THE EXPANSION OF ABU DHABI
INTERNATIONAL AIRPORT
Middle East Concrete & PMV Live ExhibitionNov. 2014
Site Location
Middle East Concrete & PMV Live ExhibitionNov. 2014
Middle East Concrete & PMV Live Exhibition
Project Organization
PROJECT MANAGER:
PARSONS
CONSULTING ENGINEER:
-OVE ARUP
-KPF
PILING CONTRACTOR:
NSCC INTERNATIONAL LTD.
RESIDENT ENGINEER:
JACOBS GIBBS CLIENT:
SCADIA
Nov. 2014
Impact of Cavities
Technical considerations
Stability of heavy machines.
Concrete Over-consumption.
Tight Schedule.
Middle East Concrete & PMV Live ExhibitionNov. 2014
Middle East Concrete & PMV Live Exhibition
Subsurface Conditions
Nov. 2014
-35
-30
-25
-20
-15
-10
-5
0
5
10
0 10 20 30 40 50 60 70 80 90 100
RQD (%)
NADD
Subsurface Conditions
Middle East Concrete & PMV Live ExhibitionNov. 2014
Subsurface Conditions
Middle East Concrete & PMV Live Exhibition
Fill and native sand.
Sandstone + Siltstone
Mudstone + Crystalline Gypsum
CAVITIES
Nov. 2014
Groundwater Condition
Middle East Concrete & PMV Live ExhibitionNov. 2014
GYPSUM DISSOLUTION
Gypsum is a highly soluble rock and under suitable groundwater flow
conditions it can dissolve forming caves and karstic features
including collapse.
Middle East Concrete & PMV Live ExhibitionNov. 2014
Subsurface Conditions
In	General	
Cavities	Were	
Found	above	
‐10	NADD
SHALLOW CAVITIESDEEP CAVITIES
Middle East Concrete & PMV Live ExhibitionNov. 2014
How the cavities were formed?
Ground Water + Carbon Dioxide = Weak Carbonic Acid Solution
The acid solution dissolves the crystalline gypsum in the flowing groundwater
through rock joints, fractures or bedding planes and forming voids or even
continuous channels.
Geophysical	and	
Geotechnical	Findings	of	
the	Site
Middle East Concrete & PMV Live ExhibitionNov. 2014
Seismic effects included in working loads (UBC 1997).
Potential cavity collapse and
corresponding down drag forces
accounted for.
Design Aspects
No skin friction considered above
-10.0 m NADD.
Reduced lateral soil resistance above
-10.0 m NADD.
Friction piles, end bearing component
neglected.
Existing Ground Level
(-10.00)
Weak Rock
With
Potential
Cavities
Competent
Rock
Middle East Concrete & PMV Live ExhibitionNov. 2014
Middle East Concrete & PMV Live Exhibition
Design Procedure
Column
loads as given by the consultant
Load
Combinations
(70 SLS& 60 ULS)
Max. Column Loads
Design Loads of piles for
SLS and ULS
GeotechnicalDesign
Structural
Design
Soil Pile friction
Effect of Cavities
Check of Wedge Failure
Settlement of a single pile
Settlement of PileGroup
PileGroup Effect
Lateral Analysis
Check of Buckling
Crack Width Control
Check of tensile stress
Main Reinforcement
Shear Reinforcement
Nov. 2014
Middle East Concrete & PMV Live Exhibition
Column Load Combinations
BS EN1991-1_2002 Eurocode 1
For UltimateLoad combinations
UBC
For Working Load Combinations
 
 4.1/)3.03.0(75.00.1
4.1/)3.03.0(75.00.1
0.10.13
0.10.10.12
0.10.11
MyEyMxExQkGkSeismicY
MyEyMxExQkGkSeismicX
WGkSLS
WQkGkSLS
QkGkSLS





