SlideShare ist ein Scribd-Unternehmen logo
1 von 16
Downloaden Sie, um offline zu lesen
MIRON CONSTRUCTION CO., INC.
Industrial Division
Building Excellence
Miron Construction Co., Inc. | INDUSTRIAL DIVISION
Overview
Since 1918...
Miron Construction Co., Inc. Profile
Miron Construction Co., Inc. is recognized as an industry leader in construction management, general construction, design-
build and industrial services by thousands of clients throughout the United States. Founded nearly 100 years ago, Miron
has grown to become one the nation’s premier construction firms. Miron puts more work in place in the state of Wisconsin
than any other contractor and is 87th among the “Top 400 Contractors in the United States” (as ranked by Engineering
News Record (ENR) based on 2016 revenue of $898 million). Incorporated on March 23, 1949, Miron is a privately-held
corporation, formed under the laws of incorporation of the State of Wisconsin.
What Sets Us Apart
Miron Construction Co., Inc., was built on the hard bid, firm-fixed pricing structure. Over the years, we have had customers
who, rather than bid their project, chose us to perform their work on a negotiated basis. As our client relationships and
reputation grew, so did our negotiated project list. We have always been sensitive to our mix of hard bid and negotiated
work:We never want to lose our competitive edge in the market, and we have found that our company runs most efficiently
when our negotiated and firm-fixed workloads are balanced. No matter what delivery method we utilize, our team retains
the same competitive mindset for each project.We believe that Miron understands hard costs better than the competition.
Project Bonding
Miron’s current bonding capacity is $175 million per project with a potential overall capacity of $650 million.
Dunn & Bradstreet Credit Rating
Rating	1R3
Experience Modifier Rate (EMR)
2017 = 0.46	 2016 = 0.47	 2015 = 0.50
1471 McMahon Drive Neenah, WI | www.miron-construction.com
Miron's Industrial Division provides construction solutions
from beginning to end by completing building and
equipment installations. Miron Construction Co., Inc., is a
full-service construction firm providing comprehensive
services:
•	 General Contractor
•	 Construction Manager
•	 Design-Build Services
•	 Complete Machine Installation
•	 Laser Alignment and Precision Layout
•	 Millwright, Ironworker, and Carpenter Services
•	 Maintenance Contracts and Services
Our project managers, superintendents, and tradespeople
are trained to work in your plant or facility. Our team is
experienced in the utilization of tools like Risk Management,
Hazard Analysis and Critical Control Point (HACCP), and
Critical Lift/Rigging plans.
Our team will complete your project safely, within budget
and to your quality standards, ensuring that your plant or
machine is back up and running on time.
1471 McMahon Drive Neenah, WI | www.miron-construction.com
Services
Expertise to deliver on all of your needs
You can expect results from the Miron Industrial Services
Group. Our understanding of the specific needs of industrial
projects means we staff and equip projects appropriately,
completing projects safely, economically and with the
highest level of quality.
Rebuilds and Shutdowns
Minimizing downtime on rebuilds requires specific
expertise which you can expect from Miron. Coordination
prior to the shutdown is key to the project’s success. Special
steps are always taken to ensure safety standards are
maintained. Detailed scheduling, down to tasks performed
per hour, enables all parties involved to have a complete
understanding of the various roles they play.
Laser Alignment
Attention to detail combines science with skill to ensure
yourmachineryisalignedandcalibratedtoexacttolerances.
Miron alignment specialists use the latest laser equipment
and techniques, with thorough documentation, to ensure
your machine is operating at peak efficiency.
Equipment handling
Miron is equipped to handle the rigging, transportation and
installationofmachineryofanysize.Weownover$60million
dollars in modern equipment, including cranes, forklifts,
manlifts and laser alignment instruments, providing us with
the competitive edge needed to bring projects in on-time,
on-budget and safely.
Staffed with industry knowledge
Miron employs over 1,400 highly skilled tradespeople
with extensive expertise in the Pulp & Paper, Energy &
Infrastructure, Food & Beverage, and General Industrial
markets. You can rest assured that our knowledge of your
project’s parameters will result in the timely, cost effective
and accurate completion of your project.
special capabilities
project execution
Project Coordination/Management • Planning
Conceptual Estimating • Bid Management & Analysis
Critical Path Scheduling • Constructibility Reviews
Safety • Quality • Risk Management
Building Information Modeling (BIM)
Virtual Process Integration (VPI) • LEED/Sustainability
concrete/carpentry
Footings, Foundations, Elevated/Flatwork • Retaining Walls
Docks/Piers/Dam Repair • Cofferdams
Roof Repair • Masonry
Office Remodeling
millwrights
Machinery/Equipment Installation and Relocation
Laser Alignment and Precision Layout
Maintenance Assistance/Outage Work
ironworkers
Rigging • Certified Welding (carbon & stainless)
Steel Erection • Pre-Cast Erection • Field Fabrication
Maintenance Assistance/Outage Work
Miron Construction Co., Inc. | INDUSTRIAL DIVISION
Miron takes a multi-discipline approach to risk management
that integrates safety, quality, and production (SQP) into the
building process. This integrated approach guides our daily
decisions and work.
Miron is committed to providing a safe and hazard-free work
environment for our clients, employees, subcontractors,
host facilities, and the general public. We first proactively
identify and plan for potential safety risks. Next, we ensure
that we capture and communicate quality expectations to
all stakeholders and team members. Finally, we integrate
production planning to ensure the most efficient plan of
work that optimizes the safety and quality of the project.
Critical to this approach is a highly skilled and safely trained
workforce. Armed with comprehensive safety training,
employees possess the knowledge and tools to identify and
eliminate unsafe acts and conditions. They provide on-site
safety, quality, and production management and ensure
project-wide accountability in all three categories.
Elimination of distractions commonly associated with
the industry, along with our pre-shift stretching program,
ensures each employee is fit for duty. We refer to this as the
SQP Stretching Program. During the 5 to 7 minute exercise,
employees complete a series of five stretches as well as
conduct an SQP huddle for the day. Miron developed this
program to increase the health and wellness of employees,
reduce injuries, and lower incident rates, as well as maximize
quality and production.
Employees are empowered to make a difference in the
safety practices of themselves and others. This philosophy
has allowed us to establish long-lasting relationships with
both subcontractors and clients who understand our
commitment to safety, protecting people, property, and
our client’s market interests through trust and reliability.
Ultimately,SQPallowsrisktobe“engineered”outofprojects,
ensures a higher quality product, and optimizes production.
Committing to this process ensures BUILDING EXCELLENCE!
Risk Management & Safety
1471 McMahon Drive Neenah, WI | www.miron-construction.com
Miron Construction Co., Inc. | INDUSTRIAL DIVISION
Miron has an extensive background
working on power projects under
extremely critical completion
requirements. We perform
construction and maintenance
work in power generation facilities
on a daily basis. Whether it be a
rebuild of a hydro unit, overhaul of
a turbine generator, or construction
of a RICE (reciprocating internal
combustion engine) facility—
Miron has the experience. The
