                                                      Agenda




       I. Introduction

       II. Classroom Design

           •   Furniture
           •   Storage
           •   Technology
           •   Utilities
           •   Circulation
           •   Materials

       III. Next Steps




proprietary and confidential
Golden Gate University SF Remodel Project Phase 7-9            2
Phasing 7A-7D: Classroom Redesign




                                                      I. Introduction




proprietary and confidential
Golden Gate University SF Remodel Project Phase 7-9                     3
Classroom Design

                                                                                         Key Elements




        Key Elements


        I. Classrooms belong to the University, not a specific school or group. As
        such, they should have a standard level of performance and quality.

        II. Classroom design should be forward-thinking and support the
        University’s pedagogical stance towards practice-ready education.

        III. All design elements should be mindful of the original architecture of the
        building at 536 Mission Street, and help support the Brutalist aesthetic.




proprietary and confidential
Golden Gate University SF Remodel Project Phase 7-9                                                     4
Classroom Design

                                                                             Key Elements




        Key Outcomes for Today


        What are the essential components of a classroom at Golden Gate
        University?

        What are some of the components that are not essential but good to
        have?

        What do we want in some rooms that can be modular/mobile, and
        possibly moved from room to room?




proprietary and confidential
Golden Gate University SF Remodel Project Phase 7-9                                         5
Phasing 7A-7D: Classroom Redesign




                                                      II. Classroom Design




proprietary and confidential
Golden Gate University SF Remodel Project Phase 7-9                          6
Classroom Design

                                                      Best Practices




        Best Practices - GGU


            •   3208     (1,307 SF, tiered)
            •   3214     (1,539 SF, tiered)
            •   3201     (1,589 SF)
            •   3205     (513 SF)




                                                      Room 3208




proprietary and confidential
Golden Gate University SF Remodel Project Phase 7-9                    7
Design Guidelines                                                   21ST CENTURY CLASSROOMS
  Classroom Design

                                                                                                                                                 Best Practices

                                                      21st Century Classroom Components
                                                      Illustrative Example



        Best Practices - OUSD Design                               Running Water
                                                                                                                 Large-Capacity,
                                                                                                                 Multi-Use Conduits
        Guidelines



                                                                                                                              T
                                                                                      Acoustic Tiles                             Transparent Entrance




                                                                                                                            F
                                                          Speakers and
        District-wide Classroom Design

                                                                                                    A
                                                          Distributed Sound                                                                  Mounts for Teaching
                                                                                        Permanent &                                          Wall Surfaces
        Guidelines for Oakland Unified

                                                                                                  R
                                                                                        Secure Storage
                                                                                        (Cabinets or
        School District.

                                                                                      D
                                                                                        Closets)




                                                                                       Network Access


                                                                                                            Teacher Station                             Portable Storage
                                                       Adequate               Re-configureable
                                                       Power                  Furniture                                                     Intercom/Phone
                                                       & Wiring
                                                                                            Artificial Lighting Controls

                                                      Classrooms must be at least 960 SF, as per the Title 5 California Code of Regulations. Rooms larger than
                                                      1,000 SF require two exits. Refer to http://www.cde.ca.gov/ls/fa/sf/title5regs.asp and the Educational
                                                      Specifications for further information about minimum specifications of performance.

proprietary and confidential
Golden Gate University SF Remodel Project Phase 7-9                                      Oakland Unified School District Design Guidelines                            6
                                                                                                                                                                           8
Classroom Design

                                                      Design Components




        Design Components

         •   Furniture
         •   Storage
         •   Technology
         •   Utilities
         •   Circulation
         •   Materials




proprietary and confidential
Golden Gate University SF Remodel Project Phase 7-9                       9
Classroom Design

                                                                     Furniture


            Furniture

        •    Desks
             • Moveable

             • Reconfigurable for lecture and small group work

             • Narrower

             • No modesty panels to allow for group work

             • Desks with built-in outlets



        •    Chairs
             • Moveable

             • Comfortable chairs

                • Soft covering, adjustable up and down, arm rests



        •    Teacher’s Podium
            • Moveable



        •    Side Table
            • Moveable

            • For demonstration items




proprietary and confidential
Golden Gate University SF Remodel Project Phase 7-9                              10
Classroom Design

                                                      Storage


            Storage

        •   Casework

        •   Closets

        •   Mobile Storage




proprietary and confidential
Golden Gate University SF Remodel Project Phase 7-9             11
Classroom Design