MyEyMxExQkGkSeismicY
MyEyMxExQkGkSeismicX
WGkULS
WGkULS
WQkGkULS
QkGkULS






3.03.06.00.1
3.03.06.00.1
Dead)l(Beneficia4.10.14
Dead)(Adverse4.14.13
2.12.12.12
6.14.11
Resulted in 70Load CombinationsResulted in 60Load Combinations
AnalysesforEach Pile
Cap
+
Load	Combinations	(SLS	&	ULS)
Nov. 2014
Middle East Concrete & PMV Live Exhibition
Pile Working & Ultimate Loads

 22
y
yM
x
xM
n
Q
P xy
p
Mx, My: Moment about x and y axes
x, y: Distance from y and x axes to any pile
x2, y2: Group moment of inertia
n: Number of piles
Ultimate load combinations  4 critical cases considered for structural design:
• Maximum Compression + corresponding moment and lateral load.
• Maximum Tension + corresponding moment and lateral load.
• Maximum moment + corresponding axial and lateral load.
• Maximum lateral load + corresponding axial and bending moment.
• Transformation of Loading Orientation:
Global  Pile Cap Local
• Calculation of Pile Loads
Nov. 2014
Geotechnical Design
Ultimate pile-rock unit skin adhesion (R.G. Horvath, 1978).usu qf .15.0.27
Working friction capacity of pile, Fs = 2.0
susocketsf
s
sf
a
fLDQ
F
Q
Q
...

W
F
fLD
Q
s
susocket
uplifta 
...
)(
 Working uplift capacity, Fs = 3.0
Soil Pile Friction, working capacity
Middle East Concrete & PMV Live ExhibitionNov. 2014
Geotechnical Design
Factor of safety against wedge failure:
t
cohesion
F
FW
SF
cos.
..


W: Total weight of the wedge (pile Wp, pile cap Wr, and soil/rock Ws)
FCohesion is the rock cohesion resistance over the wedge surface.
A minimum safety factor of 1.1 against probable wedge failure is ensured.
Check of Wedge Failure - Uplift

