2. BART Silicon Valley Berryessa Extension, Santa Clara County, California
TYLI is providing design services for Phase 1 of the $2.3B, 10-mile Bay Area
Rapid Transit (BART) line extension from Fremont to San Jose. For this $800M
contract, our Scheduling Team is developing a design schedule that will tie into
the nearly 8,000-activity project schedule. The internal design schedule will
utilize “hold points” for design approvals, deliverable milestones, design package
coordination, and QC activities to ensure coordination with the JV team.
Willamette River Bridge, Eugene, Oregon
In addition to bridge and civil design, TYLI provided design scheduling for this
$150M, CM/CG contract, the largest project ever delivered by ODOT and
the first using this contract type. TYLI developed and maintained a cost-loaded
schedule, and completed significant modifications to the baseline design
schedule to accommodate the contractor’s construction schedule.
Sellwood Bridge, Multnomah County, Oregon
For the Type, Size, and Location (TS&L) phase, the Scheduling Team developed
14 construction schedules, one for each design alternative. They included
construction activities logically tied to form a fully functional construction
schedule. During design, the team created and maintained a multipurpose
schedule with over 1,000 activities. TYLI played a crucial role in meeting the very
aggressive timeline of this signature structure.
ACCELER8 Program: Everglades Restoration, Hendry County, Florida
TYLI is providing construction management (including schedule and cost control
analysis) of areas requiring storm water improvements for the SFWMD. TYLI used
Primavera P3e/c to create individual schedules for each area and merged them
into a master schedule that is updated monthly and cost loaded with design, land
acquisition, permitting, and construction budgets. TYLI’s schedule-related tasks run
parallel with the Construction Management/Construction Inspection Service team.
Indian River Bridge, Sussex County, Delaware
TYLI provided scheduling review and analysis for this $150M Design-Build
project. We reviewed monthly schedule updates, revisions, and completed
forensic analysis of the construction contractor’s schedule using Primavera P6,
including review and analysis for multiple baseline schedule revisions, weather
extensions, stop work orders, and force majeure events (Hurricane Irene).
OR 43: Willamette River Bridge Construction Scheduling, Oregon City, Oregon
This complex bridge rehabilitation endeavor was experiencing numerous changes to the scope of work as a result of unforeseen field conditions. The Agency committed to
having the bridge open for traffic by September 15, 2012. TYLI’s Scheduling Team was not brought on board until eight months after the construction contractor was given
Notice to Proceed. To meet or exceed the needs of the owner, TYLI provided both a thorough review of the construction contractor’s CPM schedule, as well as an assessment
for meeting the critical path. Our review showed the arrangement of activities in the contemporaneous schedule would not provide an acceptable course to meeting the
deadline. TYLI schedulers participated in real time sessions with the client and the construction contractor to develop a modified schedule that would lead to meeting the
critical “Bridge Open to Traffic” milestone.
Since 1954, T.Y. Lin International (TYLI) has provided cutting-edge work in
design, construction, and other industry-related services. Our growth into
scheduling services, both internally and externally, is no exception to this
trend. Since 2009, our Scheduling Team of dedicated schedulers and a
cadre of support personnel have provided intricate scheduling services for a
number of clients on several notable projects. Our CPM services include: initial
schedule development for both construction- and design-related activities;
forensic schedule creations and analysis from contemporaneous project
documentation; providing clients with Time Impact Analysis (TIA), providing
compensatory claims analysis based upon schedule impacts; and providing
routine monitoring and maintenance of schedules for clients who need
assistance with CPM-based schedules. We also provide Project Controls metrics
for resource- and cost-loaded schedules, including Resource Usage Analysis
and Reports, Cost Flow Reports, Earned Value Charts and Reports, Claims/
Change Order Tracking Assistance, and many other tailored report services.
Achieving
Milestones Portland-Milwaukie Light Rail Transit (PMLRT) Bridge, Portland, Oregon
The 1,720-foot-long bridge is a hybrid between a traditional cable-stayed
layout and an extradosed bridge, with two towers and two landside piers. Once
constructed, the PMLRT Bridge will be the nation’s largest transit bridge for only
light rail trains, pedestrians, and bicycles. The TYLI Scheduling Team created the
project CPM design schedule including resource loading for manpower, activity
cost loading, and quality control capture activities for key deliverable submittals.
Anacostia Riverwalk Trail, Washington, DC
TYLI’s planning and design for this 16-mile, multi-use Riverwalk Trail follows both
Anacostia National Park and City property along the eastern and western banks
of the Anacostia River, providing bicyclists and pedestrians with access to the
waterfront, and creating connections with adjacent neighborhoods and transit
stations.
Erie Canal Aqueduct, Erie, New York
TYLI created a master plan for the Historic Erie Canal Aqueduct and surrounding
Broad Street corridor. Historic interpretation, establishment of a niche canal
district, creative reuse strategies, phased public improvements, and incentivizing
private investments were the primary goals of the project. TYLI’s master plan is
envisioned to act as a catalyst, resurrecting the Erie Canal Aqueduct of 1842 to
a place of prominence and public gathering in the community.
Chicago Department of Transportation Bicycle Program,
Chicago, Illinois
TYLI is responsible for managing the planning and engineering component of
the City of Chicago’s successful Bicycle Program. TYLI has helped Chicago, a
national model for integrating bicycling as an integrated mode of transportation,
to expand its network of on-street bike lanes and shared lanes totaling more than
140 miles to date.
Hamilton Train Station Parking Deck, Mercer County, New Jersey
A 2,000-space commuter parking deck adjacent to New Jersey Transit’s
Hamilton train station serves as the cornerstone for a transit-oriented
redevelopment project that incorporates a “Smart Growth” plan. The plan
addresses increasing ridership while at the same time promotes the area’s
economic revitalization. TYLI provided a complete range of services that included
civil and traffic engineering as well as site plan preparation.
Miami Intermodal Center—Miami International Airport
Automated People Mover, Miami, Florida
TYLI’s design and construction administration of a new Automated People Mover
(APM) connecting the Miami Intermodal Center to Miami International Airport’s
landside terminal pedestrian bridges and parking garage structures, will serve as
a transportation hub for highway, transit, and rail systems. The APM includes two
new elevated stations and a 1.2-mile-long guideway structure.
I-580 Corridor, Eastern Alameda County, California
The I-580 Corridor is a vital transportation link connecting the San Francisco Bay Area with the Tri-Valley and the Central Valley areas. As a result of rapid growth, this 10-mile
freeway ranks among the most congested corridors in the region. This corridor accommodates Bay Area Rapid Transit’s (BART) extension in the median of the freeway, and uses
advanced technologies and real-time system management techniques to balance traffic flows and speed. TYLI’s planning and detailed design of a full multi-modal solution
for this corridor included widening eastbound I-580 to five lanes, providing for BART trains in the corridor median, creating high-occupancy-vehicle and auxiliary lanes, and
adding a high-occupancy toll lane. Additionally, TYLI created an integrated transportation management plan for the deployment of Intelligent Transportation Systems at targeted
locations along I-580. The resulting improvements significantly facilitated mobility for both people and goods by reducing congestion and providing transit links to passengers.