                                                                                        Technology


            Technology

        •   Computer (w/ wireless mouse)              •   Storage
             • Multiple USB ports                          • Permanent

        •   Projector                                      • Portable

             • Mounting?                              •   Phone
        •   Document Camera                           •   Video-conferencing tool
        •   DVD Player                                •   Large Clock
              • Placement?                            •   Recycling, Trash, & Compost
        •   Whiteboard
             • On every wall

        •   Blackboard
             • Keep or remove? Specialty

               rooms with blackboards?
             • “Too hard to read”

        •   Smartboard
             • Consider evolving

               technologies..
        •   Printer
             • Wireless




proprietary and confidential
Golden Gate University SF Remodel Project Phase 7-9                                                  12
Classroom Design

                                                                                             Utilities


         Utilities
         •   Network Access                                 • Replicate treatment used for
              • All classrooms should have                    GGU Center Room 6211
                strong network access                     • Artificial

              • Classrooms should be WIFI                   • Provide good light conducive

                enabled                                       to learning (white light)
         •   Power & Wiring                                 •  Standardize fixtures with
              • All classrooms should have a                  existing - use 6-West as a
                sufficient amount of outlets (one             precedent
                                                            • Dim and zone controls
                per seat)
              • Ground outlets?                       •   Acoustics
              • Wall outlets?                             • Distributed sound

              • Classrooms should have a                  • Speakers?

                sufficient number of USB ports        •   Climate
         •   Lighting                                     • HVAC

              • Natural                                   • Adjustable temperature?

                • Provide windows where                   • AC blows in “one place”

                  possible                            •   Water
                • Windows should have shades              • Water fountain

                  to reduce glare and
                  overheating


proprietary and confidential
Golden Gate University SF Remodel Project Phase 7-9                                                      13
Classroom Design

                                                              Hallways & Adjacencies


         Hallways & Adjacencies


         •   Doors & Entryways
             • Secure, lockable

             • Standardized (Color, style, hardware, etc.)

             • View panel in/next to door



         •   Storage Rooms

         •   Bulletin Board
             • Outside door of classroom

                 • Show classroom availability and schedule

                 • Post announcements




proprietary and confidential
Golden Gate University SF Remodel Project Phase 7-9                                    14
Classroom Design

                                                                                                 Materials


            Materials

        •    Walls                                                • “because of allergies”
             • Support acoustics                          •   Hallways
             • Clean/refurbish/replace existing                • Cork flooring - use 5th Floor

               fabric on walls                                   Elevator Lobby as precedent
             • Wainscot protection?

             • Light, calming wall colors             •   Ceiling
                                                          • HVAC

        •    Flooring                                     • Ceiling conduits for electrical

              • Classrooms                                • Acoustic panels?

                 • Standardize with existing              • Aesthetic paneling?

                   rooms                                      • Exposed ducts are “ugly”

                     • General Classrooms -

                       use 3-West rooms as            •   Art/Photos
                       precedents
                     • 5th Floor Auditorium -

                       use 6-West rooms as
                       precedents
                 • Hard material, not carpeting




proprietary and confidential
Golden Gate University SF Remodel Project Phase 7-9                                                          15
Phasing 7A-7D: Classroom Redesign




                                                      III. Next Steps




proprietary and confidential
Golden Gate University SF Remodel Project Phase 7-9                     16

Weitere ähnliche Inhalte

Andere mochten auch

UNEP- Technology and Economic Assessment Panel Quarantine and Pre-shipment Ta...
UNEP- Technology and Economic Assessment Panel Quarantine and Pre-shipment Ta...UNEP- Technology and Economic Assessment Panel Quarantine and Pre-shipment Ta...
UNEP- Technology and Economic Assessment Panel Quarantine and Pre-shipment Ta...PalletTruth
 
Assess through games and polls
Assess through games and pollsAssess through games and polls
Assess through games and pollsCandace Figg
 
計概作業
計概作業計概作業
計概作業Blacktea
 
Ggu obj6 final_report_12-4-12
Ggu obj6 final_report_12-4-12Ggu obj6 final_report_12-4-12
Ggu obj6 final_report_12-4-12MKThink Strategy
 

Andere mochten auch (7)

Digital Signature
Digital SignatureDigital Signature
Digital Signature
 
UNEP- Technology and Economic Assessment Panel Quarantine and Pre-shipment Ta...
UNEP- Technology and Economic Assessment Panel Quarantine and Pre-shipment Ta...UNEP- Technology and Economic Assessment Panel Quarantine and Pre-shipment Ta...
UNEP- Technology and Economic Assessment Panel Quarantine and Pre-shipment Ta...
 