Wp
Wr
Ws

(a) (b)
tF tF
Middle East Concrete & PMV Live ExhibitionNov. 2014
Geotechnical Design
Settlement & Pile Group Effects
Middle East Concrete & PMV Live ExhibitionNov. 2014
Structural Design
Rotational Stiffness k:
Spansofnumberx
L
IE
k crc
4
Lateral Analysis using ALP
Lateral pile-soil interaction
Bending moments
Shear forces
Middle East Concrete & PMV Live ExhibitionNov. 2014
Middle East Concrete & PMV Live Exhibition
Structural Design
Structural Capacity
Check
Crack width
assessment
Nov. 2014
Pile Tests and Design Validation
Sonic Logging almost 1800 piles
75 Working Pile Load Tests
13 Instrumented Non-Working Pile
Load Tests (conventional +
bidirectional O-cell)
(250% of the working loads)
Caliper logging tests
LONGITUDINAL SECTION
BHT-36
Middle East Concrete & PMV Live ExhibitionNov. 2014
Testing of Piles
Analysis	and	Interpretation	of	Tests	Results
391.00
37.00
416.00
391.0098.00
98.00
416.00
37.00
-22
-20
-18
-16
-14
-12
-10
-8
-6
-4
-2
0
2
4
6
-300 200 700 1200
Depth
58
922
740
822
922
58 822
-22
-20
-18
-16
-14
-12
-10
-8
-6
-4
-2
0
2
4
6
-300 200 700 1200
873
645
901
873
598
598
901
645
-22
-20
-18
-16
-14
-12
-10
-8
-6
-4
-2
0
2
4
6
-300 200 700 1200
1.0 m dia
(Sector 5)
1.2 m dia
(Sector 5)
1.5 m dia, O-Cell
(Sector 5)
(a) (b) (c)
Middle East Concrete & PMV Live ExhibitionNov. 2014
Impact of Cavities
Technical considerations
Stability of heavy machines.
Concrete Over-consumption.
Tight Schedule.
Middle East Concrete & PMV Live ExhibitionNov. 2014
Classification of Cavities
Existing Ground Level varies from +7.00 to +16.50 NADD
(-10.00 NADD)
Shallow Cavities
(Within 8m from Ground)
Cavities above -10.0 NADD
-Permanent Casing
-Lean Mix
Cavities below -10.0 NADD
-Concrete Overbreak
90% of suspected cavities
are situated above
-10.0 NADD
Middle East Concrete & PMV Live ExhibitionNov. 2014
Probing
Middle East Concrete & PMV Live ExhibitionNov. 2014
Probing
Middle East Concrete & PMV Live ExhibitionNov. 2014
Probing Logs
Analysis of Probing Records
Spreadsheets GIS Model
Middle East Concrete & PMV Live ExhibitionNov. 2014
Probing Logs
Analysis of Probing Records
Spreadsheets GIS Model
Middle East Concrete & PMV Live ExhibitionNov. 2014
Cavity (500 psi) Soft Zone
(or cavity filled with loose materials 250 psi)
2D and 3D distribution of cavities using ArcGIS
Analysis of Probing Records
Middle East Concrete & PMV Live ExhibitionNov. 2014
Probing Conclusion
Based on the results of probing, recommendations were issued by our technical engineers to tackle:
1. For shallow cavities - either to fill or detour around it.
2. For cavities above El -10.00 NADD - use permanent
casing in pile construction, fill the cavity with lean mix
prior to pile construction, or allow for concrete over
consumption.
3. Deep cavities below El -10.00 NADD - we elected to
use self compacting concrete in order to insure that all
cavities are properly filled.
Middle East Concrete & PMV Live ExhibitionNov. 2014
Shallow Cavities Safety Measures
Middle East Concrete & PMV Live ExhibitionNov. 2014
Treatment of Cavities – Permanent Casing
Middle East Concrete & PMV Live ExhibitionNov. 2014
Middle East Concrete & PMV Live Exhibition
Treatment of Cavities – Lean Mix Filling
Nov. 2014
Middle East Concrete & PMV Live Exhibition
Overall Piles Layout
TOTAL	7423	
PILES	
COMPLETED!!
Nov. 2014
Middle East Concrete & PMV Live Exhibition
Pile s Construction
Nov. 2014
Middle East Concrete & PMV Live Exhibition
Piles construction
Nov. 2014
Diaphragm wall construction
Middle East Concrete & PMV Live ExhibitionNov. 2014
Middle East Concrete & PMV Live Exhibition
Diaphragm wall construction
Nov. 2014
Middle East Concrete & PMV Live Exhibition
Mass Excavation
Nov. 2014
Mass Excavation
Middle East Concrete & PMV Live ExhibitionNov. 2014
PROJECT HIGHTLIGHTS
Total	drilled	Length	of	Piles:	220	km
Total	linear	meter	drilled	for	probing	:293	km
Total	piles	Concrete	Volume:		339,416	m3 +	38,541	m3 for	diaphragm	
wall	
Total	Volume	of	Lean	Mix	:	31,043	m3
Total	weight	of	steel	used	:52,500	ton	
Total	length	of	P.	casings	:4040	l.m.	
Total	length	of	diaphragm	wall	:2,100	l.m.
Total	excavation	volume	:	1,500,000	m3
Total	Number	of	deep	wells:	102	nos.	covering	and	controlling	water	
levels	at		area	of		129,630	m2
Middle East Concrete & PMV Live ExhibitionNov. 2014
ACHIEVEMENTS
-Complete piling construction on time with maximum production rate of 46 piles/
day consuming about 2000m3/day.
-Cost Saving for the client by proposing Lean Mix Concrete for plugging
suspected cavities instead of using permanent casings.
Estimated Cost of all permanent casings: 109 million Dirham
Estimated Cost of Combination of Lean mix + Permanent Casings: 34 million
Dirham
Saving of approximately 65 million Dirham
- The numbers of deep wells required for dewatering are reduced to 45 nos. after
conducting various stages of de-watering optimization trials .
Middle East Concrete & PMV Live ExhibitionNov. 2014
Middle East Concrete & PMV Live Exhibition
The Final Product
Nov. 2014
Middle East Concrete & PMV Live Exhibition
THANK YOU
Nov. 2014