Words like sustainability, energy efficiency, and green living are more than
buzz words; they are a part of our core values. Whether T.Y. Lin International
(TYLI) has been charged with solving traffic congestion problems or meeting
tomorrow’s mobility demands, we embrace the principles of sustainable and
constructible design. This “big picture” understanding guides us in addressing
the heart of a community’s concerns, while also meeting the practical issues
at hand.
Taking advantage of available tools and renewable resources, we create
multi-modal plans that maximize travel efficiency, address increased
urban density, and promote regional interconnectivity. We also work with
stakeholders on such issues as how to improve a region’s economic viability
or how to balance travel demand with land use factors. What results is
a multi-layered plan that gives people real transportation choices while
enhancing their quality of life.
Sustainable
& Practical
Solutions Sustainable Freight Strategy, Portland, Oregon
TYLI is creating a sustainable freight strategy with the Bureau of Transportation that
incorporates access to alternative-fuel and electricity facilities. Our strategy identi-
fies options for shippers and carriers to efficiently move goods in a dense, mixed-
use environment, and is supported by research we are conducting on sustainable
equipment and practices. We are also reporting on the experiences of five cities
seeking to reduce their carbon footprint associated with freight movements.
Bridges at Lancer Park, Farmville, Virginia
The Longwood University Real Estate Foundation retained the design-build
team of TYLI and English Construction Company to engineer and construct
two new bridges and associated approaches and ramps. The project included
close coordination with the Owner and the Town of Farmville. The project also
included a presentation of the design concept before the Art and Architecture
Review Board (AARB).
Second Tacoma Narrows Bridge, Tacoma, Washington
TYLI provided design review, design specifications, and construction cost
estimating for the $450 million Second Tacoma Narrows Bridge. TYLI developed
a complete means and methods for construction and a complete cost-based
construction estimate. This “bottom-up” cost estimate was far more elaborate
than the traditional engineering cost estimate, and paralleled the process of a
general contractor for bidding major works.
Palmetto Expressway DB-Finance, Miami, Florida
The team of TYLI, Condotte American-Demoya Construction JV, and BCC
Engineering was awarded this project involving three miles of expressway and
three interchanges. The scope included widening the mainline in each direction,
adding auxiliary lanes, and improving the interchanges along the mainline and
interchange ramps. The team reduced the maximum bid price to $177 million,
saving over $50 million and reducing construction time by 1,300 calendar days!
I-15 Corridor Reconstruction, Salt Lake City, Utah
TYLI served as the structural consultant for this $1.6 billion reconstruction of
I-15. Seventeen miles of freeway and 144 bridges were designed, removed, and
rebuilt in less than five years. The bridges of various spans, types, and geometric
configurations included Single-Point Urban Interchanges (SPUI), overpasses,
double overhang overpasses, viaducts, and flyovers. TYLI engineers designed
seven overpasses and one ramp approximately three months ahead of schedule.
Yadkin River Bridge, Davie-Forsyth Counties, North Carolina
NCDOT contracted with the design-build team of English Construction and TYLI
to replace this major river crossing. The project is 0.7 miles and includes the
design and construction of an 1150-foot, four-lane bridge and the demolition of
the existing two-lane structure. TYLI provided design management and structure
design services. The team analyzed five types of structures, resulting in the choice
of a precast concrete bridge.
Elk Creek to Hardscrabble Creek, Drain and Elkton, Oregon
Design-builder partners TYLI and Slayden Construction Group worked together to design and construct five replacement bridges between the towns of Elkton and Drain
along highway OR 38. TYLI’s design incorporated use of the rapid bridge construction technique in which two of the five structures were built adjacent to the existing
structures, and then “slid” into place on permanent supports. Time it took to deploy? One weekend.
When it comes to the alternative delivery method, the professionals
at T.Y. Lin International (TYLI) understand what it means to work as
an integrated team to reach project goals. Many owners turn to the
alternative delivery method in order to increase value, manage risk,
and accelerate delivery. In this developing project delivery arena, TYLI
has established a reputation for designing structures with optimum
construction ease in mind, supporting the building efforts of the
largest contractors in the industry. Our blend of advanced design and
practical construction talent instills confidence, making the decision
easy for transportation officials who demand absolute accountability
for their alternative delivery projects.
Exceeding
Expectations
& Delivering
Quality
US 20 Pioneer Mountain to Eddyville, Eddyville, Oregon
The $129 million project involved realigning 8 miles of rural US 20 and
constructing eight new and one replacement structures. The replacement bridge
design accommodated a fast-track change-out using a 36-hour road closure to
minimize traffic disruption. TYLI managed a multi-disciplinary group of sub-
consultants and performed all bridge designs as well as Quality Assurance and
Control of roadway designs, and construction engineering services.
AWARDS
2009 National APWA Project of the Year
2009 DJC Top Project, First Place Public Works/Infrastructure/Transportation
2009 ACEC Grand Award, Oregon Chapter
2009 ACEC Opal Award, Contender - Outstanding Civil Engineering Achievement
Church Street Parking Garage, Saratoga Springs, NY
Encompassing approximately 72,000 square feet, this 230-space open
parking garage features a uniquely designed exterior comprised of pre-cast
panels with arches and stained brick to complement the City’s historic Central
Business District. A design-build project, TYLI’s responsibilities included site
design, structural design, code review and fire protection.
University of Rochester Medical Center Parking Garage, Rochester, NY
Performed under the Construction Manager at Risk project delivery system,
TYLI served as prime consultant for this seven-level, 685-space addition to an
existing parking garage. Our team completed the design development and
construction document phases of this fast-track project within seven weeks.
The addition was designed to match the existing structure, and consists of
cast-in-place, post-tensioned concrete slabs and beams supported by concrete
columns on spread footings.
South Avenue Parking Garage, Rochester, NY
After three levels of this garage’s exit helix ramp collapsed, TYLI was tasked
with preparing design alternatives for its reconstruction. Our design team
introduced the idea of using the situation to transform the garage’s location
into a more vibrant intersection consistent with the City’s vision for downtown,
as well as proposing that the garage could function without the exit helix ramp
if relatively minor changes were made to its existing structure — saving the
City the $1M cost of rebuilding the helix.
Cayuga Green Revitalization Project, Ithaca, NY
TYLI provided the structural and site design for this new 1,400-space, cast-in-place, post-tensioned parking structure, as well as the relocation of a regional transit
facility to the ground level of the garage. Constructed under a newly adopted New York State Building Code, the TYLI team incorporated a complete seismic analysis in
the lateral force restraint system design, as well as using a 3-D STAAD model in order to fully understand the structure’s response to a seismic event. This design-build
project was sponsored by the City of Ithaca and was progressed using the Construction Manager at Risk project delivery system.
