The Codex of Business Writing Software for Real-World Solutions 2.pptx
Krystol Magazine 15.2
1. www.kryton.com Volume 15 | Issue 2
KRYSTOL
®
THE CONCRETE WATERPROOFING MAGAZINE
Feature Story:
700 WEST 8 TH
Uncompromising
quality WITH SHOTCRETE
PLUS:
Five Things More Important
Than Price
CEO Column
Spotlight on China
2. THE ATLANTIS HOTEL
BUILDERS COULD
RISK
NOTHING.
THEY CHOSE KRYTON WATERPROOFING.
Compared to membrane solutions, Kryton protects even better with time.
Our self-sealing technology and comprehensive support system transform
concrete into a permanent waterproof barrier. Short term, you’ll shave weeks
off construction schedules, cut waterproofing costs by up to 40%, and build
your footprint to the property line. Long term, you’ll avoid leaks, discoloration
and costly callbacks. And have the peace of mind of an industry-best
25-year warranty.
www.kryton.com
Kryton takes the risk out of concrete waterproofing.
+1.604.324.8280
4. CityCenter, Las Vegas used Kryton’s Concrete Waterproofing System.
FIVE THINGS
MORE IMPORTANT THAN PRICE
Price is important. There is no getting around it. But price is seldom the most important part of a buying decision. If it was, then everyone
would drive a Lada. When people purchase a vehicle, they first consider factors like carrying capacity, performance, design and reliability.
For example, it makes no sense to buy a low-price car when what you really need is a truck. Price is considered only after a product is
found to meet your needs. And even if you do just need an economy car, you are probably making a smarter decision by spending more
to buy a Honda. This is generally the case when purchasing most products – including concrete waterproofing.
When selecting your concrete waterproofing product, consider these five points that are more important than price.
1. Performance
Probably the most important factor
in your buying decision is going to be
performance. The product must be
capable of doing the job that you intend
it to do. At the most basic level, this is not
even negotiable. Spending less money
to buy a product that does not do the job
does not save you any money at all. In fact,
it is a waste of money. At a higher level, it
is usually worthwhile to choose a better
performing product, even if the price is
higher. Better performance will normally
offset a higher price by providing other
benefits, such as reliability and longer life.
Sometimes you need to spend a little more to get a better product (and avoid leaks).
4 www.kryton.com
5. Using Kryton’s Krystol Internal Membrane saves you time on the jobsite because it combines the waterproofing and concrete pour in one step.
2. Time 4. Service and Support
Products that save time are nearly always Do not overlook the value you get from a
worth more than products that do not. quality manufacturer who provides good
The saying goes that Time Is Money, and service and technical support. There is
that is true. In fact, on most construction an enormous difference between simply
projects, time can be worth a lot of money. making concrete less permeable and
Waiting for an old-style waterproofing actually building a completely waterproof
installation can put your project behind concrete structure. Concrete structures
the competition. You will see increased are extremely complex assemblies of
site costs, prolong project financing and concrete and steel with varying degrees
possibly delay the realization of revenue of consolidation, numerous joints,
from your project. Just as it is important penetrations, and cracks. Making such
to consider the final delivered or installed structures water tight in the face of high
cost of any product, don’t forget to hydrostatic pressure takes a high degree
calculate the cost of waiting for installation of skill, knowledge and experience. These
to be completed. are things that a low-price manufacturer is
simply not able to provide.
3. Warranty
No product or application can be perfect 5. Trust
every time and there is always the Most people will only buy from someone
possibility that you will need to ask the they trust. Trust is so important that
manufacturer to address a problem you sometimes people will make a purchasing period. You must trust that a manufacturer
are experiencing. This is when you find decision based on trust alone. On the has the knowledge and experience to help
out who really stands behind their product other hand, if you cannot be sure of you build a waterproof structure. Choose
and who does not. Anybody can say getting what you are paying for, then a a manufacturer that has a dedicated staff
they provide a warranty, but a warranty is purchase is not a good deal no matter of technical support people with plenty of
only as good as the actions taken by the how low the price. Trust touches on experience in your type of project.
warranty giver. A good manufacturer will each of the factors mentioned above.
be responsive and address your problem You must trust that the product will
quickly and fairly. If you find yourself in perform and save you time as claimed Consider each of the factors above along
this situation, you will want to be sure that by the manufacturer. Be sure to choose with the price to calculate the true cost of
you have chosen a manufacturer with a reputable manufacturer that is open your purchasing decision. What you are
an excellent history of warranty service. and forthcoming with independent proof ultimately going to determine is the overall
Someone who has been in business at of their performance claims. You must value that each of your choices would give
least as long as their warranty period. A trust that the manufacturer will be there you. Naturally, you should choose the option
low-price manufacturer is very unlikely to to stand behind their product warranty. that gives you the best and greatest value.
be there for you when you really Choose a manufacturer that has projects And it is not necessarily the one with the
need them. that have already outlived their warranty lowest price.
