SlideShare a Scribd company logo
1 of 17
Download to read offline
UNCLASSIFIED / FOUO




                       National Guard
                      Black Belt Training

                          Module 45

                       Quick Changeover


                                            UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




CPI Roadmap – Improve
                                                           8-STEP PROCESS
                                                                                                    6. See
   1.Validate          2. Identify           3. Set         4. Determine        5. Develop                          7. Confirm        8. Standardize
                                                                                                   Counter-
      the             Performance         Improvement           Root             Counter-                            Results            Successful
                                                                                                   Measures
    Problem               Gaps              Targets             Cause           Measures                            & Process            Processes
                                                                                                   Through

        Define                  Measure                      Analyze                       Improve                            Control



                                                                                   TOOLS
                                        ACTIVITIES
                                                                         •Brainstorming
                        •   Develop Potential Solutions
                                                                         •Replenishment Pull/Kanban
                        •   Develop Evaluation Criteria
                                                                         •Stocking Strategy
                        •   Select Best Solutions
                                                                         •Process Flow Improvement
                        •   Develop Future State Process Map(s)
                                                                         •Process Balancing
                        •   Develop Pilot Plan
                                                                         •Standard Work
                        •   Pilot Solution
                                                                         •Quick Change Over
                        •   Develop Full Scale Action/
                                                                         •Design of Experiments (DOE)
                            Implementation Plan
                                                                         •Solution Selection Matrix
                        •   Complete Improve Gate
                                                                         •‘To-Be’ Process Mapping
                                                                         •Poka-Yoke
                                                                         •6S Visual Mgt
                                                                         •RIE

                       Note: Activities and tools vary by project. Lists provided here are not necessarily all-inclusive. UNCLASSIFIED / FOUO          2
UNCLASSIFIED / FOUO




 Changeover Definition

        The amount of time taken to change
      equipment from the Last Good Part of a
        process to the First Good Part of the
                     next process
                      Clock Time, not Labor Time!



                                              UNCLASSIFIED / FOUO   3
UNCLASSIFIED / FOUO




 Traditional vs. CPI Thinking
          Traditional Thinking
           Changeovers cause downtime
           Changeovers cause poor utilization, defects & scrap
           Big Batch Size desirable - “The Bigger, the Better”
               (less changeovers)

          CPI Thinking
           Quick changeovers decrease downtime
           Well designed changeovers decrease waste
           Quick changeovers (with small batches) Increases
               Flexibility

                                                     UNCLASSIFIED / FOUO   4
UNCLASSIFIED / FOUO




 Why Quick Changeover?
                       Shorter Changeover Times

                      More Frequent Changeovers

                         Smaller Batch Sizes

                         Shorter Lead Times


          Increased Combat Capability!
                                                  UNCLASSIFIED / FOUO   5
UNCLASSIFIED / FOUO




 Internal vs. External

      The first task is to recognize that there
     are two essentially different components
      of any changeover, Internal Activities
              and External Activities.




                                      UNCLASSIFIED / FOUO   6
UNCLASSIFIED / FOUO




Changeover Activities


          Internal Activities
                An activity that must be performed while the machine
                 or process is turned off (no product)
                Example – Refuel plane on the ground


          External Activities
                An activity that can be performed while the machine or
                 process is turned on (producing product)
                Example – Refuel plane in the air


                                                          UNCLASSIFIED / FOUO   7
UNCLASSIFIED / FOUO




 Improvement Steps
  1.      Identify changeover activities and document the
          process (time each step).


  2.      Separate Internal activity from External activity

                                    External   Internal        External




                                                          UNCLASSIFIED / FOUO   8
UNCLASSIFIED / FOUO




 Internal vs. External Quiz
     Possible CT Scan Changeover Steps:                          Which are
         1.     Machine is turned off as scan ends               Internal &
         2.     IV is removed from the patient
         3.     Patient is moved off of scan bed
                                                                Which should
         4.     Patient is removed from CT scan room            be External?
         5.     New Patient is identified off of CT scan schedule
         6.     New Patient is brought into CT scan room
         7.     Patient identification is verified
         8.     CT Scan procedure is explained to patient
         9.     Type of Scan is verified from Physician Orders
         10.    IV is started on new Patient
         11.    Patient is placed on CT scan bed
         12.    CT Scan machine is turned on and scan begins
                                                                        Adapted from “A Lean Guide to
                                                                     Transforming Healthcare”, Zidel, 2006