Parking garage design and rehabilitation are particular strong points
for T.Y. Lin International (TYLI), and we’ve provided our expertise on
more than 30 garage projects in the past ten years alone. Our team’s
in-depth knowledge and experience in structural engineering is what
built our reputation as a leader in this field. However, it’s our ability to
provide multi-discipline parking garage expertise in areas like condition
assessment, revenue control systems, aesthetics, fire protection, lighting
systems, traffic analysis, and patron safety that has allowed us to surpass
our competitors as the parking garage firm of choice. Quite simply, no
other firm is better at — or more committed to — creating comprehensive
parking garage solutions for their clients.
Structural
Integrity,
Multi-discipline
Expertise
Rochester General Hospital, Rochester, NY
TYLI provided comprehensive design services for this new six-level, double-
helix, 1,280-space, cast-in-place, post-tensioned concrete, open parking
garage. The circulation and access design was chosen to maximize usability
and security for both employees and patients, while its brick façade was
selected to enhance the aesthetic appeal in the garage’s downtown location.
This project won the 2006 Commercial Building Award from ACI.
CPM Schedule Services:
Time is of the Essence
T.Y. Lin International
Founded in 1954, T.Y. Lin International (www.tylin.com) is a globally recognized, full-service infrastructure consulting firm. With more
than 2,000 engineers and planners throughout the United States and Asia, the San Francisco-based firm can deliver project-specific
solutions to a variety of clients throughout the public and private sectors. Trade publication Engineering News-Record has included
T.Y. Lin International in its annual lists of top bridge design, transportation design, and design firms.
Portland-Milwaukie Light Rail Transit Bridge renderings provided by TriMet. BART Silicon Valley Berryessa Extension rendering provided by VBN Architects.
For more information about T.Y. Lin International projects or to contact us, please visit our website at www.tylin.com, email tylininfo@tylin.com, or call us at 415.291.3700.
MARKET SECTORS
Aviation
Bridges
Facilities
Mobility, Planning, and Management
Ports and Marine
Power and Energy
Rail and Transit
Surface Transportation
Water and Wastewater
CPM SCHEDULE SERVICES
Critical Path Method (CPM) Scheduling
Program Management Schedules,
Pre-Construction Schedule Development,
and Maintenance Administration for
Contractors and Others
Forensic Scheduling
Schedule Review and Maintenance for
Owners and Consultants
Trouble Shooting Project Schedules
Claim Preparation
Planned and As-Built Analysis Schedules
Resource- and Cost-Loaded Schedules
Construction Project Acceleration
Schedule Delay Analysis and Quantification
Total Float Management
Time Impact Analysis
“What If” Scenarios
Collapsed As-built
Founded in 1954, T.Y. Lin International (www.tylin.com) is a globally recognized, full-service infrastructure consulting firm. With more
than 2,000 engineers and planners throughout the United States and Asia, the San Francisco-based firm can deliver project-specific
solutions to a variety of clients throughout the public and private sectors. Trade publication Engineering News-Record has included
T.Y. Lin International in its annual lists of top bridge design, transportation design, and design firms.
MARKET SECTORS
Aviation
Bridges
Facilities
Mobility, Planning, and Manage-
ment
Ports and Marine
Power and Energy
Rail and Transit
Surface Transportation
Water and Wastewater
For more information about T.Y. Lin International projects or to contact us, please visit our website at www.tylin.com, email tylininfo@tylin.com, or call us at 415.291.3700.
Mobility Planning:
An Integrated Approach
T.Y. Lin International
MOBILITY PLANNING SERVICES
Transportation Systems
Corridor Studies
Traffic and Parking Studies
Complete Streets
Intelligent Transportation Systems (ITS)
Traffic/Electrical Systems
Transit Plans
Bicycle/Pedestrian/Accessibility Plans
Construction Traffic Management Plans
Training and Outreach Services
Founded in 1954, T.Y. Lin International (www.tylin.com) is a globally recognized, full-service infrastructure consulting firm. With more
than 2,000 engineers and planners throughout the United States and Asia, the San Francisco-based firm can deliver project-specific
solutions to a variety of clients throughout the public and private sectors. Trade publication Engineering News-Record has included
T.Y. Lin International in its annual lists of top bridge design, transportation design, and design firms.
BRIDGE SERVICES
Planning/Concepts
Design
Construction Engineering
Construction Support/Services
Program Management
Rehabilitation and Repair
Seismic Retrofit
Design/Build
Public-Private Partnerships (P3)
BRIDGE TYPES
Arch
Segmental
Suspension
Cable-stayed
Conventional
Pedestrian
Specialty
For more information about T.Y. Lin International projects or to contact us, please visit our website at www.tylin.com, email tylininfo@tylin.com, or call us at 415.291.3700.
Alternative
Delivery Projects
T.Y. Lin International
Parking Garages:
Comprehensive Solutions,
Superior Designs
T.Y. Lin International
Founded in 1954, T.Y. Lin International (www.tylin.com) is a globally recognized, full-service infrastructure consulting firm. With more
than 2,000 engineers and planners throughout the United States and Asia, the San Francisco-based firm can deliver project-specific
solutions to a variety of clients throughout the public and private sectors. Trade publication Engineering News-Record has included
T.Y. Lin International in its annual lists of top bridge design, transportation design, and design firms.
SERVICES
Planning/Concepts
Design
Construction Engineering/Inspection
Construction Support/Services
Program Management
Rehabilitation and Repair
Intelligent and Repair
Seismic Retrofit
Design/Build
Public-Private Partnerships (P3)
MARKET SECTORS
Aviation
Bridges
Buildings
Civil/Site
Environmental
Port/Marine
Rail/Transit
Roadway Systems
For more information about T.Y. Lin International projects or to contact us, please visit our website at www.tylin.com, email tylininfo@tylin.com, or call us at 415.291.3700.
3. Faith Village, Brighton, NY
This 70-acre church campus is being developed to include a 3,500-seat
sanctuary, K-12 school, senior living facility, parsonage, family life center, and full
athletic fields. In addition to completing and submitting SEQRA documentation
to the Town, FRA is responsible for the survey, site engineering, site layout, and
traffic analysis, as well as conducting community involvement initiatives.
Town of York Comprehensive Plan Update, York, NY
The Town of York selected FRA to complete their comprehensive plan update as
they tried to balance the pressures of increased development, while preserving
the rural character of the community. Specific issues that were explored included
the impact of demographic changes, infrastructure investments, development
pressures and patterns, and the need to protect open space and environmental
assets. A transportation assessment was also completed, focused on improving
safety, access, and function of major roadways.
