McKenney's installed a prefabricated chiller plant and piping system to support a data center in North Carolina on an aggressive schedule. They used Building Information Modeling (BIM) and prefabricated piping to minimize on-site congestion and optimize installation. Through detailed scheduling and coordination between trades, the chiller plant installation was completed in two weeks instead of the planned four weeks, and the on-site pipe fitting crew size was kept under 10 people.