 Cycle time is the actual time it takes an
operator to complete an operation, from
start to finish. It includes the time spent
on both productive and non-productive
activities.
 SMV (Standard Minute Value) is the
theoretical time it takes an operator to
complete an operation at their normal
pace, without any delays or
interruptions. It is calculated by taking
the cycle time and multiplying it by the
operator's performance rating.
SMV vs Cycle Time
Standard Minute Value (SMV)
 SMV is a widely used metric in manufacturing
that quantifies the time required for a skilled
worker to perform a specific task following a
predetermined standard method.
Standard Minute Value (SMV)
 Use: SMV is crucial for estimating labor requirements
accurately, planning production schedules efficiently,
and setting performance benchmarks for workers and
production lines.
 Formula: Explain the components of the SMV formula:
SMV = Basic Time + (Allowances * Basic Time
Factors Affecting SMV (Standard Minute
Value):
 Task Complexity: The complexity of the task itself influences the time it takes to
complete it. More intricate tasks usually have higher SMVs.
 Skill Level: The proficiency of the worker performing the task affects the SMV.
Skilled workers might complete tasks faster than less experienced ones.
 Learning Curve: Workers tend to become more efficient as they gain experience
with a task, which can lead to a decrease in SMV over time.
 Method of Work: The defined method or technique used to perform the task
impacts the time required. Efficient methods can lower the SMV.
 Allowances: Allowances are additional time factors added to the basic time to
account for rest breaks, fatigue, and other factors. The accuracy of allowances can
influence the accuracy of SMV.
 Workplace Conditions: Factors like lighting, workspace layout, and ergonomic
design can impact worker efficiency and, consequently, the SMV.
 Tools and Equipment: The availability and condition of tools and equipment
directly affect the speed and quality of task completion.
Cycle Time
 Cycle time refers to the total time it takes to
complete one full production cycle, starting
from the production of one unit to the initiation
of the next unit.
 Emphasize that cycle time provides a holistic
view of production efficiency, helping identify
bottlenecks, optimize processes, and
enhance overall productivity.
Cycle Time
 Formula:
Present the components of the cycle time
formula: Cycle Time = Production Time + Wait
Time + Move Time + Inspection Time.
Factors Affecting Cycle Time:
 Machine Speed: The speed at which machines operate in the production process directly affects the
time it takes to complete each cycle.
 Production Line Layout: An optimized layout can reduce movement and transportation time
between workstations, effectively decreasing cycle time.
 Setup and Changeover Time: The time required to set up or switch between different tasks or
products impacts overall cycle time. Reducing setup time can increase efficiency.
 Quality Inspection: The time needed for quality checks and inspections adds to the cycle time.
Efficient inspection methods can reduce this time.
 Wait Time: Any delays in material availability, worker availability, or machine downtime can lead to
waiting time and increase cycle time.
 Move Time: The time taken to move materials or products between workstations or locations
contributes to cycle time.
 Bottlenecks: Points in the production process where work accumulates due to imbalances in
capacities can significantly extend cycle time.
 Maintenance and Downtime: Unscheduled downtime for maintenance or repairs directly affects the
overall cycle time by reducing the effective working time.
 Automation: Introducing automation to certain tasks can drastically reduce cycle time, as machines
can work consistently and quickly.
 Production Volume: High production volume can lead to congestion and longer cycle times if the
process isn't scaled up appropriately.
Definition Theoretical time to complete an operation
at normal pace
Actual time to complete an
operation, from start to finish
Includes Productive and non-productive activities Productive activities only
Based on Performance rating Actual time
Used for Setting production standards, calculating
labor costs, identifying areas for
improvement
Scheduling, monitoring production,
identifying bottlenecks
SMV vs Cycle Time
Any questions ?