New York State Access Management Studies for NYSDOT, Statewide, NY
FRA was awarded a two-year term contract to assist the New York State
Department of Transportation in developing studies that would minimize the
transportation impacts of development, and more closely link transportation
improvements and operations to local economic and quality-of-life objectives.
The results and recommendations of these studies are being used to revise
municipal planning documents and to advance the preliminary design of local
transportation system improvements.
Historic Erie Canal Aqueduct & Broad Street Corridor Master Plan, Rochester, NY
FRA is leading master planning efforts for the Broad Street Corridor, which matches the original alignment of the Erie Canal, and the corridor’s major focal point: the
Erie Canal Aqueduct of 1842. The master plan will serve as a catalyst for reinvestment and development in the west side of downtown, and will assess alternatives
for resurrecting the Erie Canal Aqueduct to a place of prominence and importance in the community. Historic interpretation, preservation standards, and creative
mitigation and reuse strategies are primary goals of the project.
Unlike other consultants who create pie-in-the-sky ideas that look good
on paper but lack a solid blueprint for implementation, FRA, a T.Y. Lin
International Company helps you create your vision and gives you the tools
to make it a reality.
We start by listening; knowing that gaining a thorough understanding of
your goals for a project will only make us more dedicated to its success.
Once the vision is in place, we’re able to develop and recommend
solutions that seamlessly translate from plan to final product.
While most consultants consider their work done after offering
recommendations, FRA takes you further by helping you implement them,
as well. This includes prioritizing projects, identifying lead agency and
required processes, providing planning level cost estimates, and identifying
funding opportunities.
At FRA, we work harder and go farther than any other consultant to ensure
your project is successful.
Reliable
Results,
Superior
Process
Routes 5 & 20 Corridor Study, Canandaigua to Lima, NY
This scenic corridor serves the needs of truckers, tourists, pedestrians, and
area residents. FRA’s role for the planning study included developing a vision
for the corridor and identifying access and traffic management techniques
that would minimize safety hazards while maximizing roadway function.
These recommendations were presented in a format suitable for adoption by
municipalities. As a result, the corridor was awarded a NYS Council on the Arts
grant to implement the recommendations outlined in the study.
Caiyuanba Bridge, Chongqing, China
Located in the “Bridge Capital of China,” the world’s longest basket-handle
arch bridge was designed with an eye toward aesthetics. A pair of steel boxes
forms the arches, giving the bridge its slender appearance, while the arch ribs
incline inward, making the bridge seem lightweight. Its combined beauty and
functionality (carrying both highway and rail traffic on it’s double-deck truss) led
the owner to hail the design as a perfect blend of form and function.
Illinois High Speed Rail Engineering, Springfield, Illinois
The Illinois High Speed Rail project was the first of the American Recovery
and Reinvestment Act rail corridors to initiate actual construction. TYLI served
as an extension of railroad staff, assisting the Union Pacific Railroad with
project management activities to deal with many of the implementation
challenges including construction monitoring, construction staging, and quality
management.
Tren Eléctrico, Lima, Perú
TYLI provided a seismic engineering evaluation for the Tren Eléctrico (Electric
Train), Lima-Callao Line 1. Our team conducted several checks of existing bridge
modules and a check of the recently constructed elevated viaduct guideway
which runs along a north-south alignment over two medians in downtown Lima.
The guideway will eventually cross a major freeway.
Taiwan High Speed Rail, Taiwan
For this Build-Operate-Transfer mega-project, TYLI performed the preliminary
and final designs for 25 elevated bridges representing a total length of
approximately 30km. Undaunted by the project’s magnitude and complexity,
engineers designed an energy-dissipating locking system to limit the bridge
superstructure displacement to within five mm under train braking and
acceleration forces.
Tempe Town Lake Transit, Tempe, Arizona
This award-winning design borrows from the old rail bridge but adds modern
touches that no one could have imagined in 1912. TYLI designed for the City
of Tempe an iconic gateway that complements the Union Pacific Railroad bridge
and incorporates LED lighting activated by the trains crossing the structure.
Exponential population growth in urban areas, coupled with
diminishing opportunities to expand existing transportation systems
means innovative solutions for moving people and goods is critical
to the world’s economic future. T.Y. Lin International (TYLI) provides
long-term solutions that are focused on planning and delivering
comprehensive rail and transit strategies that are sustainable, cost
effective, constructible, and meet the future needs of our clients and
affected communities. TYLI’s rail and transit services include the
complete planning, design, and construction of railways including
high-speed rail, light rail, freight railways, multi-modal facilities, and
maintenance yards.
Solutions
that Move
the World Bay Area Rapid Transit, San Francisco and Oakland, California
TYLI led the seismic retrofit design of five Bay Area Rapid Transit (BART) stations
in San Francisco and Oakland including Glen Park, MacArthur, Church Street,
12th Street, and 19th Street stations. This project is the 13th of 14 contracts
issued for the BART Earthquake Safety Program, a $1.3 billion effort to upgrade
vulnerable portions of the original BART system.
Mission Valley East/West, San Diego, California
TYLI participated in both the preliminary engineering (PE) and final design (PS&E) phases of this 5.9-mile light rail extension for the Metropolitan Transit Development Board
in San Diego, California. The line includes a total of 12,000 linear feet of double-track, elevated guideway carried on bridge structures at seven separate bridge sites. Two
of the sites include crossings of Interstate 8, which carries an average of over 250,000 vehicles per day.
Maritime Development Alternative Study, Oakland, California
The Port of Oakland’s Vision 2000 Program implemented construction of two
fully modern marine terminals, the Middle Harbor Road Realignment, the Joint
Intermodal Terminal (JIT), the creation of Middle Harbor Shoreline Park (MHSP),
and channel dredging. TYLI was the roadway planning and traffic analysis
consultant for this endeavor.
Port of Miami Cruise Terminals D & E, Miami, Florida
TYLI was responsible for performing a cost analysis of the complete proposed
engineering designs to determine possible alternatives. The purpose was to
optimize the design in relation to short-term capital cost, as well as long-term
costs such as those for maintenance and energy. The firm produced alternatives
to the proposed design with a consequential savings of over $2.7M.
Intermodal Cargo Transfer Facility (ICTF), Port Everglades, Florida
TYLI prepared a Phase I Environmental Site Assessment (ESA), evaluated
potential wetland involvement, and investigated the requirements necessary
for permits for the ICTF project. Following the Phase I ESA, a limited Phase 2
Baseline Assessment was performed to evaluate subsurface conditions (soil and
groundwater) and establish pre-existing conditions prior to development of the
site.
Port of Miami Government Cut Utilities Relocation, Miami, Florida
TYLI was responsible for the development of an Environmental Compliance
Plan for the replacement of a 20-inch water main and a 54-inch sewer force
main beneath the Government Cut Channel near the Port of Miami. The work
was to be performed within the Biscayne Bay Aquatic Preserve (Outstanding
Florida Waters) to facilitate the dredging of the Government Cut project to
accommodate the new cargo shipping capacity.
