SlideShare ist ein Scribd-Unternehmen logo
1 von 42
Downloaden Sie, um offline zu lesen
MENARA TABUNG HAJI
Architectural Culture and History 2
ARC60203
Melissa Lim Li Lin - 0322680
Lovie Tey Yiqing - 0318155
Ng Ee Shiung - 0314228
Nur Zaliqal bt Zaher - 0317121
Nge Jia Chen - 0317738

MENARA TABUNG HAJI - ARC60203 1
Content
1. Introduction —————————————————————————————- Pg 3

2. Site Context Analysis ( Melissa Lim 0322680)——————————————— Pg 4

3. Architectural Layout of Building (Lovie Tey 0318155 )———————————— Pg 18

4. Architecture Site Analysis (Ng Ee Shiung 0314228 )———————————— Pg 23
5. Building, Construction, Structure and Materials Analysis (Nur Zaliqal 0317121)- Pg 25

6. Architectural Elements / Component Analysis (Nge Jia Chen 0317738)———— Pg 27
7. Conclusion —————————————————————————————— Pg 40

8. Reference —————————————————————————————— Pg 41
MENARA TABUNG HAJI - ARC60203 2
Introduction
LUTH Building (Lembaga Urusan Tabung Haji) is located at Jalan Tun Razak in
Kuala Lumpur, Malaysia. It is the headquarters for the Malaysian Muslim Pilgrim’s
Management Fund. The building functions as an office building for the Muslim Pilgrim’s
Management Fund(LUTH). Furthermore, it is a prominent landmark in Kuala Lumpur and
a symbol of the development of Islam. Construction began in 1982 with Tun Dr. Mahathir
Mohamad laying the foundation stone of the building. This project with a budget of RM95
Million completed in 1984.
The form of the building resembles a traditional Malay drum and has Islamic influences
which suits the function of the building. The Islamic architectural elements includes the
Five Pillars of Islam shown in the façade by five non-structural pillars. This 152m tall
building consists of 38 floors mainly for the offices and car park area. In front of the
building, there is also a cone-shaped mosque designed together with the building. The
architect of the building is the famous Hijjas Kasturi which has built many buildings and
skyscrapers in Malaysia such as Menara Maybank and Menara Alor Star. The concept
used are simplicity, discipline and unity which are the three ideas emphasised in Islam.
MENARA TABUNG HAJI - ARC60203 3
Site Context Analysis
Site plan:
Landscape at LUTH building
MENARA TABUNG HAJI - ARC60203 4
Landscape at LUTH building
Canna Musafolio and Alternanthera(purple and green)
Canna Musafolio and Alternanthera(purple and green)
MENARA TABUNG HAJI - ARC60203 5
Palm Trees
Coconut Trees
MENARA TABUNG HAJI - ARC60203 6
Landscape
The landscape of the building area is mainly at the entrance of the building
where there are trees planted along the walkway to the main door. Shrubs and bushes
can also be seen. The trees along the walkway are palm trees. There are also coconut
trees. The lower plants consists of Canna Musafolio and Alternanthera.
Building accessibility
The main door is as shown in the picture above. There is a motorcycle
parking space in front of the building. After parking one’s motorcycle, one can walk the
centre stairs towards the main door. For drivers, they can park their car in the interior
parking space located at few lower floors of the building. The interior parking space can be
accessed from the back of the building through a ramp. One can also get to the Tabung
Haji building by public transport such as taxi, bus, LRT and train. The bus service usually
used is the RapidKL bus which stops at the bus stop in front of the building. When taking
the train, one needs to stop at the Kl Sentral stop and continue with LRT, bus or taxi. One
should take the LRT towards Gombak that stops at Ampang Park which is a 6minutes
walk to the Tabung Haji building. From KLCC, there is a free service to Citibank at Jalan
Ampang which is an 8 minute walk to the Tabung Haji building.
MENARA TABUNG HAJI - ARC60203 7
! 