                                                                    UNCLASSIFIED / FOUO                      9
UNCLASSIFIED / FOUO




 Internal vs. External Quiz
   Possible CT Scan Changeover Steps:                       Internal
        1.    Machine is turned off as scan ends            External
        2.    IV is removed from the patient
        3.    Patient is moved off of scan bed
        4.    Patient is removed from CT scan room
        5.    New Patient is identified off of CT scan schedule
        6.    New Patient is brought into CT scan room
        7.    Patient identification is verified
        8.    CT Scan procedure is explained to patient
        9.    Type of Scan is verified from Physician Orders
        10.   IV is started on new Patient
        11.   Patient is placed on CT scan bed
        12.   CT Scan machine is turned on and scan begins
                                                                Adapted from “A Lean Guide to
                                                             Transforming Healthcare”, Zidel, 2006

                                                            UNCLASSIFIED / FOUO                 10
UNCLASSIFIED / FOUO




Improvement Steps
        1.      Identify activities and document the process.


        2.      Separate Internal from External activity


        3.      Convert Internal to External




                                                       UNCLASSIFIED / FOUO   11
UNCLASSIFIED / FOUO




Converting Internal to External

    Prepare operating conditions prior to changeover
           Preheat molds or dies
           Prepare Patient or Care-givers
           Prepare service materials or providers
           Pre-adjust parts
    Use intermediary sets
           Preset tools
           Position dies
    Standardize necessary functions
           Change the fewest parts possible
           Minimize or eliminate adjustments
                                                     UNCLASSIFIED / FOUO   12
UNCLASSIFIED / FOUO




 Improvement Steps
        1.      Identify activities and document the process.


        2.      Separate Internal from External activity


        3.      Convert Internal to External


        4.      Reduce all remaining activities.



                                                       UNCLASSIFIED / FOUO   13
UNCLASSIFIED / FOUO




 Reduce All Remaining Activities

          Perform Parallel Operations
          Improve Clamping Mechanisms
                One turn clamps
                One motion methods
          Eliminate all adjustments
                Numerical Settings vs. “Feel”
          Automate activities where appropriate




                                                   UNCLASSIFIED / FOUO   14
UNCLASSIFIED / FOUO




Pit Stop Photo
                      Team with Pre-assigned Tasks         Placement Clearly
                                                                Defined




        Quick Connect &                       Tools Properly Positioned Prior
       Disconnect Devices                               to Arrival


                                                                UNCLASSIFIED / FOUO   15
UNCLASSIFIED / FOUO




 Takeaways

          Remember Safety at all times!!!
          Change internal to external then reduce all
           activities
          Standards are standards, they are not flexible
          Standardize all changeover operations




                                               UNCLASSIFIED / FOUO   16
UNCLASSIFIED / FOUO




        What other comments or questions
                  do you have?




                                  UNCLASSIFIED / FOUO   17

More Related Content

What's hot

NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapLeanleaders.org
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionLeanleaders.org
 
NG BB 22 Process Measurement
NG BB 22 Process MeasurementNG BB 22 Process Measurement
NG BB 22 Process MeasurementLeanleaders.org
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the GainLeanleaders.org
 
NG BB 06 Project Charter
NG BB 06 Project CharterNG BB 06 Project Charter
NG BB 06 Project CharterLeanleaders.org
 
NG BB 43 Standardized Work
NG BB 43 Standardized WorkNG BB 43 Standardized Work
NG BB 43 Standardized WorkLeanleaders.org
 
NG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project PlanningNG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project PlanningLeanleaders.org
 
NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk AssessmentLeanleaders.org
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesLeanleaders.org
 
NG BB 20 Data Collection
NG BB 20 Data CollectionNG BB 20 Data Collection
NG BB 20 Data CollectionLeanleaders.org
 
NG BB 08 Change Management
NG BB 08 Change ManagementNG BB 08 Change Management
NG BB 08 Change ManagementLeanleaders.org
 
NG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapNG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapLeanleaders.org
 
NG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabNG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabLeanleaders.org
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapLeanleaders.org
 
NG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateNG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateLeanleaders.org
 
NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapLeanleaders.org
 
NG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the ProcessNG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the ProcessLeanleaders.org
 

What's hot (20)

NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE Roadmap
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear Regression
 
NG BB 22 Process Measurement
NG BB 22 Process MeasurementNG BB 22 Process Measurement
NG BB 22 Process Measurement
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the Gain
 
NG BB 06 Project Charter
NG BB 06 Project CharterNG BB 06 Project Charter
NG BB 06 Project Charter
 
NG BB 43 Standardized Work
NG BB 43 Standardized WorkNG BB 43 Standardized Work
NG BB 43 Standardized Work
 
NG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project PlanningNG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project Planning
 
NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk Assessment
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and Responsibilities
 
