ARTIFICIAL ISLANDS SUBMITTED BY: S.MRIDUL NAIDU 2010CET3036
Methods of Creation 1)Expanding existing islets 2)Construction on existing reefs 3)Amalgamating several natural islets into a bigger island. 4)Construction on sea bed. 5)Land Reclamation 6)Oil Platforms  Introduction An  artificial  or  man-made island  is an island or archipelago(group of islands) that has been constructed by people rather than formed by natural means.
 
Reasons for Construction ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Previous Usage ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Under the United Nations Convention on the Law of the Sea treaty (UNCLOS), artificial islands are not considered harbour works and are under the jurisdiction of the nearest coastal state if within 200 nautical miles (370 km) .Artificial islands are not considered islands for purposes of having their own territorial waters or exclusive economic zones, and only the coastal state may authorize their construction. However, on the high seas beyond national jurisdiction, any "state" may construct artificial islands . Political Status
Design Considerations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
CONSTRUCTION PROCESS DREDGING AND SOIL BED PREPERATION
PRECAST PILES CAST IN YARDS, LOADED ONTO BARGES AND PLACED AT SITE.
PILES DRIVEN, SOIL COMPACTED, SURROUNDING BUND CREATED, ARMOUR ROCKS PLACED , PLATFORM SLAB CASTED CONSTRUCTION STARTS.
SOIL BED PREPERATION
FUNCTIONS OF SAND ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Process Parameters ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Density of Sand ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Processes Involved in sand placement ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object]
Soil Investigations ,[object Object],[object Object],[object Object],[object Object]
Investigation Methods ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
PREPERATION OF ISLAND BED S.NO. PROCESS METHODS 1 SURVEY, INVESTIGATION AND CONTROLS ELECTRONIC SATELLITE NAVIGATION, SPAR BUOYS, ACOUSTIC TRANSPONDERS, CORING AND SAMPLING, GRAB SAMPLES, SPARKER SURVEY, SIDE-SCAN SONAR, ACOUSTIC IMAGING, FOUNDATION PENETROMETERS, VIDEO, SUBMERSIBLE AND DIVER INSPECTION 2 PLATFORM DERRIK BARGE, DRILL SHIP, SEMISUBMERSIBLE JACK-UP, GUYED TOWER, HEAVE COMPENSATORS 3 SEAFLOOR OBSTRUCTION REMOVAL DRAG-OFF WITH TRAWLERS, SHAPED CHARGES, ROV'S WITH MANIPULATORS, UNDERWATER BURNING, THERMIC LANCERS 4 DREDGING, REMOVAL OF SEDIMENTS TRAILER SUCTION HOPPER DREDGE, CUTTERHEAD HYDRAULIC DREDGE, GRAB DREDGE OR CLAMSHELL, CONTINOUS BUCKET LADDER DREDGE, SLACK LINE BUCKET DREDGE, PLOW, JETTING, PIPELINE BURIAL SLED, DEEP-SEA MINING DRAG EXCAVATOR, AIRLIFT, EDUCTORS, REMOTE-CONTROLLED SEAFLOOR DREDGE 5 DREDGING, REMOVAL OF HARD SEDIMENTS AND ROCKS HYDRAULIC BACKHOES, DIPPER DREDGES, POWER ACTIVATED CLAMSHELL BUCKETS, PLOWS, SHAPED CHARGES, BLASTING IN DRILLED HOLES, CHISELS, HYDRAULIC AND PNEUMATIC ROCK BREAKERS, DRIVEN SPUDS, CUTTERHEAD DREDGES, HIGH PRESSURE JETS 6 PLACEMENT OF UNDERWATER FILLS DIKES OF ROCKS OR CLAY BUNDS TO CONTAIN SAND, CONTROLLED UNDERWATER DEPOSITION, DUMP ENMASSE FROM HOPPER BARGES, TREMIE, BUCKET, SKIP, CHUTE OR LADDER 7 DENSIFICATION, CONSOLIDATION AND STRENGTHENING OF FILLS DEEP VIBRATION, SURFACE VIBRATION, DYNAMIC COMPACTION WITH DROPPED WEIGHTS, EXPLOSIVES OR AIRGUN, DEPOSITION IN MASS, PRESATURATION, SELECTION OF OPTIMUM GRADING