Weitere ähnliche Inhalte

Ähnlich wie The Expansion of Abu Dhabi International Airport

Muzamil upv test
Muzamil                   upv testMuzamil                   upv test
Muzamil upv testkhalid wani
 
KOM Presentation STN-N Conductor_rev 2
KOM Presentation STN-N Conductor_rev 2KOM Presentation STN-N Conductor_rev 2
KOM Presentation STN-N Conductor_rev 2Brian Quan (Minh)
 
SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013Hans Holkenborg
 
SELF COMPSCTING CONCRETE BY USING FLYASH
SELF COMPSCTING CONCRETE BY USING FLYASHSELF COMPSCTING CONCRETE BY USING FLYASH
SELF COMPSCTING CONCRETE BY USING FLYASHSiddhu Siddarth
 
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...Egyptian Engineers Association
 
Txmer quality plan 2
Txmer quality plan 2Txmer quality plan 2
Txmer quality plan 2Naresh Raju
 
The Niagara Tunnel Facility Project
The Niagara Tunnel Facility ProjectThe Niagara Tunnel Facility Project
The Niagara Tunnel Facility ProjectHelmut Wannenmacher
 
Roy McCullough CV Feb 2015
Roy McCullough CV Feb 2015Roy McCullough CV Feb 2015
Roy McCullough CV Feb 2015Roy McCullough
 
PILE FOUNDATION PROJECT TRAINING ANSHUL
PILE FOUNDATION PROJECT TRAINING ANSHULPILE FOUNDATION PROJECT TRAINING ANSHUL
PILE FOUNDATION PROJECT TRAINING ANSHULAnshul Shakya
 
CV6314_Lect_1_excavation_4slides_2012.pdf
CV6314_Lect_1_excavation_4slides_2012.pdfCV6314_Lect_1_excavation_4slides_2012.pdf
CV6314_Lect_1_excavation_4slides_2012.pdfjclimkanghai
 
ASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileMitchell Mantiri
 
Pump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case studyPump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case studyInfocengrs63
 
CV Siam Update 31-10-2016
CV  Siam Update 31-10-2016CV  Siam Update 31-10-2016
CV Siam Update 31-10-2016siam sayed
 
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC videoASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC videoSantie Gouws
 
Comparative Study on Flexural Strength of M-40 Grade with Lapping of Bars
Comparative Study on Flexural Strength of M-40 Grade with Lapping of BarsComparative Study on Flexural Strength of M-40 Grade with Lapping of Bars
Comparative Study on Flexural Strength of M-40 Grade with Lapping of BarsIRJET Journal
 
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINEDESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINEAnurag Jha
 

Ähnlich wie The Expansion of Abu Dhabi International Airport (20)

Muzamil upv test
Muzamil                   upv testMuzamil                   upv test
Muzamil upv test
 
KOM Presentation STN-N Conductor_rev 2
KOM Presentation STN-N Conductor_rev 2KOM Presentation STN-N Conductor_rev 2
KOM Presentation STN-N Conductor_rev 2
 
SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013
 
SELF COMPSCTING CONCRETE BY USING FLYASH
SELF COMPSCTING CONCRETE BY USING FLYASHSELF COMPSCTING CONCRETE BY USING FLYASH
SELF COMPSCTING CONCRETE BY USING FLYASH
 
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
 
Txmer quality plan 2
Txmer quality plan 2Txmer quality plan 2
Txmer quality plan 2
 
Training PPT
Training PPTTraining PPT
Training PPT
 
The Niagara Tunnel Facility Project
The Niagara Tunnel Facility ProjectThe Niagara Tunnel Facility Project
The Niagara Tunnel Facility Project
 