Taiwan
TaiwanTaiwan
Taiwan
 
Assess through games and polls
Assess through games and pollsAssess through games and polls
Assess through games and polls
 
計概作業
計概作業計概作業
計概作業
 
Ggu obj6 final_report_12-4-12
Ggu obj6 final_report_12-4-12Ggu obj6 final_report_12-4-12
Ggu obj6 final_report_12-4-12
 
Holiday Greeting
Holiday GreetingHoliday Greeting
Holiday Greeting
 

Mehr von MKThink Strategy

Ccd campus site plan future mapping
Ccd campus site plan future mappingCcd campus site plan future mapping
Ccd campus site plan future mappingMKThink Strategy
 
151012 visioning workshop findings journey map_ccd
151012 visioning workshop findings journey map_ccd151012 visioning workshop findings journey map_ccd
151012 visioning workshop findings journey map_ccdMKThink Strategy
 
151012 visioning workshop findings empathy map_ccd
151012 visioning workshop findings empathy map_ccd151012 visioning workshop findings empathy map_ccd
151012 visioning workshop findings empathy map_ccdMKThink Strategy
 
141008_Kane Hall Programming and Planning Meeting
141008_Kane Hall Programming and Planning Meeting141008_Kane Hall Programming and Planning Meeting
141008_Kane Hall Programming and Planning MeetingMKThink Strategy
 
140722 experience design 3
140722 experience design 3140722 experience design 3
140722 experience design 3MKThink Strategy
 
1400617 Experience Design Meeting 2
1400617 Experience Design Meeting 21400617 Experience Design Meeting 2
1400617 Experience Design Meeting 2MKThink Strategy
 
UC Hastings 200 Programming and Planning Update
UC Hastings 200 Programming and Planning UpdateUC Hastings 200 Programming and Planning Update
UC Hastings 200 Programming and Planning UpdateMKThink Strategy
 
140603 GGU Experience Design Kick-Off
140603 GGU Experience Design Kick-Off140603 GGU Experience Design Kick-Off
140603 GGU Experience Design Kick-OffMKThink Strategy
 
Phase 7D Meeting 1 (4/10/14)
Phase 7D Meeting 1 (4/10/14)Phase 7D Meeting 1 (4/10/14)
Phase 7D Meeting 1 (4/10/14)MKThink Strategy
 
Phase 7D Meeting 2 (4/22/14)
Phase 7D Meeting 2 (4/22/14)Phase 7D Meeting 2 (4/22/14)
Phase 7D Meeting 2 (4/22/14)MKThink Strategy
 
Conceptual Organizational Model Presentation - 140407
Conceptual Organizational Model Presentation - 140407Conceptual Organizational Model Presentation - 140407
Conceptual Organizational Model Presentation - 140407MKThink Strategy
 
140328_UCH_200 P and P_COM
140328_UCH_200 P and P_COM140328_UCH_200 P and P_COM
140328_UCH_200 P and P_COMMKThink Strategy
 
140113 UC Hastings 200 McAllister Re-Programming Kick Off
140113 UC Hastings 200 McAllister Re-Programming Kick Off140113 UC Hastings 200 McAllister Re-Programming Kick Off
140113 UC Hastings 200 McAllister Re-Programming Kick OffMKThink Strategy
 
131002 woodside priory programming v1
131002 woodside priory programming v1131002 woodside priory programming v1
131002 woodside priory programming v1MKThink Strategy
 
131002 woodside priory programming fall 2015 spring 2016
131002 woodside priory programming fall 2015   spring 2016131002 woodside priory programming fall 2015   spring 2016
131002 woodside priory programming fall 2015 spring 2016MKThink Strategy
 

Mehr von MKThink Strategy (20)

Ccd campus site plan future mapping
Ccd campus site plan future mappingCcd campus site plan future mapping
Ccd campus site plan future mapping
 
151012 visioning workshop findings journey map_ccd
151012 visioning workshop findings journey map_ccd151012 visioning workshop findings journey map_ccd
151012 visioning workshop findings journey map_ccd
 
151012 visioning workshop findings empathy map_ccd
151012 visioning workshop findings empathy map_ccd151012 visioning workshop findings empathy map_ccd
151012 visioning workshop findings empathy map_ccd
 
