SlideShare a Scribd company logo
1 of 25
Download to read offline
Posted by http://MillCityTimes.com




                                 Resolution 2011-190

   Resolution Adopting Amended Chapter 11 of the Minneapolis Park and Recreation
        Board Code of Ordinances and new Policy on Community Engagement

Whereas, The Minneapolis Park & Recreation Board ("MPRB") is the steward of the
Minneapolis Park System;

Whereas, The MPRB desires broad representation and participation for the planning,
development, and evaluation of park facilities, services, and programs;

Whereas, The MPRB Code of Ordinances, Chapter 11 is the current requirement for
pubic participation specific to facility construction and redevelopment projects;

Whereas, The MPRB’s 2007-2020 Comprehensive Plan provides the goal of providing
relevant park and recreation services through outreach and research that focuses on
identifying the needs of the city’s dynamic populations;

Whereas, The Board of Commissioners have provided strategic direction to improve and
enhance community engagement strategies, including communication methods;

Whereas, Staff developed a draft amended Chapter 11 ordinance and new policy on
community engagement based on information gathered through an extensive community
outreach and research process for the project;

Whereas, The Board authorized a 45-day public review and comment period to provide
opportunity for public feedback on the draft amended ordinance and new policy;

Whereas, The Board, staff and community feedback has been incorporated into the
amended ordinance and new policy;

Whereas, The amended Chapter 11 ordinance defines community engagement
requirements for park facility construction and redevelopment projects, and directs the
creation, maintenance and regular evaluation of a policy on community engagement;
and

Whereas, The new policy on community engagement addresses the amended Chapter
11 ordinance requirements and provides a framework for working and communicating
with the public;

RESOLVED, That the Board of Commissioners adopt the amended Chapter 11 of the
Minneapolis Park and Recreation Board Code of Ordinances and the new policy on
community engagement; and
Posted by http://MillCityTimes.com




RESOLVED, That the President and Secretary of the Board are authorized to take all
necessary administrative actions to implement this resolution.

Adopted by the Park & Recreation Board
In formal meeting assembled on October 19, 2011

                                             ______________________________
                                                   John Erwin, President


                                             ______________________________
                                                   Karen Robinson, Secretary
Approved:

_________________________________
R.T. Rybak, Mayor




                                        2
Posted by http://MillCityTimes.com




TO:           Planning Committee

FROM:         Bruce Chamberlain, Assistant Superintendent for Planning Services

DATE:         October 5, 2011

SUBJECT:      Resolution adopting amended Chapter 11 of the Minneapolis Park and
              Recreation Board Code of Ordinances and new policy on community
              engagement

BACKGROUND

Currently, the Minneapolis Park & Recreation Board (MPRB) follows a public
engagement process for facility construction and redevelopment projects as required by
Chapter 11 of the MPRB Code of Ordinances. Effective January 1, 2000, the ordinance
was adopted to address the City of Minneapolis’ public process for obtaining a
conditional use permit. The ordinance is applied almost exclusively to projects that are
budgeted and approved through the MPRB’s Capital Improvement Program (CIP) or that
would be the result of a third party agreement within the park system.

There have been proposals at various times in the past to amend the current ordinance
to attempt to better address such things as the types of projects it addresses, its scope
and its fundamental effectiveness in engaging the community. Those proposals have not
been approved by the Board.

A reorganization of the MPRB into a district-based system in 2004 prompted work to
enhance the framework of community outreach, research and engagement. This
framework was tested in applying a variety of techniques and opportunities for
community participation in the development of the 2007-2020 Comprehensive Plan.
Approved by the Board in October 2007, the Comprehensive Plan reinforced the need to
involve residents and park users in identifying the park and recreation needs and
interests of their communities to ensure that the MPRB may best serve the city’s
dynamic populations.

Guided by the goals of the Comprehensive Plan and the Board’s strategic direction to
focus on new strategies for community engagement, staff developed a timeline and
process in 2010 to develop a new Board policy. The primary purpose of the policy is to:
1) outline and support the existing requirements of the Chapter 11 Ordinance that have
proven to be functional and effective for the organization, and 2) provide consistent
practices and approved methods for working and communicating with the community in
decision making processes.

An extensive community outreach and research effort gathered feedback through
multiple opportunities for user engagement. This engagement revealed that community
Posted by http://MillCityTimes.com




members had the highest interest and expressed they were most likely to participate in
processes for capital projects. Development of the policy also examined existing national
trends and best practices, including comparison of local agency practice. After analysis
of comments received, staff drafted a new policy and simultaneously amended the
Chapter 11 ordinance to support the policy goals, definitions and procedures. In
preparation for a public comment period on the draft policy and amended ordinance, the
documents were discussed by the Board during the April 2011 Committee of the Whole
meeting.

From May 1 to June 15, 2011, a 45- day public review and comment period on the
amended ordinance and draft policy gave the public the opportunity to provide revisions.
Document review from department management, legal review and additional field testing
provided additional refinement post the public review period. Comments gathered during
this period did not indicate substantive changes to the intent or goal of both documents.
Minor revisions were presented to the Board for discussion at the September 2011
Committee of the Whole meeting.

While the practice of community engagement takes time and resources, the costs of
involving the public in decisions can avoid the more significant costs of community
conflict and the need to change decisions that prove to be inadequately informed and
unstable. The amended ordinance and policy will provide a consistent framework for
projects within the MPRB’s CIP, and serve as a model for engaging the community for
the multi-faceted projects, services and programs throughout the organization.

FUNDING/COST SUMMARY
N/A

RECOMMENDATION

Staff believes these documents provide a consistent mode of practice to engage the
community for projects approved and budgeted through the MPRB’s CIP or through third
party agreement. Community research data indicates these projects are of high interest
and have broad potential to shape future development and operation of the park system.

Resources provided by the new policy will allow for increased awareness of community
impact for projects undertaken within the park system, and diversify the methods used to
interface and build relationships with the Minneapolis community.

Staff recommends that the Board adopt a resolution to amended Chapter 11 of the
Minneapolis Park and Recreation Board Code of Ordinances and new policy on
community engagement.

RELATED BOARD ACTIONS

9/15/99       Minneapolis Park and Recreation Board Code of Ordinances,
              Amendment to Chapter 11: Park Facility Construction and
              Redevelopment – Public Participation

4/20/2011     Resolution Authorizing a Forty-Five Day Public Review and Comment
              period for Amended Chapter 11 Ordinance and New Policy



                                           4
Posted by http://MillCityTimes.com




ATTACHMENTS

MPRB Code of Ordinances, Chapter 11, Amended
Current MPRB Code of Ordinances, Chapter 11
MPRB Policy on Community Engagement



Prepared by: Ginger Cannon, Planner
Reviewed by: Bruce Chamberlain, Assistant Superintendent for Planning Services
Approved by: Jayne Miller, Superintendent




                                         5
Posted by http://MillCityTimes.com



                                      ORDINANCE 99-101

           AMENDING THE ORDINANCES OF THE MINNEAPOLIS PARK
       AND RECREATION BOARD RELATING TO PROPOSALS TO CONSTRUCT
         OR REDEVELOP PARK FACILITIES BY ADDING NEW CHAPTER 11
             RELATING TO PUBLIC PARTICIPATION AND APPEALS.

       The Minneapolis Park and Recreation Board does ordain as follows:

      Section 1. That the Minneapolis Park and Recreation Board Code of Ordinances be
amended by adding thereto a new Chapter 11 to read as follows:

                                           Chapter 11

            PARK FACILITY CONSTRUCTION AND REDEVELOPMENT –
                          PUBLIC PARTICIPATION

        PB11-1. Citizens Advisory Committee – Creation and Authority. The Park Board
shall cause a citizen advisory committee to be created when park facility construction or
redevelopment projects are proposed. The citizen advisory committee shall be balanced and
representative of the interests impacted by the proposed park facility construction or
redevelopment. The citizen advisory committee shall have the authority to make
recommendations to the Park Board’s Planning Committee on the proposed construction and
redevelopment of park facilities.

         PB11-2. Citizen Advisory Committee – Meeting Notice. The citizen advisory
committee shall hold one or more meetings on proposed park facility construction or
redevelopment projects. The Park Board shall publish notice of the time, place and purpose of
the initial meeting at least once, not less than ten (10) days before the meeting, in a newspaper of
general circulation. The Park Board shall also mail notice of the time, place and purpose of the
meeting to all park councils and registered neighborhood groups potentially impacted by the
proposed construction or redevelopment of the park facility. The Park Board shall also mail
notice of the time, place and purpose of the meeting to all owners of record of property located in
whole or in part within three (3) city blocks of the park facility being proposed to be constructed
or redeveloped.

       PB11-3. Citizens Advisory Committee – Meetings and Recommendation. All
meetings shall be open to the public. Any person may appear and speak at a meeting either in
person or by a duly appointed representative. Upon conclusion of public input, the citizen
advisory committee shall announce its recommendation or shall lay the proposal over to a
subsequent meeting. Records shall be kept on file at the Park Board office of attendance,
meetings, agendas, handouts and committee actions. All recommendations of the Citizen
Advisory Committee shall be presented at the public hearing of the Planning Committee.

        PB11-4. Planning Committee – Notice. The Planning Committee shall hold a public
hearing on all proposed park facility construction or redevelopment projects. The committee
shall publish notice of the time, place and purpose of the public hearing at least once, not less
than ten (10) days before the hearing, in a newspaper of general circulation. The Planning
Committee shall also notify the voting members of the citizen’s advisory committee and owners
of record of property located in whole or in part within three (3) city blocks of the park facility
Posted by http://MillCityTimes.com



being proposed to be constructed or redeveloped of the time and place of the public hearing. The
Planning Committee shall also comply with all other notice requirements of Minnesota’s Open
Meeting Law.

       PB11-5. Planning Committee – Appeal of Citizen Advisory Committee. Any person
may appeal and object to the recommendations of a citizen advisory committee at the public
hearing held by the Planning Committee.

        PB11-6. Planning Committee – Hearing. All hearings conducted shall be open to the
public. The chair or acting chair may set the parameters of testimony to be received from
interested parties. Any person may appear and testify at a hearing either in person or by duly
appointed representative. After reviewing the citizen advisory committee’s recommendations,
appeals and objections thereto, and the conclusion of other public testimony, the Planning
Committee shall announce its decision or shall lay the matter over to a subsequent meeting. The
Planning Committee shall keep minutes of its public hearings, and shall also keep records of its
official actions. Decisions of the Planning Committee shall be dated and forwarded to the full
Park Board.

        PB11-7. Appeal to Full Park Board Filing. All findings and decisions of the Planning
Committee shall be subject to appeal to the full Park Board. Appeals may be initiated by any
affected person by filing an appeal with the Superintendent’s office on a form approved by the
Park Board. All appeals must be received within ten (10) calendar days of the date of decision
by the Planning Committee and must be accompanied at the time of filing with payment of the
fee specified in Minneapolis Code § 525.150. Timely filing of an appeal shall stay the decision
of the Planning Committee until a decision is made by the Park Board.

        PB11-8. Full Park Board Hearing Notice. Not less than ten (10) days before the
public hearing of the Park Board to consider the appeal, the Park Board shall publish notice of
the time, place and purpose of the public hearing at least once in a newspaper of general
circulation. The Park Board shall also comply with all notice requirements of Minnesota’s Open
Meeting Law. Failure to give mailed notice to all affected parties, or defects in the notice, shall
not invalidate the proceedings provided a bona fide attempt to comply with this section has been
made.

        PB11-9. Public Hearing of Appeal. The Park Board shall hold the public hearing on
any appeal. All hearings conducted on the appeal shall be open to the public. The chair or the
acting chair may set the parameters of testimony to be received from interested parties. The Park
Board shall keep minutes of its public hearing and shall also keep records of its official actions.

       Section 2. That this Ordinance shall take effect and be in force January 1, 2000.

Passed and adopted on this 15th day of September, 1999.


                                                     Bob Fine, President
Approved:

                                                     Norman C. Merrifield, Secretary

Sharon Sayles Belton, Mayor
Posted by http://MillCityTimes.com



                                    ORDINANCE 99-101

   AMENDING CHAPTER 11 OF THE ORDINANCES OF THE MINNEAPOLIS PARK
  AND RECREATION BOARD RELATING TO PUBLIC PARTICIPATIONCOMMUNITY
              ENGAGEMENT FOR PROPOSALS TO CONSTRUCT
       OR REDEVELOP PARK FACILITIES. BY ADDING NEW CHAPTER 11
           RELATING TO PUBLIC PARTICIPATION AND APPEALS.


       The Minneapolis Park and Recreation Board does ordain as follows:

       Section 1. That the Minneapolis Park and Recreation Board Code of Ordinances chapter
11 be amended by adding thereto a new Chapter 11 to read as follows:

                                         Chapter 11

          PARK FACILITY CONSTRUCTION AND REDEVELOPMENT –
       PUBLIC PARTICIPATIONCOMMUNITY INVOLVEMENTCOMMUNITY
                            ENGAGEMENT

       PB11-1. Definitions. As used in this chapter the following terms shall mean:

       Community InvolvementEngagement: The opportunity for stakeholders to influence
       decisions that shape the park system, including the intentional effort to create public
       understanding of MRPB projects, programs, and services, and to make certain the MPRB
       is aware of and responsive to stakeholder needs, concerns and industry trends.
       Interchangeable terms include: public participation, community involvement, and citizen
       participation.


       Park facility construction and redevelopment: t: The development of new or
       redevelopment of existing facilities as approved and budgetedapproved in a Capital
       Improvement Program for the Minneapolis Park and Recreation Boardd, including
       construction and redevelopment of facilities approved and budgeted through third party
       agreement..


       PB11-2 Community InvolvementEngagement Policy. The Minneapolis Park and
Recreation Board shall create, maintain, and regularly evaluate (every three (3) years) a
community involvement engagement policy that requires that requires allall park facility
construction and redevelopment projects approved and budgeted through the Capital
Improvement Program to have a have a community involvementengagement plan.

