SlideShare ist ein Scribd-Unternehmen logo
1 von 58
Quarterly Technology Briefing “Lean Times Require Lean Thinking” presented in partnership with
Lean Times Require Lean Thinking Jason Yip ThoughtWorks Paul Heaton KM&T Image from  http://www.bluefountainmedia.com/blog/?p=38
“ As the Japanese economy entered a  steep recession  in that year, the Toyota Motor Company ran  out of cash , which was tied up in inventory for products customers no longer wanted. The company fell under the control of bankers who chopped the company in two, creating separate firms to divide the marketing and sale functions from the product development and production functions. (These firms were only recombined in 1982 to create the current Toyota Motor Corporation.)  Founding president  Kiichiro Toyoda (new president Akio Toyoda’s grandfather) was  driven out in the process . The pursuit of what became the  Toyota Production System , along with the product development, supplier management, and customer support systems, was the  creative response to this crisis .” James Womack, Respect Science Especially in a Crisis,  http://www.manufacturingnews.com/news/09/0309/womack.html
Lean was born from hardship and survival ,[object Object],[object Object],[object Object],http://www.flickr.com/photos/jtcatbagan/2420624616/
What happened since then?
In 2008, Toyota surpasses GM as the world’s largest auto maker Toyota and Honda lead in J.D Power quality ratings
“ Our  recurring losses  from operations, stockholders' deficit and  inability to generate sufficient cash flow  to meet our obligations and sustain our operations raise  substantial doubt about our ability to continue  as a going concern ” General Motors SEC filing, 2009
Who would you rather be?
Is this really relevant to us?
 
Toyota success with the Prius ,[object Object],[object Object],[object Object],[object Object],Source - National Center for Manufacturing Sciences report  Note: this includes designing the Plant to produce it!!
What message do I want to give? ,[object Object],[object Object]
Agile Toyota Honda New product development Scrum XP Lean Lean Software Development Iterative and  Incremental development Kanban
So, what is Lean?
Just-in-Time (not Just-in-Case) ,[object Object],[object Object],[object Object],[object Object]
Stop The Line ,[object Object],[object Object]
The essence of Lean is  engaging everyone  in identifying and solving problems
Activities that do not add value   workload that is not balanced work that creates burden for the  team members or processes   Picture Source – Toyota Motor Company Australia Waste Un-Evenness Overburden
8 WASTES Over- production Waiting Transport or  Conveyance Rework  Motion Stock & Materials Over-  processing In LEAN  8 types of waste   have been identified  These classifications have been adopted globally - for any process. They apply equally to  any process . All of these 8 can be either “ Necessary Waste”  or  “ Un-necessary Waste” Depending on circumstance Not using People Resource
Waiting Waiting is where people or materials are not being utilised because they are waiting for another person or process to complete before work can resume. ,[object Object],[object Object],[object Object],[object Object],Waiting
Overproduction Overproduction is where an excess of processes, or services are being created, without there being any real requirement for them.  ,[object Object],[object Object],[object Object],Over- production
Transport or Conveyance Unnecessary transportation of patients, stock, patient records and equipment which is not reaching its end goal, adds no value. Too much transportation should be avoided and is often the result of departments spaced far apart, or resources not being closely linked. ,[object Object],[object Object],[object Object],Transport  or  Conveyance
Over-processing Over-processing is where a process or person works hard, but not necessarily smart, creating a waste which is not always easy to see, and can often be mistaken as part of the process. ,[object Object],[object Object],[object Object],Over-  processing
Rework Rework is where a process or procedure is not completed correctly the first time and therefore needs to be re-done, or adjusted before it is deemed completed.  ,[object Object],[object Object],[object Object],Rework
Stock Stock = Materials in Stores  (Medical equipment, Work-In-Process (WIP) & Finished Work) Excess Stock = Cost  (Cash) ,[object Object],[object Object],[object Object],Stock
Motion Motion is related to human movement. Good work area layout and process design minimises the amount of movement and saves time & effort when finding or fetching material or documents.  ,[object Object],[object Object],[object Object],[object Object],[object Object],Motion
Resource Resource is the most valuable asset in any business, without it, no business can function or succeed successfully. The trick is to use the resource as they are the local experts. ,[object Object],[object Object],[object Object],[object Object],[object Object],Resource
How does this fit with IT?
Understanding of problem space Understanding of solution space Focus Business as Usual +++ (specification as input) +++ (focus on task efficiency) Cycle time + cost reduction Typical projects + (iterative specification) ++ (control what needs to be learned) Earlier ROI New Product Development ? (specification as output) ? (focus on learning efficiency) Acquire and exploit knowledge faster than competitors
“ Put yourself in the position of the customer and ask if you would pay less for the product or be less satisfied with it if a given step and its necessary time were left out.” Mike Rother and John Shook, Learning to See
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Software development waste
Non Value Add  “ unnecessary wastes” Waste to  Eliminate ! Non Value Add  “ necessary waste”  Waste to  Reduce ! Value Add Increase!
RENAL patients going through a Hospital Process Pictures provided courtesy of Agility Healthcare Solutions What is added value to the  Customer Look at End to End Value Chain
Mapping the Process… Source – NHS Centre for Innovation
36 process steps 7 value add 29 process steps  were non-value add or waste Who thinks that of the 36 steps: 100% - 75% was added value activity? 75%  - 50% was added value activity? 50%  - 25% was added value activity? Less than 25% was added value? 1 2 3 4 5 6 7 8 9 28 29 30 31 32 33 34 35 36 19 20 21 22 23 24 25 26 27 10 11 12 13 14 15 16 17 18
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Continuous Improvement P – Plan D – Do C – Check A - Act Improvement  to patient care  & experience Value Waste Flow Perfection
Hospital Result… ,[object Object],[object Object],ACTIVITY Process Map Team Work Waste ID Problem Solving Project Mgt Committed Leader RESULT Waste reduction allowed sustainable reduction to  EIGHT  days
 