Bus Stop in front of LUTH Building
Walkway along LUTH Building
MENARA TABUNG HAJI - ARC60203 8
Surrounding facilities
Other than offices and parking lot inside the building, there are other facilities inside
the building such as media rooms, shops, halls and cafeterias. Within a walking distance
about 100 to 200m, there are many restaurants available such as Gazebo, Koong Jung
Restaurant, 10 Binjai and PnB Darby Café. In the neighbouring building G Tower, there
are a variety of cuisines from NZ Curry House, Rakuzen (Japanese), Tanzini and the
beautiful Bridge Bar. Inside the LUTH building, there is an ATM machine for Bank Islam
whereas in the neighbouring building, Menara PNB, there are ATM machines for CIMB
Bank and Maybank.
MENARA TABUNG HAJI - ARC60203 9
Bridge Bar, G Tower
It is convenient for Muslim workers or visitors of LUTH building as there is a
mosque right outside of the building for daily prayers. The mosque is most used for Friday
prayers where it can be occupied by up to 600 people. In cases where Masjid Tabung Haji
is full, users can head to the next nearest mosque, Masjid As-Syakirin which is a 11
minute walk or 6 minute drive away. Drivers can also refill their oil tank at the petrol
stations nearby which are Caltex, Petron and Esso.
MENARA TABUNG HAJI - ARC60203 10
Masjid Tabung Haji
Entertainment and recreation nearby include the KL City Park, TGV
Cinemas, Petrosains and shopping malls such as Petronas Twin Towers and Suria KLCC.
Jalan Tun Razak is also home to many embassy buildings of countries such as Mexico,
Czech Republic, Hungary, United States, Japan and many more up to a total of 24
embassies in Jalan Tun Razak and nearby it. There are also hotels nearby such as The
Zone, Intercontinental KL and G Tower Hotel.
MENARA TABUNG HAJI - ARC60203 11
Comparison in Jalan Tun Razak
The Tabung Haji building was completed in 1984. It is considered modern at
it’s time of construction as the form of the building is circular and curved. However, other
modern buildings have been built at Jalan Tun Razak such as G Tower which has many
advanced technologies such as hydronic chilled beams, thermal storage tank and many
more as part of its sustainable design. Therefore, the LUTH building is currently lacking in
that area. Unlike other buildings, it has a more religious approach. The building features
the word “Allah” on top and at the entrance. Similar to a lot of buildings at Jalan Tun
Razak is its function. Most buildings in Jalan Tun Razak such as Menara PNB and Menara
Tan and Tan also functions as an office building. The building is one of the many
skyscrapers along the main road of Jalan Tun Razak.
Climate
The sun path is from east to west which is from the front of the building to
the back. Therefore, spaces at the front of the building will receive the morning sun. The
back and sides of the building will not receive too much sunlight as there are other
skyscrapers nearby such as G Tower, PNB Perdana Hotel & Suites and the PNB building.
Therefore the front of the building will receive the most sunlight. Throughout the year, the
building will receive about 6 to 8 hours of daily sunshine. However, for most of the time of
the year, the building will receive about 8 hours of sunlight daily.
MENARA TABUNG HAJI - ARC60203 12
In Malaysia, there are 2 seasons which is the wet and dry season. During
the wet season which is from November to March, it usually rains often especially in
November. The rainy days can reach up to 20 days a month with total rainfall of about 12
inches. However, rain or heavy downpours can happen even in the dry season on some
mornings. The dry seasons are usually from May to September with little rain. The driest
month is June with about 10 rainy days a month of around 4 inches of rainfall.
MENARA TABUNG HAJI - ARC60203 13
The dry and wet seasons correspond to the two monsoon seasons. The dry
season is also when the Northeast monsoon happens and the wet season is when the
Southwest monsoon happens. The wind direction and intensity differs every month during
the monsoon seasons. The wind source, wind direction, wind intensity and rainfall affects
the average temperature every month. With no significant differences, the highest
temperature throughout the year ranges from 32 to 34⁰C and the lowest temperature
ranges from 23 to 25⁰C.
MENARA TABUNG HAJI - ARC60203 14
MENARA TABUNG HAJI - ARC60203 15
MENARA TABUNG HAJI - ARC60203 16
MENARA TABUNG HAJI - ARC60203 17
Architectural Layout of Building
Tabung Haji building clearly portrays as one of the signifiant Islamic Building which
compiles the principles of Islamic Architecture in Malaysia.The Tabung Haji Building has
an area of 55.7k square meters. For this building, the mosque is separated from the
building itself, which is quite special as most of the mosque or prayer’s room will be
located inside of the building. At the early use of the building, the mosque can only be
access by the staffs that are working in the building itself for daily prayers. However, this
mosque had been made accessible for the nearby muslim pedestrians on every Friday as
no mosque is situated at Jalan Tun Abdul Razak.
MENARA TABUNG HAJI - ARC60203 18
From the floor plan and elevation of the building, it is clearly portrayed that
symmetrical balance in both the horizontal plane and vertical plane. When the vertical axis
is placed in the pictures, formal balance is clearly shown and there is a strong emphasis
on the centre axis. Hence, it is clearly shown that the building is balanced as a complete
structure.
The building consists of five columns which symbolise the five pillars of Islam
which is ‘Shahada’. ‘ Salat’, ‘ Zakat’, ‘ Fasting’, and ‘Hajj’’. On the other hand, it also act
as a support structure for the building itself. One of the fun fact for the building is, you can
only see a pillar from one point. This is believe and implies that the iman and the faith of
the believer is not something to be showed around and proud of, but to be proud of it by
the believer themselves in their heart.
MENARA TABUNG HAJI - ARC60203 19
From the floor plans , it is clearly shown that the architect, Hijjas Kasturi used consistency
when designing the building. This building is constructed in a hourglass shape, and
circular geometry shape is used to construct the floor plan of the building. The geometrical
floor plans of the building showed a simplistic yet elegant expression of the tradition in
Islamic art. The concept of circular concave curve acts as a symbol of the revolution and
modern approach in architecture
MENARA TABUNG HAJI - ARC60203 20
Tabung Haji Building’s carpark is made up of circular circulation whereas every
floor acted as a ramp. The carpark uses one-way-in and one-way-out to ensure that there
is no congestion in traffic when the user is inside the building. At the same time, the
architect applies the uses of ‘veil/hijab’ for the carpark whereas the building user can see
but cannot be seen. This is used to give a more privacy situation towards the building and
it helps to keep a sense of secretive to the outsider.
MENARA TABUNG HAJI - ARC60203 21
The Tabung Haji building consists of 27 office floors, which is known as the lower
zone office, middle zone office as well as the upper floor office. The building consists of 7
levelof carpark, 2 levels of service room, 2 multi-purpose room which acts as counters,
lobby, cafeteria, and convention hall.
MENARA TABUNG HAJI - ARC60203 22
151.83m
Architectural Site Analysis
“The Hour Glass" form is something new but as a sculptural symbol, it represents
the spiritual enlightenment promised by the pilgrimage" - Hijjaz Kasturi
Contrary to local popular
belief, the Tabung Haji Building
was not inspired by traditional
Malay drums but actually takes
the form from an hour glass. It
symbolizes the progressive
movement of Islam in Malaysia as
a cultural centre and growing
economy.
Modern but subtle lines are
the primary elements in the main
design of the building as it follows
the tradition of Islamic art which
exhibits simplistic expression. The
curve that concave as it goes
upwards signifies the progression
and modernization of its approach
in architecture. The use of
predominantly white colors for the
building shows the purity of Islam while the windows are tinted black to reduce heat of the
interior due the hot climate of Malaysia. Shapes and symbols pertaining to Islamic faith is
implemented all over both the exterior and interior of the building. Concrete and glass is
the main construction materials used for the building due to its cost and effectiveness.
One of the more shining example of design feature of the building is the word
“ALLAH” carved in Jawi on the top of the building. By placing the carving on the centre
and top of the building symbolises unity by the conduct of worship which is demanded by
Allah swt.
MENARA TABUNG HAJI - ARC60203 23
While most of the buildings in Kuala Lumpur shows a more modern and emerging
style of architecture that takes a departure from a more traditional style of design, such as
the Pavillion KL, The Gardens, or Starhill Gallery, Haji Tabung Building took a different
approach by combining the traditional elements of old with modern and simplistic designs
of new. This gives a new identity to the cityscape of Kuala Lumpur that many other
buildings are starting to follow such as the Maybank Tower, National Library, and Petronas
Twin Towers.
National identity has always been one of the main points for Malaysian after the
Malaysian Independence. As such, Malaysian artistic movement after independence
heavily involve traditional Malaysian design elements. Tabung Haji building was built
according to that philosophy.
MENARA TABUNG HAJI - ARC60203 24
Building, Construction , Structure and Material Analysis
According to the architect, Hijjaz Kasturi said that the Tabung Haji building has a
shape of an hourglass, which was something new and sculptural. It was also used to
represent the spiritual enlightenment promised by the pilgrimage.
The main materials that were used in this building were glass, steel and concrete.
The Tabung Haji building was amongst the first buildings in Malaysia to be constructed
using the Precast Concrete System. The used of concrete has shown as one of the
characteristics of modern buildings. The use of this system was predicated by the unique
design of a double curvature, which resulted in every floor to be different. During that era
as well, this building was considered as highly advanced as it included a VAC system of
air conditioning in each hollow column serving one fifth of each floor area, curtain wall and
etc.
Precast concrete
systems used in
Malaysia are mostly
large panels systems,
which can either be
load bearing or non-
load bearing wall. This
method had effectively
saved cost and
improved the quality
through the reduced of
MENARA TABUNG HAJI - ARC60203 25
labor intensity and construction standardization. Besides, it minimizes the wastage of
materials that lead to cleaner and neater environment and also a better quality control.
The use of precast concrete system was one of the reasons why the construction of this
building was below the budget. Glass was also use widely in the building. For this building,
the glass is used mainly for windows. The glasses on the windows were tinted to reduce
the amount of solar energy transmitted into the building as the amount of sunlight entering
them is very high. Tinting the glass retain the transparency from the inside, although the
brightness from the outside is reduced. It is also to increase visual privacy.
One of the unique features of this building is the structure supporting the whole building,
which is the arch. The arches are meant to span large areas by resolving forces into
compressive stresses and eliminating tensile stresses to support the ceiling and the
stability of the building.
MENARA TABUNG HAJI - ARC60203 26
Architectural Elements / Component Analysis
ITHIRAM: RESPECT, PROPRIETY OR ADAB
FIVE PILLARS OF ISLAM
LTH building (Lembaga Tabung Haji) of 1984, is the home to the Malaysian Muslim
Pilgrim’s Fund. It is a building that displays explicit Malay referencing. LTH building
adopted an hour glass form that arguably reflects a traditional Malay drum due to the
flaring of both the top and base. The most significant element of this building perhaps is its
display of five non-structural ‘pillars’ on its façade, known to represent the Five Pillars of
Islam (Shahada, Salat, Zakat, Fasting and Haji). The five pillars that seemed to be
concealed in the building itself from any angle emits a strong concept of Pillars of Islam
and its adherents to the faith is not something to show off and be proud of, but to be
proofed by implementation.
The non-structural ‘pillars’ means literally as it has no structural means at all. In the
hollows includes peripheral air-conditioning system serving one-fifth of each floor area.
But the seamless transition that lines from the base all the way to the top made it seemed
like a structural support. The smart blending of materials of concrete (structural support on
MENARA TABUNG HAJI - ARC60203 27
ground) and alloy (prefabricated wall cladding) done by Hijjas Kasturi really raised a notch
in the concept of modesty in Islam teachings and being an icon of modernism at its period
of time.
IKHLAS: SINCERITY
In representing Malay influenced architecture, geometric subtraction is a nature and holds
a prominent culture in Islamic Architecture. These elements can be seen all over the
building from the base to the top, on ceilings, floors, walls, columns and so on. For
example, the subtraction of the massive concrete load-bearing wall, forming an arch which
does not only provide structural benefits such as better load distributing but at the same
time it is very open and welcoming. Once again portraying the sincerity in providing
service to the people.
MENARA TABUNG HAJI - ARC60203 28
Alloy cladding
starts from level
10 to the top
Mechanical Room
Section Office Floor Plan
Ceilings
The subtraction finishes on the ceilings are elegantly done, thus, creating an ambience of
welcoming to the users and ultimately, exhibiting sincerity in the services provided to the
people.
Ground Floor Outdoor Ground Floor Lobby (2 Floors)
MENARA TABUNG HAJI - ARC60203 29
Outdoor Implementations
Floor Tiles
Hand Railings
MENARA TABUNG HAJI - ARC60203 30
Indoor Implementations
Wall Ornamentations
Floor Tiles
MENARA TABUNG HAJI - ARC60203 31
PURSUIT OF ‘ILM: KNOWLEDGE
The idea of using Calligraphy is part of Islamic Art. They are used to portray and
reveal information or ‘ilm using the language that is used in Quran. Being as it is, a
Malaysian Muslim Pilgrim’s Fund, the presence of ‘ilm is important to always be around
the user, reminding the Muslims to fulfill the pilgrimage to Mecca.
MENARA TABUNG HAJI - ARC60203 32
IQTISAD: BALANCE
The LTH building has shown great tradition of Islamic simplistic and artistic expression
and the concept of circular concave curve that represents a revolutionary approach to
architecture and modern at the time of construction. These claims can be seen through
the building geometries from the floor plans. The nature of this building is radial, thus
creating a symmetrically balanced building.
Ground Floor Plan Car Park Plan
Office Floor Plan Section
MENARA TABUNG HAJI - ARC60203 33
Offices of 27 floors
Car park up to
10th floor
Car Park
Offices
MENARA TABUNG HAJI - ARC60203 34
HAYA’: MODESTY
Adoption of Veil/Hijab are used on this building as well, it allows the building users to see
but not to be seen. This concept can be seen applied in the parking areas of this building
and complementally it gives a more appealing outlook on the building façade, in the
meantime, providing air ventilation and natural light in the car park area making it less