        PB11-3 Community InvolvementEngagement Plan. All park facility construction and
redevelopment projects approved and budgeted by the Board within the Capital Improvement
Program require a community involvementengagement plan. The community engagement plan
shall be developed in consultation with established neighborhood organizations. When possible,
other representative community groups and under-represented groups shall be involved in the
development of the plan.
Posted by http://MillCityTimes.com



        PB11-4 Citizens Community Advisory Committee – Creation and Authority. The
Park BoardMinneapolis Park and Recreation Board shall cause a citizen community advisory
committee to be created whenas park facility construction or redevelopment projects are
proposed. recommended inwithin a a community engagementnvolvement plan.n for a project.
The citizen community advisory committee shall be balanced and representative of the interests
impacted by the proposed park facility construction and redevelopment facility construction or
redevelopmentproject. The citizen community advisory committee shall have the authority to
make recommendations to thethe designated Committee of the Board Park Board’s Planning
Committee on the proposed park facility construction and redevelopment construction and
redevelopment of park facilitiesproject. The Board of Commissioners shall have the authority to
cause the creation and approve the charge and composition of a community advisory committees
for topics of its choosing.

         PB11-2. Citizen Advisory Committee – Meeting Notice. The citizen advisory
committee shall hold one or more meetings on proposed park facility construction or
redevelopment projects. The Park Board shall publish notice of the time, place and purpose of
the initial meeting at least once, not less than ten (10) days before the meeting, in a newspaper of
general circulation. The Park Board shall also mail notice of the time, place and purpose of the
meeting to all park councils and registered neighborhood groups potentially impacted by the
proposed construction or redevelopment of the park facility. The Park Board shall also mail
notice of the time, place and purpose of the meeting to all owners of record of property located in
whole or in part within three (3) city blocks of the park facility being proposed to be constructed
or redeveloped.

        PB11-5. Citizens Community Advisory Committee – Meetings and
Recommendation. All meetings shall be open to the public. Any person may appear and speak
at a meeting either in person or by a duly appointed representative. Upon conclusion of public
input, the citizen community advisory committee shall announce its recommendation or shall lay
the proposal over to a subsequent meeting. Records shall be kept on file at the Park Board office
of attendance, meetings, agendas, handouts and committee actions. All recommendations of the
Citizen community aAdvisory cCommittee shall be presented at the public hearing of the
Planning Committeeof the designated Committee of the Board.

         PB11-6. Planning CommitteeCommittee of the Board Public Hearing. – Notice. The
Planning CommitteeA Committee of the Board shall hold a public hearing on all projects that
include recommendations of a community advisory committee. The chair or acting chair may set
the parameters of testimony to be received from interested parties. Any person may appear and
testify at a hearing either in person or by duly appointed representative. After reviewing the
community advisory committee’s recommendations and after the conclusion of public testimony,
the Committee of the Board shall announce its decision or shall lay the matter over to a
subsequent meeting. The Committee of the Board shall keep records of its public hearings and
official actions. Decisions of the Committee of the Board shall be dated and forwarded to the full
Board.

all proposed park facility construction or redevelopment projects. The committee shall publish
notice of the time, place and purpose of the public hearing at least once, not less than ten (10)
days before the hearing, in a newspaper of general circulation. The Planning Committee shall
also notify the voting members of the citizen’s advisory committee and owners of record of
property located in whole or in part within three (3) city blocks of the park facility being
proposed to be constructed or redeveloped of the time and place of the public hearing.
Posted by http://MillCityTimes.com



The Planning Committee shall also comply with all other notice requirements of Minnesota’s
Open Meeting Law

        PB11-7. Community Advisory Committee Meeting and Public Hearing Notice. The
Minneapolis Park and Recreation Board shall create and maintain a notification process that
addresses all community advisory committee meetings and public hearings for the project. This
process shall require a ten (10) day notice of the first meeting in a newspaper of general
circulation, of park councils and registered neighborhood groups and of all owners of record of
property located in whole or in part within three (3) city blocks of the project area. The notice
shall comply with all other notice requirements of Minnesota’s Open Meeting Law. Failure to
give mailed notice to all affected parties, or defects in the notice, shall not invalidate the process
or proceedings provided a bona fide attempt to comply with this section has been made.


               PB11-5. Planning Committee – Appeal of Citizen Advisory Committee. Any
person may appeal and object to the recommendations of a citizen advisory committee at the
public hearing held by the Planning Committee.

                PB11-6. Planning Committee – Hearing. All hearings conducted shall be open
to the public. The chair or acting chair may set the parameters of testimony to be received from
interested parties. Any person may appear and testify at a hearing either in person or by duly
appointed representative. After reviewing the citizen advisory committee’s recommendations,
appeals and objections thereto, and the conclusion of other public testimony, the Planning
Committee shall announce its decision or shall lay the matter over to a subsequent meeting. The
Planning Committee shall keep minutes of its public hearings, and shall also keep records of its
official actions. Decisions of the Planning Committee shall be dated and forwarded to the full
Park Board.

                PB11-7. Appeal to Full Park Board Filing. All findings and decisions of the
Planning Committee shall be subject to appeal to the full Park Board. Appeals may be initiated
by any affected person by filing an appeal with the Superintendent’s office on a form approved
by the Park Board. All appeals must be received within ten (10) calendar days of the date of
decision by the Planning Committee and must be accompanied at the time of filing with payment
of the fee specified in Minneapolis Code § 525.150. Timely filing of an appeal shall stay the
decision of the Planning Committee until a decision is made by the Park Board.

                PB11-8. Full Park Board Hearing Notice. Not less than ten (10) days before
the public hearing of the Park Board to consider the appeal, the Park Board shall publish notice
of the time, place and purpose of the public hearing at least once in a newspaper of general
circulation. The Park Board shall also comply with all notice requirements of Minnesota’s Open
Meeting Law. Failure to give mailed notice to all affected parties, or defects in the notice, shall
not invalidate the proceedings provided a bona fide attempt to comply with this section has been
made.

                 PB11-9. Public Hearing of Appeal. The Park Board shall hold the public
hearing on any appeal. All hearings conducted on the appeal shall be open to the public. The
chair or the acting chair may set the parameters of testimony to be received from interested
parties. The Park Board shall keep minutes of its public hearing and shall also keep records of
its official actions.
Posted by http://MillCityTimes.com



       Section 2. That this Ordinance shall take effect and be in force January 1, 2000XX30
days after approval by the Board.

Passed and adopted on this 15th ___day of Septembermonth, year, 1999____.


                                                   Bob Fine, President
Approved:

                                                   Norman C. Merrifield, Secretary

Sharon Sayles Belton, Mayor
Posted by http://MillCityTimes.com




Policy on Community Engagement

DISCUSSION

A well-designed and consistently implemented community engagement process aligns agency
decisions with the interests and priorities of Minneapolis residents and park users. The keys to
engaging communities include visibility, transparency of process, the use of multiple channels
of communication, respect for all points of view and ensuring the opportunity for every
stakeholder to voice his or her opinion during a decision making process. The measure of
community engagement is the level of participation - through increased participation the
Minneapolis Park and Recreation Board (MPRB) is better able to successfully deliver projects
representative of community needs, interests and resources.

Perspectives of Minneapolis residents, community groups, park users, staff, and the Board of
Commissioners have informed the development of the following policy on community
engagement. Research on best practices, current trends, and national and local government
policies in working with communities have contributed to policy framework.

The MPRB Board of Commissioners recognizes the organizational commitment necessary to
stay engaged with and relevant to Minneapolis residents and users of the park system. This
policy and procedure will guide the MPRB in authentically involving residents and park users in
developing and delivering park projects that promote health, well-being, community, and the
environment.

Goals of Effective Community Engagement

The following policy goals establish the expectations of effective community engagement for
the MPRB and complement the core principles of community engagement adopted by the
Minneapolis City Council.

       1. Promote a culture of openness and learning in which consistent outreach and
          research methods increase community interest and participation.

       2. Develop and sustain relationships that encourage the MPRB and the community to
          work together to advance the common good.

       3. Provide opportunities for diverse people, ideas, and information to influence the
          development and implementation of park projects.

       4. Enhance communication and outreach methods using available and emerging
          technology, including social media.
Posted by http://MillCityTimes.com




DEFINITIONS
Stakeholder(s): Any segment of a community that is impacted by, or has direct interest in a
decision. This may include elected officials, residents, community groups or organizations,
underrepresented communities, communities of color, MPRB staff, neighborhood
organizations, developers, business owners, etc.

Community Engagement: The opportunity for stakeholders to influence decisions that shape
the park system, including the intentional effort to create public understanding of MRPB
projects, programs, and services, and to make certain the MPRB is aware of and responsive to
stakeholder needs, concerns and industry trends. Interchangeable terms include: public
participation, community involvement, and citizen participation.

Community Outreach: The practice of communicating with or gathering information from
stakeholders to inform a specific project, impending decision or strategic planning effort. A
variety of methods, tools, and strategies may be used to share information and obtain
stakeholder perspectives. Examples of outreach include surveys, meetings, and focus groups.

Community Research: The practice of gathering data from primary or secondary sources to
inform a specific project, impending decision, or strategic planning effort.

Primary Research: Any original research performed by MPRB staff. Examples include
community surveys or aggregated data about program and services offered.

Secondary Research: Any existing research performed by another entity that has application to
Minneapolis. This includes regional or national trend information; research completed by
regional or state agencies, general industry, or market research.

Project: An intentional effort to achieve specific goals or outcomes in the development of new
or redevelopment of existing facilities as approved and budgeted in a Capital Improvement
Program (CIP) for the Minneapolis Park and Recreation Board, including construction and
redevelopment of facilities approved and budgeted through third party agreement.

Project Manager: Any MPRB staff member or consultant responsible for following current
policy and procedures on community engagement in development of new or redevelopment of
existing facilities as approved and budgeted in a Capital Improvement Program for the
Minneapolis Park and Recreation Board.

Board: Reference to the nine-member Park Board of Commissioners that are the
independently elected, semi-autonomous body responsible for maintaining and developing the
Minneapolis park system.

Committee of the Board: Reference to any committee that is comprised of two (2) or more
Commissioners and established by the Board.
Posted by http://MillCityTimes.com




POLICY

This policy applies to all Minneapolis Park and Recreation Board divisions and departments and
outlines the implementation of Chapter 11 of the Minneapolis Park and Recreation Board Code
of Ordinances. The policy outlines requirements for community engagement relative to
projects for the Minneapolis Park and Recreation Board, including projects approved and
budgeted through third party agreement.

All Minneapolis Park and Recreation Board divisions and departments are encouraged to follow
this policy in working and communicating with stakeholders on initiatives outside of the
approved and budgeted Capital Improvement Program (CIP).

1. The Board is to purposefully seek the participation of a broad representation of
   stakeholders to ensure that diverse community needs, interests, and resources inform
   decisions for a project.

2. The Board is to evaluate this policy and procedure every four-year period, with the first
   evaluation conducted in 2015.

3. Project managers are to perform project assessment and develop community engagement
   plans.
   3.1. Project managers are to provide public notice of opportunities for community
        engagement as defined by Chapter 11 of the Minneapolis Park and Recreation Board
        Code of Ordinances and current policy and procedure.
   3.2. Project managers are to coordinate with the Communications and Marketing
        Department to ensure strategies are consistent with current policy.
   3.3. Project managers are to share community research and retain project records in
        accordance with the current MPRB Records Retention Schedule.
   3.4. Project managers are to oversee consultant adherence to the requirements of Chapter
        11 of the Minneapolis Park and Recreation Board Code of Ordinances and current
        policy and procedure.

4. All projects require a community engagement plan. The Board is to be informed of
   community engagement plans and resulting plan recommendations.
   4.1. Staff will consult with neighborhood organizations and other representative community
        groups and individuals in developing community engagement plans.
   4.2. The Board and staff are to utilize approved methods to involve stakeholders. New
        outreach and research methods may be introduced and reviewed by the Board as part
        of a community engagement plan.
   4.3. A community advisory committee (CAC) is recommended within a community
        engagement plan and must be conducted in compliance with Chapter 11 of the
        Minneapolis Park and Recreation Board Code of Ordinances.
       4.3.1. A CAC may be a non-appointed or appointed group of stakeholders.
Posted by http://MillCityTimes.com




        4.3.2. The Board is to approve the final composition and charge for an appointed CAC,
               conduct public hearings on committee recommendations, and make final
               decisions regarding recommendations.
               4.3.2.1. An appointed CAC is required within a community engagement plan if
                        the project outcomes may result in a change that is not specified in an
                        approved master plan for a regional park.
        4.3.3. The Board is to review the charge for a non-appointed CAC, conduct public
               hearings for committee recommendations, and make final decisions regarding
               recommendations.
               4.3.3.1. A non-appointed CAC is required within a community engagement plan
                        if the project outcomes may result in a change in public use of park
                        land.

5. The Board is to allocate staff and financial resources to provide for implementation and
   evaluation of community engagement plans.

6. This policy shall take effect and be in force thirty (30) days after adopted by the Board.
   Once in force, this policy will be in effect for projects that do not have an in-process or
   already established CAC as required or recommended.




Draft                                    Page 4                                 9/26/2011
Posted by http://MillCityTimes.com




PROCEDURE

A. Project Assessment

Upon determination of a project, project managers are to:

1. Complete and retain the project assessment form to determine the recommended level of
   community engagement for a project.
   1.1. Be aware that substantial degrees of change to a program, facility or level of service increase
        potential impact to the community and highlight the importance of a predetermined
        engagement strategy.
   1.2. Approach project stakeholders to discuss and complete the form as a collaborative effort.

2. Consult the community engagement grid to select approved outreach and research methods
   according to the recommended level of community engagement.
   2.1. A combination of approved methods may be used to form a comprehensive outreach strategy
        or community engagement plan (see section B, Community Engagement Plans).

The project assessment form and grid are tools to assist in process design and represent the minimum
requirements for project managers in developing a community engagement plan. These tools are
directly associated and designed to be used in combination with each other.

Determining the appropriate approach in working and communicating with the community is not
scientific practice; there is no one formula for determining the most effective strategy. Project
managers are to be aware of requirements for community engagement based on funding source or
other project characteristics. Methods to engage the stakeholder are defined through project
assessment, Board action and/or implementation of a community engagement plan.

B. Community Engagement Plans

All projects require a community engagement plan, even if the plan is simply a timeline for appropriate
notice and communication to the community for a project. The community engagement plan may
introduce new methods of outreach, research and engagement for Board approval through ideas
generated by stakeholders and the project manager during plan development.

At a minimum, the community engagement plan is to include the following information:
1. Identification of stakeholders that may be affected by the project.
2. Definition of stakeholder roles and responsibilities for the project.
3. Identification of approved outreach and research methods that will provide information to best
    inform the project outcome.
4. Identification of public notice and timely communication strategies for the project.
5. Identification of resources needed to implement the plan.
6. Timeline for implementation.
Posted by http://MillCityTimes.com




7. An evaluation summary examining the efficacy of the community engagement process including a
   statement indicating how the process advanced policy goals (see section F, Evaluation).