Roy McCullough CV Feb 2015
Roy McCullough CV Feb 2015Roy McCullough CV Feb 2015
Roy McCullough CV Feb 2015
 
PILE FOUNDATION PROJECT TRAINING ANSHUL
PILE FOUNDATION PROJECT TRAINING ANSHULPILE FOUNDATION PROJECT TRAINING ANSHUL
PILE FOUNDATION PROJECT TRAINING ANSHUL
 
CV6314_Lect_1_excavation_4slides_2012.pdf
CV6314_Lect_1_excavation_4slides_2012.pdfCV6314_Lect_1_excavation_4slides_2012.pdf
CV6314_Lect_1_excavation_4slides_2012.pdf
 
ASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileASL SHIPYARD - Company Profile
ASL SHIPYARD - Company Profile
 
Pump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case studyPump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case study
 
LINGAM
LINGAMLINGAM
LINGAM
 
CVbillyno3-
CVbillyno3-CVbillyno3-
CVbillyno3-
 
CV Siam Update 31-10-2016
CV  Siam Update 31-10-2016CV  Siam Update 31-10-2016
CV Siam Update 31-10-2016
 
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC videoASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
 
Comparative Study on Flexural Strength of M-40 Grade with Lapping of Bars
Comparative Study on Flexural Strength of M-40 Grade with Lapping of BarsComparative Study on Flexural Strength of M-40 Grade with Lapping of Bars
Comparative Study on Flexural Strength of M-40 Grade with Lapping of Bars
 
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINEDESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
 
SOR DWS 2010
SOR DWS 2010SOR DWS 2010
SOR DWS 2010
 

Mehr von MECandPMV

Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...MECandPMV
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryMECandPMV
 
Chemical attack on the durability of underground structures
Chemical attack on the durability of underground structuresChemical attack on the durability of underground structures
Chemical attack on the durability of underground structuresMECandPMV
 
Building materials & pollutants
Building materials & pollutantsBuilding materials & pollutants
Building materials & pollutantsMECandPMV
 
Standards for mobile towers
Standards for mobile towersStandards for mobile towers
Standards for mobile towersMECandPMV
 
Risk management
Risk managementRisk management
Risk managementMECandPMV
 
Guarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificatesGuarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificatesMECandPMV
 
Greening of concrete trends & priorities
Greening of concrete trends & prioritiesGreening of concrete trends & priorities
Greening of concrete trends & prioritiesMECandPMV
 
Emergency procedure at height
Emergency procedure at heightEmergency procedure at height
Emergency procedure at heightMECandPMV
 
Concrete durability
Concrete durabilityConcrete durability
Concrete durabilityMECandPMV
 
Al hail greens residential development
Al hail greens residential developmentAl hail greens residential development
Al hail greens residential developmentMECandPMV
 
Advancements in concrete repair technologies and techniques
Advancements in concrete repair technologies and techniquesAdvancements in concrete repair technologies and techniques
Advancements in concrete repair technologies and techniquesMECandPMV
 
Tilt up concrete structures
Tilt up concrete structuresTilt up concrete structures
Tilt up concrete structuresMECandPMV
 
Vehicle tracking & fleet management
Vehicle tracking & fleet managementVehicle tracking & fleet management
Vehicle tracking & fleet managementMECandPMV
 
Tilt up concrete Construction advancec & Applications
Tilt up concrete Construction advancec & ApplicationsTilt up concrete Construction advancec & Applications
Tilt up concrete Construction advancec & ApplicationsMECandPMV
 
Working Safely while saving time & cost
Working Safely while saving time & costWorking Safely while saving time & cost
Working Safely while saving time & costMECandPMV
 
Structural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructureStructural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructureMECandPMV
 
Concrete Durability and water resistance
Concrete Durability and water resistanceConcrete Durability and water resistance
Concrete Durability and water resistanceMECandPMV
 
