3. Scale
Date
QUARTER
INSTRUCTOR
INSTITUTION
MOHAMMED
ENVIRONMENTAL DESIGN
SERVICES
3/23/20156:46:45PM
ID-000
COVER SHEET
COMMERCIAL
PROJECT
ERIOLA
Author
3,23, 2015
Art Institute of Houston
I-6 DETAILS - ADA CORE RESTROOMS
XXXXX
REVISION#3
REVISION#2
REVISION#1
ORIGINALISSUE
DRAWING NAME
THIRD FLOOR PLAN
THIRD FLOOR POWER PLAN
COVER SHEET/GENERAL NOTES
DETAILS - PARTITION
DETAILED RECEPTION AND BREAK ROOM
THIRD FLOOR FURNITURE PLAN
THIRD FLOOR RCP
REVISION#4
DWG. NO.
1-9
I-0
I-3
1-1
I-7
I-5
I-2
1-4
ORIGINAL ISSUE
REVISED AND REISSUE OF ORIGINAL DRAWINGS
REVISED AND ISSUED ON 8 1/2" X 11" SHEET (S)
INDEX OF DRAWINGS
LONGITUDINAL AND TRANSVERSE BUILDING SECTIONS
I-10 MISCELLANEOUS CAMERA VIEWS
APPROVAL SIGNATURE DATE OF SIGNATURE
3 PAIR BUTTS
1 EACH LATCHSET
3 PAIR BUTTS
1 EACH LOCKSET
1 EACH SURFACE MOUNTED CLOSER
1 EACH DOOR STOP
1 EACH DOOR STOP (FLOOR MOUNTED)
SET "A"
SET "B"
1.
3.
2.
6.
5.
4. ALL DOOR FRAMES TO HAVE BUILDING STANDARD SILENCERS.
REFER TO DOOR SCHEDULE FOR HARDWARE COMBINATIONS.
ALL DOUBLE DOORS ARE TO HAVE DUMMY HARDWARE ON THE INACTIVE LEAF.
ALL DOORS TO BE UNDERCUT 5/8" FOR CARPET CLEARANCE.
ALL DOORS, HARDWARE AND FRAMES ARE TO BE BUILDING STANDARD UNLESS NOTED OTHERWISE.
ALL DOORS IN FIRE RATED WALLS SHALL HAVE HARDWARE AS REQUIRED TO MEET FIRE RATINGS.
DOOR HDWR. COMBINATIONS DOOR NOTES
MULLION
MANUFACTURER
MINIMUM
HORIZONTAL
HEATING, VENTILATION, & AIR CONDITIONING
INFORMATION TO FOLLOW
AMPERE
ABOVE FINISHED FLOOR
CENTER LINE
CEILING
COLUMN
CASED OPENING
H.V.A.C.
HORZ.
I.T.F.
MIN.
MFR.
MUL.
OVER HEAD DOOR
NOT IN CONTRACT
ON CENTER
TELEPHONE BOARD
REFRIGERATOR
SOLID CORE
REQUIRED
SECTION
VERIFY IN FIELD
WITH
VOLT
WITHOUT
VERTICAL
VINYL COMPOSITION TILE
UNLESS NOTED OTHERWISE
STAINLESS STEEL
TB
DOOR
DRAWING
CONTRACTOR
EQUAL
ELEVATION
ELECTRICAL PANEL
ELECTRIC WATER COOLER
ELECTRICAL
W/
V.
GUAGE
FINISH
FIRE HOSE CABINET
FIRE EXTINGUISHER CABINET
HARDWARE
HOLLOW METAL
GYSUM BOARD
GLASS
O.H. DOOR
REF.
O.C.
N.I.C.
REQD.
SECT.
S.S.
U.N.O.
S.C.
V.C.T.
V.I.F.
VERT.
W/O
CONTINUOUS
AMP.
A.F.F.
CL
CLG.
COL.
C.O.
DR.
CONTR.
DWG.
EP
E.W.C.
ELEV.
EQ.
ELEC.
GA.
FIN.
F.H.C.
F.E.C.
HDWR
GYP. BD.
H.M.
GL.
CONT.
ABBREVIATIONS
WATER HEATER
HEATER
WH
HTR.
HT. HEIGHT
WD. WOOD
1.
3.
2.
4.
5.
7.
FABRICATION.
6.
9.
10.
CONTRACTOR.
11.
12.
8.
13.
CONTRACTOR.
15.
14.
16.
17.
DEFECTIVE.
19.
OF THE WORK.
20.
18.
DESIGNER PRIOR TO INSTALLATION (TO BE INCLUDED IN BASE BID OF CONSTRUCTION)
COORDINATE HOLES FOR PLUMBING CLEANOUTS AND ACCESS PANELS WITH INTERIOR
TO PROCEEDING WITH THE WORK.
COORDINATE IN ALL PORTIONS OF THE WORK.
BEHIND, UNLESS NOTED OTHERWISE.
PERMITS AND CERTIFICATES OF OCCUPANCY.
HOURS OF OPERATION, ETC.
ALL CONSTRUCTION TO BE IN COMPLIANCE WITH LEGAL AND LOCAL CODES.
SKILL AND ATTENTION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL
OPENED WITHOUT THE USE OF A KEY FROM THE SIDE FROM WHICH EGRESS IS MADE.