Project managers are to:
1. Consult with established neighborhood organizations in developing community engagement plans.
   Interfacing with neighborhood organizations will support the effort to ensure participation is broad
   based and inclusive, and build consistency between City supported participation programs and
   practices of the MPRB.
2. Consult with representative community groups or community leaders, and work with under-
   represented groups to develop and implement the plan.
3. Review the community engagement plan with the Board of Commissioners, and obtain approvals
   as necessary.
4. Modify the plan if circumstance warrants, and communicate substantial modifications to
   stakeholders and the Board.

C. Establishment of Advisory Committees

Advisory committees provide an opportunity for stakeholder groups to share insight and resources,
and serve to build and sustain relationships between the community, partner agencies and the MPRB.
Members of different types of advisory committees work collaboratively to provide comprehensive
project recommendations to the Board.

Project Advisory Committee
1. Criteria for Creation
   1.1. The project advisory committee (PAC) is comprised of a MPRB project manager and a cross-
        functional team of staff from departments affected by or involved in the project. The PAC
        allows for full information sharing for the community on options and implications for project
        development and implementation.
   1.2. The Superintendent or Assistant Superintendent recommends MPRB staff for a PAC; the PAC
        may include individuals representing a consultant group.

2. Responsibilities
   2.1. Manage all phases of the project to completion, ensuring that diverse stakeholder needs,
        interests, and resources are shared and inform decision making throughout the project phases.
   2.2. Develop, execute and evaluate the community engagement plan.
   2.3. Provide professional expertise on topics related to work responsibility.
   2.4. Maintain records of the process and make these records available for public review.
   2.5. Attend all scheduled committee meetings or assign a representative from their work specialty
        in case of absence.
   2.6. Regularly communicate project information to appropriate stakeholders, including MPRB staff.

Technical Advisory Committee
1. Criteria for Creation


Draft                                    Page 6                                9/26/2011
Posted by http://MillCityTimes.com




    1.1. The technical advisory committee (TAC) is comprised of individuals representing public
         agencies that are affected by or involved in the proposed project, including representatives of
         the MPRB, City Council, school board, City departments, state agencies, groups of professional
         industry expertise, established partners or partner groups, and other surrounding jurisdictions.
         A TAC is typically formed for projects of regional or city-wide significance involving multiple
         layers of complexity.

2. Responsibilities
   2.1. Inform other advisory committees of inter-jurisdictional policies, professional
        recommendations, timelines, budgets, and political realities related to the project.
   2.2. Attend all scheduled committee meetings or assign a representative from their work specialty
        in case of meeting absence.
   2.3. Led by the PAC, the TAC will work collaboratively with other advisory committees to provide
        comprehensive recommendations to the Board.

Community Advisory Committee
1. Criteria for Creation and Responsibilities
   1.1. The establishment of a community advisory committee (CAC) is recommended within a
        community engagement plan.
   1.2. A CAC is one of two types: non-appointed or appointed.
   1.3. The Board approves the final composition and duties, or charge, of an appointed CAC.
   1.4. An appointed CAC is required if the project outcomes may result in a change that is not
        specified in an approved master plan for a regional park. An appointed CAC is typically used
        for projects of regional or citywide significance.
   1.5. The Board reviews the duties, or charge, for a non-appointed CAC.
   1.6. A non-appointed CAC is required if the project outcomes may result in a change in public use
        of park land. A non-appointed CAC is typically used for projects of neighborhood or
        community level significance and/or a project that replaces an existing and well used amenity,
        such as a playground, athletic field, trail segment, or wading pool.
   1.7. A CAC will work collaboratively with other advisory committees to provide comprehensive
        project recommendations. Once complete, the CAC recommendations are presented before
        the Board in conjunction with a public hearing.

2. Committee Structure
   2.1. Appointed - Appointed CACs shall be representative of stakeholder groups impacted by the
        project. An individual may be nominated for appointment by a Board Commissioner, City or
        State elected officials, neighborhood organizations, nearby cities or jurisdictions, or other
        community group representative of affected stakeholders. The project manager in
        consultation with the Board and management will review the appointees to ensure equitable
        representation from stakeholder groups. The total number of appointed members will amount
        to an odd number.
       2.1.1. A CAC chairperson is appointed by the Board President.



Draft                                     Page 7                                 9/26/2011
Posted by http://MillCityTimes.com




        2.1.2. The CAC chairperson is to assist the facilitation of public proceedings, act as
                spokesperson, and assist in presenting recommendations to the appropriate Committee
                of the Board or full Board.
    2.2. Non-appointed – Any stakeholder attending a public meeting or indicating interest in a project
         is considered a member of a non-appointed CAC. MPRB staff or a duly appointed
         representative will facilitate meetings and present the CAC recommendations before the
         Board.
        2.2.1. No CAC chairperson is required.
        2.2.2. Any amount of individual members may comprise a non-appointed CAC.

3. Meeting Requirements
   3.1. Either type of CAC is required to hold one or more meetings as necessary to determine project
        recommendations appropriate to the committee charge as approved or reviewed by the
        Board. Meeting agendas and discussion will focus on fulfillment of the committee charge.
   3.2. All meetings are open to the public.
   3.3. Expectations for all proceedings are that participants will engage in respectful civil discourse in
        an effort to enhance mutual understanding and promote collaborative decision making.
   3.4. The PAC is to maintain and keep on file records of meeting attendance, notices, agendas,
        minutes, and committee actions. Stakeholder feedback gathered through approved tools and
        methods outside of a public meeting forum is information to be considered by the CAC.
   3.5. The PAC is to make records available for review at each CAC meeting and throughout the
        course of the project upon stakeholder request.

4. Voting Requirements
   4.1. CAC members are to attend all scheduled meetings in order to ensure full, fair, and informed
        participation and decision-making. Ideally, consensus is the preferred form of decision-
        making.
   4.2. When a vote is appropriate or necessary to produce final recommendations to the Board,
        participating CAC members attending two-thirds of public meetings are eligible to vote. Voting
        results are determined by majority rule, or more than half the votes of eligible members.
   4.3. The CAC may submit resolutions to the Board indicating preferences for future improvements
        related to the project or project area that are outside the scope of the committee charge.

5. Board Procedure on Community Advisory Committees
   5.1. The designated Committee of the Board is to hold a public hearing for the review of
        recommendations of an appointed or non-appointed CAC (see section D, Public Notice).
   5.2. The chair or acting chair may set the parameters of testimony to be received from interested
        parties.
   5.3. Any person may testify at the public hearing regarding the CAC recommendations.
   5.4. The project manager or consultant is responsible for presenting the full range of stakeholder
        recommendations to the Board, including any alternative recommendations or concerns
        identified by committee members.
   5.5. After review of the recommendations and public testimony, the designated Committee of the
        Board will announce its decision to approve the recommendations or lay the matter over to a

Draft                                      Page 8                                 9/26/2011
Posted by http://MillCityTimes.com




        subsequent committee meeting. Decisions of the Committee of the Board will be dated and
        forwarded to the full Board.

D. Public Notice

The purpose of public notice is to inform stakeholders of the opportunity for participation and provide
timely, factual information on projects or proceedings. Notice may be provided to an individual by
request, or delivered to a geographical area or target audience. Failure to give adequate notice to all
affected stakeholders or defects in public notice shall not invalidate the process or project
proceedings.

Staff is to:
1. Identify methods and strategies for public notification and communication as part of a community
    engagement plan.
2. Maintain records of public notice.
3. Notify MPRB internal customers, such as affected departments and individual staff in advance or
    concurrent with public notification.
4. Consult with the Communications and Marketing Department to ensure public notice procedure is
    consistent with current policy.
5. Utilize technology and distribution formats that effectively and economically communicate public
    information.

The minimum requirements for public notice are as follows:

1. For city-wide notification, staff is to:
   1.1. Publish notice of the time, place, and purpose of a subject at least once, not less than ten (10)
        calendar days before the occurrence date in a newspaper of general circulation.
   1.2. Issue a news release indicating the time, place, and purpose of a subject at least once, not less
        than ten (10) calendar days before the occurrence date.
   1.3. Post notice of the time, place, and purpose of the subject not less than ten (10) calendar days
        before the occurrence date on the MPRB’s website.

2. For notice of public meeting(s) for a project or a public hearing, staff is to:
   2.1. Publish notice of the time, place, and purpose of the public meeting or hearing at least once,
        not less than ten (10) calendar days before the public meeting or hearing date in a newspaper
        of general circulation.
   2.2. Issue a news release indicating the time, place, and purpose of a public meeting or hearing
        date at least once, not less than ten (10) calendar days before the public meeting or hearing
        date.
   2.3. Mail notification to registered property owners within a three (3) block radius of the affected
        service area not less than ten (10) calendar days before the scheduled public meeting date or
        the first date in a series of public meetings.



Draft                                     Page 9                                 9/26/2011
Posted by http://MillCityTimes.com




    2.4. Post notice of the time, place, and purpose of the public meeting, not less than ten (10)
         calendar days before the public meeting on the MPRB’s website and at park facilities on or
         near the project area.

3. For any items subject to public review and comment, a minimum forty-five (45) calendar day
   review period is required. For notice of items, staff is to:
   3.1. Publish notice of the time, place, and purpose of the item for public review and comment
        before or concurrent to the date the review period is to begin in a newspaper of general
        circulation.
   3.2. Issue a news release indicating the schedule and purpose of the item for public review and
        comment before or concurrent to the date the review period is to begin.
   3.3. Provide a print copy of the item for public review and comment at MPRB recreation centers
        and the main customer service desk.
   3.4. Post the electronic copy of the item for public review and comment on the MPRB website and
        archive for one (1) calendar year after the closing date at this location.

Project managers are to comply with additional requirements for notification as indicated by outside
agency policy, agreement or funding source.

E. Outreach and Research

The MPRB supports the use of a variety of techniques to interact with and obtain information from
stakeholders. Outreach and research tools and methods can be applied for a variety of reasons,
including but not limited to the following:

1. To evaluate the success and measure the community impact of existing programs, services or
   facilities.
2. To gain stakeholder insight and perspective regarding the development of a new program, service
   or facility.
3. To proactively identify or explore park and recreation trends or ideas.
4. To determine the essential services to be provided for a community or park area.
5. To query stakeholders when proposing or revising policy.
6. To resolve persistent conflicts or problems.

Stakeholders are empowered to generate new ideas as to how they would like to be communicated
with, involved or engaged for a project. All new methods will be reviewed by the MPRB project
manager prior to implementation. New methods can be added to the community engagement grid
through feedback provided to the Board within an evaluation summary.

The purpose of community research is to collect data that will best inform specific project decisions or
strategic direction and support the policy goals of effective community engagement. Research
completed in advance of and during project development may include review of previously completed
directives or mandates, master plans, community studies, industry trends, historical and demographic


Draft                                    Page 10                                9/26/2011
Posted by http://MillCityTimes.com




data. The project manager is responsible for determining the research data necessary to support and
document decision making for a project.

The project manager is to retain community research data gathered for a project. The MPRB Records
Retention Schedule establishes minimum retention periods for records based on their administrative,
fiscal, legal and historical value and identifies how long to retain them. Project managers are to retain
project records as indicated by the current MPRB Records Retention Schedule.

The department supervisor is to establish a management system to capture and retain research
information in a shared repository, in either electronic or print form. The shared repository is to
include primary and secondary research work or studies, including any data obtained through research
partnerships, academic, or volunteer studies completed on behalf of the MPRB or contracted by the
MPRB.

F. Evaluation

The Board is responsible for evaluating community engagement policy and procedure within the
organization. Every four year cycle, the Board will review the community engagement policy and
procedures to determine:

1. Overall compliance and alignment with the policy goals of effective community engagement.
2. Overall satisfaction and efficacy of methods from a stakeholder and organization point of view.
3. Addition of new tools and methods.

Data gathered from this review will determine policy revisions or budget allocation, and help to align
the community engagement process with evolving stakeholder expectations. Ideally, this information
would be captured as part of a citywide, statistically valid survey of overall resident and park visitor
satisfaction and prioritization conducted on a periodic basis.

As required by a community engagement plan, the project manager is to provide an evaluation
summary analyzing the effectiveness of the process from both stakeholder and organization points of
view. The summary requires a brief statement indicating how the process advanced policy goals. The
evaluation summary will assist the Board and staff in evaluating and informing an ongoing community
engagement process.

G. Roles and Responsibilities

Every individual involved in a project is responsible for upholding excellent standards for community
engagement by following approved policy and practicing consistent procedure. All persons have a right
to be informed of projects of interest, be involved, and contribute to project goals and outcomes.

1. Stakeholder Role
   1.1. Contribute feedback and remain informed on a project; encourage other stakeholders to
        participate in the process.

Draft                                    Page 11                                 9/26/2011
Posted by http://MillCityTimes.com




    1.2. Participate in the process in a manner that promotes respectful civil discourse and enhances
         mutual understanding of all stakeholder viewpoints.
    1.3. Work collaboratively with all stakeholders toward a common goal or project outcome.
    1.4. Report project progress to community members, including businesses and interest groups.
    1.5. Direct requests for information to the designated project manager.

2. Board of Commissioners Role
   2.1. Provide policy level support and resources to maintain an ongoing and effective community
        engagement process for the organization.
   2.2. Understand and communicate the opportunities available for community engagement to
        stakeholders.
   2.3. When recommended or approved, ensure a CAC process is conducted in compliance with
        Chapter 11 of the MPRB Code of Ordinances.
   2.4. Share information obtained from stakeholders with project managers through the office of the
        Superintendent.
   2.5. Be available to and communicate with stakeholders in a timely, consistent, and respectful
        manner.

3. Staff Role
   3.1. Provide assessment and determine approved methods to engage stakeholders; develop a
        community engagement plan and provide evaluation of the process.
   3.2. Establish advisory committees as identified within a community engagement plan and manage
        the work of all advisory committee proceedings.
   3.3. Provide stakeholders with feedback on how their input influenced a project decision and
        remain productively engaged with stakeholders throughout project phases.
   3.4. Incorporate multiple sets of stakeholder considerations in order to present the most equitable
        and collaborative options for project decisions.
   3.5. Be available to and communicate with stakeholders in a timely, consistent, and respectful
        manner.
   3.6. Retain and share community research information.
   3.7. Manage consultant adherence to current requirements of ordinance, policy, and procedure.