Krystol® Magazine Volume 15 | Issue 2 5
6. Waterproofing was essential for
700 West 8th’s underground parking.
700 west 8th
Uncompromising quality with shotcrete
VANCOUVER, BRITISH COLUMBIA, CANADA | COMPLETED 2011
Vancouver, Canada, is often hailed McFarlane Green Biggar Architecture +
as one of the most beautiful and liveable Design to ensure the homes at 700 West
cities in the world. On the edge of the 8th feature a top quality finish, setting 700
Pacific Ocean and nestled against West 8th apart from the competition.
the Rocky Mountains, there is limited
space to build and it is in great demand. To complete the development, the team
Using Kryton’s
When it comes to developing premium had to overcome some significant site KIM in the
residential property, developers must challenges and work to a tight deadline.
build quickly without compromising With quality and corporate reputation shotcrete as
quality, and maximize space in tight paramount, Westbank and contractor the concrete
locations. These were the challenges ICON Pacific turned to the experts at
for one of Vancouver’s latest premium Kryton International Inc. to ensure high waterproofer
developments: 700 West 8th. quality, leak-proof construction of the
development’s below grade parking facility.
helped us
Completed fall 201 this 4,680 sq.
1, complete the
m (52,000 sq. ft.) development was Waterproofing was essential for 700 West
designed by Henriquez Partners 8th’s underground parking. project on time
Architects and has 128 units arranged with a fast
over 19 floors. A mix of one, two and From the start, waterproofing was
three bedroom units, the development recognized as critical because of the site’s paced schedule.
features condos, townhouses and location in the path of continuous run-off
penthouses. Owner/developer Westbank at the base of a long steep slope starting
Projects Corp. appointed award-winning some thirty blocks to the south and ending
6 www.kryton.com
7. The homes at 700 West 8th feature a top quality finish,
setting 700 West 8th apart from the competition.
in False Creek. Another significant challenge to effective
waterproofing was the tight location of the site, which
would make waterproofing using surface-applied methods
difficult. There was no time to waste: with a demanding
schedule, shotcrete was the chosen construction method
and an integrated system to provide waterproofing was
required. That’s where Westbank and Icon Pacific worked
with Kryton to find a system to meet their needs.
On the Pacific west coast, structural shotcrete is fast
becoming the preferred material in the construction of
foundations, building tanks, and many other structures.
Shotcrete is attractive because it saves time and money,
with half the forming and equipment of regular cast-in-
place methods. Kryton has an impressive track record of
successfully applying its expertise to other local waterproof
shotcrete projects, including residential developments by
White Water and Onni at Ora in Richmond, and Aragon’s
The Station St John’s in Port Moody. Many commercial
and industrial projects also rely on shotcrete solutions and
Kryton products for below grade tanking. For example,
Kryton worked with Whitewater/Conshot on shotcrete
around an electrical room and pits at a new IKEA store
in Richmond; a 30 ft. high, two ft. thick wall at the Mount
Pleasant Power Substation; and a cistern at popular visitor
attraction, Van Dusen Gardens.
The Quorum Group applying shotcrete at 700 West 8th for
ICON Pacific is the latest example of constructing below
grade parking without cast-in-place forms and externally
applied membranes. There are two levels of below grade
parking facilities, and Kryton’s Krystol Waterproofing
Systems were used to tank the below grade concrete that
was placed. Noting that traditional membranes can be a
challenge because the high speed in which the concrete is
forced out of the nozzle can displace or tear conventional
surface-applied systems, the team opted for Kryton’s
Krystol Internal Membrane (KIM) to ensure a leak-proof,
high quality, waterproofing solution.