ALL CUSTOM CABINET WORK TO BE FURNISHED, DELIVERED, AND INSTALLED BY THE CABINET
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES: AND SHALL
THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK, USING THE CONTRACTOR'S BEST
ALL DOORS USED IN CONJUNCTION WITH EXITS, SHALL BE SO ARRANGED AS TO BE READILY
WHERE DROPPED FASCIA IS INDICATED, GYPSUM BOARD SOFFIT IS TO BE RETURNED TO WALL
CONTRACTOR TO COORDINATE REQUIREMENTS WITH MILLWORKERS.
DO NOT SCALE DRAWINGS, DIMENSIONS GOVERN.
PARTITIONS SHALL BE DIMENSIONED FROM FINISH TO FINISH, UNLESS NOTED OTHERWISE.
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON AT THE JOB SITE
GENERAL CONTRACTOR SHALL REMIT ALL REQUIRED SHOP DRAWINGS (1 SET OF REPRODUCIBLES
CONTRACTOR FOR THE PROJECT SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED BUILDING
AND SHALL NOTIFY INTERIOR DESIGNER OF ANY ERROR, INCONSISTENCY OR OMMISIONS PRIOR
ALL MILLWORK, BLOCKING, GROUNDS, ROUGH BUCKS, AND MISCELLANEOUS BLOCKING TO BE
U.L. APPROVED NON-COMBUSTIBLE MATERIAL IN ACCORDANCE WITH LOCAL MUNICIPAL CODES.
GENERAL CONTRACTOR TO COORDINATE WITH INTERIOR DESIGNER IN REGARD TO BUILDING
AND 1 SET OF BLUE LINE PRINTS) TO INTERIOR DESIGNER FOR APPROVAL PRIOR TO
AT THE TIME OF CONSTRUCTION.
ANYONE NOT SKILLED IN THE TASK ASSIGNED THEM.
PROPER EXECUTION AND COMPLETION OF THE WORK.
WITH THE CONTRACT DOCUMENTS. ALL WORK NOT CONFORMING TO THESE REQUIRMENTS,
THE CONTRACTOR WARRANTS TO THE OWNER THAT ALL MATERIALS AND EQUIPMENT
THE WORK OR PORTIONS THEROF PROVIDED BY THE CONTRACTOR WHICH ARE LEGALLY ENACTED
FURNISHED UNDER THIS CONTRACT WILL BE NEW UNLESS OTHERWISE SPECIFIED, AND THAT ALL
INCLUDING SUBSTITUTIONS NOT PROPERLY APPROVED AND AUTHORIZED, MAY BE CONSIDERED
THE CONTRACTOR SHALL PAY ALL SALES, CONSUMER, USE AND OTHER SIMILAR TAXES FOR
WORK WILL BE OF GOOD QUALITY, FREE FROM FAULTS AND DEFECTS AND IN CONFORMANCE
ANY OTHER PERSONS PERFORMING ANY OF THE WORK UNDER A CONTRACT WITH THE
UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL
AND MACHINERY, TRANSPORTATION, AND OTHER FACILITIES AND SERVICES NECESSARY FOR THE
THE CONTRACTOR SHALL AT ALL TIMES ENFORCE STRICT DICIPLINE AND GOOD ORDER AMONG
THE CONTRACTOR'S EMPLOYEES AND SHALL NOT EMPLOY ON THE WORK ANY UNFIT PERSON OR
PROVIDE AND PAY FOR ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, CONSTRUCTION EQUIPMENT
THE CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS AND THEIR AGENTS AND EMPLOYEES, AND
IN NO WAY RELIEVE THE CONTRACTOR FROM ANY OBLIGATION IN RESECT TO THEIR WORK.
THE CONTRACTOR WILL BE PRESUMED TO HAVE INSPECTED THE SITE AND TO HAVE READ AND
REGULATIONS AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY BEARING ON THE PERFORMANCE
THE CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES,
OR OMISSION OF ANY CONTRACTOR TO EXAMINE ANY FORM, INSTRUMENT OR DOCUMENT SHALL
TO BE THOROUGHLY FAMILIAR WITH PLANS, SPECIFICATIONS, AND DOCUMENTS. THE FAILURE
THE CONTRACTOR SHALL BE RESPONSIBLE TO THE OWNER FOR THE ACTS AND OMISSIONS OF
GENERAL NOTES
EXTERIOR ELEVATIONSI-8
No. Description Date
REVIT Commercial
5. Cad pipingInventor
1
1
2
2
3
3
4
4
A A
B B
C C
D D
SHEET 1 OF 1
DRAWN
CHECKED
QA
MFG
APPROVED
aih 12/9/2014
DWG NO
TITLE
SIZE
C
SCALE
REV
R25.00
25.00
95.00
120°
20.00
95.00
20.00
R40.00
R32.50
35.0016.00
90.00
R5.00
25.00
Angle Support
2
PARTS LIST
DESCRIPTIONPART NUMBERQTYITEM
BasePart111
jawPart212
key fit into the slots on the jawPart313
screwPart424
Handle rodPart515
1
1
2
2
3
3
4
4
A A
B B
SHEET 1 OF 1
DRAWN
CHECKED
QA
MFG
APPROVED
aih 12/15/2014
DWG NO
Assemblydrawingfinail
TITLE
SIZE
B
SCALE
REV
1
3
4
2
5