More Related Content

Similar to SMV VS CYCLE TIME

IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...Karina Islam
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction ProjectIRJET Journal
 
Operations Management power point Chapter Five
Operations Management power point Chapter FiveOperations Management power point Chapter Five
Operations Management power point Chapter FiveAYNETUTEREFE1
 
Unit 2 work measurement.pdf
Unit 2 work measurement.pdfUnit 2 work measurement.pdf
Unit 2 work measurement.pdfSaurabh Jain
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurementAkash Bakshi
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...IRJET Journal
 
Pom notes unit 2
Pom notes unit 2Pom notes unit 2
Pom notes unit 2Abu Bashar
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materialspikuoec
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materialspikuoec
 
Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodsProductivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodseSAT Journals
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations SchedulingAshish Jain
 
Operation scheduling
Operation schedulingOperation scheduling
Operation schedulingsai precious
 
Production management
Production managementProduction management
Production managementVivan Kumar
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and ControlAijaz Aryan
 
Production planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringProduction planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringDarshan Shah
 
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaaSCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaainfinitepestcontrol
 
Where Does The Time Go?
Where Does The Time Go?Where Does The Time Go?
Where Does The Time Go?gstevick1980
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxLakshayKumar504432
 

Similar to SMV VS CYCLE TIME (20)

IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction Project
 
Improving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_studyImproving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_study
 
Operations Management power point Chapter Five
Operations Management power point Chapter FiveOperations Management power point Chapter Five
Operations Management power point Chapter Five
 
Pom unit 3
Pom unit 3Pom unit 3
Pom unit 3
 
Unit 2 work measurement.pdf
Unit 2 work measurement.pdfUnit 2 work measurement.pdf
Unit 2 work measurement.pdf
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
 
Pom notes unit 2
Pom notes unit 2Pom notes unit 2
Pom notes unit 2
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodsProductivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methods
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Production management
Production managementProduction management
Production management
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Production planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringProduction planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, Monitoring
 
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaaSCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
 
Where Does The Time Go?
Where Does The Time Go?Where Does The Time Go?
Where Does The Time Go?
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
 

More from Liton Ahmed

History of apparel industry in bnagladesh
History of apparel industry in bnagladeshHistory of apparel industry in bnagladesh
History of apparel industry in bnagladeshLiton Ahmed
 
How to be a good web designer
How to be a good web designerHow to be a good web designer
How to be a good web designerLiton Ahmed
 
sizing of Synthetic yarn
sizing of Synthetic yarn sizing of Synthetic yarn
sizing of Synthetic yarn Liton Ahmed
 
Fiber properties
Fiber propertiesFiber properties
Fiber propertiesLiton Ahmed
 
Computer Operating System
Computer Operating System Computer Operating System
Computer Operating System Liton Ahmed
 
Textile Machineries
Textile Machineries Textile Machineries
Textile Machineries Liton Ahmed
 
Wireless communication
Wireless communicationWireless communication
Wireless communicationLiton Ahmed
 
Advanced Materilas
 Advanced Materilas  Advanced Materilas
Advanced Materilas Liton Ahmed
 
Smartphone and its features
Smartphone and its features Smartphone and its features
Smartphone and its features Liton Ahmed
 

More from Liton Ahmed (11)

History of apparel industry in bnagladesh
History of apparel industry in bnagladeshHistory of apparel industry in bnagladesh
History of apparel industry in bnagladesh
 
How to be a good web designer
How to be a good web designerHow to be a good web designer
How to be a good web designer
 
sizing of Synthetic yarn
sizing of Synthetic yarn sizing of Synthetic yarn
sizing of Synthetic yarn
 
Fiber properties
Fiber propertiesFiber properties
Fiber properties
 
Chemical bond
Chemical bondChemical bond
Chemical bond
 
Computer Operating System
Computer Operating System Computer Operating System
Computer Operating System
 
Textile Machineries
Textile Machineries Textile Machineries
Textile Machineries
 
Smart Card
Smart Card Smart Card
Smart Card
 
Wireless communication
Wireless communicationWireless communication
Wireless communication
 