stuffy and well illuminated.
MENARA TABUNG HAJI - ARC60203 35
Glazed windows
for the office floors
Louvers for the
parking areas
Air flowing in
through these
openings
ventilating the
stuffy car park
Glass Curtain Walls
They are non-structural elements, therefore not bearing any structural load. Due to that,
these tempered and laminated glass curtain walls which does not compromise any
structural integrity, were used on the lobby or along the inner cylindrical structure. The
implementation of this curtain wall greatly limit the direct reflection of light causing the
space within to be well illuminated but lesser heat gained. Aside from that, these curtain
walls reflects on modesty as the building user can see through them but less visible from
the outside, providing a degree of privacy for the user within.
MENARA TABUNG HAJI - ARC60203 36
DIKR: REMEMBRANCE
Among the unique properties of this building that makes it stand out from other
existing Islamic buildings is the carving of Jawi scripted Allah SWT on the roof which
makes it a majestic building, a building with a purpose. The very nature of this principle is
implemented to remember Allah SWT’s existence in the first place as this is a building for
the Muslims of Malaysia to save for their pilgrimage to Mecca and the pilgrimage to Mecca
is ultimately for It. Therefore, inscriptions are done and placed on several locations.
MENARA TABUNG HAJI - ARC60203 37
Another inscription on the ground floor main entrance for remembrance.
TRANSVERSE ELEMENT
Ground Floor Plan


Lower Ground Floor Plan
MENARA TABUNG HAJI - ARC60203 38
Including the
staircases for
the fire exit
uses element
of slight curve
to present the
building as a
whole.
Stairs to lower
ground floor.
Automatic Sliding Glass Doors
On all 4 main
entrances to the
lobby, double sliding
glass doors are
employed and they
function as public
entrances. They
operate
automatically with
the help of ‘sensor’.
These automatic
doors can be
controlled directly by
the security guards
from the lobby. On top of the doors, ‘Perkhidmatan Cemerlang Amalan Kita’, stating their
slogan, ‘Excellent Services as Our Practice’. Once again, emphasizing their sincerity in
serving the people in need.
Tinted Double Glazed Window
The glazed windows
are framed with
aluminium and they
start from floor 11 to
floor 38, which is the
office floors, from
lower zone to upper
zone. From outside
they look dark, due
to the black tint,
providing privacy for
the users within.
MENARA TABUNG HAJI - ARC60203 39
Conclusion
MENARA TABUNG HAJI - ARC60203 40
Reference
• BINTI ABDUL AZIZ, S. (2012, December 22). TABUNG HAJI TOWER, KUALA
LUMPUR. Retrieved November 15, 2015, from http://al-blog-al-kaslan.blogspot.my/
2012/12/tabung-haji-tower-kuala-lumpur.html
• Binti Wan Mohd Rashdi, W. (2012, October 21). Malaysian Architectural Identity.
Retrieved November 15, 2015, from https://designerspuo.wordpress.com/
architectural-writings/teaching-and-learning-dillema-in-puo/
• http://www.hijjaskasturi.com/
• Kuala Lumpur and Putrajaya: Negotiating Urban Space in Malaysia By Ross King
• http://www.tabunghaji.gov.my/bangunan-th
• http://www.worldweatheronline.com/Kuala-Lumpur-weather-averages/Kuala-
Lumpur/MY.aspx
• http://www.holiday-weather.com/kuala_lumpur/averages/
• http://www.windfinder.com/windstatistics/morib_kuala_lumpur
• http://gtower.com.my
Reference:
http://ijesat.org/Volumes/2012_Vol_02_Iss_06/IJESAT_2012_02_06_20.pdf
http://al-blog-al-kaslan.blogspot.my/2012/12/tabung-haji-tower-kuala-lumpur.html
http://www.lendlease.com/asia/malaysia/projects/lembaga-tabung-haji-headquarters
http://wikimapia.org/14902/Menara-Tabung-Haji
http://www.commercialwindows.org/tints.php
https://www.boundless.com/physics/textbooks/boundless-physics-textbook/static-equilibrium-
elasticity-and-torque-8/applications-of-statics-77/arches-and-domes-314-11286/
Reference

Hijjas Kasturi Associates Sdn. (n.d.). Retrieved November 15, 2015, from
http://www.hijjaskasturi.com/
Portal Tabung Haji. (n.d.). Retrieved November 15, 2015, from
http://www.tabunghaji.gov.my/bangunan-th
King, R. (2008). Kuala Lumpur and Putrajaya: Negotiating urban space in Malaysia (p. 107).
Honolulu: Asian Studies Association of Australia in association with University of Hawaii Press.
Tabung Haji | Interior, computer lab | Archnet. (n.d.). Retrieved November 15, 2015, from
MENARA TABUNG HAJI - ARC60203 41
http://archnet.org/sites/530/media_contents/13070
Bangunan Tabung Haji, Kuala Lumpur | 106005 | EMPORIS. (n.d.). Retrieved November 15, 2015,
from http://www.emporis.com/buildings/106005/bangunan-tabung-haji-kuala- lumpur-malaysia
•
MENARA TABUNG HAJI - ARC60203 42

Weitere ähnliche Inhalte

Was ist angesagt?

Research Report on Menara Maybank
Research Report on Menara MaybankResearch Report on Menara Maybank
Research Report on Menara MaybankSheau Hui Tan
 
Culture project-ii-finalized
Culture project-ii-finalizedCulture project-ii-finalized
Culture project-ii-finalizedChong Yi Hui
 
Architecture Culture & History 2 Project 2 Report
Architecture Culture & History 2 Project 2 ReportArchitecture Culture & History 2 Project 2 Report
Architecture Culture & History 2 Project 2 Reportdouglasloon
 
National mosque
National mosqueNational mosque
National mosqueThien Hee
 
Theorizing Architecture : Putrajaya International Convention Centre
Theorizing Architecture : Putrajaya International Convention CentreTheorizing Architecture : Putrajaya International Convention Centre
Theorizing Architecture : Putrajaya International Convention CentreDexter Ng
 
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORT
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORTNATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORT
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORTAtiqah Ghazali
 
PAM centre (building services)
PAM centre (building services)PAM centre (building services)
PAM centre (building services)Cryslyn Tan
 
The search for Malaysian architecture identity
The search for Malaysian architecture identityThe search for Malaysian architecture identity
The search for Malaysian architecture identityAbdul Qayyum
 
Sultan abdul samad building
Sultan abdul samad buildingSultan abdul samad building
Sultan abdul samad buildingsydtlkdr
 
Culture and History II: Menara Maybank Report
Culture and History II: Menara Maybank ReportCulture and History II: Menara Maybank Report
Culture and History II: Menara Maybank ReportEuxuan Ong
 
Menara Dayabumi Analysis Report
Menara Dayabumi Analysis ReportMenara Dayabumi Analysis Report
Menara Dayabumi Analysis ReportjolynnTJL
 
Building science report [malaysia] final
Building science report [malaysia] finalBuilding science report [malaysia] final
Building science report [malaysia] finalmiranazrin
 
Stadium Negara Culture report
Stadium Negara Culture report Stadium Negara Culture report
Stadium Negara Culture report Clara Lee
 
Culture History - Stadium Negara
Culture History - Stadium NegaraCulture History - Stadium Negara
Culture History - Stadium NegaraLee Yih
 
Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Adila Zaas
 

Was ist angesagt? (20)

Research Report on Menara Maybank
Research Report on Menara MaybankResearch Report on Menara Maybank
Research Report on Menara Maybank
 
Culture project-ii-finalized
Culture project-ii-finalizedCulture project-ii-finalized
Culture project-ii-finalized
 