141008_Kane Hall Programming and Planning Meeting
141008_Kane Hall Programming and Planning Meeting141008_Kane Hall Programming and Planning Meeting
141008_Kane Hall Programming and Planning Meeting
 
140722 experience design 3
140722 experience design 3140722 experience design 3
140722 experience design 3
 
140723 july 23rd meeting
140723 july 23rd meeting140723 july 23rd meeting
140723 july 23rd meeting
 
140709 july 9th meeting
140709 july 9th meeting140709 july 9th meeting
140709 july 9th meeting
 
1400617 Experience Design Meeting 2
1400617 Experience Design Meeting 21400617 Experience Design Meeting 2
1400617 Experience Design Meeting 2
 
UC Hastings 200 Programming and Planning Update
UC Hastings 200 Programming and Planning UpdateUC Hastings 200 Programming and Planning Update
UC Hastings 200 Programming and Planning Update
 
140603 GGU Experience Design Kick-Off
140603 GGU Experience Design Kick-Off140603 GGU Experience Design Kick-Off
140603 GGU Experience Design Kick-Off
 
140506 meeting4
140506 meeting4140506 meeting4
140506 meeting4
 
140429 meeting3
140429 meeting3140429 meeting3
140429 meeting3
 
Phase 7D Meeting 1 (4/10/14)
Phase 7D Meeting 1 (4/10/14)Phase 7D Meeting 1 (4/10/14)
Phase 7D Meeting 1 (4/10/14)
 
Phase 7D Meeting 2 (4/22/14)
Phase 7D Meeting 2 (4/22/14)Phase 7D Meeting 2 (4/22/14)
Phase 7D Meeting 2 (4/22/14)
 
140425 COM Presentation
140425 COM Presentation140425 COM Presentation
140425 COM Presentation
 
Conceptual Organizational Model Presentation - 140407
Conceptual Organizational Model Presentation - 140407Conceptual Organizational Model Presentation - 140407
Conceptual Organizational Model Presentation - 140407
 
140328_UCH_200 P and P_COM
140328_UCH_200 P and P_COM140328_UCH_200 P and P_COM
140328_UCH_200 P and P_COM
 
140113 UC Hastings 200 McAllister Re-Programming Kick Off
140113 UC Hastings 200 McAllister Re-Programming Kick Off140113 UC Hastings 200 McAllister Re-Programming Kick Off
140113 UC Hastings 200 McAllister Re-Programming Kick Off
 
131002 woodside priory programming v1
131002 woodside priory programming v1131002 woodside priory programming v1
131002 woodside priory programming v1
 
131002 woodside priory programming fall 2015 spring 2016
131002 woodside priory programming fall 2015   spring 2016131002 woodside priory programming fall 2015   spring 2016
131002 woodside priory programming fall 2015 spring 2016
 