8 CONSOLIDATION AND STRENGTHENING OF WEAK SOILS SAND PILES, VIBRATION, FREEZING, PRESURCHARGING, SURCHARGING WITH MEMBRANE AND DRAINAGE, SURCHARGING WITH STRUCTURE AND BALLAST, WICK AND SAND DRAINS, DRAINAGE WELLS, PERIPHERAL SURCHARGING, CEMENT INJECTION, CHEMICAL GROUTING, LIME INJECTION, DEEP CEMENT MIXING, ELECTRO-OSMOSIS 9 PREVENTION OF LIQUEFACTION DENSIFICATION, DRAINAGE WELLS, PERIPHERAL APRON OF GRADED ROCK 10 LEVELING OF SEAFLOOR OR EMBANKMENT HYDRAULIC DUSTPAN DREDGE WITH HEAVE COMPENSATOR SUSPENSION OF DREDGE HEAD, DRAGS, BOTTOM-SUPPORTED SCREED FRAME, SCREED FRAME FROM TLP OR HEAVE COMPENSATED PLATFORM, HORIZONTAL SCREW AUGUR 11 PROVISION OF UNIFORM SUPPORT UNDER BASE OF STRUCTURE UNDERBASE GROUTING, UNDERBASE SAND INJECTION OR SAND FLOW, TREMIE CONCRETE, GROUT INTRUDED AGGREGATE, MUD JACKING 12 EXCAVATION BENEATH STRUCTURE ARTICULATED DREDGE ARMS, AIRLIFT, JETS, EDUCTORS, DRILLS 13 SCOUR AND EROSION PROTECTION SACRIFICIAL FILL, ROCK, FILTER ROCK, FILTER FABRIC, ARTICULATED MATTRESSES, SANDBAGS, GROUT FILLED POROUS BAGS, SKIRTS ON STRUCTURES, APRONS AND FLOW CONTROLLED DEVICES AT BASE OF STRUCTURES, ARTIFICIAL SEAWEED, SAND ASPHALT AND ROCK ASPHALT BLANKETS, UNDERWATER CONCRETE SLABS 14 TURBIDITY SUPPRESSION BENTONITE-CEMENT SLURRIES, DISCHARGE OF FINE SAND BLANKET
DREDGING
Dredging Basics Dredging is the  maritime transportation  of natural materials from one part of the water environment to another by specialised dredging vessels. In a usual dredging cycle, self-propelled ,trailing suction ,hopper dredgers, barges and other ships spend the majority of their time sailing back and forth between excavation sites and placement sites, transporting materials between the port and the borrow site; sailing between borrow sites; and sailing from sites where material has been extracted to unloading or placement sites.
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
EXTERNAL CONDITIONS DURING CONSTRUCTION GROUP A :  THOSE WHICH DETERMINE THE USE AND EFFICIENCY OF EQUIPMENT, BREIFLY SUMMARIZED UNDER THE HEADING OF WORKABILITY GROUP B:  THOSE ARISING FROM A CHANGE IN THE HYDRAULICS AND MORPHOLOGY OF THE AREA, OCCURING AS A RESULT OF THE WORKS, THIS INFLUENCE CAN BE OF A TEMPORARY OR PERMANENT NATURE. GROUP C:  THOSE ARISING FROM ENVIRONMENTAL CONSIDERATIONS, ALSO THIS EFFECT CAN BE OF A TEMPORARY OR PERMANENT NATURE.
Common dredging methods :  Suction  Dredging :  Sand will be dredged by putting the suction tube deep ( > 10 m) into the sand layer. Under the influence of gravity forces the sand departs from the slope and flows downward in the direction of the suction mouth.  Cutter Suction Dredging :  With cutter suction dredging the suction tube is provided with a rotating cutter head.  The swing movement is initiated by the means of a forward-side-winch wires directly behind the cutter head. A spud pole positioned on the ships aft functions as centre of the swing movement.
 
 
Trailing suction dredging :  A draghead attached to a  suction pipe is trailed over the bottom of the seafloor. Due to erosive forces at the narrow opening between the draghead and the bottom and  the application of blades in the draghead results in the formation of a sand water mixture, this mixture in pumped in the hopper and the sand settles whereas the water overflows. Cutter Dredging :  For less permeable sand the face formation will deliver a small contribution to the production. In this case the soil has to be retrieved with the cutter head. In less permeable sand, large cutting forces cause significant wear and tear to the teeth of the cutting head.
 