power industry faces challenges
unknown to other industries, and it
takes a contractor with experience
and foresight to work with and
offer solutions to these unique
customers. Miron has valuable
experience and a record of problem
solving that can be applied to your
project.
ENERGY &
INFRASTRUCTURE
Wisconsin has the highest
concentration of paper mills and
paper converters in the country.
We understand the importance
of precision installation and
timely completion in order to get
the machine running as soon as
possible. Our extensive experience
enables us to complete projects
of any size—safely, on time, and
within budget. You will find that
our staff has experience from
stock prep, throughout the paper
machine, converting, and utilities/
wastewater treatment. Shutdowns,
whether planned or unplanned,
are always a race against the clock.
Miron’s understanding of your
procedures and commitments
makes us your ideal partner. We
will provide the proper assistance
to keep your operations on track
when working against critically
tight time lines.
PULP, PAPER,
PLASTICS&PACKAGING
Markets
“Everyone at Miron
understands what our goals
are. Whether the goal is a time
frame or a budget we need to
meet; they’re all pulling in that
direction. Our project involved
a significant amount of
equipment. Miron coordinated
everything to make sure the
equipment was put in place
when it needed to be. Without
hesitation, we selected Miron
for our next building project.”
"I was impressed with
how well organized and
knowledgeable the team was
in getting the job done. The
customer was very impressed
and satisfied with how the
install went. If I have another
chance, I would be very
happy to work with Miron
Construction again. Good Job
Guys!"
1471 McMahon Drive Neenah, WI | www.miron-construction.com
Whether processing, ingredient,
beverage, or packaged food
facilities, Miron has done it all.
Our staff has the experience to
construct, modify, and maintain
production facilities. In addition to
installations, our millwright service
group of over 300 trades-people
has even traveled overseas to assist
in the disassembly of critical food
processing equipment, so as to
avoid conflicts during installation.
As a result of current food safety
issues, we have mandated a
training initiative for key project
management staff to expand our
current knowledge base to include
plant operational issues of HACCP
and Safe Quality Food Standards—
making us a leader in our industry.
FOOD & BEVERAGE
The upper Midwest has a large
concentration of natural resource
mining operations for sand, iron
ore, and other precious metals.
Mine work is driven by safety
and schedule. Miron has a large
MSHA trained work-force that has
construction experience in an
operating mine. Our expertise in
large equipment moves and cast-in
place concrete has allowed Miron
to become a leader in the mining
industry. We work with customers
to identify the critical path project
and maintenance activities that
mustbecompletedontimeinorder
to resume production. Each activity
is then reviewed and planned
ensuring that hazard analysis of the
job-site is taken into account.
MINING/NATURAL
RESOURCES
Whether it is working in a foundry
or chemical plant, a machine shop,
or a print shop, Miron has the
experience to help you with your
project. Ourstaffhastheexperience
to construct, modify and maintain
production facilities. Since 1918,
Miron has been instrumental
in helping manufacturers keep
production schedules on track with
comprehensive industrial services.
Miron gives you the quality and
support you expect from proven
professionals.
GENERAL
INDUSTRIAL
“Working with Miron
Construction on our
new facility was a terrific
experience. From the
beginning of the project
the people of Miron
demonstrated their expertise
and professionalism in the way
they handled nailing down all
the details. This ultimately
resulted in our building
being completed on time
and on budget, with minimal
surprises.”
When we decided to expand
our business by building our
new facility, it was extremely
important that we chose a
firm to assist us in making
our dream a reality... Miron
provided us with pre-
construction expertise, as well
as a skilled team to manage
our construction project.
Before, during, and even after
the project was completed,
I have found Miron to be
exceptionally supportive
of our business needs. No
matter the size, I would highly
recommend Miron for your
next project.”
“Miron has proven to be
a team player and has
responded positively to
requests for schedule and
sequencing changes required
by the Project.”
Miron Construction Co., Inc. | INDUSTRIAL DIVISION
Virtual Process Integration (VPI) Services
Miron is well versed in utilizing Virtual Process Integration as both a technology and a
cultural approach to our work. We collaborate with Owner's, design/engineering
professionals and trade contractors to provide the VPI services that are described below.
•	 Safety & Fall Protection Planning
•	 Installation Planning & Sequencing
•	 3D Coordination (Design &
Installation)
•	 Operation & Maintenance Planning
•	 Visualization
1471 McMahon Drive Neenah, WI | www.miron-construction.com
Paper Machines/Stock Preparation
Paper Converting
Power Generation Facilities
Turbine Rebuilds
Manufacturing Facilities
Foundries
Chemical Plants
Food Plants
Wastewater Treatment Plants
Mining Operations
Conveyor Systems/Material Handling
Requirements for Project Success
No matter the type of facility or product produced,
successful construction of Industrial projects shares some
absolute certainties:
•	 Safety is the highest priority
•	 Proper staffing and equipment is mission critical
•	 Attention to details in the specification and the field
is a must
•	 Project specifications and drivers must be clearly
identified, understood and followed
•	 Trades-people must be highly experienced
•	 A qualified project manager in total control of project
initiatives must be available at all times
Experience
facility type experience
Miron Construction Co., Inc. | INDUSTRIAL DIVISION
1471 McMahon Drive Neenah, WI | www.miron-construction.com
Miron’s Competitive Advantage -
We Own our Equipment!
Miron’s commitment to building excellence is evident in our
facilities and equipment, which are continually upgraded.
We continuously reinvest in equipment, training, and new
construction methodologies. We own a 112,000 SF office in
Neenah, WI and a 14-acre warehouse site in Menasha, WI. In
addition, we own $60 million worth of equipment including:
50 cranes
2 FARO laser trackers
FARO ARM
350 fork/scissors/
boom lifts
Equipment
Operators/Crane Services
•	 CCO trained crane operation up to 350 ton
•	 Mobile cranes from 6 to 350 ton
•	 Crawler cranes from 100 to 500 ton
•	 Trucking
Miron Construction Co., Inc. | INDUSTRIAL DIVISION
1471 McMahon Drive Neenah, WI | www.miron-construction.com
Industrial Team Leadership
PATRICK NATE | Vice President, Industrial Operations
920.969.7026 patrick.nate@miron-construction.com
Pat has served the industrial marketplace for over 40
years, providing project management and executive-level
leadership on many industrial projects.
DAN GOYMERAC | Vice President, Industrial Business Development
920.969.7004 dan.goymerac@miron-construction.com
Dan possesses over 30 years of experience working in and
serving the industrial and manufacturing marketplace.
OfficeLocations
CORPORATE (NEENAH) OFFICE
1471 McMahon Drive
Neenah, WI 54956
p 920.969.7000
f 920.969.7393
WAUSAU OFFICE
500 First Street
Suite 4000
Wausau, WI 54403
p 715.841.4000
f 715.845.9119
MADISON OFFICE
8215 Greenway Blvd.
Suite 100
Middleton, WI 53562
p 608.203.2700
f 608.203.2200
MILWAUKEE OFFICE
10700 Research Drive
Suite 100
Milwaukee, WI 53226
p 414.308.1510
f 414.431.0933
EAU CLAIRE OFFICE
3402 Oakwood Mall Drive
Suite 200
Eau Claire, WI 54701
p 715.598.5700
f 715.839.0242
IOWA OFFICE
335 French Ct. SW
Cedar Rapids, IA 52404
p 319.298.5200
f 319.366.5695