Classroom redesign 130211

  • 1. Golden Gate University Phasing 7A-7D: Classroom Redesign 02.11.13
  • 2. Phasing 7A-7D: Classroom Redesign Agenda I. Introduction II. Classroom Design • Furniture • Storage • Technology • Utilities • Circulation • Materials III. Next Steps proprietary and confidential Golden Gate University SF Remodel Project Phase 7-9 2
  • 3. Phasing 7A-7D: Classroom Redesign I. Introduction proprietary and confidential Golden Gate University SF Remodel Project Phase 7-9 3
  • 4. Classroom Design Key Elements Key Elements I. Classrooms belong to the University, not a specific school or group. As such, they should have a standard level of performance and quality. II. Classroom design should be forward-thinking and support the University’s pedagogical stance towards practice-ready education. III. All design elements should be mindful of the original architecture of the building at 536 Mission Street, and help support the Brutalist aesthetic. proprietary and confidential Golden Gate University SF Remodel Project Phase 7-9 4
  • 5. Classroom Design Key Elements Key Outcomes for Today What are the essential components of a classroom at Golden Gate University? What are some of the components that are not essential but good to have? What do we want in some rooms that can be modular/mobile, and possibly moved from room to room? proprietary and confidential Golden Gate University SF Remodel Project Phase 7-9 5
  • 6. Phasing 7A-7D: Classroom Redesign II. Classroom Design proprietary and confidential Golden Gate University SF Remodel Project Phase 7-9 6
  • 7. Classroom Design Best Practices Best Practices - GGU • 3208 (1,307 SF, tiered) • 3214 (1,539 SF, tiered) • 3201 (1,589 SF) • 3205 (513 SF) Room 3208 proprietary and confidential Golden Gate University SF Remodel Project Phase 7-9 7
  • 8. Design Guidelines 21ST CENTURY CLASSROOMS Classroom Design Best Practices 21st Century Classroom Components Illustrative Example Best Practices - OUSD Design Running Water Large-Capacity, Multi-Use Conduits Guidelines T Acoustic Tiles Transparent Entrance F Speakers and District-wide Classroom Design A Distributed Sound Mounts for Teaching Permanent & Wall Surfaces Guidelines for Oakland Unified R Secure Storage (Cabinets or School District. D Closets) Network Access Teacher Station Portable Storage Adequate Re-configureable Power Furniture Intercom/Phone & Wiring Artificial Lighting Controls Classrooms must be at least 960 SF, as per the Title 5 California Code of Regulations. Rooms larger than 1,000 SF require two exits. Refer to http://www.cde.ca.gov/ls/fa/sf/title5regs.asp and the Educational Specifications for further information about minimum specifications of performance. proprietary and confidential Golden Gate University SF Remodel Project Phase 7-9 Oakland Unified School District Design Guidelines 6 8
  • 9. Classroom Design Design Components Design Components • Furniture • Storage • Technology • Utilities • Circulation • Materials proprietary and confidential Golden Gate University SF Remodel Project Phase 7-9 9
  • 10. Classroom Design Furniture Furniture • Desks • Moveable • Reconfigurable for lecture and small group work • Narrower • No modesty panels to allow for group work • Desks with built-in outlets • Chairs • Moveable • Comfortable chairs • Soft covering, adjustable up and down, arm rests • Teacher’s Podium • Moveable • Side Table • Moveable • For demonstration items proprietary and confidential Golden Gate University SF Remodel Project Phase 7-9 10
  • 11. Classroom Design Storage Storage • Casework • Closets • Mobile Storage proprietary and confidential Golden Gate University SF Remodel Project Phase 7-9 11
  • 12. Classroom Design Technology Technology • Computer (w/ wireless mouse) • Storage • Multiple USB ports • Permanent • Projector • Portable • Mounting? • Phone • Document Camera • Video-conferencing tool • DVD Player • Large Clock • Placement? • Recycling, Trash, & Compost • Whiteboard • On every wall • Blackboard • Keep or remove? Specialty rooms with blackboards? • “Too hard to read” • Smartboard • Consider evolving technologies.. • Printer • Wireless proprietary and confidential Golden Gate University SF Remodel Project Phase 7-9 12
  • 13. Classroom Design Utilities Utilities • Network Access • Replicate treatment used for • All classrooms should have GGU Center Room 6211 strong network access • Artificial • Classrooms should be WIFI • Provide good light conducive enabled to learning (white light) • Power & Wiring • Standardize fixtures with • All classrooms should have a existing - use 6-West as a sufficient amount of outlets (one precedent • Dim and zone controls per seat) • Ground outlets? • Acoustics • Wall outlets? • Distributed sound • Classrooms should have a • Speakers? sufficient number of USB ports • Climate • Lighting • HVAC • Natural • Adjustable temperature? • Provide windows where • AC blows in “one place” possible • Water • Windows should have shades • Water fountain to reduce glare and overheating proprietary and confidential Golden Gate University SF Remodel Project Phase 7-9 13
  • 14. Classroom Design Hallways & Adjacencies Hallways & Adjacencies • Doors & Entryways • Secure, lockable • Standardized (Color, style, hardware, etc.) • View panel in/next to door • Storage Rooms • Bulletin Board • Outside door of classroom • Show classroom availability and schedule • Post announcements proprietary and confidential Golden Gate University SF Remodel Project Phase 7-9 14
  • 15. Classroom Design Materials Materials • Walls • “because of allergies” • Support acoustics • Hallways • Clean/refurbish/replace existing • Cork flooring - use 5th Floor fabric on walls Elevator Lobby as precedent • Wainscot protection? • Light, calming wall colors • Ceiling • HVAC • Flooring • Ceiling conduits for electrical • Classrooms • Acoustic panels? • Standardize with existing • Aesthetic paneling? rooms • Exposed ducts are “ugly” • General Classrooms - use 3-West rooms as • Art/Photos precedents • 5th Floor Auditorium - use 6-West rooms as precedents • Hard material, not carpeting proprietary and confidential Golden Gate University SF Remodel Project Phase 7-9 15
  • 16. Phasing 7A-7D: Classroom Redesign III. Next Steps proprietary and confidential Golden Gate University SF Remodel Project Phase 7-9 16