Sears Island Marine Dry Cargo Terminal, Searsport, Maine
TYLI served as the prime engineering consultant to the Maine Department of
Transportation for planning and design of the proposed Sears Island Marine
Dry Cargo Terminal in Searsport, Maine. Facilities designed by TYLI include
roadways, railroad sidings, storage areas, stormwater drainage systems, utility
services (sewers and water mains), and an office/maintenance building.
Port of Miami Tunnel, Miami, Florida
The Port of Miami Tunnel Project (US $1.5 Billion) consists of three components: a tunnel connection between Watson Island and the Port of Miami, connections to the Port
of Miami roadway system, and a widening of the MacArthur Causeway bridge. The tunnel structure is 3,900 feet in length and is composed of two 36-foot-diameter tunnels,
connecting Watson Island and the Port of Miami beneath the main shipping channel in the Biscayne Bay Aquatic Preserve. TYLI served as a technical advisor for the Florida
Department of Transportation and is currently providing oversight on the construction engineering activities.
T.Y. Lin International (TYLI) brings a broad understanding to the maritime
industry through expertise in port facilities, port terminal development,
intermodal systems, and highway and rail landside access. TYLI has expertise
in planning, engineering, and developing solutions for difficult environmental
and site conditions. This expertise includes concept and final designs for
berthing, pier design, surveys, dredging and EPA evaluations, and pier and
shore side utilities supply.
TYLI’s professionals understand the importance of maintaining port and
marine operations at all times. They bring an understanding of operations
issues and the planning and construction experience necessary to ensure
that port operations, cargo flows, and landside access continue to operate
smoothly during all project phases.
Our Solutions,
Your Oceanic
Commerce Port of Miami Crane Electrification, Miami, Florida
TYLI was responsible for performing a cost analysis of the complete proposed
electrical and mechanical design to determine possible alternatives. The purpose
was to optimize the design in relation to short-term capital cost, as well as long-
term costs such as those for maintenance and energy. TYLI produced alternatives
to the proposed design with a consequential savings of over $4.8M.
San Francisco-Oakland Bay Bridge Self-Anchored Suspension Span,
Oakland, California
TYLI, in a joint venture with Moffatt & Nichol, is currently providing complete
design services for the replacement of the 2.1-mile eastern span of the Bay
Bridge between San Francisco and Oakland. From conceptual and final design
through construction support services, TYLI has been involved in all phases of
developing the world’s longest single-tower, self-anchored suspension bridge.
San Francisco-Oakland Bay Bridge Eyebar Repair, Oakland, California
Caltrans maintenance discovered a cracked eyebar on the San Francisco-
Oakland Bay Bridge during an inspection in 2009 and immediately launched an
emergency repair effort, followed by the design of a permanent retrofit. The Bay
Area Toll Authority asked TYLI to provide an independent review of the Caltrans
design for the eyebar retrofit, which resulted in TYLI becoming intimately familiar
with the 1,400-foot-span cantilever truss.
Hoover Dam Bypass, Clark & Mohave Counties, Nevada & Colorado
The challenge? Design a bridge that complements the neighboring Hoover Dam.
TYLI engineers prevailed with a visually stunning concrete composite arch span
that crosses the rugged Black Canyon without overwhelming its famous other half,
creating a perfect match of form, function, and site unity. It is the longest concrete
arch bridge in the U.S. as well as the first hybrid bridge of its kind, combining a
composite steel deck with a segmental concrete arch and spandrels.
San Francisco-Oakland Bay Bridge Oakland Touchdown Detour,
Oakland, California
The Oakland Touchdown Detour project involves the realignment of the existing
San Francisco-Oakland Bay Bridge at the Oakland Mole to make way for
the construction of the eastbound portion of the new bridge. The TYLI Team
was retained to assist Caltrans with preliminary concepts. Once the plan was
approved, TYLI was selected to be the prime structural designer for the project.
Lowry Avenue Bridge Replacement, Hennepin County, Minnesota
With the existing bridge already closed, TYLI was awarded a contract for final
design to deliver a revitalizing, aesthetically designed structure to serve as a
cornerstone for the re-birth of the community’s key corridor, and fast. Achieving
those goals required assembling a team with the tools and the aptitude to get the
job done quickly, but done right. 3D models of complex concepts and integrated
details were created throughout the design process. This was vital to identify
contractibility issues & reslove conflicts early, saving time & money for the client.
San Francisco-Oakland Bay Bridge East Tie-In Structure, Oakland, California
The East Tie-In Structure is part of the South-South Detour (SSD). The project involved detailed design and construction support of the roll-in/roll-out of a double deck,
300-foot-long bridge truss at a height of 150 feet. Now in operation, the structure enables motorists to travel freely while construction takes place on the new Yerba Buena
Island Transition Structures connecting the existing double deck configuration of the Yerba Buena Island tunnel to the new bridge. For this project, TYLI supported Caltrans in
active and continuous coordination with multiple agencies including the Metropolitan Transportation Agency, U.S. Coast Guard, Federal Highway Administration, and San
Francisco City Council as well as a dozen different consultant firms.
Imagine being able to fully envision the anatomy of a structure such as the
new San Francisco-Oakland Bay Bridge before it’s even constructed. Every
detail—every piece of rebar, all the electrical systems, every joint—can
be studied down to the last bolt before construction commences. T.Y. Lin
International (TYLI) engineers have embraced such predictive technologies as
bridge information modeling (BrIM) to accelerate and optimize their designs.
Employing these applications, we can significantly expedite schedules and
make accurate cost estimates for the most complex structures. We use BrIM
models to generate data for the analysis of a structure, thereby making
informed decisions about the design process.
The more we know about the anatomy of a structure, the better a job we can
do to design a more effective, safer bridge. To design state-of-the-art bridges,
TYLI has taken the next leap in innovative engineering.
Informing
Design &
Construction Million Dollar Bridge, Cordova, Alaska
Originally constructed in 1911, the Million Dollar Bridge had been in need of
complete restoration and retrofitting for decades, when the Alaska Department
of Transportation and Public Facilities retained TYLI’s services in 2001 to develop
a retrofit scheme and final design for restoring the bridge to its former glory and
ensuring its use for future generations of Alaskans. The bridge is listed on the
National Register of Historic Places.
Photo courtesy of FHWA
Planning:
Envisioning a
Better Tomorrow
F|R|A, a T.Y. Lin International Company
For more information about FRA, a T.Y. Lin International Company, please visit our website at www.FRAengineering.com or call us at 585.359.0280.