 
 
 
Set-based Concurrent Engineering
No problem is a problem
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],“ Managing to Learn” by John Shook
Daily standup meetings
Heartbeat retrospectives ,[object Object],[object Object],[object Object],[object Object],[object Object]
Technique Time to detect problem Pairing Seconds Test Driven Development Seconds to minutes Co-location Seconds to minutes Continuous Integration ~20 minutes to a couple hours User Stories A couple days Timeboxed development 1 – 4 weeks Small releases 1 – 3 months
Just-in-Time  is a response to the problem of  overproduction
Stop The Line  is a response to the problem of  unnecessary rework due to defects
The essence of Lean is  engaging everyone  in identifying and solving problems
What type of results are we talking about?
McKinsey on Lean IT “ In our experience, applying the principles of lean manufacturing to [application development and maintenance] can  increase productivity by 20 to 40 percent while improving the quality and speed of execution .” N. Kindler, V. Krishnakanthan, R. Tinaikar, “Applying lean to application development and maintenance”, McKinsey on IT, Spring 2007
Forrester Research on ThoughtWorks Agile/Lean Category Improvement Total defects 63% less  Critical defects 79% less Effort 62% less Duration 69% less
So…what is required? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
What’s next? ,[object Object],[object Object],[object Object],[object Object],[object Object]
For Further Information please contact: ThoughtWorks  – Jason Yip Email [email_address] Web www.thoughtworks.com.au KM&T  – Paul Heaton mail [email_address] Web www.kmandt.com.au

Weitere ähnliche Inhalte

Was ist angesagt?

