SlideShare ist ein Scribd-Unternehmen logo
1 von 2
Downloaden Sie, um offline zu lesen
MARK THORNTON
ARCHITECTURAL TECHNOLOGY YEAR 3
G00292459
3Drenderofbuilding
SALIM PUBLISHING HOUSE SOUTH KOREA
GROUND, FIRST, SECOND AND THIRD 3D FLOOR PLANS
SOUTH EAST ELEVATION
ISOMETRIC BUILDING CORNER SECTION
RENDERED VIEW OF TOILET INTERIOR 1:200 STRUCTURAL MODEL
MIXED USE PROJECT
GALWAY DOCKS
The building for our third year Detail and Design studies is the Salim Publishing
House located in South Korea. It is a four storey office building with an basement
car park. We had to adapt the building design to accommodate retail units on
the ground floor and an open office on the first second and third floor and
ensure the building was designed to Irish building regulaƟons.
FAÇADE SECTION AT CURTAIN WALL
THIRD FLOOR PLAN
GROUND FLOOR PLAN
PARAPET, INTERMEDIATE, AND BASE DETAILS
MARK THORNTON
ARCHITECTURAL TECHNOLOGY YEAR 3
G00292459
1
2
3
1
2
3 3
2
1
PAVING SLAB ON SAND CEMENT BINDING
FIBRE CEMENT CLADDING BOARD
100mm RIDGID BOARD INSULATION
DAMP PROOF MEMBRANE
FIBRE CEMENT CLADDING BOARD
100mm RIDGID BOARD INSULATION
DAMP PROOF MEMBRANE
300mm CAST IN-SITU CONCRETE
INSULATED SPANDREL PANEL
RAISED ACCESS FLOOR
TRIPLE GLAZED ARGON FILLED PANELS
SUSPENDED CEILING FIXED
TO SLAB AND 600 x 600mm
ACCOUSTIC CEILING TILES
300mm CAST IN-SITU CONCRETE
LAMATHERM FIRE STOP
100mm RIDGID BOARD INSULATION
INSULATED SPANDREL PANEL
RAISED ACCESS FLOOR
TRIPLE GLAZED ARGON FILLED PANELS
300mm CAST IN-SITU CONCRETE
INSULATED SPANDREL PANEL
100mm RIDGID BOARD INSULATION
TAPERED RIDGID BOARD INSULATION
ALUMINUM STEEL CAPPING
STAINLESS STEEL HANDRAIL 1100mm HIGH
400 x 100mm STEEL HOLLOWCORE SECTION
300mm CAST IN-SITU REINFORCED
CONCRETE WALL
INSULATED SPANDREL PANEL
WITH LAMATHERM FIRE STOP
SUSPENDED CEILING WITH 600mm
CEILING TILES
HANDRAIL 1100mm HIGH
RAISED ACCESS
FLOOR
NORTH WEST ELEVATION
1
ROOF AND PARAPET
300MM CAST IN-SITU CONCRETEWITH DPM LAID UNDER
100 MM TAPERED RIGID BOARD INSULATION WITH 2 LAYERS
OF TORCHED ON BITUM 2 70MM C SECTION CHANNELS
WITH 400MM STEEL SHEETS FIXED EITHER SIDE FOR
PARAPET WITH 100MMRIGID BOARD INSULATION
WRAPPEDAROUND PARAPET DPM TO BE WRAPPED
INSULATION AND OVERLAP 100MM WITH INSULATION ON
THE CONCRETE WALL PARAPET FINISHED WITH ALUMINIUM
CAPPING
2
CURTAIN WALL
CURTAIN WALL CONSTRUCTED FROM 50mm X 150mm
ALUMINIUM MULLIONS @ 2000mm C/C WITH TRIPLE
GLAZED GLASS PANELS WITH ARGON GAS IN CENTRE TO GET
DESIRED U VALUE TO COMPLY WITH TGD PART L 600mm
SPANDREL PANELS FIXED AT FLOOR INTERVALS WITH
LAMATHERM FIRE STOP 1000mm X 2000mm WINDOW
OPENINGS LOCATED AT EACH FLOOR TO PROVIDE
VENTILATION
3
CLADDING
100MM RIGID BOARD INSULATION FOR DESIRED U-VALUE TO
COMPLY WITH TGD L STEEL BRACKETS FIXED TO CONCRETE
WALL AND VERTICAL RAILS FIXED TO BRACKETS AND
HORIZONTAL KINGSPAN BENCHMARK CARRIER RAIL FIXED TO
VERTICAL RAILS AND 480MM LONG FIBRE CEMENT CLADDING
FIXED TO CARRIER RAIL WITH BENCHMARK BRACKET

Weitere ähnliche Inhalte

Was ist angesagt?

Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - Portfolio
Jack Lambourne
 
Planning Amendments A1-GRD PLAN 07
Planning Amendments A1-GRD PLAN 07Planning Amendments A1-GRD PLAN 07
Planning Amendments A1-GRD PLAN 07
Jon Wood
 
1515-T_Drawings
1515-T_Drawings1515-T_Drawings
1515-T_Drawings
Mark Daly
 
B con hehe
B con heheB con hehe
B con hehe
Yue Yun
 
Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3
Aden Saitabau Kumary
 
Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron Kaira
Aaron Kaira
 

Was ist angesagt? (20)

Presentation Design Drawing for Architectural Drawing
Presentation Design Drawing for Architectural DrawingPresentation Design Drawing for Architectural Drawing
Presentation Design Drawing for Architectural Drawing
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - Portfolio
 
Elevations & sections-Architecture school 4th yr project 3
Elevations & sections-Architecture school 4th yr project  3Elevations & sections-Architecture school 4th yr project  3
Elevations & sections-Architecture school 4th yr project 3
 
Sections and details
Sections and detailsSections and details
Sections and details
 
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment DrawingsCentre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
 
Floor plans
Floor plansFloor plans
Floor plans
 
Planning Amendments A1-GRD PLAN 07
Planning Amendments A1-GRD PLAN 07Planning Amendments A1-GRD PLAN 07
Planning Amendments A1-GRD PLAN 07
 
1515-T_Drawings
1515-T_Drawings1515-T_Drawings
1515-T_Drawings
 
B con hehe
B con heheB con hehe
B con hehe
 
Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3
 
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
 
Desiree tiny house
Desiree tiny houseDesiree tiny house
Desiree tiny house
 
Everhaus catalogue
Everhaus catalogueEverhaus catalogue
Everhaus catalogue
 
Details
DetailsDetails
Details
 
Everhaus product guide
Everhaus product guideEverhaus product guide
Everhaus product guide
 
Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron Kaira
 
T30 HOTEL CHINA
T30 HOTEL CHINAT30 HOTEL CHINA
T30 HOTEL CHINA
 
final dcc
final dccfinal dcc
final dcc
 
Everhaus brochure info
Everhaus brochure infoEverhaus brochure info
Everhaus brochure info
 
Door and window fenestration system
Door and window fenestration systemDoor and window fenestration system
Door and window fenestration system
 

Andere mochten auch

LiamBaines_Construction_FACADES
LiamBaines_Construction_FACADESLiamBaines_Construction_FACADES
LiamBaines_Construction_FACADES
Liam Baines
 

Andere mochten auch (9)

Buildings
BuildingsBuildings
Buildings
 
LiamBaines_Construction_FACADES
LiamBaines_Construction_FACADESLiamBaines_Construction_FACADES
LiamBaines_Construction_FACADES
 
Curtain walls
Curtain wallsCurtain walls
Curtain walls
 
AN INTRODUCTION TO GREEN WALLS: GREEN FACADES
AN INTRODUCTION TO GREEN WALLS: GREEN FACADESAN INTRODUCTION TO GREEN WALLS: GREEN FACADES
AN INTRODUCTION TO GREEN WALLS: GREEN FACADES
 
Facade Pattern
Facade PatternFacade Pattern
Facade Pattern
 
The World's Most Fascinating Building Facades Today
The World's Most Fascinating Building Facades TodayThe World's Most Fascinating Building Facades Today
The World's Most Fascinating Building Facades Today
 
curtain wall -skin of building
 curtain wall -skin of building curtain wall -skin of building
curtain wall -skin of building
 
