SlideShare ist ein Scribd-Unternehmen logo
1 von 50
ORCCA Mini-charrette meeting Jul 16, 2010 Courtesy of Scott Edwards Architecture
The Water Balance Model: typical for Cascadia Water Quantity Before 16.5” interflow (infiltration) 26” evapo- transpiration 0.2” runoff 65” rainfall yearly avg 22” groundwater (infiltration)
The Water Balance Model Water Quantity After 0” baseflow (infiltration) reduced evapo- transpiration 63” runoff 65” rainfall yearly avg 2” evapo- transpiration Reduced infiltration
Impervious Surfaces A Watershed Perspective
The Water Balance Model Water Quality Before Some sediment
The Water Balance Model Water Quality After Sediment (air particulates), dissolved pollutants (nitrogen, zinc), heavy metals, Feces, Temperature, other debris Sediment/turbidity, Hydrocarbons, Heavy metals, temp, feces, other chemicals Sediment/turbidity fertilizers, pesticides herbicides, feces, heavy metals
Air
Soil Image from  Soil Quality Information Sheet ,  U.S. Department of Agriculture
B est  M anagement  P ractice s  (aka BMPs) Two Types N
ORCCA’s Priority List – reorganized FILTRATION ,[object Object],[object Object],[object Object],[object Object]
Structural BMPs Infiltration and Water Quality ,[object Object],Pollutant Infiltration  SW Wet-land Wet Pond Filtering WQ Swale Dry Pond Total Phosphorus 70 49 51 59 34 19 Soluble Phosphorus 85 35 66 3 38 -6 Total Nitrogen 51 30 33 38 84 25 Nitrate 82 67 43 -14 31 4 Copper N/A 40 57 49 51 26 Zinc 99 44 66 88 71 26 Total Suspended Solids 95 76 80 86 81 47
ORCCA’s Priority List – reorganized RUNOFF REDUCTION ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Infiltration trenches are a UIC not recommended for our timeline
Rain Gardens
Other vegetated systems: Planters
Other vegetated systems: Vegetated Filter Strips
Pervious pavements: Use with CAUTION here POROUS ASPHALT IN 1- 2” LIFT UNCOMPACTED SUBGRADE NON-WOVEN PROPYLENE GEOTEXTILE 12” 1-1/2” to 1” WASHED CRUSHED AGGREGATE 3”
Downspout Disconnection
Eco-roofs
Cisterns for parking lot, street, sidewalk,  and roof storage
ORCCA’s Priority List – additional BMPs RUNOFF REDUCTION ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Trellises & other vertical vegetation
Trellises & other vertical vegetation
Limit Disturbance in Planning
Limit Disturbance in Design Save a Tree
Limit Disturbance Construction Practices
Limit Disturbance Construction Practices: Don’t cement treat the soil
Minimize impervious surfaces
ORCCA’s Priority List – reorganized STORAGE (aka Peak Flow Attenuation) ,[object Object],[object Object],[object Object],[object Object]
Storage in wetland at Oleson Woods Apts
ORCCA’s Priority List: additional BMPs STORAGE (aka Peak Flow Attenuation) ,[object Object]
Compost Amendment  & other soil restoration practices Photos on left are from Soils for Salmon website
ORCCA’s Priority List – reorganized CONVEYANCE ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Eliminate curb & gutter
Eliminate curb & gutter
Swales & daylighting
Swale & Daylighting Details
Swale & Daylighting Details
Check dams
ORCCA’s Priority List: additional BMPs CONVEYANCE ,[object Object],[object Object]
Transportation BMPs Traffic calming woonerf Photo from Techniques for Urban Sustainability website
Additional BMPs: Source Control
Additional BMPs Source Control in Construction
Additional BMPs Source Control in Construction Photo excerpted from “BMPs for Stormwater Discharges Associated with Construction Activities”, DEQ, Feb 2006
Additional BMPs Source Control in Construction Photos and study and text excerpted from “BMPs for Stormwater Discharges Associated with Construction Activities”, DEQ, Feb 2006
Additional BMPs Source Control Post Construction
Biodiversity
Siting Consideration N
Additional BMPs discussed but no photos ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
ORCCA Mini-charrette meeting Jul 16, 2010 Sustainability for all the places between the buildings.

Weitere ähnliche Inhalte

Was ist angesagt?