Toyota’s Management System Tools and Behaviours
Toyota’s Management System Tools and Behaviours Toyota’s Management System Tools and Behaviours
Toyota’s Management System Tools and Behaviours Lean Enterprise Academy
 
Lean in new Product Development by Jim Morgan
Lean in new Product Development by Jim MorganLean in new Product Development by Jim Morgan
Lean in new Product Development by Jim MorganLean Enterprise Academy
 
Doing Analytics Right - Selecting Analytics
Doing Analytics Right - Selecting AnalyticsDoing Analytics Right - Selecting Analytics
Doing Analytics Right - Selecting AnalyticsTasktop
 
Gemba walk: the start of your lean journey
Gemba walk: the start of your lean journeyGemba walk: the start of your lean journey
Gemba walk: the start of your lean journeyboscollkid
 
Stdw for managers and supervisors october 2016
Stdw for managers and supervisors   october 2016Stdw for managers and supervisors   october 2016
Stdw for managers and supervisors october 2016W3 Group Canada Inc.
 
Agile Management Part 1+2-MCFINAL
Agile Management Part 1+2-MCFINALAgile Management Part 1+2-MCFINAL
Agile Management Part 1+2-MCFINALMurray Cantor
 
Metrics As A Learn And Change Agent
Metrics As A Learn And Change AgentMetrics As A Learn And Change Agent
Metrics As A Learn And Change AgentGaetano Mazzanti
 
Evolve or Die: A3 Thinking and Popcorn Flow in Action (#LKCE14)
Evolve or Die: A3 Thinking and Popcorn Flow in Action (#LKCE14)Evolve or Die: A3 Thinking and Popcorn Flow in Action (#LKCE14)
Evolve or Die: A3 Thinking and Popcorn Flow in Action (#LKCE14)Claudio Perrone
 
How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?Tina Arora
 
Training Within Industry (TWI) Programs - JI, JM & JR by Operational Excellen...
Training Within Industry (TWI) Programs - JI, JM & JR by Operational Excellen...Training Within Industry (TWI) Programs - JI, JM & JR by Operational Excellen...
Training Within Industry (TWI) Programs - JI, JM & JR by Operational Excellen...Operational Excellence Consulting
 
Lean Manager Certification Program - January 2018
Lean Manager Certification Program - January 2018Lean Manager Certification Program - January 2018
Lean Manager Certification Program - January 2018W3 Group Canada Inc.
 
Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017W3 Group Canada Inc.
 
Smarter fundraising – technology and processes
Smarter fundraising – technology and processesSmarter fundraising – technology and processes
Smarter fundraising – technology and processesShoNet
 
Webinar On Lean In Non Manufacturing Environments
Webinar On Lean In Non Manufacturing EnvironmentsWebinar On Lean In Non Manufacturing Environments
Webinar On Lean In Non Manufacturing Environmentsfertuckda
 

Was ist angesagt? (19)

Toyota’s Management System Tools and Behaviours
Toyota’s Management System Tools and Behaviours Toyota’s Management System Tools and Behaviours
Toyota’s Management System Tools and Behaviours
 
Lean in new Product Development by Jim Morgan
Lean in new Product Development by Jim MorganLean in new Product Development by Jim Morgan
Lean in new Product Development by Jim Morgan
 
A3 Thinking Masterclass by John Kiff
A3 Thinking Masterclass by John KiffA3 Thinking Masterclass by John Kiff
A3 Thinking Masterclass by John Kiff
 
Bright Spots Analysis
Bright Spots Analysis  Bright Spots Analysis
Bright Spots Analysis
 
Gemba Walks Helping Management to See
Gemba Walks Helping Management to SeeGemba Walks Helping Management to See
Gemba Walks Helping Management to See
 
Doing Analytics Right - Selecting Analytics
Doing Analytics Right - Selecting AnalyticsDoing Analytics Right - Selecting Analytics
Doing Analytics Right - Selecting Analytics
 
Gemba walk: the start of your lean journey
Gemba walk: the start of your lean journeyGemba walk: the start of your lean journey
Gemba walk: the start of your lean journey
 
Stdw for managers and supervisors october 2016
Stdw for managers and supervisors   october 2016Stdw for managers and supervisors   october 2016
Stdw for managers and supervisors october 2016
 