KIM Admixture is integrated with the concrete mix at the
ready-mix facility. This provided several clear cost and time
advantages to the project team:
• Eliminated on-site preparation for applying external
waterproofing membranes
• Increased jobsite productivity by having the
waterproofing already in the shotcrete mix
Krystol® Magazine Volume 15 | Issue 2 7
8. Features of 700 West 8th:
36
pails of Krystol
Waterstop Treatment
144
pails of Krystol
Waterstop Grout
700
cubic meters of
A tight building footprint made waterproofing with Shotcrete was the method used to construct the perimeter walls
surface-applied membranes difficult. foundation at 700 West 8th.
• Mitigated concerns over damaging
external waterproofing membranes
Waterstop Joint System
• Quality Assurance
5600
kilograms of
during the shotcrete application KIM Admixture
• Eliminated the need for detailing Vancouver’s housing market is dominated
around soil nails by condo-style developments and
developers will continue to face the DID YOU
KIM was used to tank over 700 cubic
meters of concrete perimeter walls. In
challenge of building quality product
in a fast, efficient way to stay ahead KNOW?
addition, Kryton’s Krystol Waterstop of the competition. 700 West 8th is
System was used on the vertical and the latest development to show how
horizontal construction joints to keep them opting for shotcrete and a best-in-class
as water tight as the shotcrete itself. waterproofing solution can deliver the
desired results.
For complete peace of mind, ICON Pacific
and Westbank chose to use Kryton’s Bryan Tucker, VP of Construction for ICON
Krystol Assurance Program (KAP) to Pacific, notes “Using Kryton’s KIM in the
mitigate risk and provide a better end shotcrete as the concrete waterproofer
product for their shareholders. While helped us complete the project on time
all Kryton products are covered by a with a fast paced schedule. Due to our
standard material warranty, the KAP is success on 700 West 8th, we have been
While Vancouver enjoys the mildest
a performance-based guarantee with a using Kryton’s Krystol Waterproofing climate in Canada, it receives an
robust, all-inclusive material and labor System on a variety of other projects average of over 125 cm (49.5 in.) of rain
warranty combined with a comprehensive in different parts of the lower mainland per year and December is typically the
quality control service. of BC.” ICON has since used the same rainiest month. Vancouver’s sea breezes
shotcrete and waterproofing system for and mountainous terrain creates a
The KAP guarantees Krystol-treated 60 West Cordova, 6th and Fir, and the series of microclimates with significant
areas remain watertight for 10 years from Avra in White Rock, with more projects to differences in rainfall measured within
the day the system is completed and dry. come in the future. just a few kilometres.
It also provided the team at 700 West Some of Vancouver’s most torrential
8th the enhanced quality control and rains are caused by a meteorological
supervision they were looking for: phenomenon known as the Pineapple
• Mix Design review Express. This weather system carries
• Construction detail review a strong and persistent flow of
• Supervision during placement of KIM atmospheric moisture and associated
treated concrete heavy rain from the waters around the
• On-site training for Kryton’s Krystol Hawaiian Islands up to locations along
the Pacific coast of the US and Canada.
8 www.kryton.com
9. CEO COLUMN
KARI YUERS, PRESIDENT & CEO | KRYTON INTERNATIONAL INC.
It seems like every-other week you together to create new masterpieces for construction practices that saved thousands
hear about the state of our failing the 21st Century. of lives in Chile.
infrastructure, the crumbled aftermath
from a recent earthquake or litigation for Europe is home to internationally With so much successful concrete
shoddy construction. renowned bridge designers such as construction, it makes me wonder about
Professor Michel Virlogeux who has what we can do as a concrete community
Concrete has been around for designed more than 100 bridges to help developing nations and share the
thousands of years, but over the last including the record breaking Normandy accumulated knowledge of the industry.
few decades, we have seen significant Bridge, the pre-stressed concrete
improvements and technologies that are Avignon Viaducts for the French High I’m new in the role of Chair of the
changing how we build and what we Speed Train, and the celebrated cable- American Concrete Institute’s International
build with concrete. stayed Millau Viaduct, designed with Advisory Committee, but I can see a great
architect Sir Norman Foster which has opportunity for the Institute to continue to
While I write this, I am spending some received several awards. foster relationships in the global concrete
significant time in Europe with my community that helps to add value. Our part
family. I can’t help but be amazed by Looking back a couple years to 2010, in this will be to seek out and listen to what
the design and age of the infrastructure within two months both Haiti and Chile is needed and to find meaningful ways to
surrounding me. And although you see were rocked by earthquakes. The deliver and connect this message.