FRA is a T.Y. Lin International Company (www.tylin.com), a globally recognized, full-service infrastructure consulting firm. With more
than 1,000 engineers and planners throughout the United States and Asia, T.Y. Lin International can deliver project-specific solutions
to a variety of clients throughout the public and private sectors. Trade publication Engineering News-Record has included T.Y. Lin
International in its annual lists of top bridge design, transportation design, and design firms.
SERVICES
Planning/Concepts
Design
Construction Engineering/Inspection
Construction Support/Services
Program Management
Rehabilitation and Repair
Intelligent and Repair
Seismic Retrofit
Design/Build
Public-Private Partnerships (P3)
MARKET SECTORS
Aviation
Bridges
Buildings
Civil/Site
Environmental
Port/Marine
Rail/Transit
Roadway Systems
Founded in 1954, T.Y. Lin International (www.tylin.com) is a globally recognized, full-service infrastructure consulting firm. With more
than 2000 engineers and planners throughout the United States and Asia, the San Francisco-based firm can deliver project-specific
solutions to a variety of clients throughout the public and private sectors. Trade publication Engineering News-Record has included
T.Y. Lin International in its annual lists of top bridge design, transportation design, and design firms.
RAIL AND TRANSIT SERVICES
Planning/Concepts
Design
Construction Engineering
Construction Support/Services
Program Management
Rehabilitation and Repair
Seismic Retrofit
Design/Build
Public-Private Partnerships (P3)
For more information about T.Y. Lin International bridge projects or to contact us, please visit our website at www.tylin.com, email tylininfo@tylin.com, or call us at 415.291.3700.
Rail and Transit:
Planning and Building
for the Future
T.Y. Lin International
MARKET SECTORS
Aviation
Bridges
Facilities
Mobility, Planning, and Management
Ports and Marine
Power and Energy
Rail and Transit
Surface Transportation
Water and Wastewater
Port and Marine:
Setting the Course
for New Horizons
T.Y. Lin International
Founded in 1954, T.Y. Lin International (www.tylin.com) is a globally recognized, full-service infrastructure consulting firm. With more
than 2,000 engineers and planners throughout the United States and Asia, the San Francisco-based firm can deliver project-specific
solutions to a variety of clients throughout the public and private sectors. Trade publication Engineering News-Record has included
T.Y. Lin International in its annual lists of top bridge design, transportation design, and design firms.
For more information about T.Y. Lin International projects or to contact us, please visit our website at www.tylin.com, email tylininfo@tylin.com, or call us at 415.291.3700.
PORT AND MARINE SERVICES
Planning/Concepts
Surveys
Design
Construction Engineering
Construction Support/Services
Program Management
Rehabilitation and Repair
Security
IT/Communications
Environmental Services
Dredging
EPA Evaluations
PORT AND MARINE TYPES
Piers and Wharfs
Terminals
Cargo Facilities
Parking Structures
Navigational Aids
Landside Access
Offshore Support Facilities
Infrastructure and Utilities
Technical Design Services:
Advanced Solutions
T.Y. Lin International
Founded in 1954, T.Y. Lin International (www.tylin.com) is a globally recognized, full-service infrastructure consulting firm. With more
than 2000 technical staff throughout the United States and Asia, the San Francisco-based firm can deliver project-specific solutions
to a variety of clients throughout the public and private sectors. Trade publication Engineering News-Record has included T.Y. Lin
International in its annual lists of top bridge design, transportation design, and design firms.
BRIDGE SERVICES
Planning/Concepts
Design
Construction Engineering
Construction Support/Services
Program Management
Rehabilitation and Repair
Seismic Retrofit
Design/Build
Public-Private Partnerships (P3)
BRIDGE TYPES
Truss
Arch
Segmental
Suspension
Cable-stayed
Pedestrian
Specialty
For more information about T.Y. Lin International regarding the A&E Professional and Technical Design Services and Design Support Services project, please send all
correspondence to Dennis J. Jang, PE, SE, Senior Vice President and Director of Operations, Northern California District, at dennis.jang@tylin.com or call him at 415.291.3764.
4. Reconstruction of Apshawa Dam and Butler Reservoir,
West Milford, New Jersey
Apshawa Lake has one main earthen dam with a concrete core and spillway
and two auxiliary overflow dams. The Lake and surrounding areas are part of an
overall countywide park preserve including a public beach. TYLI was selected to
design a new spillway and low flow outlet to better control the lake elevation and
to bring the county a sustainable, low maintenance and affordable design.
Berkshire Valley Road, Morris County, Jefferson, New Jersey
Berkshire Valley Road was experiencing constant flooding due to a inadequate
drainage system conveying flow from upstream Lake Swannanoa dam. TYLI
designed an environmentally friendly system of culverts and channels consisting
of structural and non-structural elements to alleviate flooding and maintain a
friendly ecosystem.
US 158 Kathryn Crosby Bridge over the Yadkin River,
Davie-Forsyth Counties, North Carolina
North Carolina DOT (NCDOT) contracted TYLI to replace this major river
crossing. During the bid process, TYLI performed hydraulic analysis and
discovered we were able to lower the bridge three to four feet which saved
NCDOT a substantial amount in construction costs. TYLI was subsequently
awarded the project design and construction support.
FEMA Flood Studies, Commonwealth of Puerto Rico and the US Virgin Islands
Through a five-year ID/IQ contract with the Federal Emergency Management Agency (FEMA), Region II, TYLI was awarded several task orders to perform updated hydraulic
studies and generate new Digital Flood Insurance Rate Maps (DFIRM) for the commonwealth of Puerto Rico and the US Virgin Islands. TYLI studied hundreds of miles of
riverine and coastal environs using detailed hydrologic and hydraulic modeling and created hundreds of new DFIRM panels. Wave run-up models from tropical storms and
hurricanes were simulated to determine the impacts on the islands. Existing levees were also analyzed and inspected in conjunction with the US Army Corps of Engineers,
(USACE) Jacksonville district. The new panels were adopted by the respective governments and are currently in use.
H2
O — a simple balance of hydrogen and oxygen which produces
one of the most important elements of our existence — water, our
most sought natural resource. Throughout history, water has provided
ways for exploration, discovery, and life itself. However, this simple
combination of atoms can be as lethal as it is vital. Uncontrolled
water can have a devastating impact on nature and human life. It can
flood homes, businesses and roadways and defoliate the environment.
At T.Y. Lin International (TYLI) we work to create a balance between
nature and human progress through planning, educating and
coordinating with our most important people — our clients. We
study, mitigate and treat water in every facet of the environment. We
offer our clients innovative solutions in every geographical setting,
evidenced by the signature projects we have completed over the past
five decades.
Balanced
Solutions,
Fluid
Innovation
Delaware River Flood Study & Floodplain Map Delineation, New Jersey
TYLI provided the Federal Emergency Management Agency (FEMA), states
and local governments, insurance agencies and the public with updated flood
insurance studies and DFIRM maps. TYLI was also awarded a contract to perform
a complete hydraulic study of 126 miles of the Delaware River from the state
borders of NY, NJ and PA to Trenton, New Jersey. The study was completed and
adopted by FEMA, NJDEP, USACE, state and other federal and local agencies.