Agile Management Part 1+2-MCFINAL
Agile Management Part 1+2-MCFINALAgile Management Part 1+2-MCFINAL
Agile Management Part 1+2-MCFINAL
 
Metrics As A Learn And Change Agent
Metrics As A Learn And Change AgentMetrics As A Learn And Change Agent
Metrics As A Learn And Change Agent
 
Evolve or Die: A3 Thinking and Popcorn Flow in Action (#LKCE14)
Evolve or Die: A3 Thinking and Popcorn Flow in Action (#LKCE14)Evolve or Die: A3 Thinking and Popcorn Flow in Action (#LKCE14)
Evolve or Die: A3 Thinking and Popcorn Flow in Action (#LKCE14)
 
CPI Training overview
CPI Training overviewCPI Training overview
CPI Training overview
 
Introduction to Standardized Work
Introduction to Standardized WorkIntroduction to Standardized Work
Introduction to Standardized Work
 
How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?
 
Training Within Industry (TWI) Programs - JI, JM & JR by Operational Excellen...
Training Within Industry (TWI) Programs - JI, JM & JR by Operational Excellen...Training Within Industry (TWI) Programs - JI, JM & JR by Operational Excellen...
Training Within Industry (TWI) Programs - JI, JM & JR by Operational Excellen...
 
Lean Manager Certification Program - January 2018
Lean Manager Certification Program - January 2018Lean Manager Certification Program - January 2018
Lean Manager Certification Program - January 2018
 
Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017
 
Smarter fundraising – technology and processes
Smarter fundraising – technology and processesSmarter fundraising – technology and processes
Smarter fundraising – technology and processes
 
Webinar On Lean In Non Manufacturing Environments
Webinar On Lean In Non Manufacturing EnvironmentsWebinar On Lean In Non Manufacturing Environments
Webinar On Lean In Non Manufacturing Environments
 

Ähnlich wie Lean times require lean thinking

Lean Times Require Lean Thinking
Lean Times Require Lean ThinkingLean Times Require Lean Thinking
Lean Times Require Lean ThinkingThoughtworks
 
Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11laukoamy
 
Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Jamie Voster
 
Lean sw development il tech-talks
Lean sw development   il tech-talksLean sw development   il tech-talks
Lean sw development il tech-talksElad Sofer
 
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...SN Panigrahi, PMP
 
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplacesIslamAbdouAbbas1
 
00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgs00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgsfreelean
 
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docx
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docxChaplin School of Hospitality and Tourism ManagementInternship Lea.docx
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docxcravennichole326
 
Lean Thinking in Government Services
Lean Thinking in Government ServicesLean Thinking in Government Services
Lean Thinking in Government Servicesbenthatcher
 
Robert Mc Geachy Common Pitfalls Agile
Robert Mc Geachy Common Pitfalls AgileRobert Mc Geachy Common Pitfalls Agile
Robert Mc Geachy Common Pitfalls AgileRobert McGeachy
 
Increasing Vehicle Outsourcing ( % Of Car Value ) Essay
Increasing Vehicle Outsourcing ( % Of Car Value ) EssayIncreasing Vehicle Outsourcing ( % Of Car Value ) Essay
Increasing Vehicle Outsourcing ( % Of Car Value ) EssayAlison Reed
 

Ähnlich wie Lean times require lean thinking (20)

Lean Times Require Lean Thinking
Lean Times Require Lean ThinkingLean Times Require Lean Thinking
Lean Times Require Lean Thinking
 
Lean Times Require Lean Thinking
Lean Times Require Lean ThinkingLean Times Require Lean Thinking
Lean Times Require Lean Thinking
 
Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11
 
Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11
 
Lean & kaizen
Lean & kaizenLean & kaizen
Lean & kaizen
 
Lean sw development il tech-talks
Lean sw development   il tech-talksLean sw development   il tech-talks
Lean sw development il tech-talks
 
