2. 1945 : Sandia was created 1979 :Sandia was made a national laboratory. Mission: Nuclear stockpile stewardship Homeland security Antiterrorism/Aviation security Tech Transfer
4. Four sites ( ~ 1100 bldg, 7M GSF) NM (Albuquerque ) CA (Livermore) NV (Tonopah) HI (Kauai) Sandia NM 891 Bldgs 6M GSF 8700 acres Construction : $80 M /YR
5.
6.
7.
8. Building Information Specifications Submittal Information Equipment data Performance data Warranty Finishes Information O&M manuals Panel Schedules FCS
16. BIM : Untapped Savings Inefficiency Costs : $15B/yr 66% borne by Owners Unit cost : $ 0.20/SFT (existing space) Est. Costs for Sandia : 6.0 M GSF ~$1.2M / yr
17. BIM : Untapped Savings NIST Study Validation: “View of the Future “ video In-House Planner Survey Results Saves 2 hours per work order (WO) (2 hrs x $50/hr ) x 24,000 WO Cost Savings : $2.4 M/year Annual Budget : $14M/yr
18. BIM (6D) :Closing the Information Gap Paper-based Inherent Inefficiencies Reentry data Multiple databases Handoffs Locating Information But what if it could be like this…………
19.
20. BIM: 6DHow to get started Start with O&M group What information is needed IT and O&M meeting FMS Import options Selected preferred import format Determine fields Use on Pilot project
21. BIM: What’s holding Owners back? What Owners want : Save money Centralized Data repository Seamless integration with FMS applications Save money $$$ Concerns : Education on BIM Updating Model information O&M Savings are not immediate Model sharing
22. BIM:Owners next steps Get to know your O&M team Investigate integration with Facilities Mgt systems Building Control systems Asset Management system Require 6D BIM as a deliverable Determine Owner Information needs Define 6D BIM data requirements
26. Determine fields Use on Pilot project Migration plan in process Seamless integration – bi directional ReceivingIntegrated 6D models O&M with models Menu Integrated 6D model Software Migration plan ( Road map) Internal processes BIM team Model Management