Introduction to Water Supply
Introduction to Water SupplyIntroduction to Water Supply
Introduction to Water Supplypradeep ramtel
 
Unit III Quality and Treatment
Unit  III Quality and TreatmentUnit  III Quality and Treatment
Unit III Quality and TreatmentMadhukarJadhav8
 
SEDIMENTATION CONTROL MODERN TECHNIQUES
SEDIMENTATION CONTROL MODERN TECHNIQUESSEDIMENTATION CONTROL MODERN TECHNIQUES
SEDIMENTATION CONTROL MODERN TECHNIQUESHAMMAD BASHIR
 
Sustainable storm water management Presentation Slides
Sustainable storm water management Presentation SlidesSustainable storm water management Presentation Slides
Sustainable storm water management Presentation SlidesArissa Loh
 
Reservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentationReservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentationPramoda Raj
 
Desalination for water supply
Desalination for water supplyDesalination for water supply
Desalination for water supplyPriya Raj
 
Direct Potable Reuse vs Desalination for California's Water Supply
Direct Potable Reuse vs Desalination for California's Water SupplyDirect Potable Reuse vs Desalination for California's Water Supply
Direct Potable Reuse vs Desalination for California's Water SupplyOCCoastkeeper
 
IRJET- De-Silting Artifice for Dams
IRJET-  	  De-Silting Artifice for DamsIRJET-  	  De-Silting Artifice for Dams
IRJET- De-Silting Artifice for DamsIRJET Journal
 
Water Infrastructure Management
Water Infrastructure ManagementWater Infrastructure Management
Water Infrastructure ManagementAman Kudesia
 
Seawater Desalination and Water Supply Reliability
Seawater Desalination and Water Supply ReliabilitySeawater Desalination and Water Supply Reliability
Seawater Desalination and Water Supply Reliability M. Ahmad
 
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...ijiert bestjournal
 
Seawater desalination – Environmental Impact Assessment (EIA) and Best Availa...
Seawater desalination – Environmental Impact Assessment (EIA) and Best Availa...Seawater desalination – Environmental Impact Assessment (EIA) and Best Availa...
Seawater desalination – Environmental Impact Assessment (EIA) and Best Availa...Zalul Environmental Association of Israel
 
Rain water harvesting
Rain water harvestingRain water harvesting
Rain water harvestingManoj Das
 
Reservoir sedimentation causes and mitigation
Reservoir sedimentation causes and mitigationReservoir sedimentation causes and mitigation
Reservoir sedimentation causes and mitigationPramoda Raj
 
Sustainable Storm-water Management Report
Sustainable Storm-water Management ReportSustainable Storm-water Management Report
Sustainable Storm-water Management ReportArissa Loh
 
Menarid: Managed Aquifer Recharge
Menarid: Managed Aquifer RechargeMenarid: Managed Aquifer Recharge
Menarid: Managed Aquifer RechargeICARDA
 

Was ist angesagt? (19)

Introduction to Water Supply
Introduction to Water SupplyIntroduction to Water Supply
Introduction to Water Supply
 
Unit III Quality and Treatment
Unit  III Quality and TreatmentUnit  III Quality and Treatment
Unit III Quality and Treatment
 
SEDIMENTATION CONTROL MODERN TECHNIQUES
SEDIMENTATION CONTROL MODERN TECHNIQUESSEDIMENTATION CONTROL MODERN TECHNIQUES
SEDIMENTATION CONTROL MODERN TECHNIQUES
 
Sustainable storm water management Presentation Slides
Sustainable storm water management Presentation SlidesSustainable storm water management Presentation Slides
Sustainable storm water management Presentation Slides
 
Reservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentationReservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentation
 
Desalination for water supply
Desalination for water supplyDesalination for water supply
Desalination for water supply
 
Direct Potable Reuse vs Desalination for California's Water Supply
Direct Potable Reuse vs Desalination for California's Water SupplyDirect Potable Reuse vs Desalination for California's Water Supply
Direct Potable Reuse vs Desalination for California's Water Supply
 
IRJET- De-Silting Artifice for Dams
IRJET-  	  De-Silting Artifice for DamsIRJET-  	  De-Silting Artifice for Dams
IRJET- De-Silting Artifice for Dams
 
Water Infrastructure Management
Water Infrastructure ManagementWater Infrastructure Management
Water Infrastructure Management
 
Seawater Desalination and Water Supply Reliability
Seawater Desalination and Water Supply ReliabilitySeawater Desalination and Water Supply Reliability
Seawater Desalination and Water Supply Reliability
 
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...
A REVIEW ON RESERVOIR SEDIMENTATION STUDIES USING SATELLITE REMOTE SENSING TE...
 