Forms
Minneapolis Park and Recreation Board: Project Assessment Form
Minneapolis Park and Recreation Board: Community Engagement Grid




Draft                                   Page 12                                9/26/2011
Posted by http://MillCityTimes.com



  Minneapolis Park & Recreation Board: Project Assessment Form

  Project Name:            _________________________________________________________
  Project Manager:         _________________________________________________________

  Instructions: Select one response for each question. Total the corresponding numerical value of all responses. Match the total numerical
  value with the corresponding level on the community engagement grid. Use the grid to select approved methods to form a community
  engagement plan or strategy for involving the community for a project.


1. What is the anticipated level of community interest or                  5. How significant are the possible benefits of involving the
   concern for this project?                                                  community in decision making processes for this project?

        Low      Moderate       High      Extremely High                           Low      Moderate       High      Extremely High
         1         2              3            4                                    1         2              3            4

2. What is the anticipated level of complexity of the project              6. How serious are the potential ramifications of not involving the
   (consider factors beyond design, including but not limited to              community in decision making processes for this project?
   inter-agency overlap and interest, environmental and
                                                                                   Low      Moderate       High      Extremely High
   operational issues, etc)?
                                                                                    1         2              3            4
        Low      Moderate       High      Extremely High
         1         2              3            4                           7. What level of community engagement does the Board desire or
                                                                              expect for this type of project (consider previous Board decisions,
3. How significant are the project’s potential impacts to the                 history of similar projects, Board directives and priorities, policy
   community (consider such impacts as service interruption,                  requirements, etc.)?
   residential proximity, equity, quality of life, etc.)?
                                                                                   Low      Moderate       High      Extremely High
        Low      Moderate       High      Extremely High                            1         2              3            4
         1         2              3            4

4. What degree of involvement does the community appear to
   expect for this project (consider factors such as previous levels of
   stakeholder participation, current partnerships, profiles of
   community leadership, etc.)?

        Low      Moderate       High      Extremely High                           Total Numerical Value: _______________
         1         2              3            4
Posted by http://MillCityTimes.com




Minneapolis Park & Recreation Board: Community Engagement Grid


Recommended Level:                Inform                     Consult                  Collaborate                   Partner
                                (Total 7-14)              (Total 14-21)              (Total 21-28)               (Total 25-28)
Commitment of the         The MPRB will keep        The MPRB will keep        The MPRB will look to        The MPRB and partner
MPRB:                     stakeholders informed.    stakeholders informed,    stakeholders for input and   entity will be
                                                    listen to and             innovation in formulating    accountable to their
                                                    acknowledge               project decisions and        roles as negotiated in
                                                    feedback, and work to     incorporate those            the partnership and
                                                    ensure stakeholder        decisions to the maximum     regularly evaluate
                                                    perspectives are          extent possible.             overall success of the
                                                    reflected in project                                   partnership.
                                                    decisions.
Approved Methods:         •   News Release          • Surveys: Internet,      •   Advisory Committee       •   Contract
                          •   Staffed information        Exit/Follow-up, In   •   Public meeting           •   Partnership
                              display                    Person, Intercept,   •   Workshop                     agreement
                          •   Information                Mailed, Telephone    •   Study group              •   Friends Groups
                              meeting               • Comment Card            •   Design Charrette         •   Grant Agreement
                          •   Open house            • Public Hearing                                       •   Memorandum of
                          •   News conference       • Focus Group                                              Understanding
                          •   Postings in parks     • Public Meeting                                       •   Memorandum of
                              and recreation        • Interview                                                Agreement
                              facilities            • Field Intervention
                          •   Website               • In-person
                          •   Email subscription         conversation


A combination of approved methods may be used to form an outreach strategy or community engagement plan.

More Related Content

What's hot

006 Coastal Communities Adapting to Change (CCATCH)
006 Coastal Communities Adapting to Change (CCATCH)006 Coastal Communities Adapting to Change (CCATCH)
006 Coastal Communities Adapting to Change (CCATCH)djhutch
 
Treatment plant relocation
Treatment plant relocationTreatment plant relocation
Treatment plant relocationDacia Johnson
 
ROBERT J BOSCO 2014
ROBERT J BOSCO 2014ROBERT J BOSCO 2014
ROBERT J BOSCO 2014Bob Bosco
 
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
9/9 FRI 09:30 | Financing Public Waterfront Access - JupiterAPA Florida
 
Killeen Parks Master Plan
Killeen Parks Master PlanKilleen Parks Master Plan
Killeen Parks Master PlanCityofKilleen
 
Item 8.3 Promenade Rezoning
Item 8.3 Promenade RezoningItem 8.3 Promenade Rezoning
Item 8.3 Promenade Rezoningarounddublin
 
BWG Stormwater-Study
BWG Stormwater-StudyBWG Stormwater-Study
BWG Stormwater-Studyjpetr0s
 
Juan Monsanto Resume And Job Descriptions 2011 2012
Juan Monsanto Resume And Job Descriptions 2011 2012Juan Monsanto Resume And Job Descriptions 2011 2012
Juan Monsanto Resume And Job Descriptions 2011 2012Juan_Monsanto
 
Ocean City's adopted Master Plan re-examination 2012
Ocean City's adopted Master Plan re-examination 2012Ocean City's adopted Master Plan re-examination 2012
Ocean City's adopted Master Plan re-examination 2012OceanCityGazette
 
College Station Comprehensive Plan and Unified Development Ordinance Review
College Station Comprehensive Plan and Unified Development Ordinance ReviewCollege Station Comprehensive Plan and Unified Development Ordinance Review
College Station Comprehensive Plan and Unified Development Ordinance ReviewCity of College Station
 
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINALPALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINALWilliam J. Pehaim
 
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockJen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockHoboken Resistance
 
Historic District Overlay Ordinance
Historic District Overlay OrdinanceHistoric District Overlay Ordinance
Historic District Overlay OrdinanceJonathan Brown
 
How Decisions Are Made in the Planning Framework By David Roemer
How Decisions Are Made in the Planning Framework By David RoemerHow Decisions Are Made in the Planning Framework By David Roemer
How Decisions Are Made in the Planning Framework By David Roemergbeltalliance
 

What's hot (20)

006 Coastal Communities Adapting to Change (CCATCH)
006 Coastal Communities Adapting to Change (CCATCH)006 Coastal Communities Adapting to Change (CCATCH)
006 Coastal Communities Adapting to Change (CCATCH)
 
Treatment plant relocation
Treatment plant relocationTreatment plant relocation
Treatment plant relocation
 
ROBERT J BOSCO 2014
ROBERT J BOSCO 2014ROBERT J BOSCO 2014
ROBERT J BOSCO 2014
 
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
 
Killeen Parks Master Plan
Killeen Parks Master PlanKilleen Parks Master Plan
Killeen Parks Master Plan
 
Wildwood_Final_Report
Wildwood_Final_ReportWildwood_Final_Report
Wildwood_Final_Report
 
Item 8.3 Promenade Rezoning
Item 8.3 Promenade RezoningItem 8.3 Promenade Rezoning
Item 8.3 Promenade Rezoning
 
BWG Stormwater-Study
BWG Stormwater-StudyBWG Stormwater-Study
BWG Stormwater-Study
 
Broadview Heights Master Plan: Public Meeting #3
Broadview Heights Master Plan: Public Meeting #3Broadview Heights Master Plan: Public Meeting #3
Broadview Heights Master Plan: Public Meeting #3
 
Juan Monsanto Resume And Job Descriptions 2011 2012
Juan Monsanto Resume And Job Descriptions 2011 2012Juan Monsanto Resume And Job Descriptions 2011 2012
Juan Monsanto Resume And Job Descriptions 2011 2012
 
AB Land-use Framework - Conference 2009 (C2)
AB Land-use Framework - Conference 2009 (C2)AB Land-use Framework - Conference 2009 (C2)
AB Land-use Framework - Conference 2009 (C2)
 
Ocean City's adopted Master Plan re-examination 2012
Ocean City's adopted Master Plan re-examination 2012Ocean City's adopted Master Plan re-examination 2012
Ocean City's adopted Master Plan re-examination 2012
 
2015_Bridge_Road
2015_Bridge_Road2015_Bridge_Road
2015_Bridge_Road
 
College Station Comprehensive Plan and Unified Development Ordinance Review
College Station Comprehensive Plan and Unified Development Ordinance ReviewCollege Station Comprehensive Plan and Unified Development Ordinance Review
College Station Comprehensive Plan and Unified Development Ordinance Review
 
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINALPALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
 
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockJen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
 
Historic District Overlay Ordinance
Historic District Overlay OrdinanceHistoric District Overlay Ordinance
Historic District Overlay Ordinance
 
How Decisions Are Made in the Planning Framework By David Roemer
How Decisions Are Made in the Planning Framework By David RoemerHow Decisions Are Made in the Planning Framework By David Roemer
How Decisions Are Made in the Planning Framework By David Roemer
 
Chapter1
Chapter1Chapter1
Chapter1
 
South academy street revitalization presentation
South academy street revitalization presentation South academy street revitalization presentation
South academy street revitalization presentation
 

Viewers also liked

Minneapolis RiverCurrent 10-13-11
Minneapolis RiverCurrent 10-13-11Minneapolis RiverCurrent 10-13-11
Minneapolis RiverCurrent 10-13-11Mill City Times
 
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011Above the Falls Policy Review and Implementation Study Presentation 9-27-2011
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011Mill City Times
 
Chute Square Park Press Release 102711
Chute Square Park Press Release 102711Chute Square Park Press Release 102711
Chute Square Park Press Release 102711Mill City Times
 
Minneapolis RiverCurrent 10-6-11
Minneapolis RiverCurrent 10-6-11Minneapolis RiverCurrent 10-6-11
Minneapolis RiverCurrent 10-6-11Mill City Times
 
Third Ward NeighborhoodFest 2011
Third Ward NeighborhoodFest 2011Third Ward NeighborhoodFest 2011
Third Ward NeighborhoodFest 2011Mill City Times
 
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...Mill City Times
 

Viewers also liked (6)

Minneapolis RiverCurrent 10-13-11
Minneapolis RiverCurrent 10-13-11Minneapolis RiverCurrent 10-13-11
Minneapolis RiverCurrent 10-13-11
 
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011Above the Falls Policy Review and Implementation Study Presentation 9-27-2011
Above the Falls Policy Review and Implementation Study Presentation 9-27-2011
 
Chute Square Park Press Release 102711
Chute Square Park Press Release 102711Chute Square Park Press Release 102711
Chute Square Park Press Release 102711
 
Minneapolis RiverCurrent 10-6-11
Minneapolis RiverCurrent 10-6-11Minneapolis RiverCurrent 10-6-11
Minneapolis RiverCurrent 10-6-11
 
Third Ward NeighborhoodFest 2011
Third Ward NeighborhoodFest 2011Third Ward NeighborhoodFest 2011
Third Ward NeighborhoodFest 2011
 
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...
WORKING TOGETHER TO ACHIEVE HEALTHY WATERS - Environmental Initiative Policy ...
 

Similar to MPRB Adopts Amended Community Engagement Rules

SF Recreation and Park 2016-2020 Strategic Plan and SF City Charter
SF Recreation and Park  2016-2020 Strategic Plan and SF City CharterSF Recreation and Park  2016-2020 Strategic Plan and SF City Charter
SF Recreation and Park 2016-2020 Strategic Plan and SF City CharterGoldenGateParkPreservationAlliance
 
Minneapolis Energy Pathways Study
Minneapolis Energy Pathways StudyMinneapolis Energy Pathways Study
Minneapolis Energy Pathways StudyJohn Farrell
 
Work Session X: Water Quality - What Is Integrated Water Quality Planning And...
Work Session X: Water Quality - What Is Integrated Water Quality Planning And...Work Session X: Water Quality - What Is Integrated Water Quality Planning And...
Work Session X: Water Quality - What Is Integrated Water Quality Planning And...Best Best and Krieger LLP
 
Report on Bozeman Montana's Neighborhood Conservation Overlay District
Report on Bozeman Montana's Neighborhood Conservation Overlay DistrictReport on Bozeman Montana's Neighborhood Conservation Overlay District
Report on Bozeman Montana's Neighborhood Conservation Overlay DistrictMarsha Fulton
 
FINAL REPORT: Indoor Recreation Center Steering Committee
FINAL REPORT: Indoor Recreation Center Steering CommitteeFINAL REPORT: Indoor Recreation Center Steering Committee
FINAL REPORT: Indoor Recreation Center Steering CommitteeVoteFor TheIndoor
 
Incorporating planned trails projects into the nepa process for highways
Incorporating planned trails projects into the nepa process for highwaysIncorporating planned trails projects into the nepa process for highways
Incorporating planned trails projects into the nepa process for highwaysBikeTexas
 
EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...
EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...
EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...U.S. Water Alliance
 
3-year Work Plan Summary for Sustainable Communities Consortium
3-year Work Plan Summary for Sustainable Communities Consortium3-year Work Plan Summary for Sustainable Communities Consortium
3-year Work Plan Summary for Sustainable Communities ConsortiumMetropolitan Area Planning Council
 
The Planning Series 2 - Local Planning Policy in Wales
The Planning Series 2 - Local Planning Policy in WalesThe Planning Series 2 - Local Planning Policy in Wales
The Planning Series 2 - Local Planning Policy in WalesDr Georgette Kluiters
 
DS-17-043 - Parks Master Plan
DS-17-043 - Parks Master PlanDS-17-043 - Parks Master Plan
DS-17-043 - Parks Master PlanCityofKilleen
 
Re-establishing the PFM as Guidelines: Update to the Land Use Aides
Re-establishing the PFM as Guidelines: Update to the Land Use AidesRe-establishing the PFM as Guidelines: Update to the Land Use Aides
Re-establishing the PFM as Guidelines: Update to the Land Use AidesFairfax County
 
Integrated Planning Framework iBook
Integrated Planning Framework iBookIntegrated Planning Framework iBook
Integrated Planning Framework iBookrobynmcguckin
 
The Dysfunctional Metropolis: Reforming Los Angeles's Land Use Planning and E...
The Dysfunctional Metropolis: Reforming Los Angeles's Land Use Planning and E...The Dysfunctional Metropolis: Reforming Los Angeles's Land Use Planning and E...
The Dysfunctional Metropolis: Reforming Los Angeles's Land Use Planning and E...CaliforniaYIMBY
 
The Dysfunctional Metropolis: Reforming Los Angeles's Land Use Planning and E...
The Dysfunctional Metropolis: Reforming Los Angeles's Land Use Planning and E...The Dysfunctional Metropolis: Reforming Los Angeles's Land Use Planning and E...
The Dysfunctional Metropolis: Reforming Los Angeles's Land Use Planning and E...CaliforniaYIMBY
 
Cultivating Vibrant & Resilient Communities, One Garden at a Time
Cultivating Vibrant & Resilient Communities, One Garden at a TimeCultivating Vibrant & Resilient Communities, One Garden at a Time
Cultivating Vibrant & Resilient Communities, One Garden at a TimeBringFoodHome
 
Blueprint Brunswick Public Review Draft
Blueprint Brunswick Public Review DraftBlueprint Brunswick Public Review Draft
Blueprint Brunswick Public Review DraftBrunswick County
 
Benn Minshall - Exploring Applications of ChatGPT
Benn Minshall - Exploring Applications of ChatGPTBenn Minshall - Exploring Applications of ChatGPT
Benn Minshall - Exploring Applications of ChatGPTScribe
 

Similar to MPRB Adopts Amended Community Engagement Rules (20)

SF Recreation and Park 2016-2020 Strategic Plan and SF City Charter
SF Recreation and Park  2016-2020 Strategic Plan and SF City CharterSF Recreation and Park  2016-2020 Strategic Plan and SF City Charter
SF Recreation and Park 2016-2020 Strategic Plan and SF City Charter
 
Minneapolis Energy Pathways Study
Minneapolis Energy Pathways StudyMinneapolis Energy Pathways Study
Minneapolis Energy Pathways Study
 
Work Session X: Water Quality - What Is Integrated Water Quality Planning And...
Work Session X: Water Quality - What Is Integrated Water Quality Planning And...Work Session X: Water Quality - What Is Integrated Water Quality Planning And...
Work Session X: Water Quality - What Is Integrated Water Quality Planning And...
 
