TECHNICAL                                                                                                                                                                                                                                          ISSUE 2



  Is the water in your Sub Zero
  Heat Transfer Fluid System costing
  you Money?
  Water causes extensive plant reliability problems and is a
  major cause of plant failure and production loss. Synthetic
  fluids are used as a heat transfer medium at temperatures
  down to –100°C and up to 400°C and water causes
  problems through the whole range. Sub zero systems are
  particularly susceptible to problems.
  In order to reduce system water content, we have
  designed a range of mobile and fixed drying units
  based on ‘nitrogen stripping’ and ‘distillation’ principles.
  The units can dry fluid down to below 10 parts per
  million while in continuous production at Sub Zero
                                                                                                                                                                                                                              Mobile drying unit
  temperature or in stand alone batch processing.



The range of heat transfer fluid
dryers are ideally suited for the                Recent example                                                                                                    Recent example
following situations:                            System Content: 175 000 litres of Dowtherm J                                                                      Water removed: 148.75 Litres
                                                 Drying cycle:   24 days (16hours per day)                                                                         Water content: 407 ppm dried to 27.38 ppm.
At Commissioning:
To dry the system following system                                                                                                                                                      Water removal from 407ppm to 27.38 = 66.43 Litres

installation or modification.                      PPM                                                                                                                                                        Overall system water removal
                                                                                  Inlet to rig ppm                                                                                                             estimated at 148.75 litres
                                                                                                                                                                                                             Start ppm             Finish ppm   Diff ppm
During plant operation:                             500                           Outlet from rig ppm                                                                                                         407.00
                                                                                                                                                                                                              285.00
                                                                                                                                                                                                                                    148.30
                                                                                                                                                                                                                                    148.80
                                                                                                                                                                                                                                                 258.70
                                                                                                                                                                                                                                                 136.20
                                                                                                                                                                                                              149.00                  82.50       66.50

To trim water levels without stopping                             Rig operated 16 hrs per day                                                                                                                 120.10                  55.40       64.70
                                                                                                                                                                                             Rig off
                                                                                                                                       Rig off




                                                                                                                                                                                                                99.00                 85.00       14.00
                                                                                                                                                                                                                63.25                 50.33       12.92
production.                                         400 *         System content 175000
                                                                                                                                                                                                                56.50
                                                                                                                                                                                                                55.85
                                                                                                                                                                                                                                      25.90
                                                                                                                                                                                                                                      50.20
                                                                                                                                                                                                                                                  30.60
                                                                                                                                                                                                                                                    5.65
                                                                          Litres                                                                                                                                36.17                 26.40         9.77
                                                                                                                                                                                                                31.16                 16.46       14.70
In emergency:                                                                                                                                                                                                   27.38                 23.31         4.07



Following accidental water ingress                  300

or heat exchanger failure.
                                                                                                                                                                                                         Variations were caused by chiller cycling
                                                                                                                  *                                                                                              and opening of sub loops

                                                                                                          *

Stock fluids:                                       200

Stand alone batch drying of ‘wet’ fluids.                                                                 *
                                                          *               *                                       *                               *
                                                                  *                                                       *                             *

Permanent Installation:                             100
                                                                                  *
                                                                                                                                                  *           *

Dedicated to one or more process plants.                          *       *
                                                                                  *
                                                                                          *       *
                                                                                                  *                       *
                                                                                                                                                        *     *        *
                                                                                                                                                                       *
                                                                                                                                                                             *
                                                                                                                                                                                   *
                                                                                                                                                                                         *
                                                                                          *                                                                                        *     *               *
                                                                                                                                                                             *                                   *        *              *
Mobile Units:                                                                                                                                                                                            *       *
                                                                                                                                                                                                                          *
                                                                                                                                                                                                                                   *
                                                                                                                                                                                                                                   *     *

                                                              1       2       3       4       5       6       7       8       9   10         11       12 13       14       15 16       17 18           19 20         21       22       23 24    25
For operation on several plants as well                                                                                                           Days