Seawater desalination – Environmental Impact Assessment (EIA) and Best Availa...
Seawater desalination – Environmental Impact Assessment (EIA) and Best Availa...Seawater desalination – Environmental Impact Assessment (EIA) and Best Availa...
Seawater desalination – Environmental Impact Assessment (EIA) and Best Availa...
 
Rain water harvesting
Rain water harvestingRain water harvesting
Rain water harvesting
 
Reservoir sedimentation causes and mitigation
Reservoir sedimentation causes and mitigationReservoir sedimentation causes and mitigation
Reservoir sedimentation causes and mitigation
 
Water desalination
Water desalinationWater desalination
Water desalination
 
sedimentation
sedimentationsedimentation
sedimentation
 
Sustainable Storm-water Management Report
Sustainable Storm-water Management ReportSustainable Storm-water Management Report
Sustainable Storm-water Management Report
 
Siltation
SiltationSiltation
Siltation
 
Menarid: Managed Aquifer Recharge
Menarid: Managed Aquifer RechargeMenarid: Managed Aquifer Recharge
Menarid: Managed Aquifer Recharge
 

Ähnlich wie 2010 07-16 orcca minicharrette

Project standards and_specifications_waste_water_sewer_system_rev01
Project standards and_specifications_waste_water_sewer_system_rev01Project standards and_specifications_waste_water_sewer_system_rev01
Project standards and_specifications_waste_water_sewer_system_rev01Robson Pessoa
 
CVS 535 - Watsewater Treatment PART LESSON 1 - Sewerage.pptx
CVS 535  - Watsewater Treatment PART LESSON 1 - Sewerage.pptxCVS 535  - Watsewater Treatment PART LESSON 1 - Sewerage.pptx
CVS 535 - Watsewater Treatment PART LESSON 1 - Sewerage.pptxMwauraMourice
 
1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...
1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...
1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...Pomcert
 
Constructed wetland
Constructed wetlandConstructed wetland
Constructed wetlandAnkit Jain
 
Tidal Flow Constructed Wetland: An Overview
Tidal Flow Constructed Wetland: An OverviewTidal Flow Constructed Wetland: An Overview
Tidal Flow Constructed Wetland: An Overviewinventy
 
Source reduction for urban stormwater
Source reduction for urban stormwaterSource reduction for urban stormwater
Source reduction for urban stormwaterLarryBaker
 
Effect of industrial effluents on receiving waters
Effect of industrial effluents on receiving watersEffect of industrial effluents on receiving waters
Effect of industrial effluents on receiving watersDipo Elegbs
 
Beach Road, Porous Pavement and Then Some
Beach Road, Porous Pavement and Then SomeBeach Road, Porous Pavement and Then Some
Beach Road, Porous Pavement and Then Somemecocca5
 
Green Connection Lid 3 12 09
Green Connection Lid 3 12 09Green Connection Lid 3 12 09
Green Connection Lid 3 12 09Michael Clark
 
Conn Bar Assoc. - Stormwater
Conn Bar Assoc. - StormwaterConn Bar Assoc. - Stormwater
Conn Bar Assoc. - StormwaterTerranceGallagher
 
LTCP meeting 11-18-04
LTCP meeting 11-18-04LTCP meeting 11-18-04
LTCP meeting 11-18-04HartTWI
 
Technical design-of-rwh (2)
Technical design-of-rwh (2)Technical design-of-rwh (2)
Technical design-of-rwh (2)ABood Al-ghamdy
 
Introduction to Low Impact Development
Introduction to Low Impact DevelopmentIntroduction to Low Impact Development
Introduction to Low Impact Developmentrlucera
 

Ähnlich wie 2010 07-16 orcca minicharrette (20)

Project standards and_specifications_waste_water_sewer_system_rev01
Project standards and_specifications_waste_water_sewer_system_rev01Project standards and_specifications_waste_water_sewer_system_rev01
Project standards and_specifications_waste_water_sewer_system_rev01
 
CVS 535 - Watsewater Treatment PART LESSON 1 - Sewerage.pptx
CVS 535  - Watsewater Treatment PART LESSON 1 - Sewerage.pptxCVS 535  - Watsewater Treatment PART LESSON 1 - Sewerage.pptx
CVS 535 - Watsewater Treatment PART LESSON 1 - Sewerage.pptx
 
1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...
1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...
1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...
 