Rehabilitation of Movable Dam 10 at Lock 14 on the Mohawk
River/Barge Canal, Canajoharie, New York
NY State Thruway Authority (NYSTA) contracted TYLI to provide inspection
and structural analysis along with preparation of a detailed Cofferdam Impact
Analysis to determine the flooding impact to upstream communities. A detailed
HEC-RAS model was developed of the river which included the lock, dam and
lake to determine impacts on adjacent properties.
I-95/Scotch Road Interchange, Mercer County, New Jersey
For this major interchange in New Jersey, TYLI conducted studies for flood alleviation,
including water spread calculation, design of retention and detention basins for water
quality, flood routing calculation, backwater analysis, floodplain delineation and state
permits. An environmental assessment was also performed, as well as preparation of
wetland mitigation plans and soil erosion and sediment control measures.
McDonald’s Restaurants, Atlanta, GA: An existing building previously occupied by another
restaurant adapted into a McDonald’s located in down town Atlanta, GA.
McDonald’s Restaurants, Atlanta, GA: We know the markets, jurisdictions and local concerns
and successfully navigate the maze of zoning, planning and approval processes on thousands
of projects in thousands of cities nationwide.
T.Y. LIN INTERNATIONAL EXCEEDS EXPECTATIONS
“T.Y. Lin International has exceeded our expectations for this work, going above
and beyond to maintain a relationship with the project owner and the Town of
Madison. Other firms just don’t compare.”
Vivian Valdivia, Development Director
McDonald’s USA, Southeast Region
Development
Services
Arby’s Restaurant, Various Locations: Provided multiple iterations of the modern prototype
building to accommodate local code and design requirements throughout GA and AL.
McDonald’s Restaurant, Hilton Head, SC: Approved by the historic Hilton Head Design Review
Board, the design maintained the low-country heritage of the island with low sloping rooftops
and storm shutters while meeting wind and flood requirements.
McDonald’s Restaurant, Charleston, SC: The restaurant was designed to meet historic
Charleston standards with a pedestrian friendly entrance, height minimum, and historic colors,
all while incorporating seismic, wind, and flooding requirements.
Architectural
Services
T.Y. LIN INTERNATIONAL — RELIABLE AND FLEXIBLE
“T.Y. Lin International is extremely reliable, friendly, flexible and accurate. They
deliver projects on-time, assist me in prioritizing projects, and offer a seamless
work environment. Last year, I was working with two firms, but this year, I’m doing
all of my projects with TYLI.…Even though my work load has increased in the last
year, I can use TYLI exclusively and they accommodate all of my needs, giving me
one-stop shopping, essentially.”
Scott Francis, Area Construction Manager
McDonald’s USA, Pittsburgh Region
Evans Army Community Hospital, Fort Carson, Colorado, USA: healthcare experience includes
over 250 projects for over 50 clients totalling more than $800 million during the last ten years.
Al Anbar Judicial Complex, Al Anbar, Iraq: provided design review services for this complex
which included courthouses, detention facilities, dormitories, classrooms and guard towers.
Hajj Terminal at King Abdul Aziz International Airport, Jeddah, Saudi Arabia: provided detailed
design for the East Hajj Terminal, comprising the terminal area, the plaza area, and apron 6.
Emergency Operations Center, Indianapolis Airport Authority, USA: executed over 40 emergency-
management facilities and 200 communications facilities.
Hoover Dam Bypass Bridge, Clark and Mohave Counties, Nevada and Arizona, USA: designed this
landmark single-span concrete arch bridge — the highest and longest in the western hemisphere.
American University of Iraq at Sulaimani, Iraq: provided master plan, design, tender documents
preparation and construction supervision services for this 250,000-square-meter campus.
Quality Innovation
Our team is committed to quality, excellence, and complete client satisfaction. We
achieve these goals by delivering comprehensive, viable, and sustainable technical
solutions on or under schedule and budget. Our highly technical staff includes well-
versed professionals who utilize the latest international design standards and strict
ISO quality management guidelines. We recognize the importance of maintaining
our reputation as a premiere consultancy, and we retain this honor by respecting our
clients’ investments and delivering superior results in a cost-effective manner.
With today’s increasing demand for reliable and economical infrastructure,
we understand the value of combining advanced design methods with practical
construction knowledge to develop cost-effective, aesthetic solutions for our
clients. The well-rounded expertise of our personnel allows us to apply innovative
solutions throughout the design and construction process, and the results speak
for themselves—award-winning projects delivered to satisfied clients. Our
flexibility, creativity and knowledge gained from years of experience in the field
embody the innovative spirit that has always made our team pioneers in the
advancement of design strategies.
Founded in 1954, T.Y. Lin International (www.tylin.com) is a globally recognized, full-service infrastructure consulting firm. With more
than 2,000 engineers and planners throughout the United States and Asia, the San Francisco-based firm can deliver project-specific
solutions to a variety of clients throughout the public and private sectors. Trade publication Engineering News-Record has included T.Y.
Lin International in its annual lists of top bridge design, transportation design, and design firms.
WATER RESOURCES SERVICES
Riverine Hydrology / Hydraulic Studies
Coastal Studies
Flood Control Studies and Design
Canal Locks & Dams
Stream Scour Projects
Dam Analyses
Environmental Studies and Permitting
Stormwater Management
Drainage Design
MARKET SECTORS
Aviation
Bridges
Facilities
Federal
Mobility Planning and Management
Ports and Marine
Power and Energy
Rail and Transit
Surface Transportation
Water and Wastewater
Water Resources
For more information about T.Y. Lin International projects or to contact us, please visit our website at www.tylin.com, email tylininfo@tylin.com, or call us at 415.291.3700.
H2
O Resources:
Ingenuity for an
Essential Element
T.Y. Lin International
Architecture &
Engineering:
Branded Concepts
T.Y. Lin International
Founded in 1954, T.Y. Lin International (www.tylin.com) is a globally recognized, full-service infrastructure consulting firm. With more
than 2,000 engineers and planners throughout the United States and Asia, the San Francisco-based firm can deliver project-specific
solutions to a variety of clients throughout the public and private sectors. Trade publication Engineering News-Record has included
T.Y. Lin International in its annual lists of top bridge design, transportation design, and design firms.
For more information about T.Y. Lin International projects or to contact us, please visit our website at www.tylin.com, email tylininfo@tylin.com, or call us at 415.291.3700.