Weitere ähnliche Inhalte

Was ist angesagt?

M&E trade recruitment specialist's at Russell Taylor 2014
M&E trade recruitment specialist's at Russell Taylor 2014M&E trade recruitment specialist's at Russell Taylor 2014
M&E trade recruitment specialist's at Russell Taylor 2014Charlotte Devereux
 
Profile Presentation-The Technical Legend Enterprises L.L.C.
Profile Presentation-The Technical Legend Enterprises L.L.C.Profile Presentation-The Technical Legend Enterprises L.L.C.
Profile Presentation-The Technical Legend Enterprises L.L.C.hamed al.harmali
 
ASASS Construction Company
ASASS Construction CompanyASASS Construction Company
ASASS Construction CompanyMostafaAwwad3
 
Jijin updated cv 25 oct-15-12-55-27 (2)
Jijin updated cv 25 oct-15-12-55-27 (2)Jijin updated cv 25 oct-15-12-55-27 (2)
Jijin updated cv 25 oct-15-12-55-27 (2)Jijin Varghese
 
Zindzi Mining & Engineering Company Profile
Zindzi Mining & Engineering Company ProfileZindzi Mining & Engineering Company Profile
Zindzi Mining & Engineering Company ProfileShamima Mulla
 
ICI Final Project Company Profile
ICI Final Project Company ProfileICI Final Project Company Profile
ICI Final Project Company ProfileChong Teo
 
CV AJITH new latest 01
CV AJITH new latest 01CV AJITH new latest 01
CV AJITH new latest 01Ajith Kumar
 
Frames D&W ind. Prequalification document
Frames D&W ind. Prequalification documentFrames D&W ind. Prequalification document
Frames D&W ind. Prequalification documentSreehariJDev
 
Update CV 01.08.15
Update CV 01.08.15Update CV 01.08.15
Update CV 01.08.15Edmar Reso
 
LinkedIn Profile template
LinkedIn Profile templateLinkedIn Profile template
LinkedIn Profile templateKevin Dixon
 
Options Company Brochure
Options Company BrochureOptions Company Brochure
Options Company BrochureDavid Hollands
 
Options Company Brochure 2014
Options Company Brochure 2014Options Company Brochure 2014
Options Company Brochure 2014Charlotte Yeoman
 
Galfar construction contribution to various sectors
Galfar construction contribution to various sectorsGalfar construction contribution to various sectors
Galfar construction contribution to various sectorsP Mohamed Ali
 
Provident Procurement Company Profile compressed
Provident Procurement Company Profile compressedProvident Procurement Company Profile compressed
Provident Procurement Company Profile compressedJeano2v2
 
2018 ARA Building Fit Out Division
2018 ARA Building Fit Out Division 2018 ARA Building Fit Out Division
2018 ARA Building Fit Out Division Tony Murr
 

Was ist angesagt? (19)

M&E trade recruitment specialist's at Russell Taylor 2014
M&E trade recruitment specialist's at Russell Taylor 2014M&E trade recruitment specialist's at Russell Taylor 2014
M&E trade recruitment specialist's at Russell Taylor 2014
 
Al manar profile copy
Al manar profile   copyAl manar profile   copy
Al manar profile copy
 
Rapid Building construction
Rapid Building construction Rapid Building construction
Rapid Building construction
 
Profile Presentation-The Technical Legend Enterprises L.L.C.
Profile Presentation-The Technical Legend Enterprises L.L.C.Profile Presentation-The Technical Legend Enterprises L.L.C.
Profile Presentation-The Technical Legend Enterprises L.L.C.
 