Constructed wetland
Constructed wetlandConstructed wetland
Constructed wetland
 
Tidal Flow Constructed Wetland: An Overview
Tidal Flow Constructed Wetland: An OverviewTidal Flow Constructed Wetland: An Overview
Tidal Flow Constructed Wetland: An Overview
 
water pollution
water pollutionwater pollution
water pollution
 
Source reduction for urban stormwater
Source reduction for urban stormwaterSource reduction for urban stormwater
Source reduction for urban stormwater
 
Effect of industrial effluents on receiving waters
Effect of industrial effluents on receiving watersEffect of industrial effluents on receiving waters
Effect of industrial effluents on receiving waters
 
7. Urban Pathways and Pressures - John Stack
7. Urban Pathways and Pressures - John Stack7. Urban Pathways and Pressures - John Stack
7. Urban Pathways and Pressures - John Stack
 
Beach Road, Porous Pavement and Then Some
Beach Road, Porous Pavement and Then SomeBeach Road, Porous Pavement and Then Some
Beach Road, Porous Pavement and Then Some
 
Green Connection Lid 3 12 09
Green Connection Lid 3 12 09Green Connection Lid 3 12 09
Green Connection Lid 3 12 09
 
Conn Bar Assoc. - Stormwater
Conn Bar Assoc. - StormwaterConn Bar Assoc. - Stormwater
Conn Bar Assoc. - Stormwater
 
LTCP meeting 11-18-04
LTCP meeting 11-18-04LTCP meeting 11-18-04
LTCP meeting 11-18-04
 
Acid Mine Drainage In Pennsylvania Streams
Acid Mine Drainage In Pennsylvania StreamsAcid Mine Drainage In Pennsylvania Streams
Acid Mine Drainage In Pennsylvania Streams
 
Technical design-of-rwh (2)
Technical design-of-rwh (2)Technical design-of-rwh (2)
Technical design-of-rwh (2)
 
Session 70 Zahra Kalantari
Session 70 Zahra KalantariSession 70 Zahra Kalantari
Session 70 Zahra Kalantari
 
Stormwater Filtering Design
Stormwater Filtering DesignStormwater Filtering Design
Stormwater Filtering Design
 
chapt 6.pptx
chapt 6.pptxchapt 6.pptx
chapt 6.pptx
 
Introduction to Low Impact Development
Introduction to Low Impact DevelopmentIntroduction to Low Impact Development
Introduction to Low Impact Development
 
groundwater pollution.pptx
groundwater pollution.pptxgroundwater pollution.pptx
groundwater pollution.pptx
 

Mehr von Maria Cahill

Structural soil questions gresham
Structural soil questions greshamStructural soil questions gresham
Structural soil questions greshamMaria Cahill
 
Urban Mentors: Erosion Prevention & Sediment Control
Urban Mentors: Erosion Prevention & Sediment ControlUrban Mentors: Erosion Prevention & Sediment Control
Urban Mentors: Erosion Prevention & Sediment ControlMaria Cahill
 
Parking Forest Questions from the City of Gresham
Parking Forest Questions from the City of GreshamParking Forest Questions from the City of Gresham
Parking Forest Questions from the City of GreshamMaria Cahill
 
Challenging Sites Overview, Part 2
Challenging Sites Overview, Part 2Challenging Sites Overview, Part 2
Challenging Sites Overview, Part 2Maria Cahill
 
Parking Forest to ASCE
Parking Forest to ASCEParking Forest to ASCE
Parking Forest to ASCEMaria Cahill
 
2013 12-05 challenging sites-rvss
2013 12-05 challenging sites-rvss2013 12-05 challenging sites-rvss
2013 12-05 challenging sites-rvssMaria Cahill
 
Parking Forest Stormwater Introduction
Parking Forest Stormwater IntroductionParking Forest Stormwater Introduction
Parking Forest Stormwater IntroductionMaria Cahill
 
Parking Forest Materials
Parking Forest MaterialsParking Forest Materials
Parking Forest MaterialsMaria Cahill
 
Bioretention1 overview
Bioretention1 overviewBioretention1 overview
Bioretention1 overviewMaria Cahill
 
2010 07-16 orcca minicharrette - copy
2010 07-16 orcca minicharrette - copy2010 07-16 orcca minicharrette - copy
2010 07-16 orcca minicharrette - copyMaria Cahill
 