Architecture Culture & History 2 Project 2 Report
Architecture Culture & History 2 Project 2 ReportArchitecture Culture & History 2 Project 2 Report
Architecture Culture & History 2 Project 2 Report
 
National mosque
National mosqueNational mosque
National mosque
 
Theorizing Architecture : Putrajaya International Convention Centre
Theorizing Architecture : Putrajaya International Convention CentreTheorizing Architecture : Putrajaya International Convention Centre
Theorizing Architecture : Putrajaya International Convention Centre
 
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORT
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORTNATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORT
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORT
 
National mosque
National mosqueNational mosque
National mosque
 
PAM centre (building services)
PAM centre (building services)PAM centre (building services)
PAM centre (building services)
 
The search for Malaysian architecture identity
The search for Malaysian architecture identityThe search for Malaysian architecture identity
The search for Malaysian architecture identity
 
Sultan abdul samad building
Sultan abdul samad buildingSultan abdul samad building
Sultan abdul samad building
 
Culture and History II: Menara Maybank Report
Culture and History II: Menara Maybank ReportCulture and History II: Menara Maybank Report
Culture and History II: Menara Maybank Report
 
Menara Dayabumi Analysis Report
Menara Dayabumi Analysis ReportMenara Dayabumi Analysis Report
Menara Dayabumi Analysis Report
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
Northeast kl
Northeast klNortheast kl
Northeast kl
 
kkr 2
kkr 2kkr 2
kkr 2
 
Dewan Tunku Canselor
Dewan Tunku CanselorDewan Tunku Canselor
Dewan Tunku Canselor
 
Building science report [malaysia] final
Building science report [malaysia] finalBuilding science report [malaysia] final
Building science report [malaysia] final
 
Stadium Negara Culture report
Stadium Negara Culture report Stadium Negara Culture report
Stadium Negara Culture report
 
Culture History - Stadium Negara
Culture History - Stadium NegaraCulture History - Stadium Negara
Culture History - Stadium Negara
 
Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report
 

Andere mochten auch

Tabung Haji as Islamic Financial Institutions
Tabung Haji as Islamic Financial InstitutionsTabung Haji as Islamic Financial Institutions
Tabung Haji as Islamic Financial InstitutionsFitri Ishak
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systemsAkshay Revekar
 
Intelligent Building (Dayabumi Complex)
Intelligent Building (Dayabumi Complex)Intelligent Building (Dayabumi Complex)
Intelligent Building (Dayabumi Complex)Ridhwan Zakaria
 
Intelligent building
Intelligent buildingIntelligent building
Intelligent buildingMohd. Ikhwan
 
Pendekatan senibina revivalisme.metafora.regioal primitif
Pendekatan senibina   revivalisme.metafora.regioal primitifPendekatan senibina   revivalisme.metafora.regioal primitif
Pendekatan senibina revivalisme.metafora.regioal primitifMohd Nizam Mohd Zan
 
Building Science 1: Project 1 G- Tower
Building Science 1: Project 1 G- TowerBuilding Science 1: Project 1 G- Tower
Building Science 1: Project 1 G- Towerhiewyennee
 
Bundled Tube Structural System
 Bundled Tube Structural System Bundled Tube Structural System
Bundled Tube Structural SystemUmer Farooq
 
analysis and design of telecommunication tower
analysis and design of telecommunication toweranalysis and design of telecommunication tower
analysis and design of telecommunication towerRohithasangaraju
 
Mgt project
Mgt projectMgt project
Mgt projectIIUM
 
Hayati Saleh
Hayati SalehHayati Saleh
Hayati Salehidmac2015
 
The Royal Museum Photo Book ( Balairung Seri )
The Royal Museum Photo Book ( Balairung Seri )The Royal Museum Photo Book ( Balairung Seri )
The Royal Museum Photo Book ( Balairung Seri )Lovie Tey
 
Kuala Lumpur - Global City
Kuala Lumpur - Global CityKuala Lumpur - Global City
Kuala Lumpur - Global CityMarcus9000
 
Menara mesiniaga kim yeang
Menara mesiniaga  kim yeangMenara mesiniaga  kim yeang
Menara mesiniaga kim yeangSudhi Agarwal
 
Chapter 5; non business income students
Chapter 5; non business income studentsChapter 5; non business income students
Chapter 5; non business income studentsCharmaine Deirdre Dave
 
Project 2
Project 2Project 2
Project 2wzhen77
 

Andere mochten auch (20)

Tabung Haji as Islamic Financial Institutions
Tabung Haji as Islamic Financial InstitutionsTabung Haji as Islamic Financial Institutions
Tabung Haji as Islamic Financial Institutions
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Intelligent Building (Dayabumi Complex)
Intelligent Building (Dayabumi Complex)Intelligent Building (Dayabumi Complex)
Intelligent Building (Dayabumi Complex)
 
Intelligent building
Intelligent buildingIntelligent building
Intelligent building
 
Pendekatan senibina revivalisme.metafora.regioal primitif
Pendekatan senibina   revivalisme.metafora.regioal primitifPendekatan senibina   revivalisme.metafora.regioal primitif
Pendekatan senibina revivalisme.metafora.regioal primitif
 
Ken Yeang - Menara mesiniaga
Ken Yeang - Menara mesiniagaKen Yeang - Menara mesiniaga
Ken Yeang - Menara mesiniaga
 
Building Science 1: Project 1 G- Tower
Building Science 1: Project 1 G- TowerBuilding Science 1: Project 1 G- Tower
Building Science 1: Project 1 G- Tower
 
Bundled Tube Structural System
 Bundled Tube Structural System Bundled Tube Structural System
Bundled Tube Structural System
 
analysis and design of telecommunication tower
analysis and design of telecommunication toweranalysis and design of telecommunication tower
analysis and design of telecommunication tower
 
Mgt project
Mgt projectMgt project
Mgt project
 
Hayati Saleh
Hayati SalehHayati Saleh
Hayati Saleh
 
Muzium Negara
Muzium NegaraMuzium Negara
Muzium Negara
 
Menara Kuala Lumpur
Menara Kuala LumpurMenara Kuala Lumpur
Menara Kuala Lumpur
 
The Royal Museum Photo Book ( Balairung Seri )
The Royal Museum Photo Book ( Balairung Seri )The Royal Museum Photo Book ( Balairung Seri )
The Royal Museum Photo Book ( Balairung Seri )
 
Sketchbook
Sketchbook Sketchbook
Sketchbook
 
Kuala Lumpur - Global City
Kuala Lumpur - Global CityKuala Lumpur - Global City
Kuala Lumpur - Global City
 
Wikilife
WikilifeWikilife
Wikilife
 
Menara mesiniaga kim yeang
Menara mesiniaga  kim yeangMenara mesiniaga  kim yeang
Menara mesiniaga kim yeang
 
Chapter 5; non business income students
Chapter 5; non business income studentsChapter 5; non business income students
Chapter 5; non business income students
 
Project 2
Project 2Project 2
Project 2
 

Ähnlich wie Menara Tabung Haji Case Study

CULTURE AND HISTORY FINAL ASSIGNMENT
CULTURE AND HISTORY FINAL ASSIGNMENTCULTURE AND HISTORY FINAL ASSIGNMENT
CULTURE AND HISTORY FINAL ASSIGNMENTNatashaLabitoria
 
Menara Standard Chartered Report
Menara Standard Chartered ReportMenara Standard Chartered Report
Menara Standard Chartered ReportJamie Lee
 
Webbook
Webbook Webbook
Webbook En Huey
 
Shah Alam Blue Mosque Report
Shah Alam Blue Mosque Report Shah Alam Blue Mosque Report
Shah Alam Blue Mosque Report hongbinng
 
Parliament building
Parliament buildingParliament building
Parliament buildingWeng Chuan
 
Parliament building
Parliament buildingParliament building
Parliament buildingSarah Esa
 
LA pjt 1: Site location and context
LA pjt 1: Site location and contextLA pjt 1: Site location and context
LA pjt 1: Site location and contextForestedTiger
 
Architectural Culture and History 2: Project 2
Architectural Culture and History 2: Project 2Architectural Culture and History 2: Project 2
Architectural Culture and History 2: Project 2KohSungJie
 
DEWAN TUNKU CANSELOR, UNIVERSITI MALAYA
DEWAN TUNKU CANSELOR, UNIVERSITI MALAYADEWAN TUNKU CANSELOR, UNIVERSITI MALAYA
DEWAN TUNKU CANSELOR, UNIVERSITI MALAYAJoe Onn Lim
 
