16. • Editors, content and information
• Time-to-market
• Project plan
• Strategy & governance
• Internal resources
• Unique requirements
• Budget
• Technology stack
• Stakeholders
• Project methodology
• Interoperability
Homework for customers
17. About the organisation
Project details, scope and goals
Project timeline
Important use case scenarios (max 10)
Selection criteria
Vendor-related requirements
Related projects
Characteristics and technical architecture
RFP Content
20. ”People don’t want a
drill machine,
they want a hole in
the wall”
- Philip Kotler
21. Thanks for listening,
any questions?
http://mmtdigital.co.uk
@MMT_Digital
@JC_CTO
James.c@mmtdigital.co.uk
Hinweis der Redaktion
Intro to talk and MMT DigitalDon’t worry, this is certainly not about promoting the CMS’s that MMT Digital works with. Rather some thoughts and practical tips on selecting a CMS and a company to deliver your website based on experience of receiving RFPs and understanding how our clients went through the CMS selection process.
Major brands we have worked for. All of which we have delivered significant pieces of work for in the last 12 months.
Find a new image. The big guns?!A safe bet? Here are a few of the big guns from 2013.
And here are some of the big guns fro 6 or 7 years ago. If you pick the wrong CMS (Gartner Quadrant or not) you could be stuck with an unsupported system in a few years time. May be that’s not something to worry about too much as you can’t ever predict 5 years ahead in this industry.
Redo this slideThese next two slides are advice from the excellent J Boye who help companies with CMS selection.“Technical stack” could be replaced with CMS shortlist. But I would suggest keeping an open mind about your shortlist.