NG BB 20 Data Collection
NG BB 20 Data CollectionNG BB 20 Data Collection
NG BB 20 Data Collection
 
NG BB 30 Basic Tools
NG BB 30 Basic ToolsNG BB 30 Basic Tools
NG BB 30 Basic Tools
 
NG BB 08 Change Management
NG BB 08 Change ManagementNG BB 08 Change Management
NG BB 08 Change Management
 
NG BB 26 Control Charts
NG BB 26 Control ChartsNG BB 26 Control Charts
NG BB 26 Control Charts
 
NG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapNG BB 12 High-Level Process Map
NG BB 12 High-Level Process Map
 
NG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabNG BB 21 Intro to Minitab
NG BB 21 Intro to Minitab
 
NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
NG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateNG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE Tollgate
 
NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL Roadmap
 
NG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the ProcessNG BB 19 Document and Analyze the Process
NG BB 19 Document and Analyze the Process
 

Viewers also liked

NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process CapabilityLeanleaders.org
 
NG BB 33 Hypothesis Testing Basics
NG BB 33 Hypothesis Testing BasicsNG BB 33 Hypothesis Testing Basics
NG BB 33 Hypothesis Testing BasicsLeanleaders.org
 
NG BB 55 CONTROL Tollgate
NG BB 55 CONTROL TollgateNG BB 55 CONTROL Tollgate
NG BB 55 CONTROL TollgateLeanleaders.org
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]Leanleaders.org
 
NG BB 28 MEASURE Tollgate
NG BB 28 MEASURE TollgateNG BB 28 MEASURE Tollgate
NG BB 28 MEASURE TollgateLeanleaders.org
 
NG BB 42 Visual Management
NG BB 42 Visual ManagementNG BB 42 Visual Management
NG BB 42 Visual ManagementLeanleaders.org
 
NG BB 40 Solution Selection
NG BB 40 Solution SelectionNG BB 40 Solution Selection
NG BB 40 Solution SelectionLeanleaders.org
 
NG BB 13 Voice of Customer
NG BB 13 Voice of CustomerNG BB 13 Voice of Customer
NG BB 13 Voice of CustomerLeanleaders.org
 
NG BB 32 Failure Modes and Effects Analysis
NG BB 32 Failure Modes and Effects AnalysisNG BB 32 Failure Modes and Effects Analysis
NG BB 32 Failure Modes and Effects AnalysisLeanleaders.org
 
How to create a SIPOC diagram
How to create a SIPOC diagramHow to create a SIPOC diagram
How to create a SIPOC diagramTom Curtis
 

Viewers also liked (11)

NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process Capability
 
NG BB 33 Hypothesis Testing Basics
NG BB 33 Hypothesis Testing BasicsNG BB 33 Hypothesis Testing Basics
NG BB 33 Hypothesis Testing Basics
 
NG BB 01 Introduction
NG BB 01 IntroductionNG BB 01 Introduction
NG BB 01 Introduction
 
NG BB 55 CONTROL Tollgate
NG BB 55 CONTROL TollgateNG BB 55 CONTROL Tollgate
NG BB 55 CONTROL Tollgate
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]
 
NG BB 28 MEASURE Tollgate
NG BB 28 MEASURE TollgateNG BB 28 MEASURE Tollgate
NG BB 28 MEASURE Tollgate
 
NG BB 42 Visual Management
NG BB 42 Visual ManagementNG BB 42 Visual Management
NG BB 42 Visual Management
 
NG BB 40 Solution Selection
NG BB 40 Solution SelectionNG BB 40 Solution Selection
NG BB 40 Solution Selection
 
NG BB 13 Voice of Customer
NG BB 13 Voice of CustomerNG BB 13 Voice of Customer
NG BB 13 Voice of Customer
 
NG BB 32 Failure Modes and Effects Analysis
NG BB 32 Failure Modes and Effects AnalysisNG BB 32 Failure Modes and Effects Analysis
NG BB 32 Failure Modes and Effects Analysis
 
How to create a SIPOC diagram
How to create a SIPOC diagramHow to create a SIPOC diagram
How to create a SIPOC diagram
 

Similar to NG BB 45 Quick Change Over

NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapLeanleaders.org
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapLeanleaders.org
 
NG BB 23 Measurement System Analysis - Introduction
NG BB 23 Measurement System Analysis - IntroductionNG BB 23 Measurement System Analysis - Introduction
NG BB 23 Measurement System Analysis - IntroductionLeanleaders.org
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process CapabilityLeanleaders.org
 