 
CRITERIA FOR DREDGER SIZE: 1.  Volume of material to be dredged. 2.  Time allowed to complete the project.  Days, weeks and months. 3.  Hours that you will work.  1 shift, 2 shifts or 3 shifts?  4. Type of material to be dredged.  Fine sand, medium sand, large sand, small gravel, large gravel, silt, clay, cobbles 3 to 10, boulders +10 inches [254mm].   5. Dredging sediments or undisturbed material.  Undisturbed material is much more difficult to dredge.  6.  Horizontal pumping distance.  7. Vertical pumping distance called static head.  vertical distance from the water surface to the discharge point. 9. Maximum digging depth. Distance from the water surface to the lowest point of dredging.  DREDGES ARE AVAILABLE IN SIZES VARYING FROM A FEW METRE LONG BARGES TO FEW HUNDRED METRE LONG VESSLES
Factors in selection of Cutter  Suction Dredger •  Kind of soils and operation area •  Dredging depth, capacities •  Degree of self-sufficiency, self-propelled or stationary. •  If self-propelled: which cutter ladder position (bow or stern  oriented) •  Seagoing dredging capability. •  Type and stroke of spud carriage (flexibility required) •  Spud handling and hoisting system(s). •  Cutter type, diameter, speed, power. •  Pump characteristics. •  Requirements related to noise and vibrations (incl.  construction fatigue) •  Degree of automation.
 
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Dredge pump capacity -required flow rate and head -discharge pipeline length(differ for pumping ashore and barge loading) -density of the mixture  -soil characteristics -suction mouth performance. Therefore a lot of scenarios have to be calculated to find an optimum design point of each pump.
[object Object],[object Object],[object Object],[object Object],[object Object]
Spud carriage The application of a spud carriage is common practise for large CSD’s. This increases the efficiency of the dredger significantly.  The larger the stroke of the carriage the more swings can be made without spud repositioning and consequently the higher the efficiency of the dredger. Automation Large cutter dredgers are complex dredgers with complex operations. Therefore process automation and monitoring instrumentation are relevant because they will increase the efficiency of the dredger. Automation can be executed to a lot of levels, which depends on the Owner’s philosophy and the cost and skills of personnel.
Increased main dimensions of the dredger result in significant lower movements of the vessel in waves.
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object]
PUMPING THE DREDGED MATERIAL :
The material dredged from the seafloor is placed either by the dredger itself by pumps on deck, or by pipelines or barges.
COMPARISION BETWEEN SAND PLACEMENT MECHANISMS.
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],SAND AND ROCK PLACEMENT MECHANISMS.
CONCRETING
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object]
5)  REINFORCING STEEL:  Plain Bars, deformed bars, welded fabrics may be used provided details of size, mechanical properties and bond properties supplied by manufacturer. 6)  SHEATHING:  Rigid or semi-rigid water-tight metal sheathing should be used. Should be spliced with tightly fitting sleeves and the joints bound with waterproof tape. 7)  GROUT :  Usually OPC cement, aggregates if used in large ducts should consist of siliceous granules, finely ground limestone, trass, pozzolan or fine sand ; admixtures to be used after testing, sea water should not be used.
[object Object],[object Object],[object Object],[object Object],SHETCH SHOWING TREMIE CONCRETING
SHIP MOUNTED CONCRETE PLACEMENT BOOM HOISTS ETC, ON GROUND OR BARGE/SHIP MOUNTED.
OTHER PROCESSES
BREAKWATER CONSTRUCTION:  ,[object Object],[object Object],[object Object],[object Object]
BREAKWATER IMAGE : PALM JUMERIAH , DUBAI
VIBRO COMPACTION:  ,[object Object],[object Object],[object Object],[object Object]
 
SKETCH SHOWING THE VIBRO-COMPACTION PROCESS
Soil Compaction Techniques
FAMOUS ARTIFICIAL ISLANDS THE WORLD- DUBAI PALM JUMERIAH - DUBAI KANSAI AIRPORT, JAPAN
BURJ AL ARAB HOTEL, DUBAI
PROBLEMS AND CHALLANGES ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 