Report on Bozeman Montana's Neighborhood Conservation Overlay District
Report on Bozeman Montana's Neighborhood Conservation Overlay DistrictReport on Bozeman Montana's Neighborhood Conservation Overlay District
Report on Bozeman Montana's Neighborhood Conservation Overlay District
 
FINAL REPORT: Indoor Recreation Center Steering Committee
FINAL REPORT: Indoor Recreation Center Steering CommitteeFINAL REPORT: Indoor Recreation Center Steering Committee
FINAL REPORT: Indoor Recreation Center Steering Committee
 
Incorporating planned trails projects into the nepa process for highways
Incorporating planned trails projects into the nepa process for highwaysIncorporating planned trails projects into the nepa process for highways
Incorporating planned trails projects into the nepa process for highways
 
EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...
EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...
EPA HOW DO WE IMPLEMENT A FRAMEWORK FOR INTEGRATED WASTEWATER AND STORMWATER ...
 
3-year Work Plan Summary for Sustainable Communities Consortium
3-year Work Plan Summary for Sustainable Communities Consortium3-year Work Plan Summary for Sustainable Communities Consortium
3-year Work Plan Summary for Sustainable Communities Consortium
 
The Planning Series 2 - Local Planning Policy in Wales
The Planning Series 2 - Local Planning Policy in WalesThe Planning Series 2 - Local Planning Policy in Wales
The Planning Series 2 - Local Planning Policy in Wales
 
DS-17-043 - Parks Master Plan
DS-17-043 - Parks Master PlanDS-17-043 - Parks Master Plan
DS-17-043 - Parks Master Plan
 
Re-establishing the PFM as Guidelines: Update to the Land Use Aides
Re-establishing the PFM as Guidelines: Update to the Land Use AidesRe-establishing the PFM as Guidelines: Update to the Land Use Aides
Re-establishing the PFM as Guidelines: Update to the Land Use Aides
 
Integrated Planning Framework iBook
Integrated Planning Framework iBookIntegrated Planning Framework iBook
Integrated Planning Framework iBook
 
The Dysfunctional Metropolis: Reforming Los Angeles's Land Use Planning and E...
The Dysfunctional Metropolis: Reforming Los Angeles's Land Use Planning and E...The Dysfunctional Metropolis: Reforming Los Angeles's Land Use Planning and E...
The Dysfunctional Metropolis: Reforming Los Angeles's Land Use Planning and E...
 
The Dysfunctional Metropolis: Reforming Los Angeles's Land Use Planning and E...
The Dysfunctional Metropolis: Reforming Los Angeles's Land Use Planning and E...The Dysfunctional Metropolis: Reforming Los Angeles's Land Use Planning and E...
The Dysfunctional Metropolis: Reforming Los Angeles's Land Use Planning and E...
 
Cultivating Vibrant & Resilient Communities, One Garden at a Time
Cultivating Vibrant & Resilient Communities, One Garden at a TimeCultivating Vibrant & Resilient Communities, One Garden at a Time
Cultivating Vibrant & Resilient Communities, One Garden at a Time
 
Mineral resource overlay increase 2006-ordinance-06-816
Mineral resource overlay increase 2006-ordinance-06-816Mineral resource overlay increase 2006-ordinance-06-816
Mineral resource overlay increase 2006-ordinance-06-816
 
Mineral resource overlay increase 2006-ordinance-06-816
Mineral resource overlay increase 2006-ordinance-06-816Mineral resource overlay increase 2006-ordinance-06-816
Mineral resource overlay increase 2006-ordinance-06-816
 
Mineral resource overlay increase 2006-ordinance-06-816
Mineral resource overlay increase 2006-ordinance-06-816Mineral resource overlay increase 2006-ordinance-06-816
Mineral resource overlay increase 2006-ordinance-06-816
 
Blueprint Brunswick Public Review Draft
Blueprint Brunswick Public Review DraftBlueprint Brunswick Public Review Draft
Blueprint Brunswick Public Review Draft
 
Benn Minshall - Exploring Applications of ChatGPT
Benn Minshall - Exploring Applications of ChatGPTBenn Minshall - Exploring Applications of ChatGPT
Benn Minshall - Exploring Applications of ChatGPT
 

More from Mill City Times

Great River Outing - Gems Along the Mississippi Trail
Great River Outing - Gems Along the Mississippi TrailGreat River Outing - Gems Along the Mississippi Trail
Great River Outing - Gems Along the Mississippi TrailMill City Times
 
Minneapolis RiverCurrent 11-10-11
Minneapolis RiverCurrent 11-10-11Minneapolis RiverCurrent 11-10-11
Minneapolis RiverCurrent 11-10-11Mill City Times
 
Re - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCARe - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCAMill City Times
 
1100 2nd St S RFP_2010 2
1100 2nd St S RFP_2010 21100 2nd St S RFP_2010 2
1100 2nd St S RFP_2010 2Mill City Times
 
DMNA November Board Meeting Agenda 11-8-11
DMNA November Board Meeting Agenda 11-8-11DMNA November Board Meeting Agenda 11-8-11
DMNA November Board Meeting Agenda 11-8-11Mill City Times
 
Minneapolis RiverCurrent 11-3-11
Minneapolis RiverCurrent 11-3-11Minneapolis RiverCurrent 11-3-11
Minneapolis RiverCurrent 11-3-11Mill City Times
 
Minneapolis RiverCurrent 10-28-11
Minneapolis RiverCurrent 10-28-11Minneapolis RiverCurrent 10-28-11
Minneapolis RiverCurrent 10-28-11Mill City Times
 
Minneapolis RiverCurrent 10-19-11
Minneapolis RiverCurrent 10-19-11Minneapolis RiverCurrent 10-19-11
Minneapolis RiverCurrent 10-19-11Mill City Times
 
East Downtown Council Job Posting for Executive Assistant
East Downtown Council Job Posting for Executive AssistantEast Downtown Council Job Posting for Executive Assistant
East Downtown Council Job Posting for Executive AssistantMill City Times
 
Vikings Stadium Proposal Risk Analysis Report
Vikings Stadium Proposal Risk Analysis ReportVikings Stadium Proposal Risk Analysis Report
Vikings Stadium Proposal Risk Analysis ReportMill City Times
 
DMNA Annual Meeting Agenda 10-11-11
DMNA Annual Meeting Agenda 10-11-11DMNA Annual Meeting Agenda 10-11-11
DMNA Annual Meeting Agenda 10-11-11Mill City Times
 
Minneapolis RiverCurrent 9-29-11
Minneapolis RiverCurrent 9-29-11Minneapolis RiverCurrent 9-29-11
Minneapolis RiverCurrent 9-29-11Mill City Times
 
Minneapolis RiverCurrent 9-22-11
Minneapolis RiverCurrent 9-22-11Minneapolis RiverCurrent 9-22-11
Minneapolis RiverCurrent 9-22-11Mill City Times
 
For distribution RiverFIRST Letter From Diane Hofstede 9.7.11
For distribution RiverFIRST Letter From Diane Hofstede 9.7.11For distribution RiverFIRST Letter From Diane Hofstede 9.7.11
For distribution RiverFIRST Letter From Diane Hofstede 9.7.11Mill City Times
 
Sanctuary Pink Tasting Menu
Sanctuary Pink Tasting MenuSanctuary Pink Tasting Menu
Sanctuary Pink Tasting MenuMill City Times
 
Loft Development Assistant Posting 9 2011_final
Loft Development Assistant Posting 9 2011_finalLoft Development Assistant Posting 9 2011_final
Loft Development Assistant Posting 9 2011_finalMill City Times
 
Minneapolis RiverCurrent 9-15-11
Minneapolis RiverCurrent 9-15-11Minneapolis RiverCurrent 9-15-11
Minneapolis RiverCurrent 9-15-11Mill City Times
 
Dredge Thompson Photos from Big River Magazine
Dredge Thompson Photos from Big River MagazineDredge Thompson Photos from Big River Magazine
Dredge Thompson Photos from Big River MagazineMill City Times
 
Minneapolis RiverCurrent 9-8-11
Minneapolis RiverCurrent 9-8-11Minneapolis RiverCurrent 9-8-11
Minneapolis RiverCurrent 9-8-11Mill City Times
 

More from Mill City Times (20)

Gold Medal Plaza
Gold Medal PlazaGold Medal Plaza
Gold Medal Plaza
 
Great River Outing - Gems Along the Mississippi Trail
Great River Outing - Gems Along the Mississippi TrailGreat River Outing - Gems Along the Mississippi Trail
Great River Outing - Gems Along the Mississippi Trail
 
Minneapolis RiverCurrent 11-10-11
Minneapolis RiverCurrent 11-10-11Minneapolis RiverCurrent 11-10-11
Minneapolis RiverCurrent 11-10-11
 
Re - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCARe - 1100 2nd Street S Environmental_RCA
Re - 1100 2nd Street S Environmental_RCA
 
1100 2nd St S RFP_2010 2
1100 2nd St S RFP_2010 21100 2nd St S RFP_2010 2
1100 2nd St S RFP_2010 2
 
DMNA November Board Meeting Agenda 11-8-11
DMNA November Board Meeting Agenda 11-8-11DMNA November Board Meeting Agenda 11-8-11
DMNA November Board Meeting Agenda 11-8-11
 
Minneapolis RiverCurrent 11-3-11
Minneapolis RiverCurrent 11-3-11Minneapolis RiverCurrent 11-3-11
Minneapolis RiverCurrent 11-3-11
 
Minneapolis RiverCurrent 10-28-11
Minneapolis RiverCurrent 10-28-11Minneapolis RiverCurrent 10-28-11
Minneapolis RiverCurrent 10-28-11
 
Minneapolis RiverCurrent 10-19-11
Minneapolis RiverCurrent 10-19-11Minneapolis RiverCurrent 10-19-11
Minneapolis RiverCurrent 10-19-11
 
East Downtown Council Job Posting for Executive Assistant
East Downtown Council Job Posting for Executive AssistantEast Downtown Council Job Posting for Executive Assistant
East Downtown Council Job Posting for Executive Assistant
 
Vikings Stadium Proposal Risk Analysis Report
Vikings Stadium Proposal Risk Analysis ReportVikings Stadium Proposal Risk Analysis Report
Vikings Stadium Proposal Risk Analysis Report
 
DMNA Annual Meeting Agenda 10-11-11
DMNA Annual Meeting Agenda 10-11-11DMNA Annual Meeting Agenda 10-11-11
DMNA Annual Meeting Agenda 10-11-11
 
Minneapolis RiverCurrent 9-29-11
Minneapolis RiverCurrent 9-29-11Minneapolis RiverCurrent 9-29-11
Minneapolis RiverCurrent 9-29-11
 
Minneapolis RiverCurrent 9-22-11
Minneapolis RiverCurrent 9-22-11Minneapolis RiverCurrent 9-22-11
Minneapolis RiverCurrent 9-22-11
 
For distribution RiverFIRST Letter From Diane Hofstede 9.7.11
For distribution RiverFIRST Letter From Diane Hofstede 9.7.11For distribution RiverFIRST Letter From Diane Hofstede 9.7.11
For distribution RiverFIRST Letter From Diane Hofstede 9.7.11
 
Sanctuary Pink Tasting Menu
Sanctuary Pink Tasting MenuSanctuary Pink Tasting Menu
Sanctuary Pink Tasting Menu
 
Loft Development Assistant Posting 9 2011_final
Loft Development Assistant Posting 9 2011_finalLoft Development Assistant Posting 9 2011_final
Loft Development Assistant Posting 9 2011_final
 
Minneapolis RiverCurrent 9-15-11
Minneapolis RiverCurrent 9-15-11Minneapolis RiverCurrent 9-15-11
Minneapolis RiverCurrent 9-15-11
 
Dredge Thompson Photos from Big River Magazine
Dredge Thompson Photos from Big River MagazineDredge Thompson Photos from Big River Magazine
Dredge Thompson Photos from Big River Magazine
 
Minneapolis RiverCurrent 9-8-11
Minneapolis RiverCurrent 9-8-11Minneapolis RiverCurrent 9-8-11
Minneapolis RiverCurrent 9-8-11
 

Recently uploaded

Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 

Recently uploaded (20)

Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 

MPRB Adopts Amended Community Engagement Rules

  • 1. Posted by http://MillCityTimes.com Resolution 2011-190 Resolution Adopting Amended Chapter 11 of the Minneapolis Park and Recreation Board Code of Ordinances and new Policy on Community Engagement Whereas, The Minneapolis Park & Recreation Board ("MPRB") is the steward of the Minneapolis Park System; Whereas, The MPRB desires broad representation and participation for the planning, development, and evaluation of park facilities, services, and programs; Whereas, The MPRB Code of Ordinances, Chapter 11 is the current requirement for pubic participation specific to facility construction and redevelopment projects; Whereas, The MPRB’s 2007-2020 Comprehensive Plan provides the goal of providing relevant park and recreation services through outreach and research that focuses on identifying the needs of the city’s dynamic populations; Whereas, The Board of Commissioners have provided strategic direction to improve and enhance community engagement strategies, including communication methods; Whereas, Staff developed a draft amended Chapter 11 ordinance and new policy on community engagement based on information gathered through an extensive community outreach and research process for the project; Whereas, The Board authorized a 45-day public review and comment period to provide opportunity for public feedback on the draft amended ordinance and new policy; Whereas, The Board, staff and community feedback has been incorporated into the amended ordinance and new policy; Whereas, The amended Chapter 11 ordinance defines community engagement requirements for park facility construction and redevelopment projects, and directs the creation, maintenance and regular evaluation of a policy on community engagement; and Whereas, The new policy on community engagement addresses the amended Chapter 11 ordinance requirements and provides a framework for working and communicating with the public; RESOLVED, That the Board of Commissioners adopt the amended Chapter 11 of the Minneapolis Park and Recreation Board Code of Ordinances and the new policy on community engagement; and
  • 2. Posted by http://MillCityTimes.com RESOLVED, That the President and Secretary of the Board are authorized to take all necessary administrative actions to implement this resolution. Adopted by the Park & Recreation Board In formal meeting assembled on October 19, 2011 ______________________________ John Erwin, President ______________________________ Karen Robinson, Secretary Approved: _________________________________ R.T. Rybak, Mayor 2
  • 3. Posted by http://MillCityTimes.com TO: Planning Committee FROM: Bruce Chamberlain, Assistant Superintendent for Planning Services DATE: October 5, 2011 SUBJECT: Resolution adopting amended Chapter 11 of the Minneapolis Park and Recreation Board Code of Ordinances and new policy on community engagement BACKGROUND Currently, the Minneapolis Park & Recreation Board (MPRB) follows a public engagement process for facility construction and redevelopment projects as required by Chapter 11 of the MPRB Code of Ordinances. Effective January 1, 2000, the ordinance was adopted to address the City of Minneapolis’ public process for obtaining a conditional use permit. The ordinance is applied almost exclusively to projects that are budgeted and approved through the MPRB’s Capital Improvement Program (CIP) or that would be the result of a third party agreement within the park system. There have been proposals at various times in the past to amend the current ordinance to attempt to better address such things as the types of projects it addresses, its scope and its fundamental effectiveness in engaging the community. Those proposals have not been approved by the Board. A reorganization of the MPRB into a district-based system in 2004 prompted work to enhance the framework of community outreach, research and engagement. This framework was tested in applying a variety of techniques and opportunities for community participation in the development of the 2007-2020 Comprehensive Plan. Approved by the Board in October 2007, the Comprehensive Plan reinforced the need to involve residents and park users in identifying the park and recreation needs and interests of their communities to ensure that the MPRB may best serve the city’s dynamic populations. Guided by the goals of the Comprehensive Plan and the Board’s strategic direction to focus on new strategies for community engagement, staff developed a timeline and process in 2010 to develop a new Board policy. The primary purpose of the policy is to: 1) outline and support the existing requirements of the Chapter 11 Ordinance that have proven to be functional and effective for the organization, and 2) provide consistent practices and approved methods for working and communicating with the community in decision making processes. An extensive community outreach and research effort gathered feedback through multiple opportunities for user engagement. This engagement revealed that community
  • 4. Posted by http://MillCityTimes.com members had the highest interest and expressed they were most likely to participate in processes for capital projects. Development of the policy also examined existing national trends and best practices, including comparison of local agency practice. After analysis of comments received, staff drafted a new policy and simultaneously amended the Chapter 11 ordinance to support the policy goals, definitions and procedures. In preparation for a public comment period on the draft policy and amended ordinance, the documents were discussed by the Board during the April 2011 Committee of the Whole meeting. From May 1 to June 15, 2011, a 45- day public review and comment period on the amended ordinance and draft policy gave the public the opportunity to provide revisions. Document review from department management, legal review and additional field testing provided additional refinement post the public review period. Comments gathered during this period did not indicate substantive changes to the intent or goal of both documents. Minor revisions were presented to the Board for discussion at the September 2011 Committee of the Whole meeting. While the practice of community engagement takes time and resources, the costs of involving the public in decisions can avoid the more significant costs of community conflict and the need to change decisions that prove to be inadequately informed and unstable. The amended ordinance and policy will provide a consistent framework for projects within the MPRB’s CIP, and serve as a model for engaging the community for the multi-faceted projects, services and programs throughout the organization. FUNDING/COST SUMMARY N/A RECOMMENDATION Staff believes these documents provide a consistent mode of practice to engage the community for projects approved and budgeted through the MPRB’s CIP or through third party agreement. Community research data indicates these projects are of high interest and have broad potential to shape future development and operation of the park system. Resources provided by the new policy will allow for increased awareness of community impact for projects undertaken within the park system, and diversify the methods used to interface and build relationships with the Minneapolis community. Staff recommends that the Board adopt a resolution to amended Chapter 11 of the Minneapolis Park and Recreation Board Code of Ordinances and new policy on community engagement. RELATED BOARD ACTIONS 9/15/99 Minneapolis Park and Recreation Board Code of Ordinances, Amendment to Chapter 11: Park Facility Construction and Redevelopment – Public Participation 4/20/2011 Resolution Authorizing a Forty-Five Day Public Review and Comment period for Amended Chapter 11 Ordinance and New Policy 4
  • 5. Posted by http://MillCityTimes.com ATTACHMENTS MPRB Code of Ordinances, Chapter 11, Amended Current MPRB Code of Ordinances, Chapter 11 MPRB Policy on Community Engagement Prepared by: Ginger Cannon, Planner Reviewed by: Bruce Chamberlain, Assistant Superintendent for Planning Services Approved by: Jayne Miller, Superintendent 5
  • 6. Posted by http://MillCityTimes.com ORDINANCE 99-101 AMENDING THE ORDINANCES OF THE MINNEAPOLIS PARK AND RECREATION BOARD RELATING TO PROPOSALS TO CONSTRUCT OR REDEVELOP PARK FACILITIES BY ADDING NEW CHAPTER 11 RELATING TO PUBLIC PARTICIPATION AND APPEALS. The Minneapolis Park and Recreation Board does ordain as follows: Section 1. That the Minneapolis Park and Recreation Board Code of Ordinances be amended by adding thereto a new Chapter 11 to read as follows: Chapter 11 PARK FACILITY CONSTRUCTION AND REDEVELOPMENT – PUBLIC PARTICIPATION PB11-1. Citizens Advisory Committee – Creation and Authority. The Park Board shall cause a citizen advisory committee to be created when park facility construction or redevelopment projects are proposed. The citizen advisory committee shall be balanced and representative of the interests impacted by the proposed park facility construction or redevelopment. The citizen advisory committee shall have the authority to make recommendations to the Park Board’s Planning Committee on the proposed construction and redevelopment of park facilities. PB11-2. Citizen Advisory Committee – Meeting Notice. The citizen advisory committee shall hold one or more meetings on proposed park facility construction or redevelopment projects. The Park Board shall publish notice of the time, place and purpose of the initial meeting at least once, not less than ten (10) days before the meeting, in a newspaper of general circulation. The Park Board shall also mail notice of the time, place and purpose of the meeting to all park councils and registered neighborhood groups potentially impacted by the proposed construction or redevelopment of the park facility. The Park Board shall also mail notice of the time, place and purpose of the meeting to all owners of record of property located in whole or in part within three (3) city blocks of the park facility being proposed to be constructed or redeveloped. PB11-3. Citizens Advisory Committee – Meetings and Recommendation. All meetings shall be open to the public. Any person may appear and speak at a meeting either in person or by a duly appointed representative. Upon conclusion of public input, the citizen advisory committee shall announce its recommendation or shall lay the proposal over to a subsequent meeting. Records shall be kept on file at the Park Board office of attendance, meetings, agendas, handouts and committee actions. All recommendations of the Citizen Advisory Committee shall be presented at the public hearing of the Planning Committee. PB11-4. Planning Committee – Notice. The Planning Committee shall hold a public hearing on all proposed park facility construction or redevelopment projects. The committee shall publish notice of the time, place and purpose of the public hearing at least once, not less than ten (10) days before the hearing, in a newspaper of general circulation. The Planning Committee shall also notify the voting members of the citizen’s advisory committee and owners of record of property located in whole or in part within three (3) city blocks of the park facility
  • 7. Posted by http://MillCityTimes.com being proposed to be constructed or redeveloped of the time and place of the public hearing. The Planning Committee shall also comply with all other notice requirements of Minnesota’s Open Meeting Law. PB11-5. Planning Committee – Appeal of Citizen Advisory Committee. Any person may appeal and object to the recommendations of a citizen advisory committee at the public hearing held by the Planning Committee. PB11-6. Planning Committee – Hearing. All hearings conducted shall be open to the public. The chair or acting chair may set the parameters of testimony to be received from interested parties. Any person may appear and testify at a hearing either in person or by duly appointed representative. After reviewing the citizen advisory committee’s recommendations, appeals and objections thereto, and the conclusion of other public testimony, the Planning Committee shall announce its decision or shall lay the matter over to a subsequent meeting. The Planning Committee shall keep minutes of its public hearings, and shall also keep records of its official actions. Decisions of the Planning Committee shall be dated and forwarded to the full Park Board. PB11-7. Appeal to Full Park Board Filing. All findings and decisions of the Planning Committee shall be subject to appeal to the full Park Board. Appeals may be initiated by any affected person by filing an appeal with the Superintendent’s office on a form approved by the Park Board. All appeals must be received within ten (10) calendar days of the date of decision by the Planning Committee and must be accompanied at the time of filing with payment of the fee specified in Minneapolis Code § 525.150. Timely filing of an appeal shall stay the decision of the Planning Committee until a decision is made by the Park Board. PB11-8. Full Park Board Hearing Notice. Not less than ten (10) days before the public hearing of the Park Board to consider the appeal, the Park Board shall publish notice of the time, place and purpose of the public hearing at least once in a newspaper of general circulation. The Park Board shall also comply with all notice requirements of Minnesota’s Open Meeting Law. Failure to give mailed notice to all affected parties, or defects in the notice, shall not invalidate the proceedings provided a bona fide attempt to comply with this section has been made. PB11-9. Public Hearing of Appeal. The Park Board shall hold the public hearing on any appeal. All hearings conducted on the appeal shall be open to the public. The chair or the acting chair may set the parameters of testimony to be received from interested parties. The Park Board shall keep minutes of its public hearing and shall also keep records of its official actions. Section 2. That this Ordinance shall take effect and be in force January 1, 2000. Passed and adopted on this 15th day of September, 1999. Bob Fine, President Approved: Norman C. Merrifield, Secretary Sharon Sayles Belton, Mayor
  • 8. Posted by http://MillCityTimes.com ORDINANCE 99-101 AMENDING CHAPTER 11 OF THE ORDINANCES OF THE MINNEAPOLIS PARK AND RECREATION BOARD RELATING TO PUBLIC PARTICIPATIONCOMMUNITY ENGAGEMENT FOR PROPOSALS TO CONSTRUCT OR REDEVELOP PARK FACILITIES. BY ADDING NEW CHAPTER 11 RELATING TO PUBLIC PARTICIPATION AND APPEALS. The Minneapolis Park and Recreation Board does ordain as follows: Section 1. That the Minneapolis Park and Recreation Board Code of Ordinances chapter 11 be amended by adding thereto a new Chapter 11 to read as follows: Chapter 11 PARK FACILITY CONSTRUCTION AND REDEVELOPMENT – PUBLIC PARTICIPATIONCOMMUNITY INVOLVEMENTCOMMUNITY ENGAGEMENT PB11-1. Definitions. As used in this chapter the following terms shall mean: Community InvolvementEngagement: The opportunity for stakeholders to influence decisions that shape the park system, including the intentional effort to create public understanding of MRPB projects, programs, and services, and to make certain the MPRB is aware of and responsive to stakeholder needs, concerns and industry trends. Interchangeable terms include: public participation, community involvement, and citizen participation. Park facility construction and redevelopment: t: The development of new or redevelopment of existing facilities as approved and budgetedapproved in a Capital Improvement Program for the Minneapolis Park and Recreation Boardd, including construction and redevelopment of facilities approved and budgeted through third party agreement.. PB11-2 Community InvolvementEngagement Policy. The Minneapolis Park and Recreation Board shall create, maintain, and regularly evaluate (every three (3) years) a community involvement engagement policy that requires that requires allall park facility construction and redevelopment projects approved and budgeted through the Capital Improvement Program to have a have a community involvementengagement plan. PB11-3 Community InvolvementEngagement Plan. All park facility construction and redevelopment projects approved and budgeted by the Board within the Capital Improvement Program require a community involvementengagement plan. The community engagement plan shall be developed in consultation with established neighborhood organizations. When possible, other representative community groups and under-represented groups shall be involved in the development of the plan.
  • 9. Posted by http://MillCityTimes.com PB11-4 Citizens Community Advisory Committee – Creation and Authority. The Park BoardMinneapolis Park and Recreation Board shall cause a citizen community advisory committee to be created whenas park facility construction or redevelopment projects are proposed. recommended inwithin a a community engagementnvolvement plan.n for a project. The citizen community advisory committee shall be balanced and representative of the interests impacted by the proposed park facility construction and redevelopment facility construction or redevelopmentproject. The citizen community advisory committee shall have the authority to make recommendations to thethe designated Committee of the Board Park Board’s Planning Committee on the proposed park facility construction and redevelopment construction and redevelopment of park facilitiesproject. The Board of Commissioners shall have the authority to cause the creation and approve the charge and composition of a community advisory committees for topics of its choosing. PB11-2. Citizen Advisory Committee – Meeting Notice. The citizen advisory committee shall hold one or more meetings on proposed park facility construction or redevelopment projects. The Park Board shall publish notice of the time, place and purpose of the initial meeting at least once, not less than ten (10) days before the meeting, in a newspaper of general circulation. The Park Board shall also mail notice of the time, place and purpose of the meeting to all park councils and registered neighborhood groups potentially impacted by the proposed construction or redevelopment of the park facility. The Park Board shall also mail notice of the time, place and purpose of the meeting to all owners of record of property located in whole or in part within three (3) city blocks of the park facility being proposed to be constructed or redeveloped. PB11-5. Citizens Community Advisory Committee – Meetings and Recommendation. All meetings shall be open to the public. Any person may appear and speak at a meeting either in person or by a duly appointed representative. Upon conclusion of public input, the citizen community advisory committee shall announce its recommendation or shall lay the proposal over to a subsequent meeting. Records shall be kept on file at the Park Board office of attendance, meetings, agendas, handouts and committee actions. All recommendations of the Citizen community aAdvisory cCommittee shall be presented at the public hearing of the Planning Committeeof the designated Committee of the Board. PB11-6. Planning CommitteeCommittee of the Board Public Hearing. – Notice. The Planning CommitteeA Committee of the Board shall hold a public hearing on all projects that include recommendations of a community advisory committee. The chair or acting chair may set the parameters of testimony to be received from interested parties. Any person may appear and testify at a hearing either in person or by duly appointed representative. After reviewing the community advisory committee’s recommendations and after the conclusion of public testimony, the Committee of the Board shall announce its decision or shall lay the matter over to a subsequent meeting. The Committee of the Board shall keep records of its public hearings and official actions. Decisions of the Committee of the Board shall be dated and forwarded to the full Board. all proposed park facility construction or redevelopment projects. The committee shall publish notice of the time, place and purpose of the public hearing at least once, not less than ten (10) days before the hearing, in a newspaper of general circulation. The Planning Committee shall also notify the voting members of the citizen’s advisory committee and owners of record of property located in whole or in part within three (3) city blocks of the park facility being proposed to be constructed or redeveloped of the time and place of the public hearing.
