1. BRIEF PRESENTATION OF SNGS
PROGRAMME:
• PROJECT DESIGN
• PRODUCTS
• CURRENT PROGRESS STATUS
Kari Suominen Collaboration Meeting at UN, 4.7.2012
2. PROGRAMME
Bilateral Development Co-operation Programme
Total budget 6.5 MEUR, GOF 6 MEUR, GOL 0.5
MEUR
Approach is Institutional Development and Capacity
Building
Duration of the programme is 4 years, from August
2010 to July 2014
Mapping area for this phase covers southern part of
the Lao PDR covering 1/3 of the country.
3. OUTPUT PRODUCTS
Geodetic Horizontal and Vertical Network
Aerial Photographs
Digital Elevation Model
Ortophotos
Vector data
Seamless Geodatabase
1:50,000 Topographic Base Maps
1:5,000 Orthophoto Maps
1:5,000 Topographic Maps in big cities
4. AERIAL PHOTOGRAPHY
PROJECT AREA
Southern part of Laos
Savannakhet, Saravan,
Champasak, Xekong, Attapu
and southern part of the
Khammouan province
Approx. 71,000 km² (1/3 of
the country)
Photography completed
between November 2010 and
January 2011
5. AERIAL PHOTOGRAPHY
EQUIPMENT
VEXCEL UltraCam Xp large format digital camera
17310 x 11310 pixels = 200 Megapixels
Tracker GPS navigation system
AEROControl GPS/IMU registration
Piper Cheyenne II Turboprop
9. PROGRESS STATUS
RGB Orthophotos 100% competed
2D digitizing well in progress
3D DEM editing well in progress
98% of Procurement programme completed
70% of Training programme completed
ICT infrastructure 95% completed
Client survey in good state and will continue
Financially on right track; about 50% of budget is used
now.
10. NEW AERIAL PHOTOGRAPHY
NEW AREA
Approx. 90,000 km²
(1/3 of the country)
Photography will be
completed during this
dry season