stone everywhere you look, there are earthquake in Haiti devastated much of
exceptional concrete structures created the country’s buildings and infrastructure The concrete community has many global
by the artisans of the region today. and killed more than 200,000; while the challenges, but there are passionate
Artisans are engineers and architects, 500 times more powerful earthquake concrete professionals who are making
and they have harnessed the knowledge in Chile killed 800 people and left most a difference and would like to continue
past down over the centuries including of the country’s buildings standing. to contribute and give back to the global
an appreciation of art, beauty, form and There were many reasons for the concrete community. This is an exciting time
design and fused it with cutting edge greater damage in Haiti but a couple for the concrete industry.
contemporary science and engineering of the contributing factors were better
to create outstanding structures. implementation of building codes Kari Yuers, FACI
Somehow they seem to blend these and the execution of more disciplined
Krystol® Magazine Volume 15 | Issue 2 9
10. Kryton International Inc.’s Concrete Laboratory at Kryton’s
Technical Headquarters, Vancouver B.C.
R&D: TRIALS
LAB AND PLANT
Concrete is made up of cement, water, aggregate, The Lab Trial
SCMs and admixtures. Before you can pour your concrete and The purpose of a lab trial is to test for compatibility and make
build your structure you need to determine the quantities of the adjustments to the mix design. Lab trials are beneficial because
aforementioned components for your mix, this is your mix design. you can make adjustments to the mix design without being
The mix design process starts on paper then moves to the lab for restricted by the number of trials you can perform; in the lab
trial batches followed by field trials. setting you can perform hundreds of trials if needed while in the
plant you are usually restricted to one or two trials.
• Confirm • Test for • Test in uncontrolled • Using all the data
components compatibility and conditions, and collected, the mix
of mix make adjustments adjust accordingly design is ready
• Determine the to wind and to be batched and
quantities humidity variences used in the field
10 www.kryton.com
11. Measuring the compressive strength of a concrete
cylinder in a lab trial
Lab trials are not the time for mix design experimentation or
development, this work happens long before lab trials. Trials are
performed to verify the properties of fresh concrete such as workability
and finishing and adjust the mix design in order to obtain the best
combination of fresh concrete properties.
If possible it is best to use the same materials that will be used in the
real world pour for the lab trial.
Lab Trials Versus Plant Trials
Even if you are able to use the same raw materials in your lab trial that
will be used on-site there are still variables that cannot be duplicated
from the field. These differences include:
• Air temperature in the lab is always controlled (23° +/- 2° C)
• The wind and humidity are controlled
• Materials are used when ready – there is no delay in driving the
concrete to the site
• Timing is controlled – you can add materials when you want
• Time of day variance is not present – on the jobsite properties such Plant trials verify
as temperature and moisture content of materials can change from that a concrete
mixture meets
morning to night
design
requirements
Because of the above differences it is always good practice to perform prior to use in
a plant trial following a lab trial. construction
Between lab and plant trials the types of testing are similar; most
commonly slump, air content and compressive strength tests are
performed on each batch of concrete over three days.
The sampling frequency for some tests in plant trials is different
than lab trials due to the volume of concrete produced. For example,
samples of concrete are taken at the beginning, middle, and end point
of the discharge from the mixer for testing. At a plant where concrete
is batched in a central mixer and mixed in a truck mixer, testing should
be performed on several different truck mixers to evaluate consistency.
Trials can prevent future
No Trials problems on-site.
One of the main performance requirements in determining a suitable
mix design is compressive strength. When a ready-mix company
submits a mix design for engineering approval, strength test results
from previous projects can be used in place of trial data, provided that
the ready-mix company has a standard mix design and consistent
material source that meets the project specifications. There are
guidelines published by the American Concrete Institute (ACI) that
engineers and concrete producers can use to determine appropriate
concrete mixtures using statistical analysis of past field data or
conducting laboratory trials. However, for new mix designs that require
validation of mix proportioning, there is no substitute for trials either
in a laboratory or in a plant. Testing will determine the compatibility of
materials and can mitigate potential other problems.
Krystol® Magazine Volume 15 | Issue 2 11
12. KRYTON NEWS
WELCOME
TO OUR NEW DISTRIBUTORS
Al Jaber Structural JIT (Cambodia) Co., Ltd
Protection Co. Cambodia
Qatar www.jit.com.kh
00974 5588 2371
Kryton attended World of Concrete 2012 in January.