Report 2.0.0
Report 2.0.0Report 2.0.0
Report 2.0.0nurinana
 
Building Economics Cost Plan Report
Building Economics Cost Plan ReportBuilding Economics Cost Plan Report
Building Economics Cost Plan ReportFarah Sham
 
Wisma Rubber Lee Analysis
Wisma Rubber Lee AnalysisWisma Rubber Lee Analysis
Wisma Rubber Lee AnalysisEric Lo
 
Cnh2 masjid negarareport
Cnh2 masjid negarareportCnh2 masjid negarareport
Cnh2 masjid negarareportPe Zhi Yong
 
ARCHITECTURE DESIGN PROJECT (STUDIO VI): PROJECT 1A - PRE-DESIGN ANALYSIS
ARCHITECTURE DESIGN PROJECT (STUDIO VI): PROJECT 1A - PRE-DESIGN ANALYSISARCHITECTURE DESIGN PROJECT (STUDIO VI): PROJECT 1A - PRE-DESIGN ANALYSIS
ARCHITECTURE DESIGN PROJECT (STUDIO VI): PROJECT 1A - PRE-DESIGN ANALYSISNekumi Kida
 
Sekl- TIME-LINE AND DIAGRAM ANALYSIS
Sekl- TIME-LINE AND DIAGRAM ANALYSISSekl- TIME-LINE AND DIAGRAM ANALYSIS
Sekl- TIME-LINE AND DIAGRAM ANALYSISJamie Lee
 

Ähnlich wie Menara Tabung Haji Case Study (20)

Culture
Culture Culture
Culture
 
CULTURE AND HISTORY FINAL ASSIGNMENT
CULTURE AND HISTORY FINAL ASSIGNMENTCULTURE AND HISTORY FINAL ASSIGNMENT
CULTURE AND HISTORY FINAL ASSIGNMENT
 
Report C&H 2
Report C&H 2Report C&H 2
Report C&H 2
 
Culture FInal
Culture FInalCulture FInal
Culture FInal
 
Menara Standard Chartered Report
Menara Standard Chartered ReportMenara Standard Chartered Report
Menara Standard Chartered Report
 
Telekom tower
Telekom towerTelekom tower
Telekom tower
 
Webbook
Webbook Webbook
Webbook
 
Shah Alam Blue Mosque Report
Shah Alam Blue Mosque Report Shah Alam Blue Mosque Report
Shah Alam Blue Mosque Report
 
Parliament building
Parliament buildingParliament building
Parliament building
 
Parliament building
Parliament buildingParliament building
Parliament building
 
LA pjt 1: Site location and context
LA pjt 1: Site location and contextLA pjt 1: Site location and context
LA pjt 1: Site location and context
 
Architectural Culture and History 2: Project 2
Architectural Culture and History 2: Project 2Architectural Culture and History 2: Project 2
Architectural Culture and History 2: Project 2
 
DEWAN TUNKU CANSELOR, UNIVERSITI MALAYA
DEWAN TUNKU CANSELOR, UNIVERSITI MALAYADEWAN TUNKU CANSELOR, UNIVERSITI MALAYA
DEWAN TUNKU CANSELOR, UNIVERSITI MALAYA
 
National mosque
National mosqueNational mosque
National mosque
 
Report 2.0.0
Report 2.0.0Report 2.0.0
Report 2.0.0
 
Building Economics Cost Plan Report
Building Economics Cost Plan ReportBuilding Economics Cost Plan Report
Building Economics Cost Plan Report
 
Wisma Rubber Lee Analysis
Wisma Rubber Lee AnalysisWisma Rubber Lee Analysis
Wisma Rubber Lee Analysis
 
Cnh2 masjid negarareport
Cnh2 masjid negarareportCnh2 masjid negarareport
Cnh2 masjid negarareport
 
ARCHITECTURE DESIGN PROJECT (STUDIO VI): PROJECT 1A - PRE-DESIGN ANALYSIS
ARCHITECTURE DESIGN PROJECT (STUDIO VI): PROJECT 1A - PRE-DESIGN ANALYSISARCHITECTURE DESIGN PROJECT (STUDIO VI): PROJECT 1A - PRE-DESIGN ANALYSIS
ARCHITECTURE DESIGN PROJECT (STUDIO VI): PROJECT 1A - PRE-DESIGN ANALYSIS
 
Sekl- TIME-LINE AND DIAGRAM ANALYSIS
Sekl- TIME-LINE AND DIAGRAM ANALYSISSekl- TIME-LINE AND DIAGRAM ANALYSIS
Sekl- TIME-LINE AND DIAGRAM ANALYSIS
 

Mehr von Lovie Tey

Georgetown (tales of three cities)
Georgetown (tales of three cities)Georgetown (tales of three cities)
Georgetown (tales of three cities)Lovie Tey
 
Tales of Three Cities - Petaling Street
Tales of Three Cities - Petaling StreetTales of Three Cities - Petaling Street
Tales of Three Cities - Petaling StreetLovie Tey
 
Internship Report and Logsheet - Taylor's University Lakeside Campus
Internship Report and Logsheet - Taylor's University Lakeside CampusInternship Report and Logsheet - Taylor's University Lakeside Campus
Internship Report and Logsheet - Taylor's University Lakeside CampusLovie Tey
 
ASIAN ARCHITECTURE - THREE COURTYARD COMMUNITY CENTRE CASE STUDY /
ASIAN ARCHITECTURE - THREE COURTYARD COMMUNITY CENTRE CASE STUDY /ASIAN ARCHITECTURE - THREE COURTYARD COMMUNITY CENTRE CASE STUDY /
ASIAN ARCHITECTURE - THREE COURTYARD COMMUNITY CENTRE CASE STUDY /Lovie Tey
 
Building Structure // Beam Analysis Report
Building Structure // Beam Analysis ReportBuilding Structure // Beam Analysis Report
Building Structure // Beam Analysis ReportLovie Tey
 
Building Structure Roof Truss
Building Structure Roof Truss Building Structure Roof Truss
Building Structure Roof Truss Lovie Tey
 
Building Structure // Column Analysis Report
Building Structure // Column Analysis ReportBuilding Structure // Column Analysis Report
Building Structure // Column Analysis ReportLovie Tey
 
Building Structure - Structural Analysis of a bungalow
Building Structure - Structural Analysis of a bungalowBuilding Structure - Structural Analysis of a bungalow
Building Structure - Structural Analysis of a bungalowLovie Tey
 
Building Service, Taylor's University Lakeside Campus //
Building Service, Taylor's University Lakeside Campus // Building Service, Taylor's University Lakeside Campus //
Building Service, Taylor's University Lakeside Campus // Lovie Tey
 
Final report compilation
Final report compilationFinal report compilation
Final report compilationLovie Tey
 
Precedent Study and Analysis sketches for Pantheon
Precedent Study and Analysis sketches for PantheonPrecedent Study and Analysis sketches for Pantheon
Precedent Study and Analysis sketches for PantheonLovie Tey
 
Precedent Study and Analysis sketches for Pantheon
Precedent Study and Analysis sketches for PantheonPrecedent Study and Analysis sketches for Pantheon
Precedent Study and Analysis sketches for PantheonLovie Tey
 
Precedent Study and analysis for Pantheon
Precedent Study and analysis for PantheonPrecedent Study and analysis for Pantheon
Precedent Study and analysis for PantheonLovie Tey
 
DPJ 4 BACK COVER
DPJ 4 BACK COVERDPJ 4 BACK COVER
DPJ 4 BACK COVERLovie Tey
 
SPiderman Keyword.
SPiderman Keyword.SPiderman Keyword.
SPiderman Keyword.Lovie Tey
 
Psy final report (1)
Psy final report (1)Psy final report (1)
Psy final report (1)Lovie Tey
 
Psycho slide
Psycho slidePsycho slide
Psycho slideLovie Tey
 
Psycho comic pdf
Psycho comic pdfPsycho comic pdf
Psycho comic pdfLovie Tey
 
Psychology Journal
Psychology JournalPsychology Journal
Psychology JournalLovie Tey
 
Charity drive report fnbe0214
Charity drive report fnbe0214Charity drive report fnbe0214
Charity drive report fnbe0214Lovie Tey
 

Mehr von Lovie Tey (20)

Georgetown (tales of three cities)
Georgetown (tales of three cities)Georgetown (tales of three cities)
Georgetown (tales of three cities)
 
Tales of Three Cities - Petaling Street
Tales of Three Cities - Petaling StreetTales of Three Cities - Petaling Street
Tales of Three Cities - Petaling Street
 