Facade - presentation
Facade - presentationFacade - presentation
Facade - presentation
 
CURTAIN WALL
CURTAIN WALLCURTAIN WALL
CURTAIN WALL
 

Ähnlich wie MARK THORNTON EXHIBITION DRAWING

Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1
Vincent Doherty
 
SEC01_BRYAN,BIETSCH_A310-WALLSECTION4
SEC01_BRYAN,BIETSCH_A310-WALLSECTION4SEC01_BRYAN,BIETSCH_A310-WALLSECTION4
SEC01_BRYAN,BIETSCH_A310-WALLSECTION4
Bryan Bietsch
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
Jan Malesela
 
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
Angeline KH
 
Kopane Courts Mixed Use
Kopane Courts Mixed UseKopane Courts Mixed Use
Kopane Courts Mixed Use
Grant Hepburn
 
Samben - Elevations - r2 Sections
Samben - Elevations - r2 SectionsSamben - Elevations - r2 Sections
Samben - Elevations - r2 Sections
Andrew Karl Schulze
 
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ Pharmacy
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ PharmacySheet No - 28 - Details (11) - Structural Glazing Sloped @ Pharmacy
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ Pharmacy
Conor McEvoy
 
Aluminium- as building material and use in interior design
Aluminium- as building material and use in interior design Aluminium- as building material and use in interior design
Aluminium- as building material and use in interior design
Anvi Gandhi
 
FBP_1200 Series details-1213
FBP_1200 Series details-1213FBP_1200 Series details-1213
FBP_1200 Series details-1213
Adam Barnett
 
Arch roofings
Arch roofingsArch roofings
Arch roofings
veer1516
 
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Sin Byrne
 

Ähnlich wie MARK THORNTON EXHIBITION DRAWING (20)

Building Technology 2 P2
Building Technology 2 P2Building Technology 2 P2
Building Technology 2 P2
 
Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1
 
5th batch.pptx
5th batch.pptx5th batch.pptx
5th batch.pptx
 
SEC01_BRYAN,BIETSCH_A310-WALLSECTION4
SEC01_BRYAN,BIETSCH_A310-WALLSECTION4SEC01_BRYAN,BIETSCH_A310-WALLSECTION4
SEC01_BRYAN,BIETSCH_A310-WALLSECTION4
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
 
Kopane Courts Mixed Use
Kopane Courts Mixed UseKopane Courts Mixed Use
Kopane Courts Mixed Use
 
Samben - Elevations - r2 Sections
Samben - Elevations - r2 SectionsSamben - Elevations - r2 Sections
Samben - Elevations - r2 Sections
 
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ Pharmacy
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ PharmacySheet No - 28 - Details (11) - Structural Glazing Sloped @ Pharmacy
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ Pharmacy
 
Ferrocement roof
Ferrocement roofFerrocement roof
Ferrocement roof
 
Aluminium- as building material and use in interior design
Aluminium- as building material and use in interior design Aluminium- as building material and use in interior design
Aluminium- as building material and use in interior design
 
FBP_1200 Series details-1213
FBP_1200 Series details-1213FBP_1200 Series details-1213
FBP_1200 Series details-1213
 
Revit project No. 3 Thesis - Exhibition posters
 Revit project No. 3 Thesis - Exhibition posters Revit project No. 3 Thesis - Exhibition posters
Revit project No. 3 Thesis - Exhibition posters
 