Weitere ähnliche Inhalte

Was ist angesagt?

grouting and guniting
grouting and gunitinggrouting and guniting
grouting and guniting
Vipul Kerni
 
harbour and dock engineering ppt 01 introduction
harbour and dock engineering ppt 01 introductionharbour and dock engineering ppt 01 introduction
harbour and dock engineering ppt 01 introduction
Hasna Hassan
 
Site selection for a harbour
Site selection for a harbourSite selection for a harbour
Site selection for a harbour
Latif Hyder Wadho
 
Chapter 7 dams and reservoirs
Chapter 7 dams and reservoirsChapter 7 dams and reservoirs
Chapter 7 dams and reservoirs
Mohammed Salahat
 

Was ist angesagt? (20)

Lessons learned from past earthquake - Structural dynamics and Earthquake Eng...
Lessons learned from past earthquake - Structural dynamics and Earthquake Eng...Lessons learned from past earthquake - Structural dynamics and Earthquake Eng...
Lessons learned from past earthquake - Structural dynamics and Earthquake Eng...
 
FLOATING CITY
FLOATING CITYFLOATING CITY
FLOATING CITY
 
Breakwater, jetties and groins.
Breakwater, jetties and groins.Breakwater, jetties and groins.
Breakwater, jetties and groins.
 
UNDERWATER CONSTRUCTION
UNDERWATER CONSTRUCTIONUNDERWATER CONSTRUCTION
UNDERWATER CONSTRUCTION
 
Sinking airport-KANSAI INTERNATIONAL AIRPORT
Sinking airport-KANSAI INTERNATIONAL AIRPORTSinking airport-KANSAI INTERNATIONAL AIRPORT
Sinking airport-KANSAI INTERNATIONAL AIRPORT
 
Concrete Armors | Rubble mound breakwaters
Concrete Armors | Rubble mound breakwatersConcrete Armors | Rubble mound breakwaters
Concrete Armors | Rubble mound breakwaters
 
Harbour
HarbourHarbour
Harbour
 
Maintenance and repair strategies - Repair and rehabilitation of structures(RRS)
Maintenance and repair strategies - Repair and rehabilitation of structures(RRS)Maintenance and repair strategies - Repair and rehabilitation of structures(RRS)
Maintenance and repair strategies - Repair and rehabilitation of structures(RRS)
 
grouting and guniting
grouting and gunitinggrouting and guniting
grouting and guniting
 
Docks & harbors construction
Docks & harbors construction  Docks & harbors construction
Docks & harbors construction
 
harbour and dock engineering ppt 01 introduction
harbour and dock engineering ppt 01 introductionharbour and dock engineering ppt 01 introduction
harbour and dock engineering ppt 01 introduction
 
Submerged Floating Tunnel
Submerged Floating TunnelSubmerged Floating Tunnel
Submerged Floating Tunnel
 
Palm island
Palm islandPalm island
Palm island
 
Site selection for a harbour
Site selection for a harbourSite selection for a harbour
Site selection for a harbour
 
Marine structures
Marine structuresMarine structures
Marine structures
 
Dams & its Construction
Dams & its ConstructionDams & its Construction
Dams & its Construction
 
Chapter 7 dams and reservoirs
Chapter 7 dams and reservoirsChapter 7 dams and reservoirs
Chapter 7 dams and reservoirs
 
Classification of dams
Classification of damsClassification of dams
Classification of dams
 
Jetties and breakwater.pptx
Jetties and breakwater.pptxJetties and breakwater.pptx
Jetties and breakwater.pptx
 
Coal Tar Based Pavement Sealcoat: Health and Environmental Overview
Coal Tar Based Pavement Sealcoat: Health and Environmental OverviewCoal Tar Based Pavement Sealcoat: Health and Environmental Overview
Coal Tar Based Pavement Sealcoat: Health and Environmental Overview
 

Ähnlich wie Artificial islands

Explosive Compaction of Foundation Soils Seymour Falls Dam
Explosive Compaction of Foundation Soils Seymour Falls DamExplosive Compaction of Foundation Soils Seymour Falls Dam
Explosive Compaction of Foundation Soils Seymour Falls Dam
Dario Gnoato
 