Internship Report and Logsheet - Taylor's University Lakeside Campus
Internship Report and Logsheet - Taylor's University Lakeside CampusInternship Report and Logsheet - Taylor's University Lakeside Campus
Internship Report and Logsheet - Taylor's University Lakeside Campus
 
ASIAN ARCHITECTURE - THREE COURTYARD COMMUNITY CENTRE CASE STUDY /
ASIAN ARCHITECTURE - THREE COURTYARD COMMUNITY CENTRE CASE STUDY /ASIAN ARCHITECTURE - THREE COURTYARD COMMUNITY CENTRE CASE STUDY /
ASIAN ARCHITECTURE - THREE COURTYARD COMMUNITY CENTRE CASE STUDY /
 
Building Structure // Beam Analysis Report
Building Structure // Beam Analysis ReportBuilding Structure // Beam Analysis Report
Building Structure // Beam Analysis Report
 
Building Structure Roof Truss
Building Structure Roof Truss Building Structure Roof Truss
Building Structure Roof Truss
 
Building Structure // Column Analysis Report
Building Structure // Column Analysis ReportBuilding Structure // Column Analysis Report
Building Structure // Column Analysis Report
 
Building Structure - Structural Analysis of a bungalow
Building Structure - Structural Analysis of a bungalowBuilding Structure - Structural Analysis of a bungalow
Building Structure - Structural Analysis of a bungalow
 
Building Service, Taylor's University Lakeside Campus //
Building Service, Taylor's University Lakeside Campus // Building Service, Taylor's University Lakeside Campus //
Building Service, Taylor's University Lakeside Campus //
 
Final report compilation
Final report compilationFinal report compilation
Final report compilation
 
Precedent Study and Analysis sketches for Pantheon
Precedent Study and Analysis sketches for PantheonPrecedent Study and Analysis sketches for Pantheon
Precedent Study and Analysis sketches for Pantheon
 
Precedent Study and Analysis sketches for Pantheon
Precedent Study and Analysis sketches for PantheonPrecedent Study and Analysis sketches for Pantheon
Precedent Study and Analysis sketches for Pantheon
 
Precedent Study and analysis for Pantheon
Precedent Study and analysis for PantheonPrecedent Study and analysis for Pantheon
Precedent Study and analysis for Pantheon
 
DPJ 4 BACK COVER
DPJ 4 BACK COVERDPJ 4 BACK COVER
DPJ 4 BACK COVER
 
SPiderman Keyword.
SPiderman Keyword.SPiderman Keyword.
SPiderman Keyword.
 
Psy final report (1)
Psy final report (1)Psy final report (1)
Psy final report (1)
 
Psycho slide
Psycho slidePsycho slide
Psycho slide
 
Psycho comic pdf
Psycho comic pdfPsycho comic pdf
Psycho comic pdf
 
Psychology Journal
Psychology JournalPsychology Journal
Psychology Journal
 
Charity drive report fnbe0214
Charity drive report fnbe0214Charity drive report fnbe0214
Charity drive report fnbe0214
 

Kürzlich hochgeladen

Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxdhanalakshmis0310
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseAnaAcapella
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 

Kürzlich hochgeladen (20)

Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 

Menara Tabung Haji Case Study

  • 1. MENARA TABUNG HAJI Architectural Culture and History 2 ARC60203 Melissa Lim Li Lin - 0322680 Lovie Tey Yiqing - 0318155 Ng Ee Shiung - 0314228 Nur Zaliqal bt Zaher - 0317121 Nge Jia Chen - 0317738
 MENARA TABUNG HAJI - ARC60203 1
  • 2. Content 1. Introduction —————————————————————————————- Pg 3
 2. Site Context Analysis ( Melissa Lim 0322680)——————————————— Pg 4
 3. Architectural Layout of Building (Lovie Tey 0318155 )———————————— Pg 18
 4. Architecture Site Analysis (Ng Ee Shiung 0314228 )———————————— Pg 23 5. Building, Construction, Structure and Materials Analysis (Nur Zaliqal 0317121)- Pg 25
 6. Architectural Elements / Component Analysis (Nge Jia Chen 0317738)———— Pg 27 7. Conclusion —————————————————————————————— Pg 40
 8. Reference —————————————————————————————— Pg 41 MENARA TABUNG HAJI - ARC60203 2
  • 3. Introduction LUTH Building (Lembaga Urusan Tabung Haji) is located at Jalan Tun Razak in Kuala Lumpur, Malaysia. It is the headquarters for the Malaysian Muslim Pilgrim’s Management Fund. The building functions as an office building for the Muslim Pilgrim’s Management Fund(LUTH). Furthermore, it is a prominent landmark in Kuala Lumpur and a symbol of the development of Islam. Construction began in 1982 with Tun Dr. Mahathir Mohamad laying the foundation stone of the building. This project with a budget of RM95 Million completed in 1984. The form of the building resembles a traditional Malay drum and has Islamic influences which suits the function of the building. The Islamic architectural elements includes the Five Pillars of Islam shown in the façade by five non-structural pillars. This 152m tall building consists of 38 floors mainly for the offices and car park area. In front of the building, there is also a cone-shaped mosque designed together with the building. The architect of the building is the famous Hijjas Kasturi which has built many buildings and skyscrapers in Malaysia such as Menara Maybank and Menara Alor Star. The concept used are simplicity, discipline and unity which are the three ideas emphasised in Islam. MENARA TABUNG HAJI - ARC60203 3
  • 4. Site Context Analysis Site plan: Landscape at LUTH building MENARA TABUNG HAJI - ARC60203 4
  • 5. Landscape at LUTH building Canna Musafolio and Alternanthera(purple and green) Canna Musafolio and Alternanthera(purple and green) MENARA TABUNG HAJI - ARC60203 5
  • 6. Palm Trees Coconut Trees MENARA TABUNG HAJI - ARC60203 6
  • 7. Landscape The landscape of the building area is mainly at the entrance of the building where there are trees planted along the walkway to the main door. Shrubs and bushes can also be seen. The trees along the walkway are palm trees. There are also coconut trees. The lower plants consists of Canna Musafolio and Alternanthera. Building accessibility The main door is as shown in the picture above. There is a motorcycle parking space in front of the building. After parking one’s motorcycle, one can walk the centre stairs towards the main door. For drivers, they can park their car in the interior parking space located at few lower floors of the building. The interior parking space can be accessed from the back of the building through a ramp. One can also get to the Tabung Haji building by public transport such as taxi, bus, LRT and train. The bus service usually used is the RapidKL bus which stops at the bus stop in front of the building. When taking the train, one needs to stop at the Kl Sentral stop and continue with LRT, bus or taxi. One should take the LRT towards Gombak that stops at Ampang Park which is a 6minutes walk to the Tabung Haji building. From KLCC, there is a free service to Citibank at Jalan Ampang which is an 8 minute walk to the Tabung Haji building. MENARA TABUNG HAJI - ARC60203 7
  • 8. ! 
 Bus Stop in front of LUTH Building Walkway along LUTH Building MENARA TABUNG HAJI - ARC60203 8
  • 9. Surrounding facilities Other than offices and parking lot inside the building, there are other facilities inside the building such as media rooms, shops, halls and cafeterias. Within a walking distance about 100 to 200m, there are many restaurants available such as Gazebo, Koong Jung Restaurant, 10 Binjai and PnB Darby Café. In the neighbouring building G Tower, there are a variety of cuisines from NZ Curry House, Rakuzen (Japanese), Tanzini and the beautiful Bridge Bar. Inside the LUTH building, there is an ATM machine for Bank Islam whereas in the neighbouring building, Menara PNB, there are ATM machines for CIMB Bank and Maybank. MENARA TABUNG HAJI - ARC60203 9
  • 10. Bridge Bar, G Tower It is convenient for Muslim workers or visitors of LUTH building as there is a mosque right outside of the building for daily prayers. The mosque is most used for Friday prayers where it can be occupied by up to 600 people. In cases where Masjid Tabung Haji is full, users can head to the next nearest mosque, Masjid As-Syakirin which is a 11 minute walk or 6 minute drive away. Drivers can also refill their oil tank at the petrol stations nearby which are Caltex, Petron and Esso. MENARA TABUNG HAJI - ARC60203 10
  • 11. Masjid Tabung Haji Entertainment and recreation nearby include the KL City Park, TGV Cinemas, Petrosains and shopping malls such as Petronas Twin Towers and Suria KLCC. Jalan Tun Razak is also home to many embassy buildings of countries such as Mexico, Czech Republic, Hungary, United States, Japan and many more up to a total of 24 embassies in Jalan Tun Razak and nearby it. There are also hotels nearby such as The Zone, Intercontinental KL and G Tower Hotel. MENARA TABUNG HAJI - ARC60203 11
  • 12. Comparison in Jalan Tun Razak The Tabung Haji building was completed in 1984. It is considered modern at it’s time of construction as the form of the building is circular and curved. However, other modern buildings have been built at Jalan Tun Razak such as G Tower which has many advanced technologies such as hydronic chilled beams, thermal storage tank and many more as part of its sustainable design. Therefore, the LUTH building is currently lacking in that area. Unlike other buildings, it has a more religious approach. The building features the word “Allah” on top and at the entrance. Similar to a lot of buildings at Jalan Tun Razak is its function. Most buildings in Jalan Tun Razak such as Menara PNB and Menara Tan and Tan also functions as an office building. The building is one of the many skyscrapers along the main road of Jalan Tun Razak. Climate The sun path is from east to west which is from the front of the building to the back. Therefore, spaces at the front of the building will receive the morning sun. The back and sides of the building will not receive too much sunlight as there are other skyscrapers nearby such as G Tower, PNB Perdana Hotel & Suites and the PNB building. Therefore the front of the building will receive the most sunlight. Throughout the year, the building will receive about 6 to 8 hours of daily sunshine. However, for most of the time of the year, the building will receive about 8 hours of sunlight daily. MENARA TABUNG HAJI - ARC60203 12
  • 13. In Malaysia, there are 2 seasons which is the wet and dry season. During the wet season which is from November to March, it usually rains often especially in November. The rainy days can reach up to 20 days a month with total rainfall of about 12 inches. However, rain or heavy downpours can happen even in the dry season on some mornings. The dry seasons are usually from May to September with little rain. The driest month is June with about 10 rainy days a month of around 4 inches of rainfall. MENARA TABUNG HAJI - ARC60203 13
  • 14. The dry and wet seasons correspond to the two monsoon seasons. The dry season is also when the Northeast monsoon happens and the wet season is when the Southwest monsoon happens. The wind direction and intensity differs every month during the monsoon seasons. The wind source, wind direction, wind intensity and rainfall affects the average temperature every month. With no significant differences, the highest temperature throughout the year ranges from 32 to 34⁰C and the lowest temperature ranges from 23 to 25⁰C. MENARA TABUNG HAJI - ARC60203 14
  • 15. MENARA TABUNG HAJI - ARC60203 15
  • 16. MENARA TABUNG HAJI - ARC60203 16
  • 17. MENARA TABUNG HAJI - ARC60203 17
  • 18. Architectural Layout of Building Tabung Haji building clearly portrays as one of the signifiant Islamic Building which compiles the principles of Islamic Architecture in Malaysia.The Tabung Haji Building has an area of 55.7k square meters. For this building, the mosque is separated from the building itself, which is quite special as most of the mosque or prayer’s room will be located inside of the building. At the early use of the building, the mosque can only be access by the staffs that are working in the building itself for daily prayers. However, this mosque had been made accessible for the nearby muslim pedestrians on every Friday as no mosque is situated at Jalan Tun Abdul Razak. MENARA TABUNG HAJI - ARC60203 18
  • 19. From the floor plan and elevation of the building, it is clearly portrayed that symmetrical balance in both the horizontal plane and vertical plane. When the vertical axis is placed in the pictures, formal balance is clearly shown and there is a strong emphasis on the centre axis. Hence, it is clearly shown that the building is balanced as a complete structure. The building consists of five columns which symbolise the five pillars of Islam which is ‘Shahada’. ‘ Salat’, ‘ Zakat’, ‘ Fasting’, and ‘Hajj’’. On the other hand, it also act as a support structure for the building itself. One of the fun fact for the building is, you can only see a pillar from one point. This is believe and implies that the iman and the faith of the believer is not something to be showed around and proud of, but to be proud of it by the believer themselves in their heart. MENARA TABUNG HAJI - ARC60203 19
  • 20. From the floor plans , it is clearly shown that the architect, Hijjas Kasturi used consistency when designing the building. This building is constructed in a hourglass shape, and circular geometry shape is used to construct the floor plan of the building. The geometrical floor plans of the building showed a simplistic yet elegant expression of the tradition in Islamic art. The concept of circular concave curve acts as a symbol of the revolution and modern approach in architecture MENARA TABUNG HAJI - ARC60203 20
  • 21. Tabung Haji Building’s carpark is made up of circular circulation whereas every floor acted as a ramp. The carpark uses one-way-in and one-way-out to ensure that there is no congestion in traffic when the user is inside the building. At the same time, the architect applies the uses of ‘veil/hijab’ for the carpark whereas the building user can see but cannot be seen. This is used to give a more privacy situation towards the building and it helps to keep a sense of secretive to the outsider. MENARA TABUNG HAJI - ARC60203 21
  • 22. The Tabung Haji building consists of 27 office floors, which is known as the lower zone office, middle zone office as well as the upper floor office. The building consists of 7 levelof carpark, 2 levels of service room, 2 multi-purpose room which acts as counters, lobby, cafeteria, and convention hall. MENARA TABUNG HAJI - ARC60203 22 151.83m
  • 23. Architectural Site Analysis “The Hour Glass" form is something new but as a sculptural symbol, it represents the spiritual enlightenment promised by the pilgrimage" - Hijjaz Kasturi Contrary to local popular belief, the Tabung Haji Building was not inspired by traditional Malay drums but actually takes the form from an hour glass. It symbolizes the progressive movement of Islam in Malaysia as a cultural centre and growing economy. Modern but subtle lines are the primary elements in the main design of the building as it follows the tradition of Islamic art which exhibits simplistic expression. The curve that concave as it goes upwards signifies the progression and modernization of its approach in architecture. The use of predominantly white colors for the building shows the purity of Islam while the windows are tinted black to reduce heat of the interior due the hot climate of Malaysia. Shapes and symbols pertaining to Islamic faith is implemented all over both the exterior and interior of the building. Concrete and glass is the main construction materials used for the building due to its cost and effectiveness. One of the more shining example of design feature of the building is the word “ALLAH” carved in Jawi on the top of the building. By placing the carving on the centre and top of the building symbolises unity by the conduct of worship which is demanded by Allah swt. MENARA TABUNG HAJI - ARC60203 23