ASASS Construction Company
ASASS Construction CompanyASASS Construction Company
ASASS Construction Company
 
Jijin updated cv 25 oct-15-12-55-27 (2)
Jijin updated cv 25 oct-15-12-55-27 (2)Jijin updated cv 25 oct-15-12-55-27 (2)
Jijin updated cv 25 oct-15-12-55-27 (2)
 
Zindzi Mining & Engineering Company Profile
Zindzi Mining & Engineering Company ProfileZindzi Mining & Engineering Company Profile
Zindzi Mining & Engineering Company Profile
 
ICI Final Project Company Profile
ICI Final Project Company ProfileICI Final Project Company Profile
ICI Final Project Company Profile
 
CV AJITH new latest 01
CV AJITH new latest 01CV AJITH new latest 01
CV AJITH new latest 01
 
Frames D&W ind. Prequalification document
Frames D&W ind. Prequalification documentFrames D&W ind. Prequalification document
Frames D&W ind. Prequalification document
 
Update CV 01.08.15
Update CV 01.08.15Update CV 01.08.15
Update CV 01.08.15
 
LinkedIn Profile template
LinkedIn Profile templateLinkedIn Profile template
LinkedIn Profile template
 
Thomas Maher C.V
Thomas Maher C.VThomas Maher C.V
Thomas Maher C.V
 
Options Company Brochure
Options Company BrochureOptions Company Brochure
Options Company Brochure
 
Options Company Brochure 2014
Options Company Brochure 2014Options Company Brochure 2014
Options Company Brochure 2014
 
Majid CV
Majid CVMajid CV
Majid CV
 
Galfar construction contribution to various sectors
Galfar construction contribution to various sectorsGalfar construction contribution to various sectors
Galfar construction contribution to various sectors
 
Provident Procurement Company Profile compressed
Provident Procurement Company Profile compressedProvident Procurement Company Profile compressed
Provident Procurement Company Profile compressed
 
2018 ARA Building Fit Out Division
2018 ARA Building Fit Out Division 2018 ARA Building Fit Out Division
2018 ARA Building Fit Out Division
 

Andere mochten auch

Veolia Hickory Meadows LEED Project Profile | Miron Construction
Veolia Hickory Meadows LEED Project Profile | Miron ConstructionVeolia Hickory Meadows LEED Project Profile | Miron Construction
Veolia Hickory Meadows LEED Project Profile | Miron ConstructionMiron Construction
 
The Role of Evidence-Based Design | Miron Construction
The Role of Evidence-Based Design | Miron ConstructionThe Role of Evidence-Based Design | Miron Construction
The Role of Evidence-Based Design | Miron ConstructionMiron Construction
 
Creating the ideal patient experience
Creating the ideal patient experienceCreating the ideal patient experience
Creating the ideal patient experienceMiron Construction
 
Miron Construction - Best Advantage Credit Union Case Study
Miron Construction - Best Advantage Credit Union Case StudyMiron Construction - Best Advantage Credit Union Case Study
Miron Construction - Best Advantage Credit Union Case StudyMiron Construction
 
Case Study: Transforming the Worker's Compensation Experience
Case Study: Transforming the Worker's Compensation ExperienceCase Study: Transforming the Worker's Compensation Experience
Case Study: Transforming the Worker's Compensation ExperienceMiron Construction
 
50 Inspiring Healthcare Innovation Ideas
50 Inspiring Healthcare Innovation Ideas50 Inspiring Healthcare Innovation Ideas
50 Inspiring Healthcare Innovation IdeasMiron Construction
 

Andere mochten auch (7)

Veolia Hickory Meadows LEED Project Profile | Miron Construction
Veolia Hickory Meadows LEED Project Profile | Miron ConstructionVeolia Hickory Meadows LEED Project Profile | Miron Construction
Veolia Hickory Meadows LEED Project Profile | Miron Construction
 
The Role of Evidence-Based Design | Miron Construction
The Role of Evidence-Based Design | Miron ConstructionThe Role of Evidence-Based Design | Miron Construction
The Role of Evidence-Based Design | Miron Construction
 
Creating the ideal patient experience
Creating the ideal patient experienceCreating the ideal patient experience
Creating the ideal patient experience
 
Miron Construction - Best Advantage Credit Union Case Study
Miron Construction - Best Advantage Credit Union Case StudyMiron Construction - Best Advantage Credit Union Case Study
Miron Construction - Best Advantage Credit Union Case Study
 
Case Study: Transforming the Worker's Compensation Experience
Case Study: Transforming the Worker's Compensation ExperienceCase Study: Transforming the Worker's Compensation Experience
Case Study: Transforming the Worker's Compensation Experience
 
Innovation team brochure 2012
Innovation team brochure 2012Innovation team brochure 2012
Innovation team brochure 2012
 
50 Inspiring Healthcare Innovation Ideas
50 Inspiring Healthcare Innovation Ideas50 Inspiring Healthcare Innovation Ideas
50 Inspiring Healthcare Innovation Ideas
 

Ähnlich wie Miron's Industrial Division

Vim Construction Company Profile
Vim Construction Company ProfileVim Construction Company Profile
Vim Construction Company Profilejulius david
 
Construction Company Profile template
Construction Company Profile template Construction Company Profile template
Construction Company Profile template jawad malik
 
Contractor in Bhiwadi
Contractor in BhiwadiContractor in Bhiwadi
Contractor in Bhiwadiihbinfracon
 
Cuplocks System & Prop Sleeve By Shree Hari Engineering
Cuplocks System & Prop Sleeve By Shree Hari EngineeringCuplocks System & Prop Sleeve By Shree Hari Engineering
Cuplocks System & Prop Sleeve By Shree Hari EngineeringIndiaMART InterMESH Limited
 
Cleared Job Fair Handbook | April 8
Cleared Job Fair Handbook | April 8Cleared Job Fair Handbook | April 8
Cleared Job Fair Handbook | April 8ClearedJobs.Net
 
Cyber or Cleared Job Fair Job Seeker Handbook Feb 13, 2020 San Antonio
Cyber or Cleared Job Fair Job Seeker Handbook Feb 13, 2020 San AntonioCyber or Cleared Job Fair Job Seeker Handbook Feb 13, 2020 San Antonio
Cyber or Cleared Job Fair Job Seeker Handbook Feb 13, 2020 San AntonioClearedJobs.Net
 