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...MECandPMV
 
Cement based solutions for early return to service
Cement based solutions for early return to serviceCement based solutions for early return to service
Cement based solutions for early return to serviceMECandPMV
 

Mehr von MECandPMV (20)

Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project delivery
 
Chemical attack on the durability of underground structures
Chemical attack on the durability of underground structuresChemical attack on the durability of underground structures
Chemical attack on the durability of underground structures
 
Building materials & pollutants
Building materials & pollutantsBuilding materials & pollutants
Building materials & pollutants
 
Standards for mobile towers
Standards for mobile towersStandards for mobile towers
Standards for mobile towers
 
Risk management
Risk managementRisk management
Risk management
 
Guarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificatesGuarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificates
 
Greening of concrete trends & priorities
Greening of concrete trends & prioritiesGreening of concrete trends & priorities
Greening of concrete trends & priorities
 
Emergency procedure at height
Emergency procedure at heightEmergency procedure at height
Emergency procedure at height
 
Concrete durability
Concrete durabilityConcrete durability
Concrete durability
 
Al hail greens residential development
Al hail greens residential developmentAl hail greens residential development
Al hail greens residential development
 
Advancements in concrete repair technologies and techniques
Advancements in concrete repair technologies and techniquesAdvancements in concrete repair technologies and techniques
Advancements in concrete repair technologies and techniques
 
Tilt up concrete structures
Tilt up concrete structuresTilt up concrete structures
Tilt up concrete structures
 
Vehicle tracking & fleet management
Vehicle tracking & fleet managementVehicle tracking & fleet management
Vehicle tracking & fleet management
 
Tilt up concrete Construction advancec & Applications
Tilt up concrete Construction advancec & ApplicationsTilt up concrete Construction advancec & Applications
Tilt up concrete Construction advancec & Applications
 
Working Safely while saving time & cost
Working Safely while saving time & costWorking Safely while saving time & cost
Working Safely while saving time & cost
 
Structural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructureStructural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructure
 
Concrete Durability and water resistance
Concrete Durability and water resistanceConcrete Durability and water resistance
Concrete Durability and water resistance
 
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
 
Cement based solutions for early return to service
Cement based solutions for early return to serviceCement based solutions for early return to service
Cement based solutions for early return to service
 

Kürzlich hochgeladen

Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 

Kürzlich hochgeladen (20)

Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 

The Expansion of Abu Dhabi International Airport

  • 1. THE EXPANSION OF ABU DHABI INTERNATIONAL AIRPORT Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 2. Site Location Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 3. Middle East Concrete & PMV Live Exhibition Project Organization PROJECT MANAGER: PARSONS CONSULTING ENGINEER: -OVE ARUP -KPF PILING CONTRACTOR: NSCC INTERNATIONAL LTD. RESIDENT ENGINEER: JACOBS GIBBS CLIENT: SCADIA Nov. 2014
  • 4. Impact of Cavities Technical considerations Stability of heavy machines. Concrete Over-consumption. Tight Schedule. Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 5. Middle East Concrete & PMV Live Exhibition Subsurface Conditions Nov. 2014
  • 6. -35 -30 -25 -20 -15 -10 -5 0 5 10 0 10 20 30 40 50 60 70 80 90 100 RQD (%) NADD Subsurface Conditions Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 7. Subsurface Conditions Middle East Concrete & PMV Live Exhibition Fill and native sand. Sandstone + Siltstone Mudstone + Crystalline Gypsum CAVITIES Nov. 2014
  • 8. Groundwater Condition Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 9. GYPSUM DISSOLUTION Gypsum is a highly soluble rock and under suitable groundwater flow conditions it can dissolve forming caves and karstic features including collapse. Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 10. Subsurface Conditions In General Cavities Were Found above ‐10 NADD SHALLOW CAVITIESDEEP CAVITIES Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 11. How the cavities were formed? Ground Water + Carbon Dioxide = Weak Carbonic Acid Solution The acid solution dissolves the crystalline gypsum in the flowing groundwater through rock joints, fractures or bedding planes and forming voids or even continuous channels. Geophysical and Geotechnical Findings of the Site Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 12. Seismic effects included in working loads (UBC 1997). Potential cavity collapse and corresponding down drag forces accounted for. Design Aspects No skin friction considered above -10.0 m NADD. Reduced lateral soil resistance above -10.0 m NADD. Friction piles, end bearing component neglected. Existing Ground Level (-10.00) Weak Rock With Potential Cavities Competent Rock Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 13. Middle East Concrete & PMV Live Exhibition Design Procedure Column loads as given by the consultant Load Combinations (70 SLS& 60 ULS) Max. Column Loads Design Loads of piles for SLS and ULS GeotechnicalDesign Structural Design Soil Pile friction Effect of Cavities Check of Wedge Failure Settlement of a single pile Settlement of PileGroup PileGroup Effect Lateral Analysis Check of Buckling Crack Width Control Check of tensile stress Main Reinforcement Shear Reinforcement Nov. 2014
  • 14. Middle East Concrete & PMV Live Exhibition Column Load Combinations BS EN1991-1_2002 Eurocode 1 For UltimateLoad combinations UBC For Working Load Combinations    4.1/)3.03.0(75.00.1 4.1/)3.03.0(75.00.1 0.10.13 0.10.10.12 0.10.11 MyEyMxExQkGkSeismicY MyEyMxExQkGkSeismicX WGkSLS WQkGkSLS QkGkSLS      MyEyMxExQkGkSeismicY MyEyMxExQkGkSeismicX WGkULS WGkULS WQkGkULS QkGkULS       3.03.06.00.1 3.03.06.00.1 Dead)l(Beneficia4.10.14 Dead)(Adverse4.14.13 2.12.12.12 6.14.11 Resulted in 70Load CombinationsResulted in 60Load Combinations AnalysesforEach Pile Cap + Load Combinations (SLS & ULS) Nov. 2014
  • 15. Middle East Concrete & PMV Live Exhibition Pile Working & Ultimate Loads   22 y yM x xM n Q P xy p Mx, My: Moment about x and y axes x, y: Distance from y and x axes to any pile x2, y2: Group moment of inertia n: Number of piles Ultimate load combinations  4 critical cases considered for structural design: • Maximum Compression + corresponding moment and lateral load. • Maximum Tension + corresponding moment and lateral load. • Maximum moment + corresponding axial and lateral load. • Maximum lateral load + corresponding axial and bending moment. • Transformation of Loading Orientation: Global  Pile Cap Local • Calculation of Pile Loads Nov. 2014
  • 16. Geotechnical Design Ultimate pile-rock unit skin adhesion (R.G. Horvath, 1978).usu qf .15.0.27 Working friction capacity of pile, Fs = 2.0 susocketsf s sf a fLDQ F Q Q ...  W F fLD Q s susocket uplifta  ... )(  Working uplift capacity, Fs = 3.0 Soil Pile Friction, working capacity Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 17. Geotechnical Design Factor of safety against wedge failure: t cohesion F FW SF cos. ..   W: Total weight of the wedge (pile Wp, pile cap Wr, and soil/rock Ws) FCohesion is the rock cohesion resistance over the wedge surface. A minimum safety factor of 1.1 against probable wedge failure is ensured. Check of Wedge Failure - Uplift  Wp Wr Ws  (a) (b) tF tF Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 18. Geotechnical Design Settlement & Pile Group Effects Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 19. Structural Design Rotational Stiffness k: Spansofnumberx L IE k crc 4 Lateral Analysis using ALP Lateral pile-soil interaction Bending moments Shear forces Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 20. Middle East Concrete & PMV Live Exhibition Structural Design Structural Capacity Check Crack width assessment Nov. 2014