Advanced Materilas
 Advanced Materilas  Advanced Materilas
Advanced Materilas
 
Smartphone and its features
Smartphone and its features Smartphone and its features
Smartphone and its features
 

Recently uploaded

POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 

Recently uploaded (20)

POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 

SMV VS CYCLE TIME

  • 1. SMV vs Cycle Time Name: Md. Liton Ahamed Presentation on
  • 2.  Cycle time is the actual time it takes an operator to complete an operation, from start to finish. It includes the time spent on both productive and non-productive activities.  SMV (Standard Minute Value) is the theoretical time it takes an operator to complete an operation at their normal pace, without any delays or interruptions. It is calculated by taking the cycle time and multiplying it by the operator's performance rating. SMV vs Cycle Time
  • 3. Standard Minute Value (SMV)  SMV is a widely used metric in manufacturing that quantifies the time required for a skilled worker to perform a specific task following a predetermined standard method.
  • 4. Standard Minute Value (SMV)  Use: SMV is crucial for estimating labor requirements accurately, planning production schedules efficiently, and setting performance benchmarks for workers and production lines.  Formula: Explain the components of the SMV formula: SMV = Basic Time + (Allowances * Basic Time
  • 5. Factors Affecting SMV (Standard Minute Value):  Task Complexity: The complexity of the task itself influences the time it takes to complete it. More intricate tasks usually have higher SMVs.  Skill Level: The proficiency of the worker performing the task affects the SMV. Skilled workers might complete tasks faster than less experienced ones.  Learning Curve: Workers tend to become more efficient as they gain experience with a task, which can lead to a decrease in SMV over time.  Method of Work: The defined method or technique used to perform the task impacts the time required. Efficient methods can lower the SMV.  Allowances: Allowances are additional time factors added to the basic time to account for rest breaks, fatigue, and other factors. The accuracy of allowances can influence the accuracy of SMV.  Workplace Conditions: Factors like lighting, workspace layout, and ergonomic design can impact worker efficiency and, consequently, the SMV.  Tools and Equipment: The availability and condition of tools and equipment directly affect the speed and quality of task completion.
  • 6. Cycle Time  Cycle time refers to the total time it takes to complete one full production cycle, starting from the production of one unit to the initiation of the next unit.  Emphasize that cycle time provides a holistic view of production efficiency, helping identify bottlenecks, optimize processes, and enhance overall productivity.
  • 7. Cycle Time  Formula: Present the components of the cycle time formula: Cycle Time = Production Time + Wait Time + Move Time + Inspection Time.
  • 8. Factors Affecting Cycle Time:  Machine Speed: The speed at which machines operate in the production process directly affects the time it takes to complete each cycle.  Production Line Layout: An optimized layout can reduce movement and transportation time between workstations, effectively decreasing cycle time.  Setup and Changeover Time: The time required to set up or switch between different tasks or products impacts overall cycle time. Reducing setup time can increase efficiency.  Quality Inspection: The time needed for quality checks and inspections adds to the cycle time. Efficient inspection methods can reduce this time.  Wait Time: Any delays in material availability, worker availability, or machine downtime can lead to waiting time and increase cycle time.  Move Time: The time taken to move materials or products between workstations or locations contributes to cycle time.  Bottlenecks: Points in the production process where work accumulates due to imbalances in capacities can significantly extend cycle time.  Maintenance and Downtime: Unscheduled downtime for maintenance or repairs directly affects the overall cycle time by reducing the effective working time.  Automation: Introducing automation to certain tasks can drastically reduce cycle time, as machines can work consistently and quickly.  Production Volume: High production volume can lead to congestion and longer cycle times if the process isn't scaled up appropriately.
  • 9. Definition Theoretical time to complete an operation at normal pace Actual time to complete an operation, from start to finish Includes Productive and non-productive activities Productive activities only Based on Performance rating Actual time Used for Setting production standards, calculating labor costs, identifying areas for improvement Scheduling, monitoring production, identifying bottlenecks SMV vs Cycle Time