C Sachpazis: Soil liquefaction potential assessment for a ccgt power plant in...
C Sachpazis: Soil liquefaction potential assessment for a ccgt power plant in...C Sachpazis: Soil liquefaction potential assessment for a ccgt power plant in...
C Sachpazis: Soil liquefaction potential assessment for a ccgt power plant in...
Dr.Costas Sachpazis
 
Weathering and erosion
Weathering and erosionWeathering and erosion
Weathering and erosion
teacher2010
 
sm-ich-1-150513173810-lva1-app6891.pptx
sm-ich-1-150513173810-lva1-app6891.pptxsm-ich-1-150513173810-lva1-app6891.pptx
sm-ich-1-150513173810-lva1-app6891.pptx
Anbarasan Sivaraj
 

Ähnlich wie Artificial islands (20)

pptce-150421030022-conversion-gate01.pdf
pptce-150421030022-conversion-gate01.pdfpptce-150421030022-conversion-gate01.pdf
pptce-150421030022-conversion-gate01.pdf
 
Break waters
Break watersBreak waters
Break waters
 
7. SEAPORT MAINTENANCE (PHE) GTU 3170623
7. SEAPORT MAINTENANCE (PHE) GTU 31706237. SEAPORT MAINTENANCE (PHE) GTU 3170623
7. SEAPORT MAINTENANCE (PHE) GTU 3170623
 
Breakwater construction
Breakwater constructionBreakwater construction
Breakwater construction
 
Explosive Compaction of Foundation Soils Seymour Falls Dam
Explosive Compaction of Foundation Soils Seymour Falls DamExplosive Compaction of Foundation Soils Seymour Falls Dam
Explosive Compaction of Foundation Soils Seymour Falls Dam
 
project on dam and dam safety with application of geophysics
project on dam and dam safety with application of geophysicsproject on dam and dam safety with application of geophysics
project on dam and dam safety with application of geophysics
 
Breakwater
BreakwaterBreakwater
Breakwater
 
Design of Rubble Mound Seawall
Design of Rubble Mound SeawallDesign of Rubble Mound Seawall
Design of Rubble Mound Seawall
 
Sand control why and how
Sand control why and howSand control why and how
Sand control why and how
 
C Sachpazis: Soil liquefaction potential assessment for a ccgt power plant in...
C Sachpazis: Soil liquefaction potential assessment for a ccgt power plant in...C Sachpazis: Soil liquefaction potential assessment for a ccgt power plant in...
C Sachpazis: Soil liquefaction potential assessment for a ccgt power plant in...
 
Lecture-6 Earthdams.pptx
Lecture-6 Earthdams.pptxLecture-6 Earthdams.pptx
Lecture-6 Earthdams.pptx
 
RAHE UNIT 5.pptx
RAHE UNIT 5.pptxRAHE UNIT 5.pptx
RAHE UNIT 5.pptx
 
Weathering and erosion
Weathering and erosionWeathering and erosion
Weathering and erosion
 
Landslides Causes and Prevention ppt
Landslides Causes and Prevention pptLandslides Causes and Prevention ppt
Landslides Causes and Prevention ppt
 
Design_and_Construction_of_Embankment_Da (2).pdf
Design_and_Construction_of_Embankment_Da (2).pdfDesign_and_Construction_of_Embankment_Da (2).pdf
Design_and_Construction_of_Embankment_Da (2).pdf
 
Design_and_Construction_of_Embankment_Da (1).pdf
Design_and_Construction_of_Embankment_Da (1).pdfDesign_and_Construction_of_Embankment_Da (1).pdf
Design_and_Construction_of_Embankment_Da (1).pdf
 
DREDGING PROCESS AND ITS EFFECT
DREDGING PROCESS AND ITS EFFECTDREDGING PROCESS AND ITS EFFECT
DREDGING PROCESS AND ITS EFFECT
 
sm-ich-1-150513173810-lva1-app6891.pptx
sm-ich-1-150513173810-lva1-app6891.pptxsm-ich-1-150513173810-lva1-app6891.pptx
sm-ich-1-150513173810-lva1-app6891.pptx
 