  • 21. Pile Tests and Design Validation Sonic Logging almost 1800 piles 75 Working Pile Load Tests 13 Instrumented Non-Working Pile Load Tests (conventional + bidirectional O-cell) (250% of the working loads) Caliper logging tests LONGITUDINAL SECTION BHT-36 Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 22. Testing of Piles Analysis and Interpretation of Tests Results 391.00 37.00 416.00 391.0098.00 98.00 416.00 37.00 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 -300 200 700 1200 Depth 58 922 740 822 922 58 822 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 -300 200 700 1200 873 645 901 873 598 598 901 645 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 -300 200 700 1200 1.0 m dia (Sector 5) 1.2 m dia (Sector 5) 1.5 m dia, O-Cell (Sector 5) (a) (b) (c) Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 23. Impact of Cavities Technical considerations Stability of heavy machines. Concrete Over-consumption. Tight Schedule. Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 24. Classification of Cavities Existing Ground Level varies from +7.00 to +16.50 NADD (-10.00 NADD) Shallow Cavities (Within 8m from Ground) Cavities above -10.0 NADD -Permanent Casing -Lean Mix Cavities below -10.0 NADD -Concrete Overbreak 90% of suspected cavities are situated above -10.0 NADD Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 25. Probing Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 26. Probing Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 27. Probing Logs Analysis of Probing Records Spreadsheets GIS Model Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 28. Probing Logs Analysis of Probing Records Spreadsheets GIS Model Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 29. Cavity (500 psi) Soft Zone (or cavity filled with loose materials 250 psi) 2D and 3D distribution of cavities using ArcGIS Analysis of Probing Records Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 30. Probing Conclusion Based on the results of probing, recommendations were issued by our technical engineers to tackle: 1. For shallow cavities - either to fill or detour around it. 2. For cavities above El -10.00 NADD - use permanent casing in pile construction, fill the cavity with lean mix prior to pile construction, or allow for concrete over consumption. 3. Deep cavities below El -10.00 NADD - we elected to use self compacting concrete in order to insure that all cavities are properly filled. Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 31. Shallow Cavities Safety Measures Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 32. Treatment of Cavities – Permanent Casing Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 33. Middle East Concrete & PMV Live Exhibition Treatment of Cavities – Lean Mix Filling Nov. 2014
  • 34. Middle East Concrete & PMV Live Exhibition Overall Piles Layout TOTAL 7423 PILES COMPLETED!! Nov. 2014
  • 35. Middle East Concrete & PMV Live Exhibition Pile s Construction Nov. 2014
  • 36. Middle East Concrete & PMV Live Exhibition Piles construction Nov. 2014
  • 37. Diaphragm wall construction Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 38. Middle East Concrete & PMV Live Exhibition Diaphragm wall construction Nov. 2014
  • 39. Middle East Concrete & PMV Live Exhibition Mass Excavation Nov. 2014
  • 40. Mass Excavation Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 41. PROJECT HIGHTLIGHTS Total drilled Length of Piles: 220 km Total linear meter drilled for probing :293 km Total piles Concrete Volume: 339,416 m3 + 38,541 m3 for diaphragm wall Total Volume of Lean Mix : 31,043 m3 Total weight of steel used :52,500 ton Total length of P. casings :4040 l.m. Total length of diaphragm wall :2,100 l.m. Total excavation volume : 1,500,000 m3 Total Number of deep wells: 102 nos. covering and controlling water levels at area of 129,630 m2 Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 42. ACHIEVEMENTS -Complete piling construction on time with maximum production rate of 46 piles/ day consuming about 2000m3/day. -Cost Saving for the client by proposing Lean Mix Concrete for plugging suspected cavities instead of using permanent casings. Estimated Cost of all permanent casings: 109 million Dirham Estimated Cost of Combination of Lean mix + Permanent Casings: 34 million Dirham Saving of approximately 65 million Dirham - The numbers of deep wells required for dewatering are reduced to 45 nos. after conducting various stages of de-watering optimization trials . Middle East Concrete & PMV Live ExhibitionNov. 2014
  • 43. Middle East Concrete & PMV Live Exhibition The Final Product Nov. 2014