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
 
The Toyota Way
The Toyota WayThe Toyota Way
The Toyota Way
 
LeanKaizenTraining
LeanKaizenTrainingLeanKaizenTraining
LeanKaizenTraining
 
Knowledge Management for 2018
Knowledge Management for 2018Knowledge Management for 2018
Knowledge Management for 2018
 
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
 
Innovation training
Innovation trainingInnovation training
Innovation training
 
00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgs00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgs
 
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docx
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docxChaplin School of Hospitality and Tourism ManagementInternship Lea.docx
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docx
 
Lean Thinking in Government Services
Lean Thinking in Government ServicesLean Thinking in Government Services
Lean Thinking in Government Services
 
Kaizen: The Art of Continuous Improvement"
Kaizen: The Art of Continuous Improvement"Kaizen: The Art of Continuous Improvement"
Kaizen: The Art of Continuous Improvement"
 
Robert Mc Geachy Common Pitfalls Agile
Robert Mc Geachy Common Pitfalls AgileRobert Mc Geachy Common Pitfalls Agile
Robert Mc Geachy Common Pitfalls Agile
 
Increasing Vehicle Outsourcing ( % Of Car Value ) Essay
Increasing Vehicle Outsourcing ( % Of Car Value ) EssayIncreasing Vehicle Outsourcing ( % Of Car Value ) Essay
Increasing Vehicle Outsourcing ( % Of Car Value ) Essay
 
Lean
LeanLean
Lean
 
Total Quality Managment
Total Quality ManagmentTotal Quality Managment
Total Quality Managment
 

Mehr von Catchi

Personalisation to individualisation retail deck
Personalisation to individualisation retail deckPersonalisation to individualisation retail deck
Personalisation to individualisation retail deckCatchi
 
Janrain Identity trends report 2016
Janrain Identity trends report 2016Janrain Identity trends report 2016
Janrain Identity trends report 2016Catchi
 
CRO PROS - Customer Journey Mapping
CRO PROS - Customer Journey MappingCRO PROS - Customer Journey Mapping
CRO PROS - Customer Journey MappingCatchi
 
CRO PROS - Optimisation Insights | Journey and Lessons on building a product
CRO PROS - Optimisation Insights | Journey and Lessons on building a productCRO PROS - Optimisation Insights | Journey and Lessons on building a product
CRO PROS - Optimisation Insights | Journey and Lessons on building a productCatchi
 
CRO PROS - Data driven product design
CRO PROS - Data driven product designCRO PROS - Data driven product design
CRO PROS - Data driven product designCatchi
 
CRO PROS Leveraging call analytics for conversion rate optimisation [CRO]
CRO PROS Leveraging call analytics for conversion rate optimisation [CRO]CRO PROS Leveraging call analytics for conversion rate optimisation [CRO]
CRO PROS Leveraging call analytics for conversion rate optimisation [CRO]Catchi
 
RACV CRO session @ RACV digital masterminds May 2016
RACV CRO session @ RACV digital masterminds May 2016RACV CRO session @ RACV digital masterminds May 2016
RACV CRO session @ RACV digital masterminds May 2016Catchi
 
Lead generation strategy for mortgage brokers
Lead generation strategy for mortgage brokersLead generation strategy for mortgage brokers
Lead generation strategy for mortgage brokersCatchi
 
CRO PROS conversion forms and funnel best practice
CRO PROS conversion forms and funnel best practiceCRO PROS conversion forms and funnel best practice
CRO PROS conversion forms and funnel best practiceCatchi
 
ADMA CRO Lunch n' Learn at Optus
ADMA CRO Lunch n' Learn at OptusADMA CRO Lunch n' Learn at Optus
ADMA CRO Lunch n' Learn at OptusCatchi
 
CRO PROS - Customer Idendity and Access Management via Social login
CRO PROS - Customer Idendity and Access Management via Social loginCRO PROS - Customer Idendity and Access Management via Social login
CRO PROS - Customer Idendity and Access Management via Social loginCatchi
 