OK
OKOK
OK
 
Dredging Techniques and dredgers
Dredging Techniques and dredgersDredging Techniques and dredgers
Dredging Techniques and dredgers
 

Kürzlich hochgeladen

Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 

Kürzlich hochgeladen (20)

SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 

Artificial islands

  • 1. ARTIFICIAL ISLANDS SUBMITTED BY: S.MRIDUL NAIDU 2010CET3036
  • 2. Methods of Creation 1)Expanding existing islets 2)Construction on existing reefs 3)Amalgamating several natural islets into a bigger island. 4)Construction on sea bed. 5)Land Reclamation 6)Oil Platforms Introduction An  artificial  or  man-made island  is an island or archipelago(group of islands) that has been constructed by people rather than formed by natural means.
  • 3.  
  • 4.
  • 5.
  • 6. Under the United Nations Convention on the Law of the Sea treaty (UNCLOS), artificial islands are not considered harbour works and are under the jurisdiction of the nearest coastal state if within 200 nautical miles (370 km) .Artificial islands are not considered islands for purposes of having their own territorial waters or exclusive economic zones, and only the coastal state may authorize their construction. However, on the high seas beyond national jurisdiction, any "state" may construct artificial islands . Political Status
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. CONSTRUCTION PROCESS DREDGING AND SOIL BED PREPERATION
  • 12. PRECAST PILES CAST IN YARDS, LOADED ONTO BARGES AND PLACED AT SITE.
  • 13. PILES DRIVEN, SOIL COMPACTED, SURROUNDING BUND CREATED, ARMOUR ROCKS PLACED , PLATFORM SLAB CASTED CONSTRUCTION STARTS.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22. PREPERATION OF ISLAND BED S.NO. PROCESS METHODS 1 SURVEY, INVESTIGATION AND CONTROLS ELECTRONIC SATELLITE NAVIGATION, SPAR BUOYS, ACOUSTIC TRANSPONDERS, CORING AND SAMPLING, GRAB SAMPLES, SPARKER SURVEY, SIDE-SCAN SONAR, ACOUSTIC IMAGING, FOUNDATION PENETROMETERS, VIDEO, SUBMERSIBLE AND DIVER INSPECTION 2 PLATFORM DERRIK BARGE, DRILL SHIP, SEMISUBMERSIBLE JACK-UP, GUYED TOWER, HEAVE COMPENSATORS 3 SEAFLOOR OBSTRUCTION REMOVAL DRAG-OFF WITH TRAWLERS, SHAPED CHARGES, ROV'S WITH MANIPULATORS, UNDERWATER BURNING, THERMIC LANCERS 4 DREDGING, REMOVAL OF SEDIMENTS TRAILER SUCTION HOPPER DREDGE, CUTTERHEAD HYDRAULIC DREDGE, GRAB DREDGE OR CLAMSHELL, CONTINOUS BUCKET LADDER DREDGE, SLACK LINE BUCKET DREDGE, PLOW, JETTING, PIPELINE BURIAL SLED, DEEP-SEA MINING DRAG EXCAVATOR, AIRLIFT, EDUCTORS, REMOTE-CONTROLLED SEAFLOOR DREDGE 5 DREDGING, REMOVAL OF HARD SEDIMENTS AND ROCKS HYDRAULIC BACKHOES, DIPPER DREDGES, POWER ACTIVATED CLAMSHELL BUCKETS, PLOWS, SHAPED CHARGES, BLASTING IN DRILLED HOLES, CHISELS, HYDRAULIC AND PNEUMATIC ROCK BREAKERS, DRIVEN SPUDS, CUTTERHEAD DREDGES, HIGH PRESSURE JETS 6 PLACEMENT OF UNDERWATER FILLS DIKES OF ROCKS OR CLAY BUNDS TO CONTAIN SAND, CONTROLLED UNDERWATER DEPOSITION, DUMP ENMASSE FROM HOPPER BARGES, TREMIE, BUCKET, SKIP, CHUTE OR LADDER 7 DENSIFICATION, CONSOLIDATION AND STRENGTHENING OF FILLS DEEP VIBRATION, SURFACE VIBRATION, DYNAMIC COMPACTION WITH DROPPED WEIGHTS, EXPLOSIVES OR AIRGUN, DEPOSITION IN MASS, PRESATURATION, SELECTION OF OPTIMUM GRADING