Kaymonto and Partners_Profile 8 Apr 2016 (1)
Kaymonto and Partners_Profile 8 Apr 2016 (1)Kaymonto and Partners_Profile 8 Apr 2016 (1)
Kaymonto and Partners_Profile 8 Apr 2016 (1)Islam Shafiqul
 
Cleared Job Fair Handbook | April 8
Cleared Job Fair Handbook | April 8Cleared Job Fair Handbook | April 8
Cleared Job Fair Handbook | April 8ClearedJobs.Net
 
Owensboro Health Facility Development RFQ - Danco Construction
Owensboro Health Facility Development RFQ - Danco ConstructionOwensboro Health Facility Development RFQ - Danco Construction
Owensboro Health Facility Development RFQ - Danco ConstructionRyan Bosecker
 
Cleared Job Fair Job Seeker Handbook Sept 5 2019 BWI, MD
Cleared Job Fair Job Seeker Handbook Sept 5 2019 BWI, MDCleared Job Fair Job Seeker Handbook Sept 5 2019 BWI, MD
Cleared Job Fair Job Seeker Handbook Sept 5 2019 BWI, MDClearedJobs.Net
 
Zafe builders : A Proposed Business Plan
Zafe builders : A Proposed Business PlanZafe builders : A Proposed Business Plan
Zafe builders : A Proposed Business Planharoldtaylor1113
 
Proven project management.docx
Proven project management.docxProven project management.docx
Proven project management.docxFairFASST
 
BS Enterprise Bathinda
BS Enterprise BathindaBS Enterprise Bathinda
BS Enterprise Bathindaimaanbakshi
 

Ähnlich wie Miron's Industrial Division (20)

Vim Construction Company Profile
Vim Construction Company ProfileVim Construction Company Profile
Vim Construction Company Profile
 
Construction Company Profile template
Construction Company Profile template Construction Company Profile template
Construction Company Profile template
 
PIC Trifold
PIC TrifoldPIC Trifold
PIC Trifold
 
Contractor in Bhiwadi
Contractor in BhiwadiContractor in Bhiwadi
Contractor in Bhiwadi
 
PBG Brochure
PBG BrochurePBG Brochure
PBG Brochure
 
Why Choose Us
Why Choose UsWhy Choose Us
Why Choose Us
 
Cuplocks System & Prop Sleeve By Shree Hari Engineering
Cuplocks System & Prop Sleeve By Shree Hari EngineeringCuplocks System & Prop Sleeve By Shree Hari Engineering
Cuplocks System & Prop Sleeve By Shree Hari Engineering
 
Cleared Job Fair Handbook | April 8
Cleared Job Fair Handbook | April 8Cleared Job Fair Handbook | April 8
Cleared Job Fair Handbook | April 8
 
Cyber or Cleared Job Fair Job Seeker Handbook Feb 13, 2020 San Antonio
Cyber or Cleared Job Fair Job Seeker Handbook Feb 13, 2020 San AntonioCyber or Cleared Job Fair Job Seeker Handbook Feb 13, 2020 San Antonio
Cyber or Cleared Job Fair Job Seeker Handbook Feb 13, 2020 San Antonio
 
Blue Ocean Ventures
Blue Ocean VenturesBlue Ocean Ventures
Blue Ocean Ventures
 
Kaymonto and Partners_Profile 8 Apr 2016 (1)
Kaymonto and Partners_Profile 8 Apr 2016 (1)Kaymonto and Partners_Profile 8 Apr 2016 (1)
Kaymonto and Partners_Profile 8 Apr 2016 (1)
 
Cleared Job Fair Handbook | April 8
Cleared Job Fair Handbook | April 8Cleared Job Fair Handbook | April 8
Cleared Job Fair Handbook | April 8
 
Owensboro Health Facility Development RFQ - Danco Construction
Owensboro Health Facility Development RFQ - Danco ConstructionOwensboro Health Facility Development RFQ - Danco Construction
Owensboro Health Facility Development RFQ - Danco Construction
 
Cleared Job Fair Job Seeker Handbook Sept 5 2019 BWI, MD
Cleared Job Fair Job Seeker Handbook Sept 5 2019 BWI, MDCleared Job Fair Job Seeker Handbook Sept 5 2019 BWI, MD
Cleared Job Fair Job Seeker Handbook Sept 5 2019 BWI, MD
 
ALAQ ALEZDEHAR1
ALAQ ALEZDEHAR1ALAQ ALEZDEHAR1
ALAQ ALEZDEHAR1
 
Zafe builders : A Proposed Business Plan
Zafe builders : A Proposed Business PlanZafe builders : A Proposed Business Plan
Zafe builders : A Proposed Business Plan
 
Proven project management.docx
Proven project management.docxProven project management.docx
Proven project management.docx
 
BS Enterprise Bathinda
BS Enterprise BathindaBS Enterprise Bathinda
BS Enterprise Bathinda
 
STI Group Brochure
STI Group BrochureSTI Group Brochure
STI Group Brochure
 
EMI Brochure
EMI Brochure  EMI Brochure
EMI Brochure
 

Mehr von Miron Construction

Menasha Corporation Corporate Office LEED Project Profile | Miron Construction
Menasha Corporation Corporate Office LEED Project Profile | Miron ConstructionMenasha Corporation Corporate Office LEED Project Profile | Miron Construction
Menasha Corporation Corporate Office LEED Project Profile | Miron ConstructionMiron Construction
 
Measured: Authors of Change | Miron Construction
Measured: Authors of Change | Miron ConstructionMeasured: Authors of Change | Miron Construction
Measured: Authors of Change | Miron ConstructionMiron Construction
 
Meaured: Rapid Access Prototyping | Miron Construction
Meaured: Rapid Access Prototyping | Miron ConstructionMeaured: Rapid Access Prototyping | Miron Construction
Meaured: Rapid Access Prototyping | Miron ConstructionMiron Construction
 
Landscaping? Go Native! | Miron Construction
Landscaping? Go Native! | Miron ConstructionLandscaping? Go Native! | Miron Construction
Landscaping? Go Native! | Miron ConstructionMiron Construction
 
Hillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron ConstructionHillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron ConstructionMiron Construction
 
WPS Corporate Office Expansion LEED Project Profile | Miron Construction
WPS Corporate Office Expansion LEED Project Profile | Miron ConstructionWPS Corporate Office Expansion LEED Project Profile | Miron Construction
WPS Corporate Office Expansion LEED Project Profile | Miron ConstructionMiron Construction
 
Lake Mills Middle School LEED Project Profile | Miron Construction
Lake Mills Middle School LEED Project Profile | Miron ConstructionLake Mills Middle School LEED Project Profile | Miron Construction
Lake Mills Middle School LEED Project Profile | Miron ConstructionMiron Construction
 
A formula for success: a four-year referendum journey
A formula for success: a four-year referendum journeyA formula for success: a four-year referendum journey
A formula for success: a four-year referendum journeyMiron Construction
 
Route to Referendum Success: Strategies to Get to Yes
Route to Referendum Success: Strategies to Get to YesRoute to Referendum Success: Strategies to Get to Yes
Route to Referendum Success: Strategies to Get to YesMiron Construction
 
The evolution of the patient experience
The evolution of the patient experience The evolution of the patient experience
The evolution of the patient experience Miron Construction
 
Expect the Unexpected: A health care construction case study
Expect the Unexpected: A health care construction case study Expect the Unexpected: A health care construction case study
Expect the Unexpected: A health care construction case study Miron Construction
 
Miron Construction - OSI Patient Experience
Miron Construction - OSI Patient ExperienceMiron Construction - OSI Patient Experience
Miron Construction - OSI Patient ExperienceMiron Construction
 
Miron Construction - Healthcare Services Brochure
Miron Construction - Healthcare Services BrochureMiron Construction - Healthcare Services Brochure
Miron Construction - Healthcare Services BrochureMiron Construction
 

Mehr von Miron Construction (14)

Menasha Corporation Corporate Office LEED Project Profile | Miron Construction
Menasha Corporation Corporate Office LEED Project Profile | Miron ConstructionMenasha Corporation Corporate Office LEED Project Profile | Miron Construction
Menasha Corporation Corporate Office LEED Project Profile | Miron Construction
 
Measured: Authors of Change | Miron Construction
Measured: Authors of Change | Miron ConstructionMeasured: Authors of Change | Miron Construction
Measured: Authors of Change | Miron Construction
 
Meaured: Rapid Access Prototyping | Miron Construction
Meaured: Rapid Access Prototyping | Miron ConstructionMeaured: Rapid Access Prototyping | Miron Construction
Meaured: Rapid Access Prototyping | Miron Construction
 
Landscaping? Go Native! | Miron Construction
Landscaping? Go Native! | Miron ConstructionLandscaping? Go Native! | Miron Construction
Landscaping? Go Native! | Miron Construction
 
Hillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron ConstructionHillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron Construction
 
WPS Corporate Office Expansion LEED Project Profile | Miron Construction
WPS Corporate Office Expansion LEED Project Profile | Miron ConstructionWPS Corporate Office Expansion LEED Project Profile | Miron Construction
WPS Corporate Office Expansion LEED Project Profile | Miron Construction
 
Lake Mills Middle School LEED Project Profile | Miron Construction
Lake Mills Middle School LEED Project Profile | Miron ConstructionLake Mills Middle School LEED Project Profile | Miron Construction
Lake Mills Middle School LEED Project Profile | Miron Construction
 
Langlade case study
Langlade case studyLanglade case study
Langlade case study
 
A formula for success: a four-year referendum journey
A formula for success: a four-year referendum journeyA formula for success: a four-year referendum journey
A formula for success: a four-year referendum journey
 
Route to Referendum Success: Strategies to Get to Yes
Route to Referendum Success: Strategies to Get to YesRoute to Referendum Success: Strategies to Get to Yes
Route to Referendum Success: Strategies to Get to Yes
 
The evolution of the patient experience
The evolution of the patient experience The evolution of the patient experience
The evolution of the patient experience
 
Expect the Unexpected: A health care construction case study
Expect the Unexpected: A health care construction case study Expect the Unexpected: A health care construction case study
Expect the Unexpected: A health care construction case study
 
Miron Construction - OSI Patient Experience
Miron Construction - OSI Patient ExperienceMiron Construction - OSI Patient Experience
Miron Construction - OSI Patient Experience
 
Miron Construction - Healthcare Services Brochure
Miron Construction - Healthcare Services BrochureMiron Construction - Healthcare Services Brochure
Miron Construction - Healthcare Services Brochure
 

Kürzlich hochgeladen

Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 

Kürzlich hochgeladen (20)

Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 

Miron's Industrial Division

  • 1. MIRON CONSTRUCTION CO., INC. Industrial Division Building Excellence
  • 2. Miron Construction Co., Inc. | INDUSTRIAL DIVISION Overview Since 1918... Miron Construction Co., Inc. Profile Miron Construction Co., Inc. is recognized as an industry leader in construction management, general construction, design- build and industrial services by thousands of clients throughout the United States. Founded nearly 100 years ago, Miron has grown to become one the nation’s premier construction firms. Miron puts more work in place in the state of Wisconsin than any other contractor and is 87th among the “Top 400 Contractors in the United States” (as ranked by Engineering News Record (ENR) based on 2016 revenue of $898 million). Incorporated on March 23, 1949, Miron is a privately-held corporation, formed under the laws of incorporation of the State of Wisconsin. What Sets Us Apart Miron Construction Co., Inc., was built on the hard bid, firm-fixed pricing structure. Over the years, we have had customers who, rather than bid their project, chose us to perform their work on a negotiated basis. As our client relationships and reputation grew, so did our negotiated project list. We have always been sensitive to our mix of hard bid and negotiated work:We never want to lose our competitive edge in the market, and we have found that our company runs most efficiently when our negotiated and firm-fixed workloads are balanced. No matter what delivery method we utilize, our team retains the same competitive mindset for each project.We believe that Miron understands hard costs better than the competition. Project Bonding Miron’s current bonding capacity is $175 million per project with a potential overall capacity of $650 million. Dunn & Bradstreet Credit Rating Rating 1R3 Experience Modifier Rate (EMR) 2017 = 0.46 2016 = 0.47 2015 = 0.50
  • 3. 1471 McMahon Drive Neenah, WI | www.miron-construction.com Miron's Industrial Division provides construction solutions from beginning to end by completing building and equipment installations. Miron Construction Co., Inc., is a full-service construction firm providing comprehensive services: • General Contractor • Construction Manager • Design-Build Services • Complete Machine Installation • Laser Alignment and Precision Layout • Millwright, Ironworker, and Carpenter Services • Maintenance Contracts and Services Our project managers, superintendents, and tradespeople are trained to work in your plant or facility. Our team is experienced in the utilization of tools like Risk Management, Hazard Analysis and Critical Control Point (HACCP), and Critical Lift/Rigging plans. Our team will complete your project safely, within budget and to your quality standards, ensuring that your plant or machine is back up and running on time.
  • 4.
  • 5. 1471 McMahon Drive Neenah, WI | www.miron-construction.com Services Expertise to deliver on all of your needs You can expect results from the Miron Industrial Services Group. Our understanding of the specific needs of industrial projects means we staff and equip projects appropriately, completing projects safely, economically and with the highest level of quality. Rebuilds and Shutdowns Minimizing downtime on rebuilds requires specific expertise which you can expect from Miron. Coordination prior to the shutdown is key to the project’s success. Special steps are always taken to ensure safety standards are maintained. Detailed scheduling, down to tasks performed per hour, enables all parties involved to have a complete understanding of the various roles they play. Laser Alignment Attention to detail combines science with skill to ensure yourmachineryisalignedandcalibratedtoexacttolerances. Miron alignment specialists use the latest laser equipment and techniques, with thorough documentation, to ensure your machine is operating at peak efficiency. Equipment handling Miron is equipped to handle the rigging, transportation and installationofmachineryofanysize.Weownover$60million dollars in modern equipment, including cranes, forklifts, manlifts and laser alignment instruments, providing us with the competitive edge needed to bring projects in on-time, on-budget and safely. Staffed with industry knowledge Miron employs over 1,400 highly skilled tradespeople with extensive expertise in the Pulp & Paper, Energy & Infrastructure, Food & Beverage, and General Industrial markets. You can rest assured that our knowledge of your project’s parameters will result in the timely, cost effective and accurate completion of your project. special capabilities project execution Project Coordination/Management • Planning Conceptual Estimating • Bid Management & Analysis Critical Path Scheduling • Constructibility Reviews Safety • Quality • Risk Management Building Information Modeling (BIM) Virtual Process Integration (VPI) • LEED/Sustainability concrete/carpentry Footings, Foundations, Elevated/Flatwork • Retaining Walls Docks/Piers/Dam Repair • Cofferdams Roof Repair • Masonry Office Remodeling millwrights Machinery/Equipment Installation and Relocation Laser Alignment and Precision Layout Maintenance Assistance/Outage Work ironworkers Rigging • Certified Welding (carbon & stainless) Steel Erection • Pre-Cast Erection • Field Fabrication Maintenance Assistance/Outage Work
  • 6. Miron Construction Co., Inc. | INDUSTRIAL DIVISION Miron takes a multi-discipline approach to risk management that integrates safety, quality, and production (SQP) into the building process. This integrated approach guides our daily decisions and work. Miron is committed to providing a safe and hazard-free work environment for our clients, employees, subcontractors, host facilities, and the general public. We first proactively identify and plan for potential safety risks. Next, we ensure that we capture and communicate quality expectations to all stakeholders and team members. Finally, we integrate production planning to ensure the most efficient plan of work that optimizes the safety and quality of the project. Critical to this approach is a highly skilled and safely trained workforce. Armed with comprehensive safety training, employees possess the knowledge and tools to identify and eliminate unsafe acts and conditions. They provide on-site safety, quality, and production management and ensure project-wide accountability in all three categories. Elimination of distractions commonly associated with the industry, along with our pre-shift stretching program, ensures each employee is fit for duty. We refer to this as the SQP Stretching Program. During the 5 to 7 minute exercise, employees complete a series of five stretches as well as conduct an SQP huddle for the day. Miron developed this program to increase the health and wellness of employees, reduce injuries, and lower incident rates, as well as maximize quality and production. Employees are empowered to make a difference in the safety practices of themselves and others. This philosophy has allowed us to establish long-lasting relationships with both subcontractors and clients who understand our commitment to safety, protecting people, property, and our client’s market interests through trust and reliability. Ultimately,SQPallowsrisktobe“engineered”outofprojects, ensures a higher quality product, and optimizes production. Committing to this process ensures BUILDING EXCELLENCE! Risk Management & Safety
  • 7. 1471 McMahon Drive Neenah, WI | www.miron-construction.com