Lean Enterprise Experience Canves
Lean Enterprise Experience CanvesLean Enterprise Experience Canves
Lean Enterprise Experience CanvesCatchi
 

Mehr von Catchi (12)

Personalisation to individualisation retail deck
Personalisation to individualisation retail deckPersonalisation to individualisation retail deck
Personalisation to individualisation retail deck
 
Janrain Identity trends report 2016
Janrain Identity trends report 2016Janrain Identity trends report 2016
Janrain Identity trends report 2016
 
CRO PROS - Customer Journey Mapping
CRO PROS - Customer Journey MappingCRO PROS - Customer Journey Mapping
CRO PROS - Customer Journey Mapping
 
CRO PROS - Optimisation Insights | Journey and Lessons on building a product
CRO PROS - Optimisation Insights | Journey and Lessons on building a productCRO PROS - Optimisation Insights | Journey and Lessons on building a product
CRO PROS - Optimisation Insights | Journey and Lessons on building a product
 
CRO PROS - Data driven product design
CRO PROS - Data driven product designCRO PROS - Data driven product design
CRO PROS - Data driven product design
 
CRO PROS Leveraging call analytics for conversion rate optimisation [CRO]
CRO PROS Leveraging call analytics for conversion rate optimisation [CRO]CRO PROS Leveraging call analytics for conversion rate optimisation [CRO]
CRO PROS Leveraging call analytics for conversion rate optimisation [CRO]
 
RACV CRO session @ RACV digital masterminds May 2016
RACV CRO session @ RACV digital masterminds May 2016RACV CRO session @ RACV digital masterminds May 2016
RACV CRO session @ RACV digital masterminds May 2016
 
Lead generation strategy for mortgage brokers
Lead generation strategy for mortgage brokersLead generation strategy for mortgage brokers
Lead generation strategy for mortgage brokers
 
CRO PROS conversion forms and funnel best practice
CRO PROS conversion forms and funnel best practiceCRO PROS conversion forms and funnel best practice
CRO PROS conversion forms and funnel best practice
 
ADMA CRO Lunch n' Learn at Optus
ADMA CRO Lunch n' Learn at OptusADMA CRO Lunch n' Learn at Optus
ADMA CRO Lunch n' Learn at Optus
 
CRO PROS - Customer Idendity and Access Management via Social login
CRO PROS - Customer Idendity and Access Management via Social loginCRO PROS - Customer Idendity and Access Management via Social login
CRO PROS - Customer Idendity and Access Management via Social login
 
Lean Enterprise Experience Canves
Lean Enterprise Experience CanvesLean Enterprise Experience Canves
Lean Enterprise Experience Canves
 