  • 23. 8 CONSOLIDATION AND STRENGTHENING OF WEAK SOILS SAND PILES, VIBRATION, FREEZING, PRESURCHARGING, SURCHARGING WITH MEMBRANE AND DRAINAGE, SURCHARGING WITH STRUCTURE AND BALLAST, WICK AND SAND DRAINS, DRAINAGE WELLS, PERIPHERAL SURCHARGING, CEMENT INJECTION, CHEMICAL GROUTING, LIME INJECTION, DEEP CEMENT MIXING, ELECTRO-OSMOSIS 9 PREVENTION OF LIQUEFACTION DENSIFICATION, DRAINAGE WELLS, PERIPHERAL APRON OF GRADED ROCK 10 LEVELING OF SEAFLOOR OR EMBANKMENT HYDRAULIC DUSTPAN DREDGE WITH HEAVE COMPENSATOR SUSPENSION OF DREDGE HEAD, DRAGS, BOTTOM-SUPPORTED SCREED FRAME, SCREED FRAME FROM TLP OR HEAVE COMPENSATED PLATFORM, HORIZONTAL SCREW AUGUR 11 PROVISION OF UNIFORM SUPPORT UNDER BASE OF STRUCTURE UNDERBASE GROUTING, UNDERBASE SAND INJECTION OR SAND FLOW, TREMIE CONCRETE, GROUT INTRUDED AGGREGATE, MUD JACKING 12 EXCAVATION BENEATH STRUCTURE ARTICULATED DREDGE ARMS, AIRLIFT, JETS, EDUCTORS, DRILLS 13 SCOUR AND EROSION PROTECTION SACRIFICIAL FILL, ROCK, FILTER ROCK, FILTER FABRIC, ARTICULATED MATTRESSES, SANDBAGS, GROUT FILLED POROUS BAGS, SKIRTS ON STRUCTURES, APRONS AND FLOW CONTROLLED DEVICES AT BASE OF STRUCTURES, ARTIFICIAL SEAWEED, SAND ASPHALT AND ROCK ASPHALT BLANKETS, UNDERWATER CONCRETE SLABS 14 TURBIDITY SUPPRESSION BENTONITE-CEMENT SLURRIES, DISCHARGE OF FINE SAND BLANKET
  • 25. Dredging Basics Dredging is the maritime transportation of natural materials from one part of the water environment to another by specialised dredging vessels. In a usual dredging cycle, self-propelled ,trailing suction ,hopper dredgers, barges and other ships spend the majority of their time sailing back and forth between excavation sites and placement sites, transporting materials between the port and the borrow site; sailing between borrow sites; and sailing from sites where material has been extracted to unloading or placement sites.
  • 26.
  • 27. EXTERNAL CONDITIONS DURING CONSTRUCTION GROUP A : THOSE WHICH DETERMINE THE USE AND EFFICIENCY OF EQUIPMENT, BREIFLY SUMMARIZED UNDER THE HEADING OF WORKABILITY GROUP B: THOSE ARISING FROM A CHANGE IN THE HYDRAULICS AND MORPHOLOGY OF THE AREA, OCCURING AS A RESULT OF THE WORKS, THIS INFLUENCE CAN BE OF A TEMPORARY OR PERMANENT NATURE. GROUP C: THOSE ARISING FROM ENVIRONMENTAL CONSIDERATIONS, ALSO THIS EFFECT CAN BE OF A TEMPORARY OR PERMANENT NATURE.
  • 28. Common dredging methods : Suction Dredging : Sand will be dredged by putting the suction tube deep ( > 10 m) into the sand layer. Under the influence of gravity forces the sand departs from the slope and flows downward in the direction of the suction mouth. Cutter Suction Dredging : With cutter suction dredging the suction tube is provided with a rotating cutter head. The swing movement is initiated by the means of a forward-side-winch wires directly behind the cutter head. A spud pole positioned on the ships aft functions as centre of the swing movement.
  • 29.  
  • 30.  
  • 31. Trailing suction dredging : A draghead attached to a suction pipe is trailed over the bottom of the seafloor. Due to erosive forces at the narrow opening between the draghead and the bottom and the application of blades in the draghead results in the formation of a sand water mixture, this mixture in pumped in the hopper and the sand settles whereas the water overflows. Cutter Dredging : For less permeable sand the face formation will deliver a small contribution to the production. In this case the soil has to be retrieved with the cutter head. In less permeable sand, large cutting forces cause significant wear and tear to the teeth of the cutting head.
  • 32.  
  • 33.  