2010 07-16 orcca minicharrette - copy
2010 07-16 orcca minicharrette - copy2010 07-16 orcca minicharrette - copy
2010 07-16 orcca minicharrette - copyMaria Cahill
 
Sustainable Principles for Land Development
Sustainable Principles for Land DevelopmentSustainable Principles for Land Development
Sustainable Principles for Land DevelopmentMaria Cahill
 
Pervious Concrete Projects in Beaverton
Pervious Concrete Projects in BeavertonPervious Concrete Projects in Beaverton
Pervious Concrete Projects in BeavertonMaria Cahill
 

Mehr von Maria Cahill (13)

Structural soil questions gresham
Structural soil questions greshamStructural soil questions gresham
Structural soil questions gresham
 
Urban Mentors: Erosion Prevention & Sediment Control
Urban Mentors: Erosion Prevention & Sediment ControlUrban Mentors: Erosion Prevention & Sediment Control
Urban Mentors: Erosion Prevention & Sediment Control
 
Parking Forest Questions from the City of Gresham
Parking Forest Questions from the City of GreshamParking Forest Questions from the City of Gresham
Parking Forest Questions from the City of Gresham
 
Challenging Sites Overview, Part 2
Challenging Sites Overview, Part 2Challenging Sites Overview, Part 2
Challenging Sites Overview, Part 2
 
Parking Forest to ASCE
Parking Forest to ASCEParking Forest to ASCE
Parking Forest to ASCE
 
2013 12-05 challenging sites-rvss
2013 12-05 challenging sites-rvss2013 12-05 challenging sites-rvss
2013 12-05 challenging sites-rvss
 
Parking Forest Stormwater Introduction
Parking Forest Stormwater IntroductionParking Forest Stormwater Introduction
Parking Forest Stormwater Introduction
 
Parking Forest Materials
Parking Forest MaterialsParking Forest Materials
Parking Forest Materials
 
Bioretention1 overview
Bioretention1 overviewBioretention1 overview
Bioretention1 overview
 
2010 07-16 orcca minicharrette - copy
2010 07-16 orcca minicharrette - copy2010 07-16 orcca minicharrette - copy
2010 07-16 orcca minicharrette - copy
 
2010 07-16 orcca minicharrette - copy
2010 07-16 orcca minicharrette - copy2010 07-16 orcca minicharrette - copy
2010 07-16 orcca minicharrette - copy
 
Sustainable Principles for Land Development
Sustainable Principles for Land DevelopmentSustainable Principles for Land Development
Sustainable Principles for Land Development
 
Pervious Concrete Projects in Beaverton
Pervious Concrete Projects in BeavertonPervious Concrete Projects in Beaverton
Pervious Concrete Projects in Beaverton
 

Kürzlich hochgeladen

定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一z zzz
 
Introduction to Political Parties (1).ppt
Introduction to Political Parties (1).pptIntroduction to Political Parties (1).ppt
Introduction to Political Parties (1).pptSohamChavan9
 
办理(Salford毕业证书)索尔福德大学毕业证成绩单原版一比一
办理(Salford毕业证书)索尔福德大学毕业证成绩单原版一比一办理(Salford毕业证书)索尔福德大学毕业证成绩单原版一比一
办理(Salford毕业证书)索尔福德大学毕业证成绩单原版一比一diploma 1
 
LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024Bruce Bennett
 
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证nhjeo1gg
 
Nathan_Baughman_Resume_copywriter_and_editor
Nathan_Baughman_Resume_copywriter_and_editorNathan_Baughman_Resume_copywriter_and_editor
Nathan_Baughman_Resume_copywriter_and_editorNathanBaughman3
 
ME 205- Chapter 6 - Pure Bending of Beams.pdf
ME 205- Chapter 6 - Pure Bending of Beams.pdfME 205- Chapter 6 - Pure Bending of Beams.pdf
ME 205- Chapter 6 - Pure Bending of Beams.pdfaae4149584
 
Escort Service Andheri WhatsApp:+91-9833363713
Escort Service Andheri WhatsApp:+91-9833363713Escort Service Andheri WhatsApp:+91-9833363713
Escort Service Andheri WhatsApp:+91-9833363713Riya Pathan
 
Human Rights are notes and helping material
Human Rights are notes and helping materialHuman Rights are notes and helping material
Human Rights are notes and helping materialnadeemcollege26
 