Lean times require lean thinking

  • 1. Quarterly Technology Briefing “Lean Times Require Lean Thinking” presented in partnership with
  • 2. Lean Times Require Lean Thinking Jason Yip ThoughtWorks Paul Heaton KM&T Image from http://www.bluefountainmedia.com/blog/?p=38
  • 3. “ As the Japanese economy entered a steep recession in that year, the Toyota Motor Company ran out of cash , which was tied up in inventory for products customers no longer wanted. The company fell under the control of bankers who chopped the company in two, creating separate firms to divide the marketing and sale functions from the product development and production functions. (These firms were only recombined in 1982 to create the current Toyota Motor Corporation.) Founding president Kiichiro Toyoda (new president Akio Toyoda’s grandfather) was driven out in the process . The pursuit of what became the Toyota Production System , along with the product development, supplier management, and customer support systems, was the creative response to this crisis .” James Womack, Respect Science Especially in a Crisis, http://www.manufacturingnews.com/news/09/0309/womack.html
  • 4.
  • 6. In 2008, Toyota surpasses GM as the world’s largest auto maker Toyota and Honda lead in J.D Power quality ratings
  • 7. “ Our recurring losses from operations, stockholders' deficit and inability to generate sufficient cash flow to meet our obligations and sustain our operations raise substantial doubt about our ability to continue as a going concern ” General Motors SEC filing, 2009
  • 8. Who would you rather be?
  • 9. Is this really relevant to us?
  • 10.  
  • 11.
  • 12.
  • 13. Agile Toyota Honda New product development Scrum XP Lean Lean Software Development Iterative and Incremental development Kanban
  • 14. So, what is Lean?
  • 15.
  • 16.
  • 17. The essence of Lean is engaging everyone in identifying and solving problems
  • 18. Activities that do not add value workload that is not balanced work that creates burden for the team members or processes Picture Source – Toyota Motor Company Australia Waste Un-Evenness Overburden
  • 19. 8 WASTES Over- production Waiting Transport or Conveyance Rework Motion Stock & Materials Over- processing In LEAN 8 types of waste have been identified These classifications have been adopted globally - for any process. They apply equally to any process . All of these 8 can be either “ Necessary Waste” or “ Un-necessary Waste” Depending on circumstance Not using People Resource
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28. How does this fit with IT?
  • 29. Understanding of problem space Understanding of solution space Focus Business as Usual +++ (specification as input) +++ (focus on task efficiency) Cycle time + cost reduction Typical projects + (iterative specification) ++ (control what needs to be learned) Earlier ROI New Product Development ? (specification as output) ? (focus on learning efficiency) Acquire and exploit knowledge faster than competitors
  • 30. “ Put yourself in the position of the customer and ask if you would pay less for the product or be less satisfied with it if a given step and its necessary time were left out.” Mike Rother and John Shook, Learning to See
  • 31.
  • 32. Non Value Add “ unnecessary wastes” Waste to Eliminate ! Non Value Add “ necessary waste” Waste to Reduce ! Value Add Increase!
  • 33. RENAL patients going through a Hospital Process Pictures provided courtesy of Agility Healthcare Solutions What is added value to the Customer Look at End to End Value Chain
  • 34. Mapping the Process… Source – NHS Centre for Innovation
  • 35. 36 process steps 7 value add 29 process steps were non-value add or waste Who thinks that of the 36 steps: 100% - 75% was added value activity? 75% - 50% was added value activity? 50% - 25% was added value activity? Less than 25% was added value? 1 2 3 4 5 6 7 8 9 28 29 30 31 32 33 34 35 36 19 20 21 22 23 24 25 26 27 10 11 12 13 14 15 16 17 18
  • 36.
  • 37. Continuous Improvement P – Plan D – Do C – Check A - Act Improvement to patient care & experience Value Waste Flow Perfection
  • 38.
  • 39.  
  • 40.  
  • 41.  
  • 42.  
  • 44. No problem is a problem
  • 45.
  • 47.
  • 48. Technique Time to detect problem Pairing Seconds Test Driven Development Seconds to minutes Co-location Seconds to minutes Continuous Integration ~20 minutes to a couple hours User Stories A couple days Timeboxed development 1 – 4 weeks Small releases 1 – 3 months
  • 49. Just-in-Time is a response to the problem of overproduction
  • 50. Stop The Line is a response to the problem of unnecessary rework due to defects
  • 51. The essence of Lean is engaging everyone in identifying and solving problems
  • 52. What type of results are we talking about?
  • 53. McKinsey on Lean IT “ In our experience, applying the principles of lean manufacturing to [application development and maintenance] can increase productivity by 20 to 40 percent while improving the quality and speed of execution .” N. Kindler, V. Krishnakanthan, R. Tinaikar, “Applying lean to application development and maintenance”, McKinsey on IT, Spring 2007
  • 54. Forrester Research on ThoughtWorks Agile/Lean Category Improvement Total defects 63% less Critical defects 79% less Effort 62% less Duration 69% less
  • 55.
  • 56.  
  • 57.
  • 58. For Further Information please contact: ThoughtWorks – Jason Yip Email [email_address] Web www.thoughtworks.com.au KM&T – Paul Heaton mail [email_address] Web www.kmandt.com.au