  • 10. Posted by http://MillCityTimes.com The Planning Committee shall also comply with all other notice requirements of Minnesota’s Open Meeting Law PB11-7. Community Advisory Committee Meeting and Public Hearing Notice. The Minneapolis Park and Recreation Board shall create and maintain a notification process that addresses all community advisory committee meetings and public hearings for the project. This process shall require a ten (10) day notice of the first meeting in a newspaper of general circulation, of park councils and registered neighborhood groups and of all owners of record of property located in whole or in part within three (3) city blocks of the project area. The notice shall comply with all other notice requirements of Minnesota’s Open Meeting Law. Failure to give mailed notice to all affected parties, or defects in the notice, shall not invalidate the process or proceedings provided a bona fide attempt to comply with this section has been made. PB11-5. Planning Committee – Appeal of Citizen Advisory Committee. Any person may appeal and object to the recommendations of a citizen advisory committee at the public hearing held by the Planning Committee. PB11-6. Planning Committee – Hearing. All hearings conducted shall be open to the public. The chair or acting chair may set the parameters of testimony to be received from interested parties. Any person may appear and testify at a hearing either in person or by duly appointed representative. After reviewing the citizen advisory committee’s recommendations, appeals and objections thereto, and the conclusion of other public testimony, the Planning Committee shall announce its decision or shall lay the matter over to a subsequent meeting. The Planning Committee shall keep minutes of its public hearings, and shall also keep records of its official actions. Decisions of the Planning Committee shall be dated and forwarded to the full Park Board. PB11-7. Appeal to Full Park Board Filing. All findings and decisions of the Planning Committee shall be subject to appeal to the full Park Board. Appeals may be initiated by any affected person by filing an appeal with the Superintendent’s office on a form approved by the Park Board. All appeals must be received within ten (10) calendar days of the date of decision by the Planning Committee and must be accompanied at the time of filing with payment of the fee specified in Minneapolis Code § 525.150. Timely filing of an appeal shall stay the decision of the Planning Committee until a decision is made by the Park Board. PB11-8. Full Park Board Hearing Notice. Not less than ten (10) days before the public hearing of the Park Board to consider the appeal, the Park Board shall publish notice of the time, place and purpose of the public hearing at least once in a newspaper of general circulation. The Park Board shall also comply with all notice requirements of Minnesota’s Open Meeting Law. Failure to give mailed notice to all affected parties, or defects in the notice, shall not invalidate the proceedings provided a bona fide attempt to comply with this section has been made. PB11-9. Public Hearing of Appeal. The Park Board shall hold the public hearing on any appeal. All hearings conducted on the appeal shall be open to the public. The chair or the acting chair may set the parameters of testimony to be received from interested parties. The Park Board shall keep minutes of its public hearing and shall also keep records of its official actions.
  • 11. Posted by http://MillCityTimes.com Section 2. That this Ordinance shall take effect and be in force January 1, 2000XX30 days after approval by the Board. Passed and adopted on this 15th ___day of Septembermonth, year, 1999____. Bob Fine, President Approved: Norman C. Merrifield, Secretary Sharon Sayles Belton, Mayor
  • 12. Posted by http://MillCityTimes.com Policy on Community Engagement DISCUSSION A well-designed and consistently implemented community engagement process aligns agency decisions with the interests and priorities of Minneapolis residents and park users. The keys to engaging communities include visibility, transparency of process, the use of multiple channels of communication, respect for all points of view and ensuring the opportunity for every stakeholder to voice his or her opinion during a decision making process. The measure of community engagement is the level of participation - through increased participation the Minneapolis Park and Recreation Board (MPRB) is better able to successfully deliver projects representative of community needs, interests and resources. Perspectives of Minneapolis residents, community groups, park users, staff, and the Board of Commissioners have informed the development of the following policy on community engagement. Research on best practices, current trends, and national and local government policies in working with communities have contributed to policy framework. The MPRB Board of Commissioners recognizes the organizational commitment necessary to stay engaged with and relevant to Minneapolis residents and users of the park system. This policy and procedure will guide the MPRB in authentically involving residents and park users in developing and delivering park projects that promote health, well-being, community, and the environment. Goals of Effective Community Engagement The following policy goals establish the expectations of effective community engagement for the MPRB and complement the core principles of community engagement adopted by the Minneapolis City Council. 1. Promote a culture of openness and learning in which consistent outreach and research methods increase community interest and participation. 2. Develop and sustain relationships that encourage the MPRB and the community to work together to advance the common good. 3. Provide opportunities for diverse people, ideas, and information to influence the development and implementation of park projects. 4. Enhance communication and outreach methods using available and emerging technology, including social media.
  • 13. Posted by http://MillCityTimes.com DEFINITIONS Stakeholder(s): Any segment of a community that is impacted by, or has direct interest in a decision. This may include elected officials, residents, community groups or organizations, underrepresented communities, communities of color, MPRB staff, neighborhood organizations, developers, business owners, etc. Community Engagement: The opportunity for stakeholders to influence decisions that shape the park system, including the intentional effort to create public understanding of MRPB projects, programs, and services, and to make certain the MPRB is aware of and responsive to stakeholder needs, concerns and industry trends. Interchangeable terms include: public participation, community involvement, and citizen participation. Community Outreach: The practice of communicating with or gathering information from stakeholders to inform a specific project, impending decision or strategic planning effort. A variety of methods, tools, and strategies may be used to share information and obtain stakeholder perspectives. Examples of outreach include surveys, meetings, and focus groups. Community Research: The practice of gathering data from primary or secondary sources to inform a specific project, impending decision, or strategic planning effort. Primary Research: Any original research performed by MPRB staff. Examples include community surveys or aggregated data about program and services offered. Secondary Research: Any existing research performed by another entity that has application to Minneapolis. This includes regional or national trend information; research completed by regional or state agencies, general industry, or market research. Project: An intentional effort to achieve specific goals or outcomes in the development of new or redevelopment of existing facilities as approved and budgeted in a Capital Improvement Program (CIP) for the Minneapolis Park and Recreation Board, including construction and redevelopment of facilities approved and budgeted through third party agreement. Project Manager: Any MPRB staff member or consultant responsible for following current policy and procedures on community engagement in development of new or redevelopment of existing facilities as approved and budgeted in a Capital Improvement Program for the Minneapolis Park and Recreation Board. Board: Reference to the nine-member Park Board of Commissioners that are the independently elected, semi-autonomous body responsible for maintaining and developing the Minneapolis park system. Committee of the Board: Reference to any committee that is comprised of two (2) or more Commissioners and established by the Board.
  • 14. Posted by http://MillCityTimes.com POLICY This policy applies to all Minneapolis Park and Recreation Board divisions and departments and outlines the implementation of Chapter 11 of the Minneapolis Park and Recreation Board Code of Ordinances. The policy outlines requirements for community engagement relative to projects for the Minneapolis Park and Recreation Board, including projects approved and budgeted through third party agreement. All Minneapolis Park and Recreation Board divisions and departments are encouraged to follow this policy in working and communicating with stakeholders on initiatives outside of the approved and budgeted Capital Improvement Program (CIP). 1. The Board is to purposefully seek the participation of a broad representation of stakeholders to ensure that diverse community needs, interests, and resources inform decisions for a project. 2. The Board is to evaluate this policy and procedure every four-year period, with the first evaluation conducted in 2015. 3. Project managers are to perform project assessment and develop community engagement plans. 3.1. Project managers are to provide public notice of opportunities for community engagement as defined by Chapter 11 of the Minneapolis Park and Recreation Board Code of Ordinances and current policy and procedure. 3.2. Project managers are to coordinate with the Communications and Marketing Department to ensure strategies are consistent with current policy. 3.3. Project managers are to share community research and retain project records in accordance with the current MPRB Records Retention Schedule. 3.4. Project managers are to oversee consultant adherence to the requirements of Chapter 11 of the Minneapolis Park and Recreation Board Code of Ordinances and current policy and procedure. 4. All projects require a community engagement plan. The Board is to be informed of community engagement plans and resulting plan recommendations. 4.1. Staff will consult with neighborhood organizations and other representative community groups and individuals in developing community engagement plans. 4.2. The Board and staff are to utilize approved methods to involve stakeholders. New outreach and research methods may be introduced and reviewed by the Board as part of a community engagement plan. 4.3. A community advisory committee (CAC) is recommended within a community engagement plan and must be conducted in compliance with Chapter 11 of the Minneapolis Park and Recreation Board Code of Ordinances. 4.3.1. A CAC may be a non-appointed or appointed group of stakeholders.
  • 15. Posted by http://MillCityTimes.com 4.3.2. The Board is to approve the final composition and charge for an appointed CAC, conduct public hearings on committee recommendations, and make final decisions regarding recommendations. 4.3.2.1. An appointed CAC is required within a community engagement plan if the project outcomes may result in a change that is not specified in an approved master plan for a regional park. 4.3.3. The Board is to review the charge for a non-appointed CAC, conduct public hearings for committee recommendations, and make final decisions regarding recommendations. 4.3.3.1. A non-appointed CAC is required within a community engagement plan if the project outcomes may result in a change in public use of park land. 5. The Board is to allocate staff and financial resources to provide for implementation and evaluation of community engagement plans. 6. This policy shall take effect and be in force thirty (30) days after adopted by the Board. Once in force, this policy will be in effect for projects that do not have an in-process or already established CAC as required or recommended. Draft Page 4 9/26/2011
  • 16. Posted by http://MillCityTimes.com PROCEDURE A. Project Assessment Upon determination of a project, project managers are to: 1. Complete and retain the project assessment form to determine the recommended level of community engagement for a project. 1.1. Be aware that substantial degrees of change to a program, facility or level of service increase potential impact to the community and highlight the importance of a predetermined engagement strategy. 1.2. Approach project stakeholders to discuss and complete the form as a collaborative effort. 2. Consult the community engagement grid to select approved outreach and research methods according to the recommended level of community engagement. 2.1. A combination of approved methods may be used to form a comprehensive outreach strategy or community engagement plan (see section B, Community Engagement Plans). The project assessment form and grid are tools to assist in process design and represent the minimum requirements for project managers in developing a community engagement plan. These tools are directly associated and designed to be used in combination with each other. Determining the appropriate approach in working and communicating with the community is not scientific practice; there is no one formula for determining the most effective strategy. Project managers are to be aware of requirements for community engagement based on funding source or other project characteristics. Methods to engage the stakeholder are defined through project assessment, Board action and/or implementation of a community engagement plan. B. Community Engagement Plans All projects require a community engagement plan, even if the plan is simply a timeline for appropriate notice and communication to the community for a project. The community engagement plan may introduce new methods of outreach, research and engagement for Board approval through ideas generated by stakeholders and the project manager during plan development. At a minimum, the community engagement plan is to include the following information: 1. Identification of stakeholders that may be affected by the project. 2. Definition of stakeholder roles and responsibilities for the project. 3. Identification of approved outreach and research methods that will provide information to best inform the project outcome. 4. Identification of public notice and timely communication strategies for the project. 5. Identification of resources needed to implement the plan. 6. Timeline for implementation.
  • 17. Posted by http://MillCityTimes.com 7. An evaluation summary examining the efficacy of the community engagement process including a statement indicating how the process advanced policy goals (see section F, Evaluation). Project managers are to: 1. Consult with established neighborhood organizations in developing community engagement plans. Interfacing with neighborhood organizations will support the effort to ensure participation is broad based and inclusive, and build consistency between City supported participation programs and practices of the MPRB. 2. Consult with representative community groups or community leaders, and work with under- represented groups to develop and implement the plan. 3. Review the community engagement plan with the Board of Commissioners, and obtain approvals as necessary. 4. Modify the plan if circumstance warrants, and communicate substantial modifications to stakeholders and the Board. C. Establishment of Advisory Committees Advisory committees provide an opportunity for stakeholder groups to share insight and resources, and serve to build and sustain relationships between the community, partner agencies and the MPRB. Members of different types of advisory committees work collaboratively to provide comprehensive project recommendations to the Board. Project Advisory Committee 1. Criteria for Creation 1.1. The project advisory committee (PAC) is comprised of a MPRB project manager and a cross- functional team of staff from departments affected by or involved in the project. The PAC allows for full information sharing for the community on options and implications for project development and implementation. 1.2. The Superintendent or Assistant Superintendent recommends MPRB staff for a PAC; the PAC may include individuals representing a consultant group. 2. Responsibilities 2.1. Manage all phases of the project to completion, ensuring that diverse stakeholder needs, interests, and resources are shared and inform decision making throughout the project phases. 2.2. Develop, execute and evaluate the community engagement plan. 2.3. Provide professional expertise on topics related to work responsibility. 2.4. Maintain records of the process and make these records available for public review. 2.5. Attend all scheduled committee meetings or assign a representative from their work specialty in case of absence. 2.6. Regularly communicate project information to appropriate stakeholders, including MPRB staff. Technical Advisory Committee 1. Criteria for Creation Draft Page 6 9/26/2011