Ktrimbee A-4
Ktrimbee A-4Ktrimbee A-4
Ktrimbee A-4
 
Ktrimbee A-4
Ktrimbee A-4Ktrimbee A-4
Ktrimbee A-4
 
Arch roofings
Arch roofingsArch roofings
Arch roofings
 
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
 
Bo q for shelter
Bo q  for shelterBo q  for shelter
Bo q for shelter
 
Project1
Project1Project1
Project1
 
Assignment 1
Assignment 1Assignment 1
Assignment 1
 

MARK THORNTON EXHIBITION DRAWING

  • 1. MARK THORNTON ARCHITECTURAL TECHNOLOGY YEAR 3 G00292459 3Drenderofbuilding SALIM PUBLISHING HOUSE SOUTH KOREA GROUND, FIRST, SECOND AND THIRD 3D FLOOR PLANS SOUTH EAST ELEVATION ISOMETRIC BUILDING CORNER SECTION RENDERED VIEW OF TOILET INTERIOR 1:200 STRUCTURAL MODEL MIXED USE PROJECT GALWAY DOCKS The building for our third year Detail and Design studies is the Salim Publishing House located in South Korea. It is a four storey office building with an basement car park. We had to adapt the building design to accommodate retail units on the ground floor and an open office on the first second and third floor and ensure the building was designed to Irish building regulaƟons.
  • 2. FAÇADE SECTION AT CURTAIN WALL THIRD FLOOR PLAN GROUND FLOOR PLAN PARAPET, INTERMEDIATE, AND BASE DETAILS MARK THORNTON ARCHITECTURAL TECHNOLOGY YEAR 3 G00292459 1 2 3 1 2 3 3 2 1 PAVING SLAB ON SAND CEMENT BINDING FIBRE CEMENT CLADDING BOARD 100mm RIDGID BOARD INSULATION DAMP PROOF MEMBRANE FIBRE CEMENT CLADDING BOARD 100mm RIDGID BOARD INSULATION DAMP PROOF MEMBRANE 300mm CAST IN-SITU CONCRETE INSULATED SPANDREL PANEL RAISED ACCESS FLOOR TRIPLE GLAZED ARGON FILLED PANELS SUSPENDED CEILING FIXED TO SLAB AND 600 x 600mm ACCOUSTIC CEILING TILES 300mm CAST IN-SITU CONCRETE LAMATHERM FIRE STOP 100mm RIDGID BOARD INSULATION INSULATED SPANDREL PANEL RAISED ACCESS FLOOR TRIPLE GLAZED ARGON FILLED PANELS 300mm CAST IN-SITU CONCRETE INSULATED SPANDREL PANEL 100mm RIDGID BOARD INSULATION TAPERED RIDGID BOARD INSULATION ALUMINUM STEEL CAPPING STAINLESS STEEL HANDRAIL 1100mm HIGH 400 x 100mm STEEL HOLLOWCORE SECTION 300mm CAST IN-SITU REINFORCED CONCRETE WALL INSULATED SPANDREL PANEL WITH LAMATHERM FIRE STOP SUSPENDED CEILING WITH 600mm CEILING TILES HANDRAIL 1100mm HIGH RAISED ACCESS FLOOR NORTH WEST ELEVATION 1 ROOF AND PARAPET 300MM CAST IN-SITU CONCRETEWITH DPM LAID UNDER 100 MM TAPERED RIGID BOARD INSULATION WITH 2 LAYERS OF TORCHED ON BITUM 2 70MM C SECTION CHANNELS WITH 400MM STEEL SHEETS FIXED EITHER SIDE FOR PARAPET WITH 100MMRIGID BOARD INSULATION WRAPPEDAROUND PARAPET DPM TO BE WRAPPED INSULATION AND OVERLAP 100MM WITH INSULATION ON THE CONCRETE WALL PARAPET FINISHED WITH ALUMINIUM CAPPING 2 CURTAIN WALL CURTAIN WALL CONSTRUCTED FROM 50mm X 150mm ALUMINIUM MULLIONS @ 2000mm C/C WITH TRIPLE GLAZED GLASS PANELS WITH ARGON GAS IN CENTRE TO GET DESIRED U VALUE TO COMPLY WITH TGD PART L 600mm SPANDREL PANELS FIXED AT FLOOR INTERVALS WITH LAMATHERM FIRE STOP 1000mm X 2000mm WINDOW OPENINGS LOCATED AT EACH FLOOR TO PROVIDE VENTILATION 3 CLADDING 100MM RIGID BOARD INSULATION FOR DESIRED U-VALUE TO COMPLY WITH TGD L STEEL BRACKETS FIXED TO CONCRETE WALL AND VERTICAL RAILS FIXED TO BRACKETS AND HORIZONTAL KINGSPAN BENCHMARK CARRIER RAIL FIXED TO VERTICAL RAILS AND 480MM LONG FIBRE CEMENT CLADDING FIXED TO CARRIER RAIL WITH BENCHMARK BRACKET