30-11-2015
M. Darwish CV 30-11-2015M. Darwish CV 30-11-2015
M. Darwish CV 30-11-2015
 
Detailed (C.V) 8814
Detailed (C.V) 8814 Detailed (C.V) 8814
Detailed (C.V) 8814
 
Maya Assaf CV
Maya Assaf CVMaya Assaf CV
Maya Assaf CV
 
CV hany
CV hanyCV hany
CV hany
 
Hani Nasif Resume 2014
Hani Nasif Resume 2014Hani Nasif Resume 2014
Hani Nasif Resume 2014
 
CV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-KumaranCV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-Kumaran
 
Hani Farraj CV Final
Hani Farraj CV FinalHani Farraj CV Final
Hani Farraj CV Final
 
mohamed AWAD SHERIF CV
mohamed AWAD SHERIF CVmohamed AWAD SHERIF CV
mohamed AWAD SHERIF CV
 
Kahlid Abdul Aziz CV
Kahlid Abdul Aziz CVKahlid Abdul Aziz CV
Kahlid Abdul Aziz CV
 
AJMAL CV,
AJMAL CV,AJMAL CV,
AJMAL CV,
 
ahmad CV
ahmad CVahmad CV
ahmad CV
 
hani C.V pdf
hani C.V pdfhani C.V pdf
hani C.V pdf
 
DR NOREEN JAWAD CV PDF
DR NOREEN JAWAD CV PDFDR NOREEN JAWAD CV PDF
DR NOREEN JAWAD CV PDF
 
Omar CV
Omar CVOmar CV
Omar CV
 
C.V. Eng. Abdulqader 10-8-2015
C.V. Eng. Abdulqader 10-8-2015C.V. Eng. Abdulqader 10-8-2015
C.V. Eng. Abdulqader 10-8-2015
 
Curriculum vitae CV date 13-1-2016
Curriculum vitae CV date 13-1-2016Curriculum vitae CV date 13-1-2016
Curriculum vitae CV date 13-1-2016
 
Hani El Jamal Jan 2015 resume
Hani El Jamal Jan 2015 resumeHani El Jamal Jan 2015 resume
Hani El Jamal Jan 2015 resume
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 

Similar to C v surveyor( Mumtaz )

Bio Data Sukdeb Samanta
Bio Data Sukdeb SamantaBio Data Sukdeb Samanta
Bio Data Sukdeb Samanta
sukdeb samanta
 
shakeel cv 19-2-2015
shakeel cv 19-2-2015shakeel cv 19-2-2015
shakeel cv 19-2-2015
shakeel anjum
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
Gowrijayashankar S V
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
mahmood mansor
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
Atif Ashraf
 
NAVI MUMBAI SPECIAL ECONOMIC ZONE
NAVI MUMBAI SPECIAL ECONOMIC ZONENAVI MUMBAI SPECIAL ECONOMIC ZONE
NAVI MUMBAI SPECIAL ECONOMIC ZONE
mihir Das
 
Raman K Gupta ,QC Engr
Raman K Gupta ,QC EngrRaman K Gupta ,QC Engr
Raman K Gupta ,QC Engr
Raman K Gupta
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016
Abi Joseph
 

Similar to C v surveyor( Mumtaz ) (20)

Bio Data Sukdeb Samanta
Bio Data Sukdeb SamantaBio Data Sukdeb Samanta
Bio Data Sukdeb Samanta
 
Sami resume new
Sami resume newSami resume new
Sami resume new
 
Shafaqat Hussain
Shafaqat Hussain Shafaqat Hussain
Shafaqat Hussain
 
Santhan CV-2016
Santhan CV-2016Santhan CV-2016
Santhan CV-2016
 
shakeel cv 19-2-2015
shakeel cv 19-2-2015shakeel cv 19-2-2015
shakeel cv 19-2-2015
 
UPDATED RESUME
UPDATED RESUMEUPDATED RESUME
UPDATED RESUME
 
Shafaqat Hussain
Shafaqat Hussain Shafaqat Hussain
Shafaqat Hussain
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
inayat ur rahman cv 1
inayat ur rahman cv 1inayat ur rahman cv 1
inayat ur rahman cv 1
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
RAVI CV (1)
RAVI CV (1)RAVI CV (1)
RAVI CV (1)
 
shafaqat cv 1
shafaqat cv 1shafaqat cv 1
shafaqat cv 1
 
NAVI MUMBAI SPECIAL ECONOMIC ZONE
NAVI MUMBAI SPECIAL ECONOMIC ZONENAVI MUMBAI SPECIAL ECONOMIC ZONE
NAVI MUMBAI SPECIAL ECONOMIC ZONE
 
Josefino Waje cv 2
Josefino Waje cv 2Josefino Waje cv 2
Josefino Waje cv 2
 
Babar Sohail Khan (1)
Babar Sohail Khan (1)Babar Sohail Khan (1)
Babar Sohail Khan (1)
 