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证diploma001
 
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书saphesg8
 
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一A SSS
 
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一lvtagr7
 
AICTE PPT slide of Engineering college kr pete
AICTE PPT slide of Engineering college kr peteAICTE PPT slide of Engineering college kr pete
AICTE PPT slide of Engineering college kr peteshivubhavv
 
LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024Bruce Bennett
 
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一Fs sss
 
办理哈珀亚当斯大学学院毕业证书文凭学位证书
办理哈珀亚当斯大学学院毕业证书文凭学位证书办理哈珀亚当斯大学学院毕业证书文凭学位证书
办理哈珀亚当斯大学学院毕业证书文凭学位证书saphesg8
 
Black and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfBlack and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfpadillaangelina0023
 

Kürzlich hochgeladen (20)

定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一
 
Introduction to Political Parties (1).ppt
Introduction to Political Parties (1).pptIntroduction to Political Parties (1).ppt
Introduction to Political Parties (1).ppt
 
办理(Salford毕业证书)索尔福德大学毕业证成绩单原版一比一
办理(Salford毕业证书)索尔福德大学毕业证成绩单原版一比一办理(Salford毕业证书)索尔福德大学毕业证成绩单原版一比一
办理(Salford毕业证书)索尔福德大学毕业证成绩单原版一比一
 
LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024
 
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
 
Nathan_Baughman_Resume_copywriter_and_editor
Nathan_Baughman_Resume_copywriter_and_editorNathan_Baughman_Resume_copywriter_and_editor
Nathan_Baughman_Resume_copywriter_and_editor
 
ME 205- Chapter 6 - Pure Bending of Beams.pdf
ME 205- Chapter 6 - Pure Bending of Beams.pdfME 205- Chapter 6 - Pure Bending of Beams.pdf
ME 205- Chapter 6 - Pure Bending of Beams.pdf
 
Escort Service Andheri WhatsApp:+91-9833363713
Escort Service Andheri WhatsApp:+91-9833363713Escort Service Andheri WhatsApp:+91-9833363713
Escort Service Andheri WhatsApp:+91-9833363713
 
Human Rights are notes and helping material
Human Rights are notes and helping materialHuman Rights are notes and helping material
Human Rights are notes and helping material
 
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
 
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
 
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
 
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
 
AICTE PPT slide of Engineering college kr pete
AICTE PPT slide of Engineering college kr peteAICTE PPT slide of Engineering college kr pete
AICTE PPT slide of Engineering college kr pete
 
Young Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort Service
Young Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort ServiceYoung Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort Service
Young Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort Service
 
LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024
 
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 
办理哈珀亚当斯大学学院毕业证书文凭学位证书
办理哈珀亚当斯大学学院毕业证书文凭学位证书办理哈珀亚当斯大学学院毕业证书文凭学位证书
办理哈珀亚当斯大学学院毕业证书文凭学位证书
 
Black and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfBlack and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdf
 
Students with Oppositional Defiant Disorder
Students with Oppositional Defiant DisorderStudents with Oppositional Defiant Disorder
Students with Oppositional Defiant Disorder
 