We debuted our new booth complete with a simulated
concrete column with a working leak.
Fernco Environmental Organizarte, S.A
UK & Ireland Guatemala
www.ferncoenvironmental.com www.duratop.net
Al-HanDsya for tO FIND A DISTRIBUTOR
Construction and NEAR YOU, PLEASE VISIT:
Real Estate
Egypt KRYTON.COM
002 02330 4664
Kryton representatives at the International Concrete
Repair Institute’s Spring Convention in Quebec City.
Upload Your Video and you could receive a FREE
Kryton Technical Jacket, PLUS a chance to win a
Kryton branded iPad!
• It only takes 10 minutes!
• Upload your short video
• If your video is selected for our site, you will receive a
Kryton Technical Jacket, perfect for the jobsite
• PLUS One lucky video will win a new iPad, preloaded with
all our Kryton Technical Information.
LATEST VIDEOS
CYPRESS MOUNTAIN
Visit www.kryton.com/reel
CONCRETE PHILOSOPHER
for contest information
or to submit your video. CENTRAL COAST WATERPROOFING
Visit www.kryton.com/reel to view.
12 www.kryton.com
13. ASK A KRYTON EXPERT
INSIGHTS FROM THE LARGEST CONCRETE PERMEABILITY
TESTING LABRATORY IN NORTH AMERICA.
US E OF GG B FS (G ROU N D G RAN U LATE D
B LAST FU R NACE S LAG) I N CONCR ETE M IXE S
Supplementary cementitious materials (SCM) are commonly added to today’s
concrete mixes. One common SCM is Ground Granulated Blast Furnace Slag.
Q: What is Ground Granulated 100 per cent of the price of cement. As
Blast Furnace Slag (GGBFS)? a rule of thumb, the production of one ton
of Portland cement will produce about
A: Blast Furnace Slag is a waste one ton of carbon dioxide emissions.
product of iron and steel production and Using GGBFS can lead to significant Alireza Biparva
is used in the construction industry in a reduction in those emissions. More Research & Development Manager /
variety of ways. When granulated blast importantly, a key premise of green Concrete Specialist
furnace slag is ground to an appropriate building is extending the long term at Kryton International Inc.
fineness, it is called Ground Granulated performance and health of structures.
Blast Furnace Slag (GGBFS). It can
replace between 20 and 80 per cent of concrete is not adequately cured, adding
Ordinary Portland Cement needed Q: Does GGBFS always make GGBFS can increase the permeability.
in concrete. concrete more durable?
While GGBFS reduces permeability
A: As long as the correct proportions are when used in the correct proportion, it
Q: Why use GGBFS? used when replacing Portland cement is not the equivalent of a waterproofer.
with GGBFS and the concrete is cured Under hydrostatic pressure, other
A: The construction industry’s desire properly, the durability of the structure Permeability Reducing Admixtures
for cost savings, greener practices, will be enhanced, leading to a longer life for Hydrostatic Conditions (PRAHs)
and enhanced structural durability for the concrete. Nevertheless, studies are required to make concrete less
are driving factors in the adoption of found that properly designed and cured permeable and more durable.
GGBFS into more concrete mixtures. concrete containing GGBFS has lower
permeability than Ordinary Portland Ask Kryton your concrete related questions!
Based on the availability and grade of Cement concrete. However, studies by Email: info@kryton.com
GGBFS, its price is approximately 85 to Toronto University have shown that if
Krystol® Magazine Volume 15 | Issue 2 13
14. KRYTON
IN CHINA
China’s construction industry saw significant growth, going from $0.7 trillion USD in 2007 to $1.8 trillion USD in 201 and
1,
these numbers are expected to rise. China’s central government is planning to invest $160 billion USD in economy housing,
that coupled with $1.03 trillion USD earmarked for infrastructure during 201 1-2015 has the China construction market poised
for continued growth.
China’s concrete and cement products grew over 30% from 2006-2010 and is one of the building material industry’s fastest
growing sectors.
Kryton has maintained a consistent presence in China since 1980 and in 2000 the first Kryton China office was opened. As
China’s construction industry has grown significantly over the past decade the need for concrete and related waterproofing
and repair products has grown exponentially. Kryton continues to invest heavily in this market with two new hires for the
Beijing office in 2011.