  • 18. Posted by http://MillCityTimes.com 1.1. The technical advisory committee (TAC) is comprised of individuals representing public agencies that are affected by or involved in the proposed project, including representatives of the MPRB, City Council, school board, City departments, state agencies, groups of professional industry expertise, established partners or partner groups, and other surrounding jurisdictions. A TAC is typically formed for projects of regional or city-wide significance involving multiple layers of complexity. 2. Responsibilities 2.1. Inform other advisory committees of inter-jurisdictional policies, professional recommendations, timelines, budgets, and political realities related to the project. 2.2. Attend all scheduled committee meetings or assign a representative from their work specialty in case of meeting absence. 2.3. Led by the PAC, the TAC will work collaboratively with other advisory committees to provide comprehensive recommendations to the Board. Community Advisory Committee 1. Criteria for Creation and Responsibilities 1.1. The establishment of a community advisory committee (CAC) is recommended within a community engagement plan. 1.2. A CAC is one of two types: non-appointed or appointed. 1.3. The Board approves the final composition and duties, or charge, of an appointed CAC. 1.4. An appointed CAC is required if the project outcomes may result in a change that is not specified in an approved master plan for a regional park. An appointed CAC is typically used for projects of regional or citywide significance. 1.5. The Board reviews the duties, or charge, for a non-appointed CAC. 1.6. A non-appointed CAC is required if the project outcomes may result in a change in public use of park land. A non-appointed CAC is typically used for projects of neighborhood or community level significance and/or a project that replaces an existing and well used amenity, such as a playground, athletic field, trail segment, or wading pool. 1.7. A CAC will work collaboratively with other advisory committees to provide comprehensive project recommendations. Once complete, the CAC recommendations are presented before the Board in conjunction with a public hearing. 2. Committee Structure 2.1. Appointed - Appointed CACs shall be representative of stakeholder groups impacted by the project. An individual may be nominated for appointment by a Board Commissioner, City or State elected officials, neighborhood organizations, nearby cities or jurisdictions, or other community group representative of affected stakeholders. The project manager in consultation with the Board and management will review the appointees to ensure equitable representation from stakeholder groups. The total number of appointed members will amount to an odd number. 2.1.1. A CAC chairperson is appointed by the Board President. Draft Page 7 9/26/2011
  • 19. Posted by http://MillCityTimes.com 2.1.2. The CAC chairperson is to assist the facilitation of public proceedings, act as spokesperson, and assist in presenting recommendations to the appropriate Committee of the Board or full Board. 2.2. Non-appointed – Any stakeholder attending a public meeting or indicating interest in a project is considered a member of a non-appointed CAC. MPRB staff or a duly appointed representative will facilitate meetings and present the CAC recommendations before the Board. 2.2.1. No CAC chairperson is required. 2.2.2. Any amount of individual members may comprise a non-appointed CAC. 3. Meeting Requirements 3.1. Either type of CAC is required to hold one or more meetings as necessary to determine project recommendations appropriate to the committee charge as approved or reviewed by the Board. Meeting agendas and discussion will focus on fulfillment of the committee charge. 3.2. All meetings are open to the public. 3.3. Expectations for all proceedings are that participants will engage in respectful civil discourse in an effort to enhance mutual understanding and promote collaborative decision making. 3.4. The PAC is to maintain and keep on file records of meeting attendance, notices, agendas, minutes, and committee actions. Stakeholder feedback gathered through approved tools and methods outside of a public meeting forum is information to be considered by the CAC. 3.5. The PAC is to make records available for review at each CAC meeting and throughout the course of the project upon stakeholder request. 4. Voting Requirements 4.1. CAC members are to attend all scheduled meetings in order to ensure full, fair, and informed participation and decision-making. Ideally, consensus is the preferred form of decision- making. 4.2. When a vote is appropriate or necessary to produce final recommendations to the Board, participating CAC members attending two-thirds of public meetings are eligible to vote. Voting results are determined by majority rule, or more than half the votes of eligible members. 4.3. The CAC may submit resolutions to the Board indicating preferences for future improvements related to the project or project area that are outside the scope of the committee charge. 5. Board Procedure on Community Advisory Committees 5.1. The designated Committee of the Board is to hold a public hearing for the review of recommendations of an appointed or non-appointed CAC (see section D, Public Notice). 5.2. The chair or acting chair may set the parameters of testimony to be received from interested parties. 5.3. Any person may testify at the public hearing regarding the CAC recommendations. 5.4. The project manager or consultant is responsible for presenting the full range of stakeholder recommendations to the Board, including any alternative recommendations or concerns identified by committee members. 5.5. After review of the recommendations and public testimony, the designated Committee of the Board will announce its decision to approve the recommendations or lay the matter over to a Draft Page 8 9/26/2011
  • 20. Posted by http://MillCityTimes.com subsequent committee meeting. Decisions of the Committee of the Board will be dated and forwarded to the full Board. D. Public Notice The purpose of public notice is to inform stakeholders of the opportunity for participation and provide timely, factual information on projects or proceedings. Notice may be provided to an individual by request, or delivered to a geographical area or target audience. Failure to give adequate notice to all affected stakeholders or defects in public notice shall not invalidate the process or project proceedings. Staff is to: 1. Identify methods and strategies for public notification and communication as part of a community engagement plan. 2. Maintain records of public notice. 3. Notify MPRB internal customers, such as affected departments and individual staff in advance or concurrent with public notification. 4. Consult with the Communications and Marketing Department to ensure public notice procedure is consistent with current policy. 5. Utilize technology and distribution formats that effectively and economically communicate public information. The minimum requirements for public notice are as follows: 1. For city-wide notification, staff is to: 1.1. Publish notice of the time, place, and purpose of a subject at least once, not less than ten (10) calendar days before the occurrence date in a newspaper of general circulation. 1.2. Issue a news release indicating the time, place, and purpose of a subject at least once, not less than ten (10) calendar days before the occurrence date. 1.3. Post notice of the time, place, and purpose of the subject not less than ten (10) calendar days before the occurrence date on the MPRB’s website. 2. For notice of public meeting(s) for a project or a public hearing, staff is to: 2.1. Publish notice of the time, place, and purpose of the public meeting or hearing at least once, not less than ten (10) calendar days before the public meeting or hearing date in a newspaper of general circulation. 2.2. Issue a news release indicating the time, place, and purpose of a public meeting or hearing date at least once, not less than ten (10) calendar days before the public meeting or hearing date. 2.3. Mail notification to registered property owners within a three (3) block radius of the affected service area not less than ten (10) calendar days before the scheduled public meeting date or the first date in a series of public meetings. Draft Page 9 9/26/2011
  • 21. Posted by http://MillCityTimes.com 2.4. Post notice of the time, place, and purpose of the public meeting, not less than ten (10) calendar days before the public meeting on the MPRB’s website and at park facilities on or near the project area. 3. For any items subject to public review and comment, a minimum forty-five (45) calendar day review period is required. For notice of items, staff is to: 3.1. Publish notice of the time, place, and purpose of the item for public review and comment before or concurrent to the date the review period is to begin in a newspaper of general circulation. 3.2. Issue a news release indicating the schedule and purpose of the item for public review and comment before or concurrent to the date the review period is to begin. 3.3. Provide a print copy of the item for public review and comment at MPRB recreation centers and the main customer service desk. 3.4. Post the electronic copy of the item for public review and comment on the MPRB website and archive for one (1) calendar year after the closing date at this location. Project managers are to comply with additional requirements for notification as indicated by outside agency policy, agreement or funding source. E. Outreach and Research The MPRB supports the use of a variety of techniques to interact with and obtain information from stakeholders. Outreach and research tools and methods can be applied for a variety of reasons, including but not limited to the following: 1. To evaluate the success and measure the community impact of existing programs, services or facilities. 2. To gain stakeholder insight and perspective regarding the development of a new program, service or facility. 3. To proactively identify or explore park and recreation trends or ideas. 4. To determine the essential services to be provided for a community or park area. 5. To query stakeholders when proposing or revising policy. 6. To resolve persistent conflicts or problems. Stakeholders are empowered to generate new ideas as to how they would like to be communicated with, involved or engaged for a project. All new methods will be reviewed by the MPRB project manager prior to implementation. New methods can be added to the community engagement grid through feedback provided to the Board within an evaluation summary. The purpose of community research is to collect data that will best inform specific project decisions or strategic direction and support the policy goals of effective community engagement. Research completed in advance of and during project development may include review of previously completed directives or mandates, master plans, community studies, industry trends, historical and demographic Draft Page 10 9/26/2011
  • 22. Posted by http://MillCityTimes.com data. The project manager is responsible for determining the research data necessary to support and document decision making for a project. The project manager is to retain community research data gathered for a project. The MPRB Records Retention Schedule establishes minimum retention periods for records based on their administrative, fiscal, legal and historical value and identifies how long to retain them. Project managers are to retain project records as indicated by the current MPRB Records Retention Schedule. The department supervisor is to establish a management system to capture and retain research information in a shared repository, in either electronic or print form. The shared repository is to include primary and secondary research work or studies, including any data obtained through research partnerships, academic, or volunteer studies completed on behalf of the MPRB or contracted by the MPRB. F. Evaluation The Board is responsible for evaluating community engagement policy and procedure within the organization. Every four year cycle, the Board will review the community engagement policy and procedures to determine: 1. Overall compliance and alignment with the policy goals of effective community engagement. 2. Overall satisfaction and efficacy of methods from a stakeholder and organization point of view. 3. Addition of new tools and methods. Data gathered from this review will determine policy revisions or budget allocation, and help to align the community engagement process with evolving stakeholder expectations. Ideally, this information would be captured as part of a citywide, statistically valid survey of overall resident and park visitor satisfaction and prioritization conducted on a periodic basis. As required by a community engagement plan, the project manager is to provide an evaluation summary analyzing the effectiveness of the process from both stakeholder and organization points of view. The summary requires a brief statement indicating how the process advanced policy goals. The evaluation summary will assist the Board and staff in evaluating and informing an ongoing community engagement process. G. Roles and Responsibilities Every individual involved in a project is responsible for upholding excellent standards for community engagement by following approved policy and practicing consistent procedure. All persons have a right to be informed of projects of interest, be involved, and contribute to project goals and outcomes. 1. Stakeholder Role 1.1. Contribute feedback and remain informed on a project; encourage other stakeholders to participate in the process. Draft Page 11 9/26/2011
  • 23. Posted by http://MillCityTimes.com 1.2. Participate in the process in a manner that promotes respectful civil discourse and enhances mutual understanding of all stakeholder viewpoints. 1.3. Work collaboratively with all stakeholders toward a common goal or project outcome. 1.4. Report project progress to community members, including businesses and interest groups. 1.5. Direct requests for information to the designated project manager. 2. Board of Commissioners Role 2.1. Provide policy level support and resources to maintain an ongoing and effective community engagement process for the organization. 2.2. Understand and communicate the opportunities available for community engagement to stakeholders. 2.3. When recommended or approved, ensure a CAC process is conducted in compliance with Chapter 11 of the MPRB Code of Ordinances. 2.4. Share information obtained from stakeholders with project managers through the office of the Superintendent. 2.5. Be available to and communicate with stakeholders in a timely, consistent, and respectful manner. 3. Staff Role 3.1. Provide assessment and determine approved methods to engage stakeholders; develop a community engagement plan and provide evaluation of the process. 3.2. Establish advisory committees as identified within a community engagement plan and manage the work of all advisory committee proceedings. 3.3. Provide stakeholders with feedback on how their input influenced a project decision and remain productively engaged with stakeholders throughout project phases. 3.4. Incorporate multiple sets of stakeholder considerations in order to present the most equitable and collaborative options for project decisions. 3.5. Be available to and communicate with stakeholders in a timely, consistent, and respectful manner. 3.6. Retain and share community research information. 3.7. Manage consultant adherence to current requirements of ordinance, policy, and procedure. Forms Minneapolis Park and Recreation Board: Project Assessment Form Minneapolis Park and Recreation Board: Community Engagement Grid Draft Page 12 9/26/2011
  • 24. Posted by http://MillCityTimes.com Minneapolis Park & Recreation Board: Project Assessment Form Project Name: _________________________________________________________ Project Manager: _________________________________________________________ Instructions: Select one response for each question. Total the corresponding numerical value of all responses. Match the total numerical value with the corresponding level on the community engagement grid. Use the grid to select approved methods to form a community engagement plan or strategy for involving the community for a project. 1. What is the anticipated level of community interest or 5. How significant are the possible benefits of involving the concern for this project? community in decision making processes for this project? Low Moderate High Extremely High Low Moderate High Extremely High 1 2 3 4 1 2 3 4 2. What is the anticipated level of complexity of the project 6. How serious are the potential ramifications of not involving the (consider factors beyond design, including but not limited to community in decision making processes for this project? inter-agency overlap and interest, environmental and Low Moderate High Extremely High operational issues, etc)? 1 2 3 4 Low Moderate High Extremely High 1 2 3 4 7. What level of community engagement does the Board desire or expect for this type of project (consider previous Board decisions, 3. How significant are the project’s potential impacts to the history of similar projects, Board directives and priorities, policy community (consider such impacts as service interruption, requirements, etc.)? residential proximity, equity, quality of life, etc.)? Low Moderate High Extremely High Low Moderate High Extremely High 1 2 3 4 1 2 3 4 4. What degree of involvement does the community appear to expect for this project (consider factors such as previous levels of stakeholder participation, current partnerships, profiles of community leadership, etc.)? Low Moderate High Extremely High Total Numerical Value: _______________ 1 2 3 4
  • 25. Posted by http://MillCityTimes.com Minneapolis Park & Recreation Board: Community Engagement Grid Recommended Level: Inform Consult Collaborate Partner (Total 7-14) (Total 14-21) (Total 21-28) (Total 25-28) Commitment of the The MPRB will keep The MPRB will keep The MPRB will look to The MPRB and partner MPRB: stakeholders informed. stakeholders informed, stakeholders for input and entity will be listen to and innovation in formulating accountable to their acknowledge project decisions and roles as negotiated in feedback, and work to incorporate those the partnership and ensure stakeholder decisions to the maximum regularly evaluate perspectives are extent possible. overall success of the reflected in project partnership. decisions. Approved Methods: • News Release • Surveys: Internet, • Advisory Committee • Contract • Staffed information Exit/Follow-up, In • Public meeting • Partnership display Person, Intercept, • Workshop agreement • Information Mailed, Telephone • Study group • Friends Groups meeting • Comment Card • Design Charrette • Grant Agreement • Open house • Public Hearing • Memorandum of • News conference • Focus Group Understanding • Postings in parks • Public Meeting • Memorandum of and recreation • Interview Agreement facilities • Field Intervention • Website • In-person • Email subscription conversation A combination of approved methods may be used to form an outreach strategy or community engagement plan.