ARCHITECTURE AND ENGINEERING SERVICES
Development Services
Site Investigation
Site Planning
Due Diligence
Real Estate Transaction Review
Project & Consultant Management
Construction Management
Architectural Services
Feasibility Studies
Programming
Interior Design
Sustainable Design
Historic Preservation
Tenant Coordination
Prototype Development & Maintenance
Existing Facilities Evaluation
Engineering Services
Civil Engineering
- Pre-Development Services
- Regulatory Approvals
- Land Planning
- Site Engineering (Grading, Utilities, Roadway/Pedestrian)
Electrical Engineering
- Power Distribution Design
- Lighting Design
- Emergency Generators
- Fire/Life Safety
- Security
- Data/Telephone Cabling
Mechanical Engineering
- HVAC/Plumbing Design
- Fire Sprinkler Specification
- Initial Planning and Conceptualization
Existing Facilities Evaluation
Landscape Architecture
MARKET SECTORS
Aviation
Bridges
Buildings
Civil/Site
Environmental
Port/Marine
Rail/Transit
Roadway Systems
SERVICES
Planning/Concepts
Design
Construction Engineering/Inspection
Construction Support/Services
Program Management
Rehabilitation and Repair
Intelligent and Repair
Seismic Retrofit
Design/Build
Public-Private Partnerships (P3)
GLOBAL RESOURCES TO RESPOND
TO LOCAL MISSION OBJECTIVES
Our team is proud to have served the federal govern-
ment for over 40 years. We have grown into an inter-
nationally renowned network of the best engineering
and architectural talent worldwide — a global network
that always has and always will provide the most
comprehensive local support. Our clients benefit from
the personal attention of our organization’s experts,
delivering quality services and state-of-the-art technical
solutions on a variety of mission-critical facility and
infrastructure projects led by well-respected experts.
Our goal is always to put our clients first, reduce
project risks, and provide projects that contribute
to our clients success, resulting in long term value.
• General Services Administration
• National Geospatial-Intelligence Agency
• U.S. Postal Service
• U.S. Department of the Interior
• U.S. Transportation Command
O U R F E D E R A L C L I E N T S I N C L U D E :
• U.S. Army Corps of Engineers
• U.S. Army Medical Command
• U.S. Department of Veterans Affairs
• Electric Power Research Institute
• Federal Bureau of Prisons
Biomedical Research Facility, Washington University School of Medicine, Washington, USA:
provided construction and renovation services for this 700,000-square-foot facility.
New Doha International Airport, Doha, State of Qatar: have worked at over 150 airports on four
continents providing planning, design and construction management services.
M.W. Boudreaux Memorial Visitor Center, Mark Twain Lake, Missouri, USA: provided A/E services
from concept to completion for the United States Army Corps of Engineers.
Expertise
With significant resources to draw upon from nearly every corner of the globe,
resources that include renowned facility and infrastructure design experts for some
of the world’s most iconic and technically oriented projects, our organization is
accustomed to delivering projects of varying size, type and complexity that are
tailored to local conditions such as geology and climate. Our staff resources
can be allocated to meet any local agency requirements, and through our
worldwide network of professionals, support a project regardless of its location.
Our philosophy also supports local talent and partnerships by contributing and
collaborating with in-country professionals.
Allegheny River Lock/Dam No. 4, USACE, Pittsburgh, Pennsylvania, USA: provided structural en-
gineering for the design of precast concrete panels used in this 12,000-square-foot restoration.
Geographic Presence
and Project Locations
Project Locations
Our team’s geographic presence and project locations are depicted on the map above.
The firms provide local expert engineers, planners, architects, economists and scientists.
Sakarya Yenikent State Hospital, Adapazari, Turkey: provided design, value engineering, con-
struction supervision and medical equipment procurement services for this 250-bed hospital.
Integrity
Our clients have come to rely upon us and our partners to deliver superior
projects worldwide. Our organization continuously leverages our comprehensive
services, broad capabilities, and in-depth technical resources to respond to
projects unlike anyone else. We have achieved success and our clients’ trust with
a simple strategy — putting our clients’ needs first — and without exception our
clients benefit from both our reliability, as well as our unique dedication to the
same key values that made us pioneers in the industry.
A G L O B A L I N T E G R A T E D
P R O J E C T D E L I V E R Y T E A M
Ross & Baruzzini, T.Y. Lin International, and Dar
Al-Handasah (Shair and Partners) are members
of the DAR Group, a global partnership comprised
of over 12,000 professional engineers, planners,
architects, economists and scientists who share a
common goal of providing quality and responsive
design and construction resources to support the
on-going mission of the United States around
the world. Having grown into an internationally
recognized, award-winning, multi-disciplined,
full-service design, consulting, program manage-
ment and construction management firm, our
projects span the Middle East, Europe, Africa,
North and South America, and Asia. Our
organization specializes in providing leadership
and expertise on all projects, in any locale.
Global Integrated
Project Delivery Services
for Federal Design and
Construction Programs
RESHAPING THE FUTURE — Our team comprised of Ross & Baruzzini, T.Y. Lin International and Dar Al-Handasah (Shair and Partners),
members of The Dar Group, have been a pioneering force in the planning, design and implementation of projects in the Middle East,
Africa, Asia, North and South America and Europe. Today we are one of the largest engineering and design practices in the world and
are known for our problem identification, tailor made designs, quality, on-time deliverables and multi-disciplinary expertise.
SERVICES
Hydraulic Engineering
Landscape Architecture
LEED/Energy Consulting
Master Planning
Mechanical/Electrical/
Plumbing
Planning/Feasibility Studies
Program Management
Security Consulting
Seismic Analysis
Surveying
Telecommunications/
Information Technology
Activation Services/
Operational Readiness
Alternative Delivery
Architecture/Interior Design
Code Services
Commissioning
Construction Engineering
and Inspection
Construction Management
Economics
Engineering Design
Environmental
Force Protection
Geospatial
Geotechnical Engineering
MARKET SECTORS
Aviation
Bridges
General Buildings
Government
Industrial Plants
Non-Motorized
Transportation
Ports and Marine
Power and Energy
Railways/Mass Transit/
Multi-modal
Roadways
Support Facilities
Tunnels/Viaducts
Urban Infrastructure/
Utilities
Water and Wastewater
Water Resources
Ross & Baruzzini is a leader in providing design and consulting for clients requiring solutions to their facilities and infrastructure challenges in the avia-
tion, education, government, healthcare and maritime industries.
T.Y. Lin International (TYLI) is distinguished for its planning, design, and construction engineering/inspection of transportation infrastructure. With
projects throughout Asia, Africa, Australia and North and South America, TYLI has a well-founded reputation for providing clients with innovative
engineering solutions.
Dar Al-Handasah (Shair and Partners) is one of the world’s leading international consultancies, specializing in engineering, architecture, planning,
environment, project management and economics.
For further information regarding our team’s capabilities and experience, please contact Michael Shea, AIA at mshea@rossbar.com.
R&B/TYLI/DAR EC, A Joint Venture