MUHAMMAD ZEESHAN
MUHAMMAD ZEESHANMUHAMMAD ZEESHAN
MUHAMMAD ZEESHAN
 
Raman K Gupta ,QC Engr
Raman K Gupta ,QC EngrRaman K Gupta ,QC Engr
Raman K Gupta ,QC Engr
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016
 

C v surveyor( Mumtaz )

  • 1. Curriculum vitae 1 Post for the Senior Land surveyor Mumtaz Ahmad Mob # 00966-501848538 ,580016658 Date of Birth 15th October1977 Nationality Pakistani Languages Known Urdu, English &. Arabic Marital Status Married Iqma status valid . Transferable Email zainmumtaz@yahoo.com Driving Lincse Valid K.S.A ___________________________________________________________________________________ Carrier Objective To secure a challenging and relative position in Land Surveyor Organization that provides platform for my skills to scaffold and contribute to the growth of the organization in an environment conductive to continual advancement of knowledge and skills to prove inherent creativeness innovationness and natural leadership qualities. Personal Profile Attitude to work hard with dedication and involvement, ability to learn new skills and thirst for the new emerging technologies. ___________________________________________________________________________________ Academic Qualification: Secondary School Certificate (with Science 1994) Technical Qualification Diploma of Associate Engineer Civil Technology(D.A.E) Passed 1999 from the Institute of Engineering and Technology Lahore Board (Pakistan) Short Courses of Basic Computer Knowledge Excel , word ,auto cad,auto desk,traverse measreurment & recorede data download . Instruments Used Instruments SOKKIA 510 & 610 Leica , Ts 02 , 1203 G.P.S All kinds of Simple Theodlite All kinds of Level Page 1
  • 2. Curriculum vitae 2 Total Experience 16 Years in Relevant Field Work Experience in Saudi Arabia Duration May 2011 to Present . Company Dar Al Riyadh ( E & A Consultant ) Project ITCC(information Technology &communication complex &K A F D King Abdullah financial district .) A Construction project High rise Buildings ,world class Hotel . Position Senior Surveyor : Responsibility:  Perform survey work under the direction and guidance of the Assistant Resident Engineer.  Report discrepancies or technical problems to the Assistant Resident Engineer.  Coordinate with the Contractor’s surveyor on work priorities and schedules.  Coordinate work assignments with the schedule of the contractor to ensure timely completion of projects.  Perform regular checks of the Contractor’s setting out to verify proper execution and accuracy.  Check completed work for conformance to the line and grade required by the project plans in coordination with the Inspector assigned to the item of work.  Check all work by completing traverse closures and bench mark circuits .  Prepare relocation, verification, accomplishment, and survey findings report  Plan, coordinate and supervise the work of several field survey crews.  Supervise survey party staff.  Arrange joint survey with contractor collect details from site for grading and preparation of new design.  Complete all surveying assignments on time as per schedule.  Maintain equipment in proper condition and perform frequent calibration checks.  Monitor and assure compliance with procedures and quality assurance / control standards.  Perform periodic QA/QC review of the project work .  Check the primary horizontal and vertical control points including reference ties for re- establishing the points in the field.  Record all measurements, rod readings and calculations neatly and accurately in field books as the work progresses.  Keep detailed and accurate records of crew activities, survey data. Detail study of drawing for avoiding any mistake during work .  Review and analyze work methods to increase efficiency and productivity and provide input into the Writing of performance stander .  Review of As built drawings & verify/ coordinate the shop drawings with other MEP services.  Review the submittal ( G. arrangement ,Setting out , Section ) and approve shop drawings.  Supervise Structural work of contractor horizontal .vertical element like ( core wall share wall , ratting wall , mass wall, ramp of basement , slab ,beams . setting out of columns .planted columns ,Racking columns. Raft and footing . Supervise the survey work of architectural setting out curve stone wheel stopper ,block work ,lintel beam, stiffener columns , stair case step & landing.ect. Page 2
  • 3. Curriculum vitae 3 Duration 22Feb 2011 To 11 April 2011 . Company Seder Group. Project Rcc structure Position Surveyor & site Supervisor. Responsibility: responsible survey work completion of project with in time . responsible for overall site management of material, equipment Quantity surveying preparation of project completion report . responsible survey work overall the project excavation up to final handover. detail studies of design drawing avoid any mistake prepared setting out plan lean concrete ,footing columns .columns neck ,grad beams. roof slab .beams & up stand . supervise the survey party staff (structure & architectural ) contribute completion of project as per Project manger instruction final as built . Duration 1st June 2009 To 10Th Jan 2011 Company Technical United Works Company Ltd Project RCC Car scanning Building of Saudi Custom Position Site Supervisor / Surveyor Responsibility:  Setting out axis of building .traversing closed ,adjustment coordinates.  Setting out of building Excavation footing & raft .  Setting out of footing & raft foundation .  Setting out planted columns , beams ,slab ratting wall .  As built and prepared red line drawings.  Visits the job-site for the purpose of clarifying of structural plans and to inspect structural works prior to consultant inspection & concrete pouring.  