  • 34. CRITERIA FOR DREDGER SIZE: 1.  Volume of material to be dredged. 2.  Time allowed to complete the project.  Days, weeks and months. 3.  Hours that you will work.  1 shift, 2 shifts or 3 shifts?  4. Type of material to be dredged.  Fine sand, medium sand, large sand, small gravel, large gravel, silt, clay, cobbles 3 to 10, boulders +10 inches [254mm].   5. Dredging sediments or undisturbed material.  Undisturbed material is much more difficult to dredge.  6. Horizontal pumping distance.  7. Vertical pumping distance called static head.  vertical distance from the water surface to the discharge point. 9. Maximum digging depth. Distance from the water surface to the lowest point of dredging.  DREDGES ARE AVAILABLE IN SIZES VARYING FROM A FEW METRE LONG BARGES TO FEW HUNDRED METRE LONG VESSLES
  • 35. Factors in selection of Cutter Suction Dredger • Kind of soils and operation area • Dredging depth, capacities • Degree of self-sufficiency, self-propelled or stationary. • If self-propelled: which cutter ladder position (bow or stern oriented) • Seagoing dredging capability. • Type and stroke of spud carriage (flexibility required) • Spud handling and hoisting system(s). • Cutter type, diameter, speed, power. • Pump characteristics. • Requirements related to noise and vibrations (incl. construction fatigue) • Degree of automation.
  • 36.  
  • 37.
  • 38.
  • 39.
  • 40.
  • 41. Dredge pump capacity -required flow rate and head -discharge pipeline length(differ for pumping ashore and barge loading) -density of the mixture -soil characteristics -suction mouth performance. Therefore a lot of scenarios have to be calculated to find an optimum design point of each pump.
  • 42.
  • 43. Spud carriage The application of a spud carriage is common practise for large CSD’s. This increases the efficiency of the dredger significantly. The larger the stroke of the carriage the more swings can be made without spud repositioning and consequently the higher the efficiency of the dredger. Automation Large cutter dredgers are complex dredgers with complex operations. Therefore process automation and monitoring instrumentation are relevant because they will increase the efficiency of the dredger. Automation can be executed to a lot of levels, which depends on the Owner’s philosophy and the cost and skills of personnel.
  • 44. Increased main dimensions of the dredger result in significant lower movements of the vessel in waves.
  • 45.
  • 46.
  • 47. PUMPING THE DREDGED MATERIAL :
  • 48. The material dredged from the seafloor is placed either by the dredger itself by pumps on deck, or by pipelines or barges.
  • 49. COMPARISION BETWEEN SAND PLACEMENT MECHANISMS.
  • 50.
  • 52.
  • 53.
  • 54. 5) REINFORCING STEEL: Plain Bars, deformed bars, welded fabrics may be used provided details of size, mechanical properties and bond properties supplied by manufacturer. 6) SHEATHING: Rigid or semi-rigid water-tight metal sheathing should be used. Should be spliced with tightly fitting sleeves and the joints bound with waterproof tape. 7) GROUT : Usually OPC cement, aggregates if used in large ducts should consist of siliceous granules, finely ground limestone, trass, pozzolan or fine sand ; admixtures to be used after testing, sea water should not be used.
  • 55.
  • 56. SHIP MOUNTED CONCRETE PLACEMENT BOOM HOISTS ETC, ON GROUND OR BARGE/SHIP MOUNTED.
  • 58.
  • 59. BREAKWATER IMAGE : PALM JUMERIAH , DUBAI
  • 60.
  • 61.  
  • 62. SKETCH SHOWING THE VIBRO-COMPACTION PROCESS
  • 64. FAMOUS ARTIFICIAL ISLANDS THE WORLD- DUBAI PALM JUMERIAH - DUBAI KANSAI AIRPORT, JAPAN
  • 65. BURJ AL ARAB HOTEL, DUBAI
  • 66.
  • 67.
  • 68.