2010 07-16 orcca minicharrette

Hinweis der Redaktion

  1. 0-10% Coverage: Streams are structurally sound with good biodiversity and habitat 11-25% Coverage: Streambanks become unstable, biodiversity is lost, & water quality is degraded >25% Coverage: Stream life is lost & water quality is poor
  2. Soils support plant and animal biodiversity, sequester GH Soil temperature is important for seed germination, pest control, nitrogen uptake.
  3. Non-Structural: Preventative Restorative Early planning Structural: Mitigative Engineered/Designed After the fact
  4. Costs Vegetation Land area Benefits Biodiversity Water Quality Water Quantity We reduce the cost of: Pipes Detention basins Water quality facilities Catch basins Manholes Excavation Compaction
  5. Costs Vegetation Land area Benefits Biodiversity Water Quality Water Quantity We reduce the cost of: Pipes Detention basins Water quality facilities Catch basins Manholes Excavation Compaction
  6. Costs Vegetation Land area Benefits Biodiversity Water Quality Water Quantity We reduce the cost of: Pipes Detention basins Water quality facilities Catch basins Manholes Excavation Compaction
  7. Asphalt Concrete Pavers Flexible Paving Systems Gravel Aggregate Turf Soft porous surfaces Decks & Boardwalks
  8. Compared to a pipe, daylighting Slows, treats and cools the flow Contributes to biodiversity Fish habitat Animal passage Native plants Increases infiltration Can be an Costs Vegetation or other material to finish off swale look (not mulch – it floats!) Splash blocks Check dams Liners near footings (30 mil polyethylene or bentonite clay) Extra design and construction considerations Amenity Benefits Reduces the cost of: Excavation and compaction of pipe trench Pipe installation Eliminates the cost of base rock Slows, treats and cools the flow Contributes to biodiversity Fish habitat Animal passage Native plants Increases infiltration Can be an amenity
  9. Develop a plan that reuses resources in place Re-purpose previously disturbed areas Avoid sensitive areas. Reduce excavation. Limit compaction. Avoid building in areas that provide habitat for threatened and endangered species. Don't build in the floodplain, in wetlands, too close to waterways, or too close to coastal shorelines. Don't build on prime farmland or other significant soils. Build on gray or brownfields. Plan for transportation. To cross a stream with a utility, align it across a bridge or in casing above the stream instead of boring underneath the stream to bury it. Align utilities together in the same trench. Costs Working and designing around existing infrastructure Benefits Saves natural resources Reduce the cost of: Tipping fees Shipping Buying & installing new materials
  10. Filter air pollution Sequester carbon dioxide to roduce oxygen Reduce the heat island effect Provide erosion control Filter pollutants in water Reduce stormwater runoff Cool streams Increase property values Reduce property selling time Costs Arborist report Extra design considerations Define haul road & stockpile locations Design infrastructure around driplines Tree fencing (orange mesh or rented chainlink) Pre-construction meeting to coordinate intent with subs Benefits Increase property values Reduce property selling time Reduce the cost of: Clearing Erosion control Tree mitigation fees Planting and establishing new trees Irrigation system for new trees Stormwater management
  11. Develop a plan that reuses resources in place Re-purpose previously disturbed areas Avoid sensitive areas. Reduce excavation. Limit compaction. Avoid building in areas that provide habitat for threatened and endangered species. Don't build in the floodplain, in wetlands, too close to waterways, or too close to coastal shorelines. Don't build on prime farmland or other significant soils. Build on gray or brownfields. Plan for transportation. To cross a stream with a utility, align it across a bridge or in casing above the stream instead of boring underneath the stream to bury it. Align utilities together in the same trench. Costs Working and designing around existing infrastructure Benefits Saves natural resources Reduce the cost of: Tipping fees Shipping Buying & installing new materials
  12. Develop a plan that reuses resources in place Re-purpose previously disturbed areas Avoid sensitive areas. Reduce excavation. Limit compaction. Avoid building in areas that provide habitat for threatened and endangered species. Don't build in the floodplain, in wetlands, too close to waterways, or too close to coastal shorelines. Don't build on prime farmland or other significant soils. Build on gray or brownfields. Plan for transportation. To cross a stream with a utility, align it across a bridge or in casing above the stream instead of boring underneath the stream to bury it. Align utilities together in the same trench. Costs Working and designing around existing infrastructure Benefits Saves natural resources Reduce the cost of: Tipping fees Shipping Buying & installing new materials
  13. Compared to a pipe, daylighting Slows, treats and cools the flow Contributes to biodiversity Fish habitat Animal passage Native plants Increases infiltration Can be an Costs Vegetation or other material to finish off swale look (not mulch – it floats!) Splash blocks Check dams Liners near footings (30 mil polyethylene or bentonite clay) Extra design and construction considerations Amenity Benefits Reduces the cost of: Excavation and compaction of pipe trench Pipe installation Eliminates the cost of base rock Slows, treats and cools the flow Contributes to biodiversity Fish habitat Animal passage Native plants Increases infiltration Can be an amenity