as standby for emergencies.
The Problem                                                                                                  How does water get in?                              Services:
                                                                                                                                                                 Saturated nitrogen used for blanketing. We
                                                                                                             New Systems:
The water saturation point of heat transfer                                                                                                                      have experienced systems where 30% water
                                                                                                             New systems, extensions and alterations not
fluids varies with the fluid type and the                                                                                                                        was found after a heat exchanger failure,
                                                                                                             being sufficiently dried at commissioning.
operational temperature.                                                                                                                                         with a complete plant closure. Similarly we
                                                                                                             New Fluid:                                          have seen systems where around 20ppm is
Free water, above the saturation point, will
                                                                                                             Fluid suppliers do not necessarily guarantee        causing maintenance headaches, particularly
circulate as ice particles which will deposit
                                                                                                             a low moisture content on barrelled fluid. We       where Plate Heat Exchangers are used.
themselves on heat exchanger surfaces, in
                                                                                                             have tested new fluids at 60—80ppm:- not
chiller heat exchangers and in expansion tanks.
                                                                                                             much help if you are running at –30°C!!
It should be noted that the surface temperature
on heat exchangers will be far lower                                                                         Poor Housekeeping:                                  What can be done?
than the circulating fluid and that the                                                                      External filling points unprotected from the
                                                                                                             weather. Barrels stood upright and not properly     Our units, available for hire or purchase,
refrigerant temperature should be taken into
                                                                                                             dried before use. Barrels that are partially full   are connected to the system as a side stream,
consideration. Allow at least 10°C lower than
                                                                                                             being stored upright wit loose caps. The use of     taking a proportion of the flow through a heat
the fluid requirement.
                                                                                                             non dedicated filling pumps and hoses.              exchanger to a temperature below the boiling
As systems are closed loop, eliminating water is                                                                                                                 point of the HTfluid and above 100°C.
not easy. Cycling chillers and allowing individual                                                           Plant Failure:
reactors jackets to warm to release water still                                                              Water heat exchangers, reactor jackets              The fluid is passed through a ‘flash chamber’,
leaves the problem of removal or the water will                                                              failing:- the nightmare scenario.                   over a series of micromeshes, cooled and
simply deposit itself elsewhere in the system.                                                                                                                   returned to the system. Nitrogen is passed
                                                                                                                                                                 through the ‘flash chamber’ to pick up
                                                                                                                                                                 the released vapours and passed through
                                                                                                                                                                 a condenser.
         PPM                             Reduction in water content in a 20,000 litre system of Dowtherm Syltherm 800
                                                                                                                                                                 The condensate can be collected for
                                         Starting content 2520 ppm Finishing content 36 ppm
         2500*
                                                                                                                                                                 safe disposal or further reconditioning.
                                         System content 20,000 Litres         Rig operated 24hrs per day




         2000                            Inlet to rig ppm

                                         Outlet from rig ppm                                                 Recent example                                      Mobile drying unit on its way to a customer.
                                                                                                             System Content:         20 000 Litres of            This is ATEX Zone 1 compliant.
         1500
                                                                                                                                     Syltherm 800
                                                                                                             Drying cycle:           42 hours
         1000
                        *                                                                                    Water removed: 68 litres                            ject in detail without any obligation.
                                                                                                             Water content:          2 520 ppm
                                                *                                                                                    dried to 36 ppm.
          500                        *


                                                                                               *
                                     *
                                                                                                    *
                *                               *                                              *         *              *
                        *                                                                           *          *    *
            0                                                                                           *      *    *       *   *                *
                                                                                                                                                 *      *
                                                                                                                                                        *
                                          5                  10             15                 20              25               30     35        40
                                                                                     Hours




 PPM
                        Recent example
 30000
                        System Content:                          2 500 litres                                Water / Condensate removal to waste
                                                Batch Drying system
 28000                                                           Syltherm 800
                            2500 litres reduced from 27,700 ppm tp 36.83ppm in 9 hours.

 26000                  Drying cycle:                            9 hours
 24000                  Water removed: 69.16 Litres
 22000
                        Water content:                           27 700 ppm
 20000
                                                                 dried to 36.83 ppm.

 18000

                                                     Batch Drying system
 16000
                                 2500 litres reduced from 27,700 ppm tp 36.83ppm in 9 hours.


 14000


 12000



 10000



 8000                                                                                                                                                            Heat Transfer Systems Limited
 6000                                                                                                                                                            Ridge Hall, Chapel-en-le-Frith, High Peak
 4000                                                                                                                                                            Derbyshire SK23 9UD
 2000
                                                                                                                                                                 telephone 01298 815862
    0
                                                                                                                                                                 fax 01298 815863
                    1        2            3         4        5       6       7        8         9
                                                                                                                                                                 e-mail office@heattransfersystems.co.uk
                                                     HOURS
                                                                                                                                                                 website www.heattransfersystems.co.uk

Weitere ähnliche Inhalte

Andere mochten auch (6)

Funcion de cada ministerio
Funcion de cada ministerioFuncion de cada ministerio
Funcion de cada ministerio
 
Polygyny and family planning programmes in sub-Saharan Africa: representation...
Polygyny and family planning programmes in sub-Saharan Africa: representation...Polygyny and family planning programmes in sub-Saharan Africa: representation...
Polygyny and family planning programmes in sub-Saharan Africa: representation...
 
coeficienti 2
coeficienti 2coeficienti 2
coeficienti 2
 
Preliminary task analysis
Preliminary task analysisPreliminary task analysis
Preliminary task analysis
 
Autibiografia de maythe
Autibiografia de maytheAutibiografia de maythe
Autibiografia de maythe
 
Zaluzje drewniane 50 mm hurt 1
Zaluzje drewniane 50 mm hurt 1Zaluzje drewniane 50 mm hurt 1
Zaluzje drewniane 50 mm hurt 1
 

