12. Footings installed… Standard footings are installed according to applicable building codes and engineering requirements. Stepped footings are easily accommodated with the flexibility of ICF construction.
13. Block are set… Form units are stacked similar to building blocks to the required building dimensions.
14. Reinforcing rebar is placed according to the design requirements into notches provided by the webbing. Reinforcing Rebar added…
40. Hilton Garden Inn – Lewisville, TX 6-stories + conference center ICF system allowed switch from PTAC units to Diakin System Able to reduce electric service to building by 3,500 AMPS (saved approx. $130,000)
103. Cost comparison completed by a hotel developer and contractor Block and Plank Interior walls – every other one Exterior 6” walls 18500 Labor Internal non-bearing walls includes labor & materials Insulation – interior walls only Foam Fill Red Steel 20 Tons (fabricated odd jobs, $1) Footing Design Add for 5’ additional to building for drywall & brick additions Precast Floor System Concrete SOG Elevator walls Total $170,000.00 157,250.00 Included $159,360.00 $12,000.00 $21,757.00 $50,000.00 $1,890.00 $330,825.00 $42,600.00 $60,000.00 $1,005,682.00 Nudura ICF Wall System Interior walls – every other one includes $1 of contingency Exterior 6” walls 18500 Labor includes a $1 of contingency Internal non-bearing walls includes labor & materials Insulation – interior walls only Shoring Red Steel 20 Tons (fabricated odd jobs, $1) Footing Design Add for 5’ additional to building for drywall & brick additions Precast Floor System Concrete SOG Elevator walls Total $171,800.00 $158,915.00 Included $121,360.00 $12,000.00 Not Required $50,000.00 $1,890.00 $330,825.00 $42,000.00 $60,000.00 $950,025.00 Infinity Systems Metal Stud Wall System 42057 sf of Composite deck epicore msr Pourstop Structural internal walls Installation estimate Exterior non-load bearing walls 18500 Exterior installation 18500 Internal non-bearing walls includes labor & materials Insulation – interior walls only Shoring Red Steel 20 Tons Check lateral loads Footing Redesign Shear Panel walls Sheathing Brick Relief Angle 30’ 3 rd floor Brick Relief Angle 30’ 4 th floor Concrete Pours 5” slab Concrete SOG Elevator walls and stairs Total $365,325.00 Included Included $157,775.00 $150,500.00 $25,000.00 $81,360.00 $6,000.00 Included $50,000.00 $5,000.00 $3,500.00 ?? $4,500.00 $4,500.00 $168,228.00 $42,600.00 $60,000.00 $1,124,288.00
104. Cost comparison completed by a hotel developer and contractor Wood 2 x 6 Construction Panel Walls interior and exterior Interior walls 2 x 4 staggered Interior Framing Exterior 2 x 6 Labor to install should be 3.25sf bid at 4.25 Tyvek 30 rolls Insulation – interior walls only R19 insulation .52st, .62sf both sides (please note attic $38 is .51sf – this building will cost approximately 7542 Insulation exterior walls 24k Exterior 2 x 6 walls, 28000 ½ foam and R19 insulation, 3” 50,000 Red Steel 16 Tons Shear Panel walls Footing Redesign Fire stopping, fire collars Sheathing In-between floors 42500, .52 Drywall Costs Additional Brick Costs Floor trusses and OSB Concrete SOG Elevator walls and stairs Total $113,447.00 $25,000.00 Included Included $138,125.00 $5,400.00 $34,560.00 $28,000.00 $40,000.00 $20,000.00 $5,000.00 $10,000.00 Included above $22,100.00 $35,000.00 $16,286.00 $114,000.00 $42,600.00 $60,000.00 $709,518.00 Nudura ICF Wall System Interior walls – every other one includes $1 of contingency Exterior 6” walls 18500 Labor includes a $1 of contingency Internal non-bearing walls includes labor & materials Insulation – interior walls only Shoring Red Steel 20 Tons (fabricated odd jobs, $1) Footing Design Add for 5’ additional to building for drywall & brick additions Floor truss system and OSB Concrete SOG Elevator walls Total $171,800.00 $158,915.00 Included $121,360.00 $12,000.00 Not Required $50,000.00 $1,890.00 $114,000.00 $42,000.00 $60,000.00 $733,200.00