Plan, coordinate and supervise the work of several field survey crews.  Keep detailed and accurate records of crew activities, survey data. Prepared bar banding schedule as per steel drawing ,supervise Steel work installation .  Prepares evaluation or site inspection reports.  Responsible for material deliveries, inventory, stockpile, unloading and selection. Direct reporting to Project Manager to coordinate about the project problem. Monitored and pro-actively identified and corrected technical, schedule and financial issues through effective communication with the Project Manager and other management staff.  Participated in preparation of engineering services proposals, including the calculation/estimation of time schedules and costs of the proposed work.  Independently communicated on technical matters with the consultant . Collect date from the site prepared proposal change of design . Check setting out Electro mechanical work, Safety fair , Security Camera. All cables related electrical work installation .finishing Page 3
  • 4. Curriculum vitae 4 Work ,marble Ceramic tiles ,door ,windows, paints & aluminum cladding . bathroom setting & sewer system Installation . Supervise landscaping work cement tiles curve stones & irrigation system . Duration 9th June 2008 to 25may 2009 Company Geo Reference Consultant(surveying &mapping) Project Road Design Survey & Topography survey Position Senior Surveyor . Responsibility :  Handling the survey works setting out & level Making Traverse control points.(traverse calculate by manual & computer )  Plan, coordinate and supervise the work of several field survey crews. All (field ) data recorded in the total station & download via Pro link total station to computer .  Triangulation surveys to fix survey control point along the roads Bridge Sit surveys producing plans of various surveys. Calculates heights, depths, relative positions, boundary lines, and other characteristics of terrains and structures.  Conducted and supervised research of public records in connection with land surveys.  Performed and supervised various surveying functions including topography surveys .  Topography survey supervision & management of site  Supervise survey party staff. All land surveying activities as well as coordination with Engineers and Project Managers clients, and others concerned with projects. Duration 12th June 2004 to 28th may 2008 Company Al Marafik Construction Co. Project Main Sewer Line Riyadh North Sewerage Project. RCC & VCP pipe dia 1600mm to 700mm &Sewerage treatment plant and building, Road Works. Position Senior Surveyor . Responsibility: Head of Land Surveying department, preparing surveying data coordinates, drawing for layout.  Setting out of Pipe Line survey calculating surveying data. Preparing surveying inspections.  Detail study of drawing for avoiding any mistake during work. Responsible the overall construction site work check the Quantity of material as per requirement . Plan actives of manpower give instruction assistant get the more progress . Prepared bar banding schedule supervise Reinforcement installation & concrete pouring program . Direct reporting to Project Manager to coordinate about the project problem Prepared Daily Weekly Monthly Progress report.  Provide data and prepare documents for Project Billing Collection.  Any change the design drawing submit to engineer prepared new layout as comments consultant and project manager .  prepared design of pipe in term of slop and invert levels & profile ,survey sheet . Page 4
  • 5. Curriculum vitae 5 Duration 2nd April 2003 to 30th May 2004 Company Al Alwan Contracting Est. Project Main Sewer Line Dirryah City. RCCP pipe dia 1700mm to s1100mm. Position Surveyor . Responsibility: Setting out center line of Excavation . Shift Bench mark working area with total station . Setting out of main hole. calculate the quantity of Excavation & back filling ,concrete .  Prepared bar banding should submit to consultant for the approval.  Team member of Engineers to carryout day to day work as per specifications. Prepared the daily progress report submit to project manager . Co-ordination with the consultant staff. Work Experience in Pakistan Duration 4th March 1998 to 12th November 1998 Company ECHO West Const. Group Project Mid Country Oil Refinery Project Position Site supervisor. Responsibility: Setting out Rcc tank , footing & supervised steel ,concrete ,finishing work. Supervise substation building excavation up to finishing . Duration 17th December 1998 to 22nd March 1999 Company Descon Engineering Ltd. Project PARCO Project . Position Supervisor . Responsibility: Supervising the construction work, checking the excavation, backfilling & compaction, leveling and reinforcement works and concreting of different reinforced concrete structures in accordance with the drawings and specification. Columns, foundation, paving, floor slab ,calculation paving slope. Installation electrical erathing pit ,layout heavy voltage cable location ,cable trench .installation mechanical salve ,boxes . Duration 15th April 1999 to 22nd March 2000 Company Habib Rafiq Ltd. Project PARCO Project at Sub-Station and Housing . Position Site supervisor. Responsibility: Rcc based transformer foundation .check setting out, steel rebar, concrete Pouring . Housing project inspection all steel & concrete work. Finishing work check marble ,ceramic ,paint bath room setting .water Supply ,hot & cold line. Reference Available on demand Finally, all the data given above is true and correct to the best of my personal knowledge and belief. Page 5
  • 6. Curriculum vitae 6 Copies of my testimonials are available on demand. Page 6
  • 7. Curriculum vitae 6 Copies of my testimonials are available on demand. Page 6