Drying Of Thermal Oil

  • 1. TECHNICAL ISSUE 2 Is the water in your Sub Zero Heat Transfer Fluid System costing you Money? Water causes extensive plant reliability problems and is a major cause of plant failure and production loss. Synthetic fluids are used as a heat transfer medium at temperatures down to –100°C and up to 400°C and water causes problems through the whole range. Sub zero systems are particularly susceptible to problems. In order to reduce system water content, we have designed a range of mobile and fixed drying units based on ‘nitrogen stripping’ and ‘distillation’ principles. The units can dry fluid down to below 10 parts per million while in continuous production at Sub Zero Mobile drying unit temperature or in stand alone batch processing. The range of heat transfer fluid dryers are ideally suited for the Recent example Recent example following situations: System Content: 175 000 litres of Dowtherm J Water removed: 148.75 Litres Drying cycle: 24 days (16hours per day) Water content: 407 ppm dried to 27.38 ppm. At Commissioning: To dry the system following system Water removal from 407ppm to 27.38 = 66.43 Litres installation or modification. PPM Overall system water removal Inlet to rig ppm estimated at 148.75 litres Start ppm Finish ppm Diff ppm During plant operation: 500 Outlet from rig ppm 407.00 285.00 148.30 148.80 258.70 136.20 149.00 82.50 66.50 To trim water levels without stopping Rig operated 16 hrs per day 120.10 55.40 64.70 Rig off Rig off 99.00 85.00 14.00 63.25 50.33 12.92 production. 400 * System content 175000 56.50 55.85 25.90 50.20 30.60 5.65 Litres 36.17 26.40 9.77 31.16 16.46 14.70 In emergency: 27.38 23.31 4.07 Following accidental water ingress 300 or heat exchanger failure. Variations were caused by chiller cycling * and opening of sub loops * Stock fluids: 200 Stand alone batch drying of ‘wet’ fluids. * * * * * * * * Permanent Installation: 100 * * * Dedicated to one or more process plants. * * * * * * * * * * * * * * * * * * * * * * Mobile Units: * * * * * * 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 For operation on several plants as well Days as standby for emergencies.
  • 2. The Problem How does water get in? Services: Saturated nitrogen used for blanketing. We New Systems: The water saturation point of heat transfer have experienced systems where 30% water New systems, extensions and alterations not fluids varies with the fluid type and the was found after a heat exchanger failure, being sufficiently dried at commissioning. operational temperature. with a complete plant closure. Similarly we New Fluid: have seen systems where around 20ppm is Free water, above the saturation point, will Fluid suppliers do not necessarily guarantee causing maintenance headaches, particularly circulate as ice particles which will deposit a low moisture content on barrelled fluid. We where Plate Heat Exchangers are used. themselves on heat exchanger surfaces, in have tested new fluids at 60—80ppm:- not chiller heat exchangers and in expansion tanks. much help if you are running at –30°C!! It should be noted that the surface temperature on heat exchangers will be far lower Poor Housekeeping: What can be done? than the circulating fluid and that the External filling points unprotected from the weather. Barrels stood upright and not properly Our units, available for hire or purchase, refrigerant temperature should be taken into dried before use. Barrels that are partially full are connected to the system as a side stream, consideration. Allow at least 10°C lower than being stored upright wit loose caps. The use of taking a proportion of the flow through a heat the fluid requirement. non dedicated filling pumps and hoses. exchanger to a temperature below the boiling As systems are closed loop, eliminating water is point of the HTfluid and above 100°C. not easy. Cycling chillers and allowing individual Plant Failure: reactors jackets to warm to release water still Water heat exchangers, reactor jackets The fluid is passed through a ‘flash chamber’, leaves the problem of removal or the water will failing:- the nightmare scenario. over a series of micromeshes, cooled and simply deposit itself elsewhere in the system. returned to the system. Nitrogen is passed through the ‘flash chamber’ to pick up the released vapours and passed through a condenser. PPM Reduction in water content in a 20,000 litre system of Dowtherm Syltherm 800 The condensate can be collected for Starting content 2520 ppm Finishing content 36 ppm 2500* safe disposal or further reconditioning. System content 20,000 Litres Rig operated 24hrs per day 2000 Inlet to rig ppm Outlet from rig ppm Recent example Mobile drying unit on its way to a customer. System Content: 20 000 Litres of This is ATEX Zone 1 compliant. 1500 Syltherm 800 Drying cycle: 42 hours 1000 * Water removed: 68 litres ject in detail without any obligation. Water content: 2 520 ppm * dried to 36 ppm. 500 * * * * * * * * * * * * * 0 * * * * * * * * * 5 10 15 20 25 30 35 40 Hours PPM Recent example 30000 System Content: 2 500 litres Water / Condensate removal to waste Batch Drying system 28000 Syltherm 800 2500 litres reduced from 27,700 ppm tp 36.83ppm in 9 hours. 26000 Drying cycle: 9 hours 24000 Water removed: 69.16 Litres 22000 Water content: 27 700 ppm 20000 dried to 36.83 ppm. 18000 Batch Drying system 16000 2500 litres reduced from 27,700 ppm tp 36.83ppm in 9 hours. 14000 12000 10000 8000 Heat Transfer Systems Limited 6000 Ridge Hall, Chapel-en-le-Frith, High Peak 4000 Derbyshire SK23 9UD 2000 telephone 01298 815862 0 fax 01298 815863 1 2 3 4 5 6 7 8 9 e-mail office@heattransfersystems.co.uk HOURS website www.heattransfersystems.co.uk