Shanghai Songjiang Villa Vancouver Forest
Sonjiang Villa is an upscale private residence located Vancouver Forest is a unique 900-unit residential development
in Shanghai. The sprawling 1500 square meter (16,000 designed to replicate a mini-Vancouver neighborhood complete
square foot) home sits on 0.6 hectares (1.5 acres) of land. with Vancouver-style housing, natural landscaping and lots
Kryton’s Krystol Internal Membrane (KIM) and Krystol T1 & of trees.
T2 Waterproofing System were used to waterproof multiple
elements of the estate including the washrooms, balcony, The project was won with collaboration between our Beijing
exterior walls, swimming pool and sauna. Then the entire villa office, our head office in Vancouver, and Canada Mortgage and
received an application of Hydrostop Sealer to protect the Housing Corp (CMHC). In addition to the Kryton BC connection
stone and maintain the original appearance of the high-end the project was designed by Vancouver based architects,
home. To date this was the largest application of Hydrostop Ekistics and features BC wood in the framing.
Sealer in China.
Krystol Internal Membrane (KIM) admixture was used to
waterproof the below grade areas of the homes. The team also
used Kryton’s Krystol Waterstop System for joints to ensure a
fully tanked basement. The homes are being built in phases with
an estimated completion date of 2015.
14 www.kryton.com
15. CHINA DISTRIBUTORS
Kryton has exclusive distributors throughout China.
Contact the distributor in your region to find out more
about Kryton’s waterproofing products or contact the
Kryton Beijing office at www.krytonchina.com or
by phone at 010-51285665.
Shanghai Supers Industrial Co. Ltd
(Anhui)
www.sps100.com
Beijing Haichuan Jincheng Science and Technology Ltd Co.
(Beijing)
Vancouver Pavilion 86 1051285658
The Vancouver Pavilion was constructed for the 2010 Dongguan Caili Building Maintenance Technique Ltd.
Shanghai Expo. The three-story pavilion was designed with (Dongguan)
green materials and showcased Vancouver’s transformation www.cai-li.com
from Expo 1986 into one of the world’s most desirable Hunan Kaidun Waterproof Engineering Co. Ltd
cities today. (Hunan)
86 73185862858
Kryton’s Krystol T1 & T2 and Krystol Bari-Cote products were
selected to waterproof the foundation and elevator pits of the Suzhou GIFT Energy-Conservation Technology Co. Ltd.
Vancouver Pavilion. (Suzhou)
86 5126515758
73 million people visited the 2010 Shanghai Expo. Nanjing Yunlv Building Materials Co. Ltd
(Nanjing)
86 02586562973
Dalian Kryton Waterproof System Co. Ltd.
(Liaoning)
86 41183895657
Dynamic New Style Waterproof Building Materials Co. Ltd
(Yantai)
86 5356649347
Shanghai Beiyuan Industrial Co. Ltd.
(Shanghai)
86 2165256529
Chengdu Kaidun Underground Project Disease
Prevent and Control Co. Ltd.
(Sichuan)
86 2887076552
Guandi Hydropower Station Tianjin Hong Ba Waterproofing Material Co. Ltd.
(Tianjin City)
The Guandi Dam is part of the large Guandi Hydropower Station 86 2228229431
on the Yalong River (a tributary of the Yangtze River) in Sichuan Hangzhou Guo Dian Dam Safety Engineering Co. Ltd.
Province. The Guandi Dam has a generating capacity of 2400 (Zheijang)
MW and will generate power for the Sichuan Province area. www.hzgdfs.com
The 168 m (551 ft.) tall dam is a gravity dam constructed using
roller-compacted concrete (RCC). The entire face of the tall
dam was coated with Kryton’s Krystol T1 & T2 surface-applied
waterproofing system to protect the important structure from the
high water pressure.
Krystol® Magazine Volume 15 | Issue 2 15
16. WHAT’S
YOUR PLAN
WHEN THE CONCRETE AND THE
ENVIRONMENT NEED PROTECTING?
ONLY KRYTON PROTECTS CONCRETE AND
THE ENVIRONMENT PERMANENTLY.
Kryton’s crystalline technology allows you to build right to the property line, so
you have more space with which to create. Our superior products help bring
even your most innovative designs to life. And our comprehensive system helps
you avoid trade-offs between LEED certification and the realities of budget and
schedule demands.
www.kryton.com
Kryton takes the risk out of concrete waterproofing.
+1.604.324.8280
16 www.kryton.com