  14. Develop a plan that reuses resources in place Re-purpose previously disturbed areas Avoid sensitive areas. Reduce excavation. Limit compaction. Avoid building in areas that provide habitat for threatened and endangered species. Don't build in the floodplain, in wetlands, too close to waterways, or too close to coastal shorelines. Don't build on prime farmland or other significant soils. Build on gray or brownfields. Plan for transportation. To cross a stream with a utility, align it across a bridge or in casing above the stream instead of boring underneath the stream to bury it. Align utilities together in the same trench. Costs Working and designing around existing infrastructure Benefits Saves natural resources Reduce the cost of: Tipping fees Shipping Buying & installing new materials
  15. Compared to a pipe, daylighting Slows, treats and cools the flow Contributes to biodiversity Fish habitat Animal passage Native plants Increases infiltration Can be an Costs Vegetation or other material to finish off swale look (not mulch – it floats!) Splash blocks Check dams Liners near footings (30 mil polyethylene or bentonite clay) Extra design and construction considerations Amenity Benefits Reduces the cost of: Excavation and compaction of pipe trench Pipe installation Eliminates the cost of base rock Slows, treats and cools the flow Contributes to biodiversity Fish habitat Animal passage Native plants Increases infiltration Can be an amenity
  16. Compared to a pipe, daylighting Slows, treats and cools the flow Contributes to biodiversity Fish habitat Animal passage Native plants Increases infiltration Can be an Costs Vegetation or other material to finish off swale look (not mulch – it floats!) Splash blocks Check dams Liners near footings (30 mil polyethylene or bentonite clay) Extra design and construction considerations Amenity Benefits Reduces the cost of: Excavation and compaction of pipe trench Pipe installation Eliminates the cost of base rock Slows, treats and cools the flow Contributes to biodiversity Fish habitat Animal passage Native plants Increases infiltration Can be an amenity
  17. Compared to a pipe, daylighting Slows, treats and cools the flow Contributes to biodiversity Fish habitat Animal passage Native plants Increases infiltration Can be an Costs Vegetation or other material to finish off swale look (not mulch – it floats!) Splash blocks Check dams Liners near footings (30 mil polyethylene or bentonite clay) Extra design and construction considerations Amenity Benefits Reduces the cost of: Excavation and compaction of pipe trench Pipe installation Eliminates the cost of base rock Slows, treats and cools the flow Contributes to biodiversity Fish habitat Animal passage Native plants Increases infiltration Can be an amenity
  18. Compared to a pipe, daylighting Slows, treats and cools the flow Contributes to biodiversity Fish habitat Animal passage Native plants Increases infiltration Can be an Costs Vegetation or other material to finish off swale look (not mulch – it floats!) Splash blocks Check dams Liners near footings (30 mil polyethylene or bentonite clay) Extra design and construction considerations Amenity Benefits Reduces the cost of: Excavation and compaction of pipe trench Pipe installation Eliminates the cost of base rock Slows, treats and cools the flow Contributes to biodiversity Fish habitat Animal passage Native plants Increases infiltration Can be an amenity
  19. Compared to a pipe, daylighting Slows, treats and cools the flow Contributes to biodiversity Fish habitat Animal passage Native plants Increases infiltration Can be an Costs Vegetation or other material to finish off swale look (not mulch – it floats!) Splash blocks Check dams Liners near footings (30 mil polyethylene or bentonite clay) Extra design and construction considerations Amenity Benefits Reduces the cost of: Excavation and compaction of pipe trench Pipe installation Eliminates the cost of base rock Slows, treats and cools the flow Contributes to biodiversity Fish habitat Animal passage Native plants Increases infiltration Can be an amenity
  20. Compared to a pipe, daylighting Slows, treats and cools the flow Contributes to biodiversity Fish habitat Animal passage Native plants Increases infiltration Can be an Costs Vegetation or other material to finish off swale look (not mulch – it floats!) Splash blocks Check dams Liners near footings (30 mil polyethylene or bentonite clay) Extra design and construction considerations Amenity Benefits Reduces the cost of: Excavation and compaction of pipe trench Pipe installation Eliminates the cost of base rock Slows, treats and cools the flow Contributes to biodiversity Fish habitat Animal passage Native plants Increases infiltration Can be an amenity
  21. “ Sediment runoff rates from construction sites can be up to 20 times greater than agricultural sediment loss rates and 1000-2000 greater than those of forested lands .”
  22. Costs Keep it clean or a clogged filter sack will flood the street Benefits Easier to maintain than biobags Much better protection against polluted waters leaving the site
  23. Caine 2001 Snohomish County 2006 studies by WRG Costs Compost berm can be created with a bobcat or by blowing it in place Lack of familiarity Benefits No trenching, compaction, construction, or disposal Easier to maintain than sediment fences Much better protection against turbid waters leaving the site Compost can be spread over site when project is done instead of disposing of sediment fence
  24. Orient long side of building on east-west axis Plant deciduous trees on the south sides of buildings Order trash and recycling pick up when bins are full instead of on a regular basis Plan to encourage walking Specify low-grow native seed mixes instead of high maintenance lawn
  25. Orient long side of building on east-west axis Plant deciduous trees on the south sides of buildings Order trash and recycling pick up when bins are full instead of on a regular basis Plan to encourage walking Specify low-grow native seed mixes instead of high maintenance lawn