  • 24. While most of the buildings in Kuala Lumpur shows a more modern and emerging style of architecture that takes a departure from a more traditional style of design, such as the Pavillion KL, The Gardens, or Starhill Gallery, Haji Tabung Building took a different approach by combining the traditional elements of old with modern and simplistic designs of new. This gives a new identity to the cityscape of Kuala Lumpur that many other buildings are starting to follow such as the Maybank Tower, National Library, and Petronas Twin Towers. National identity has always been one of the main points for Malaysian after the Malaysian Independence. As such, Malaysian artistic movement after independence heavily involve traditional Malaysian design elements. Tabung Haji building was built according to that philosophy. MENARA TABUNG HAJI - ARC60203 24
  • 25. Building, Construction , Structure and Material Analysis According to the architect, Hijjaz Kasturi said that the Tabung Haji building has a shape of an hourglass, which was something new and sculptural. It was also used to represent the spiritual enlightenment promised by the pilgrimage. The main materials that were used in this building were glass, steel and concrete. The Tabung Haji building was amongst the first buildings in Malaysia to be constructed using the Precast Concrete System. The used of concrete has shown as one of the characteristics of modern buildings. The use of this system was predicated by the unique design of a double curvature, which resulted in every floor to be different. During that era as well, this building was considered as highly advanced as it included a VAC system of air conditioning in each hollow column serving one fifth of each floor area, curtain wall and etc. Precast concrete systems used in Malaysia are mostly large panels systems, which can either be load bearing or non- load bearing wall. This method had effectively saved cost and improved the quality through the reduced of MENARA TABUNG HAJI - ARC60203 25
  • 26. labor intensity and construction standardization. Besides, it minimizes the wastage of materials that lead to cleaner and neater environment and also a better quality control. The use of precast concrete system was one of the reasons why the construction of this building was below the budget. Glass was also use widely in the building. For this building, the glass is used mainly for windows. The glasses on the windows were tinted to reduce the amount of solar energy transmitted into the building as the amount of sunlight entering them is very high. Tinting the glass retain the transparency from the inside, although the brightness from the outside is reduced. It is also to increase visual privacy. One of the unique features of this building is the structure supporting the whole building, which is the arch. The arches are meant to span large areas by resolving forces into compressive stresses and eliminating tensile stresses to support the ceiling and the stability of the building. MENARA TABUNG HAJI - ARC60203 26
  • 27. Architectural Elements / Component Analysis ITHIRAM: RESPECT, PROPRIETY OR ADAB FIVE PILLARS OF ISLAM LTH building (Lembaga Tabung Haji) of 1984, is the home to the Malaysian Muslim Pilgrim’s Fund. It is a building that displays explicit Malay referencing. LTH building adopted an hour glass form that arguably reflects a traditional Malay drum due to the flaring of both the top and base. The most significant element of this building perhaps is its display of five non-structural ‘pillars’ on its façade, known to represent the Five Pillars of Islam (Shahada, Salat, Zakat, Fasting and Haji). The five pillars that seemed to be concealed in the building itself from any angle emits a strong concept of Pillars of Islam and its adherents to the faith is not something to show off and be proud of, but to be proofed by implementation. The non-structural ‘pillars’ means literally as it has no structural means at all. In the hollows includes peripheral air-conditioning system serving one-fifth of each floor area. But the seamless transition that lines from the base all the way to the top made it seemed like a structural support. The smart blending of materials of concrete (structural support on MENARA TABUNG HAJI - ARC60203 27
  • 28. ground) and alloy (prefabricated wall cladding) done by Hijjas Kasturi really raised a notch in the concept of modesty in Islam teachings and being an icon of modernism at its period of time. IKHLAS: SINCERITY In representing Malay influenced architecture, geometric subtraction is a nature and holds a prominent culture in Islamic Architecture. These elements can be seen all over the building from the base to the top, on ceilings, floors, walls, columns and so on. For example, the subtraction of the massive concrete load-bearing wall, forming an arch which does not only provide structural benefits such as better load distributing but at the same time it is very open and welcoming. Once again portraying the sincerity in providing service to the people. MENARA TABUNG HAJI - ARC60203 28 Alloy cladding starts from level 10 to the top Mechanical Room Section Office Floor Plan
  • 29. Ceilings The subtraction finishes on the ceilings are elegantly done, thus, creating an ambience of welcoming to the users and ultimately, exhibiting sincerity in the services provided to the people. Ground Floor Outdoor Ground Floor Lobby (2 Floors) MENARA TABUNG HAJI - ARC60203 29
  • 30. Outdoor Implementations Floor Tiles Hand Railings MENARA TABUNG HAJI - ARC60203 30
  • 31. Indoor Implementations Wall Ornamentations Floor Tiles MENARA TABUNG HAJI - ARC60203 31
  • 32. PURSUIT OF ‘ILM: KNOWLEDGE The idea of using Calligraphy is part of Islamic Art. They are used to portray and reveal information or ‘ilm using the language that is used in Quran. Being as it is, a Malaysian Muslim Pilgrim’s Fund, the presence of ‘ilm is important to always be around the user, reminding the Muslims to fulfill the pilgrimage to Mecca. MENARA TABUNG HAJI - ARC60203 32
  • 33. IQTISAD: BALANCE The LTH building has shown great tradition of Islamic simplistic and artistic expression and the concept of circular concave curve that represents a revolutionary approach to architecture and modern at the time of construction. These claims can be seen through the building geometries from the floor plans. The nature of this building is radial, thus creating a symmetrically balanced building. Ground Floor Plan Car Park Plan Office Floor Plan Section MENARA TABUNG HAJI - ARC60203 33 Offices of 27 floors Car park up to 10th floor
  • 34. Car Park Offices MENARA TABUNG HAJI - ARC60203 34
  • 35. HAYA’: MODESTY Adoption of Veil/Hijab are used on this building as well, it allows the building users to see but not to be seen. This concept can be seen applied in the parking areas of this building and complementally it gives a more appealing outlook on the building façade, in the meantime, providing air ventilation and natural light in the car park area making it less
 stuffy and well illuminated. MENARA TABUNG HAJI - ARC60203 35 Glazed windows for the office floors Louvers for the parking areas Air flowing in through these openings ventilating the stuffy car park
  • 36. Glass Curtain Walls They are non-structural elements, therefore not bearing any structural load. Due to that, these tempered and laminated glass curtain walls which does not compromise any structural integrity, were used on the lobby or along the inner cylindrical structure. The implementation of this curtain wall greatly limit the direct reflection of light causing the space within to be well illuminated but lesser heat gained. Aside from that, these curtain walls reflects on modesty as the building user can see through them but less visible from the outside, providing a degree of privacy for the user within. MENARA TABUNG HAJI - ARC60203 36
  • 37. DIKR: REMEMBRANCE Among the unique properties of this building that makes it stand out from other existing Islamic buildings is the carving of Jawi scripted Allah SWT on the roof which makes it a majestic building, a building with a purpose. The very nature of this principle is implemented to remember Allah SWT’s existence in the first place as this is a building for the Muslims of Malaysia to save for their pilgrimage to Mecca and the pilgrimage to Mecca is ultimately for It. Therefore, inscriptions are done and placed on several locations. MENARA TABUNG HAJI - ARC60203 37 Another inscription on the ground floor main entrance for remembrance.
  • 38. TRANSVERSE ELEMENT Ground Floor Plan 
 Lower Ground Floor Plan MENARA TABUNG HAJI - ARC60203 38 Including the staircases for the fire exit uses element of slight curve to present the building as a whole. Stairs to lower ground floor.
  • 39. Automatic Sliding Glass Doors On all 4 main entrances to the lobby, double sliding glass doors are employed and they function as public entrances. They operate automatically with the help of ‘sensor’. These automatic doors can be controlled directly by the security guards from the lobby. On top of the doors, ‘Perkhidmatan Cemerlang Amalan Kita’, stating their slogan, ‘Excellent Services as Our Practice’. Once again, emphasizing their sincerity in serving the people in need. Tinted Double Glazed Window The glazed windows are framed with aluminium and they start from floor 11 to floor 38, which is the office floors, from lower zone to upper zone. From outside they look dark, due to the black tint, providing privacy for the users within. MENARA TABUNG HAJI - ARC60203 39
  • 41. Reference • BINTI ABDUL AZIZ, S. (2012, December 22). TABUNG HAJI TOWER, KUALA LUMPUR. Retrieved November 15, 2015, from http://al-blog-al-kaslan.blogspot.my/ 2012/12/tabung-haji-tower-kuala-lumpur.html • Binti Wan Mohd Rashdi, W. (2012, October 21). Malaysian Architectural Identity. Retrieved November 15, 2015, from https://designerspuo.wordpress.com/ architectural-writings/teaching-and-learning-dillema-in-puo/ • http://www.hijjaskasturi.com/ • Kuala Lumpur and Putrajaya: Negotiating Urban Space in Malaysia By Ross King • http://www.tabunghaji.gov.my/bangunan-th • http://www.worldweatheronline.com/Kuala-Lumpur-weather-averages/Kuala- Lumpur/MY.aspx • http://www.holiday-weather.com/kuala_lumpur/averages/ • http://www.windfinder.com/windstatistics/morib_kuala_lumpur • http://gtower.com.my Reference: http://ijesat.org/Volumes/2012_Vol_02_Iss_06/IJESAT_2012_02_06_20.pdf http://al-blog-al-kaslan.blogspot.my/2012/12/tabung-haji-tower-kuala-lumpur.html http://www.lendlease.com/asia/malaysia/projects/lembaga-tabung-haji-headquarters http://wikimapia.org/14902/Menara-Tabung-Haji http://www.commercialwindows.org/tints.php https://www.boundless.com/physics/textbooks/boundless-physics-textbook/static-equilibrium- elasticity-and-torque-8/applications-of-statics-77/arches-and-domes-314-11286/ Reference
 Hijjas Kasturi Associates Sdn. (n.d.). Retrieved November 15, 2015, from http://www.hijjaskasturi.com/ Portal Tabung Haji. (n.d.). Retrieved November 15, 2015, from http://www.tabunghaji.gov.my/bangunan-th King, R. (2008). Kuala Lumpur and Putrajaya: Negotiating urban space in Malaysia (p. 107). Honolulu: Asian Studies Association of Australia in association with University of Hawaii Press. Tabung Haji | Interior, computer lab | Archnet. (n.d.). Retrieved November 15, 2015, from MENARA TABUNG HAJI - ARC60203 41
  • 42. http://archnet.org/sites/530/media_contents/13070 Bangunan Tabung Haji, Kuala Lumpur | 106005 | EMPORIS. (n.d.). Retrieved November 15, 2015, from http://www.emporis.com/buildings/106005/bangunan-tabung-haji-kuala- lumpur-malaysia • MENARA TABUNG HAJI - ARC60203 42