  • 8. Miron Construction Co., Inc. | INDUSTRIAL DIVISION Miron has an extensive background working on power projects under extremely critical completion requirements. We perform construction and maintenance work in power generation facilities on a daily basis. Whether it be a rebuild of a hydro unit, overhaul of a turbine generator, or construction of a RICE (reciprocating internal combustion engine) facility— Miron has the experience. The power industry faces challenges unknown to other industries, and it takes a contractor with experience and foresight to work with and offer solutions to these unique customers. Miron has valuable experience and a record of problem solving that can be applied to your project. ENERGY & INFRASTRUCTURE Wisconsin has the highest concentration of paper mills and paper converters in the country. We understand the importance of precision installation and timely completion in order to get the machine running as soon as possible. Our extensive experience enables us to complete projects of any size—safely, on time, and within budget. You will find that our staff has experience from stock prep, throughout the paper machine, converting, and utilities/ wastewater treatment. Shutdowns, whether planned or unplanned, are always a race against the clock. Miron’s understanding of your procedures and commitments makes us your ideal partner. We will provide the proper assistance to keep your operations on track when working against critically tight time lines. PULP, PAPER, PLASTICS&PACKAGING Markets “Everyone at Miron understands what our goals are. Whether the goal is a time frame or a budget we need to meet; they’re all pulling in that direction. Our project involved a significant amount of equipment. Miron coordinated everything to make sure the equipment was put in place when it needed to be. Without hesitation, we selected Miron for our next building project.” "I was impressed with how well organized and knowledgeable the team was in getting the job done. The customer was very impressed and satisfied with how the install went. If I have another chance, I would be very happy to work with Miron Construction again. Good Job Guys!"
  • 9. 1471 McMahon Drive Neenah, WI | www.miron-construction.com Whether processing, ingredient, beverage, or packaged food facilities, Miron has done it all. Our staff has the experience to construct, modify, and maintain production facilities. In addition to installations, our millwright service group of over 300 trades-people has even traveled overseas to assist in the disassembly of critical food processing equipment, so as to avoid conflicts during installation. As a result of current food safety issues, we have mandated a training initiative for key project management staff to expand our current knowledge base to include plant operational issues of HACCP and Safe Quality Food Standards— making us a leader in our industry. FOOD & BEVERAGE The upper Midwest has a large concentration of natural resource mining operations for sand, iron ore, and other precious metals. Mine work is driven by safety and schedule. Miron has a large MSHA trained work-force that has construction experience in an operating mine. Our expertise in large equipment moves and cast-in place concrete has allowed Miron to become a leader in the mining industry. We work with customers to identify the critical path project and maintenance activities that mustbecompletedontimeinorder to resume production. Each activity is then reviewed and planned ensuring that hazard analysis of the job-site is taken into account. MINING/NATURAL RESOURCES Whether it is working in a foundry or chemical plant, a machine shop, or a print shop, Miron has the experience to help you with your project. Ourstaffhastheexperience to construct, modify and maintain production facilities. Since 1918, Miron has been instrumental in helping manufacturers keep production schedules on track with comprehensive industrial services. Miron gives you the quality and support you expect from proven professionals. GENERAL INDUSTRIAL “Working with Miron Construction on our new facility was a terrific experience. From the beginning of the project the people of Miron demonstrated their expertise and professionalism in the way they handled nailing down all the details. This ultimately resulted in our building being completed on time and on budget, with minimal surprises.” When we decided to expand our business by building our new facility, it was extremely important that we chose a firm to assist us in making our dream a reality... Miron provided us with pre- construction expertise, as well as a skilled team to manage our construction project. Before, during, and even after the project was completed, I have found Miron to be exceptionally supportive of our business needs. No matter the size, I would highly recommend Miron for your next project.” “Miron has proven to be a team player and has responded positively to requests for schedule and sequencing changes required by the Project.”
  • 10. Miron Construction Co., Inc. | INDUSTRIAL DIVISION Virtual Process Integration (VPI) Services Miron is well versed in utilizing Virtual Process Integration as both a technology and a cultural approach to our work. We collaborate with Owner's, design/engineering professionals and trade contractors to provide the VPI services that are described below. • Safety & Fall Protection Planning • Installation Planning & Sequencing • 3D Coordination (Design & Installation) • Operation & Maintenance Planning • Visualization
  • 11. 1471 McMahon Drive Neenah, WI | www.miron-construction.com Paper Machines/Stock Preparation Paper Converting Power Generation Facilities Turbine Rebuilds Manufacturing Facilities Foundries Chemical Plants Food Plants Wastewater Treatment Plants Mining Operations Conveyor Systems/Material Handling Requirements for Project Success No matter the type of facility or product produced, successful construction of Industrial projects shares some absolute certainties: • Safety is the highest priority • Proper staffing and equipment is mission critical • Attention to details in the specification and the field is a must • Project specifications and drivers must be clearly identified, understood and followed • Trades-people must be highly experienced • A qualified project manager in total control of project initiatives must be available at all times Experience facility type experience
  • 12. Miron Construction Co., Inc. | INDUSTRIAL DIVISION
  • 13. 1471 McMahon Drive Neenah, WI | www.miron-construction.com Miron’s Competitive Advantage - We Own our Equipment! Miron’s commitment to building excellence is evident in our facilities and equipment, which are continually upgraded. We continuously reinvest in equipment, training, and new construction methodologies. We own a 112,000 SF office in Neenah, WI and a 14-acre warehouse site in Menasha, WI. In addition, we own $60 million worth of equipment including: 50 cranes 2 FARO laser trackers FARO ARM 350 fork/scissors/ boom lifts Equipment Operators/Crane Services • CCO trained crane operation up to 350 ton • Mobile cranes from 6 to 350 ton • Crawler cranes from 100 to 500 ton • Trucking
  • 14. Miron Construction Co., Inc. | INDUSTRIAL DIVISION
  • 15. 1471 McMahon Drive Neenah, WI | www.miron-construction.com Industrial Team Leadership PATRICK NATE | Vice President, Industrial Operations 920.969.7026 patrick.nate@miron-construction.com Pat has served the industrial marketplace for over 40 years, providing project management and executive-level leadership on many industrial projects. DAN GOYMERAC | Vice President, Industrial Business Development 920.969.7004 dan.goymerac@miron-construction.com Dan possesses over 30 years of experience working in and serving the industrial and manufacturing marketplace.
  • 16. OfficeLocations CORPORATE (NEENAH) OFFICE 1471 McMahon Drive Neenah, WI 54956 p 920.969.7000 f 920.969.7393 WAUSAU OFFICE 500 First Street Suite 4000 Wausau, WI 54403 p 715.841.4000 f 715.845.9119 MADISON OFFICE 8215 Greenway Blvd. Suite 100 Middleton, WI 53562 p 608.203.2700 f 608.203.2200 MILWAUKEE OFFICE 10700 Research Drive Suite 100 Milwaukee, WI 53226 p 414.308.1510 f 414.431.0933 EAU CLAIRE OFFICE 3402 Oakwood Mall Drive Suite 200 Eau Claire, WI 54701 p 715.598.5700 f 715.839.0242 IOWA OFFICE 335 French Ct. SW Cedar Rapids, IA 52404 p 319.298.5200 f 319.366.5695