NG BB 25 Measurement System Analysis - Attribute
NG BB 25 Measurement System Analysis - AttributeNG BB 25 Measurement System Analysis - Attribute
NG BB 25 Measurement System Analysis - AttributeLeanleaders.org
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionLeanleaders.org
 
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnban
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnbanTQM, 5S, Kaizen, Poka-yoke, JIT, KAnban
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnbanAkansha Jha
 

Similar to NG BB 45 Quick Change Over (10)

NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE Roadmap
 
NG BB 23 Measurement System Analysis - Introduction
NG BB 23 Measurement System Analysis - IntroductionNG BB 23 Measurement System Analysis - Introduction
NG BB 23 Measurement System Analysis - Introduction
 
NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
NG BB 04 DEFINE Roadmap
NG BB 04 DEFINE RoadmapNG BB 04 DEFINE Roadmap
NG BB 04 DEFINE Roadmap
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process Capability
 
NG BB 25 Measurement System Analysis - Attribute
NG BB 25 Measurement System Analysis - AttributeNG BB 25 Measurement System Analysis - Attribute
NG BB 25 Measurement System Analysis - Attribute
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear Regression
 
NG BB 30 Basic Tools
NG BB 30 Basic ToolsNG BB 30 Basic Tools
NG BB 30 Basic Tools
 
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnban
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnbanTQM, 5S, Kaizen, Poka-yoke, JIT, KAnban
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnban
 

More from Leanleaders.org

More from Leanleaders.org (20)

Variation and mistake proofing
Variation and mistake proofingVariation and mistake proofing
Variation and mistake proofing
 
D11 Define Review
D11 Define ReviewD11 Define Review
D11 Define Review
 
Blankgage.MTW
Blankgage.MTWBlankgage.MTW
Blankgage.MTW
 
Chi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xlsChi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xls
 
D04 Why6Sigma
D04 Why6SigmaD04 Why6Sigma
D04 Why6Sigma
 
D10 Project Management
D10 Project ManagementD10 Project Management
D10 Project Management
 
Attrib R&R.xls
Attrib R&R.xlsAttrib R&R.xls
Attrib R&R.xls
 
Blank Logo LEAN template
Blank Logo LEAN templateBlank Logo LEAN template
Blank Logo LEAN template
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)
 
Cause and Effect Tree.vst
Cause and Effect Tree.vstCause and Effect Tree.vst
Cause and Effect Tree.vst
 
LEAN template
LEAN templateLEAN template
LEAN template
 
I07 Simulation
I07 SimulationI07 Simulation
I07 Simulation
 
D01 Define Spacer
D01 Define SpacerD01 Define Spacer
D01 Define Spacer
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
Attribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xlsAttribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xls
 
A05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat TestsA05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat Tests
 
XY Matrix.xls
XY Matrix.xlsXY Matrix.xls
XY Matrix.xls
 
D06 Project Selection
D06 Project SelectionD06 Project Selection
D06 Project Selection
 
G04 Root Cause Relationships
G04 Root Cause RelationshipsG04 Root Cause Relationships
G04 Root Cause Relationships
 

Recently uploaded

Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 

Recently uploaded (20)

Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 

NG BB 45 Quick Change Over

  • 1. UNCLASSIFIED / FOUO National Guard Black Belt Training Module 45 Quick Changeover UNCLASSIFIED / FOUO
  • 2. UNCLASSIFIED / FOUO CPI Roadmap – Improve 8-STEP PROCESS 6. See 1.Validate 2. Identify 3. Set 4. Determine 5. Develop 7. Confirm 8. Standardize Counter- the Performance Improvement Root Counter- Results Successful Measures Problem Gaps Targets Cause Measures & Process Processes Through Define Measure Analyze Improve Control TOOLS ACTIVITIES •Brainstorming • Develop Potential Solutions •Replenishment Pull/Kanban • Develop Evaluation Criteria •Stocking Strategy • Select Best Solutions •Process Flow Improvement • Develop Future State Process Map(s) •Process Balancing • Develop Pilot Plan •Standard Work • Pilot Solution •Quick Change Over • Develop Full Scale Action/ •Design of Experiments (DOE) Implementation Plan •Solution Selection Matrix • Complete Improve Gate •‘To-Be’ Process Mapping •Poka-Yoke •6S Visual Mgt •RIE Note: Activities and tools vary by project. Lists provided here are not necessarily all-inclusive. UNCLASSIFIED / FOUO 2
  • 3. UNCLASSIFIED / FOUO Changeover Definition The amount of time taken to change equipment from the Last Good Part of a process to the First Good Part of the next process Clock Time, not Labor Time! UNCLASSIFIED / FOUO 3
  • 4. UNCLASSIFIED / FOUO Traditional vs. CPI Thinking  Traditional Thinking  Changeovers cause downtime  Changeovers cause poor utilization, defects & scrap  Big Batch Size desirable - “The Bigger, the Better” (less changeovers)  CPI Thinking  Quick changeovers decrease downtime  Well designed changeovers decrease waste  Quick changeovers (with small batches) Increases Flexibility UNCLASSIFIED / FOUO 4
  • 5. UNCLASSIFIED / FOUO Why Quick Changeover? Shorter Changeover Times More Frequent Changeovers Smaller Batch Sizes Shorter Lead Times Increased Combat Capability! UNCLASSIFIED / FOUO 5
  • 6. UNCLASSIFIED / FOUO Internal vs. External The first task is to recognize that there are two essentially different components of any changeover, Internal Activities and External Activities. UNCLASSIFIED / FOUO 6
  • 7. UNCLASSIFIED / FOUO Changeover Activities  Internal Activities  An activity that must be performed while the machine or process is turned off (no product)  Example – Refuel plane on the ground  External Activities  An activity that can be performed while the machine or process is turned on (producing product)  Example – Refuel plane in the air UNCLASSIFIED / FOUO 7
  • 8. UNCLASSIFIED / FOUO Improvement Steps 1. Identify changeover activities and document the process (time each step). 2. Separate Internal activity from External activity External Internal External UNCLASSIFIED / FOUO 8
  • 9. UNCLASSIFIED / FOUO Internal vs. External Quiz Possible CT Scan Changeover Steps: Which are 1. Machine is turned off as scan ends Internal & 2. IV is removed from the patient 3. Patient is moved off of scan bed Which should 4. Patient is removed from CT scan room be External? 5. New Patient is identified off of CT scan schedule 6. New Patient is brought into CT scan room 7. Patient identification is verified 8. CT Scan procedure is explained to patient 9. Type of Scan is verified from Physician Orders 10. IV is started on new Patient 11. Patient is placed on CT scan bed 12. CT Scan machine is turned on and scan begins Adapted from “A Lean Guide to Transforming Healthcare”, Zidel, 2006 UNCLASSIFIED / FOUO 9
  • 10. UNCLASSIFIED / FOUO Internal vs. External Quiz Possible CT Scan Changeover Steps: Internal 1. Machine is turned off as scan ends External 2. IV is removed from the patient 3. Patient is moved off of scan bed 4. Patient is removed from CT scan room 5. New Patient is identified off of CT scan schedule 6. New Patient is brought into CT scan room 7. Patient identification is verified 8. CT Scan procedure is explained to patient 9. Type of Scan is verified from Physician Orders 10. IV is started on new Patient 11. Patient is placed on CT scan bed 12. CT Scan machine is turned on and scan begins Adapted from “A Lean Guide to Transforming Healthcare”, Zidel, 2006 UNCLASSIFIED / FOUO 10
  • 11. UNCLASSIFIED / FOUO Improvement Steps 1. Identify activities and document the process. 2. Separate Internal from External activity 3. Convert Internal to External UNCLASSIFIED / FOUO 11
  • 12. UNCLASSIFIED / FOUO Converting Internal to External  Prepare operating conditions prior to changeover  Preheat molds or dies  Prepare Patient or Care-givers  Prepare service materials or providers  Pre-adjust parts  Use intermediary sets  Preset tools  Position dies  Standardize necessary functions  Change the fewest parts possible  Minimize or eliminate adjustments UNCLASSIFIED / FOUO 12
  • 13. UNCLASSIFIED / FOUO Improvement Steps 1. Identify activities and document the process. 2. Separate Internal from External activity 3. Convert Internal to External 4. Reduce all remaining activities. UNCLASSIFIED / FOUO 13
  • 14. UNCLASSIFIED / FOUO Reduce All Remaining Activities  Perform Parallel Operations  Improve Clamping Mechanisms  One turn clamps  One motion methods  Eliminate all adjustments  Numerical Settings vs. “Feel”  Automate activities where appropriate UNCLASSIFIED / FOUO 14
  • 15. UNCLASSIFIED / FOUO Pit Stop Photo Team with Pre-assigned Tasks Placement Clearly Defined Quick Connect & Tools Properly Positioned Prior Disconnect Devices to Arrival UNCLASSIFIED / FOUO 15
  • 16. UNCLASSIFIED / FOUO Takeaways  Remember Safety at all times!!!  Change internal to external then reduce all activities  Standards are standards, they are not flexible  Standardize all changeover operations UNCLASSIFIED / FOUO 16
  • 17. UNCLASSIFIED / FOUO What other comments or questions do you have? UNCLASSIFIED / FOUO 17