SlideShare ist ein Scribd-Unternehmen logo
1 von 84
Downloaden Sie, um offline zu lesen
Structuring chaos
Passage from «Some Essays About Management»



                   essay


                   3
Earlier we’ve told about a
project as a certain system
we manage
That is why –
 the project is a whole set (hierarchy)
       of all project participants
and relations between them (structure)
Now we’d like to dwell at length on how project is born,
     how it’s stood out from its surrounding and

         how it’s organized
Why is that important?
Because besides an objective of the project,
there are many project participants and stakeholders

        of different levels
          who are also to be worked with
Or there are many important and principal contractors
 and partners who influence considerably the project

 success and effectiveness
Or

    it may require gathering
of a great number of bits of different knowledge domains
     (planning, construction, supply, for example, etc.)
A really difficult thing in such projects is –
to organize all participants and stakeholders
Lack of such organization hardly lets passing
    from project initiation to its planning,
needless to say that it also complicates moving
            to the project objective
Well, let’s get it one after another
1
Project «birth»
What is the reason of project initiation?

     Of course – project objective
It’s exactly the fact that there is an objective
              provokes the process

 of reality structuring
The surrounding reality keeps on being the chaos –
a super-intricate dynamic system, until project birth
And so, such chaos provokes a need in some result
And this need of surrounding world
converts lastly into an objective [of the project]
In surrounding environment the defined objective
         provokes exigence to create a certain system,
a certain mechanism intended to reach the desired objective
Finally, thanks to all of that, separate persons

      start to team up
in a distinct and organized entity of people –
      exactly to what we name a project
The objective is the very pivot which holds all participants
           in project borders and keeps stable
                the project as a mechanism
The project objective is

        a backbone factor
which enables the «birth» of the project as a system
2
Limiting chaos
Well, now we are in need
of a working system
The first step in this direction is

          to outline borders
of the project, of all participants and stakeholders entity,
         people whom we are going to manage
Why do we always underline people as project
     participants, and no companies?
It’s just because in our understanding
               we always work

with certain people only
Where a certain man works is not principal for us.

It’ important that he is taken within our project,
     it’s to him whom we’ll collaborate with,
          but not always with his company
We outline on our own the borders of our project
where we decide whether include or exclude somebody
We say these people are included in the project,
          and we’ll do manage them,
           but those people are not
Why is that so important to manage
  project borders consciously?
‘Cause project borders represent the very filters
     which influence directly the thing of how

we visualize the project itself
Those are the very filters

 we create artificially
for ourselves and for all project participants
By means of borders and filters

we consciously enlarge
or artificially reduce the number of people
           we are going to manage
3
About project structure and hierarchies
We’ve outlined project borders
and now we face a super-complicated task –

to organize the project,
 i.e. people who develop and implement it
There are two ways of organization
  when creating a working mechanism –

structure and hierarchy
We need structuring all people taking part in the project
            by standing out diverse elements,
                 by connecting them and
by bringing accurate and clear hierarchy in their relations
In result we reach two basic goals of management:
― by means of structure, we distribute all functions
     and tasks, which lead to the project objective,
     between all those who are responsible
― by means of hierarchy we get a mechanism of
  management and coordination of all participants
  within the project
What’s the use of structuring?


What are structures
  needed for?
It depends on that greatly –
how our project and our system, as people entity, will move
The structure specifies behavior of all project stakeholders

      Achievement of the project objective depends
          on whether it’s correct and adequate
Our task is to structure all participants in such a way
 that all functions and tasks would be distributed
          and assigned to diverse elements
In the capacity of such elements we mean

people or groups of people,
                  naturally
What is the logics of these elements standing out?
It’s very simple –
if there is a function or a task, therefore, there must be a separate

             specialized element
                                for it
It’s important that such elements are

stood out artificially
according to the project requirements
A typical mistake – if «natural» borders, for example,
employees of the same department, are taken as a basis
The technology of these elements fixation in the project
is mutual arrangements, which makes the ground to keep
in the project all elements we need, such as technologies,
        council of experts, logistics workgroup, etc.
These elements are bricks in the structure of our project,
   components of mechanism handling all necessary
    functions and moving us to the project objective
But these elements standing out doesn’t let us say:

   «We’ve created the structure of our project»
We’ve prepared only building materials –
        bricks, which we’ll use

to build our structure
And now we need mortar to bring them together
How to establish relations between
  separate elements of our structure?

And what should these
  relations be like?
Relations. They bring mutual restraints on behavior of
objects [project elements], which restrain behavior of
  elements and make them depend one on another
New relations in our project let creating new opportunities
      and implementing some functions and tasks
           which are unavailable to implement
           with separate project elements only
The basis for emergence of such relations,
i. e. the technology of how to create them is –

 concluding of mutual
    arrangements
          between all stakeholders
…Mutual arrangements
about subject of relations, about rights and duties
That’s arrangements exactly that represent

        a framework
holding the project, cement piecing broken
           elements in a whole
How to shape arrangements?
First of all, it’s necessary to reveal interests
       of project participants and stakeholders
and to propose smth. to all of them within our project
These arrangements let to distribute rights and duties,
to fix all functions and processes and to form project hierarchy
       (to stand out levels of decision-making for the first)
Relying on these arrangements we create all relations
         we need between project elements
From the standpoint of relations shaping, it’s important

               to have fixed
              (legitimate) arrangements
In result – our project
(as entity of people and interrelations between them)

              is organized
No arrangements –

          no relations
     We do have fixed arrangements –
and the structure of the project does appear
Relying on these relations we form

communication channels
Channels which let through not only information
  in our project, but – what’s more interesting
   for us as managers – managerial influences
A little remark:
     legitimate arrangements equal relations,
          when here these relations equal
     any number of communication channels,
formed on the basis of these relations (arrangements)
Why are relations so important?
They are important for
    management
  They make our project manageable
Management

is based on communication
Transmission of any managerial influence is available
     when there is a communication channel –
                 direct or by mesne
That’s why we’d like to underline it once more :
arrangements and relations make the project framework,
and communication channels specify organizational
design where our project elements are ordered
according to certain hierarchy as well as communication
channels, designed for information transmission,
including managerial influences, are adjusted
What principles does the project structure
         have to be based on?
a)

Maximal information flow – information exchange
should be instant and have the least number
of mediatory stages
b)

Minimal distortions of any information, especially
– in case of managerial influences
c)

Rapid transmission of information which can be
reached by large number of direct
communication channels
d)

Centralization within the project when one of project
elements (subject of management) has a maximal
number of relations and communication channels for
effective implementation of his managerial functions
e)

Flexibility within the project when there is
a possibility to replace one element with another
on a management or junction position
Everyone should define all by oneself what type of structure
  would be optimal and appropriate for him in his project
Anyway, the key instrument
or technology of project organization is the

    ability to provide
              arrangements
The ground for project organization technology is –
providing the environment for arrangements making
             (communication grounds)
             and managing the process
           of arrangements making itself
At the expense of arrangements
      we can change borders of the project,
       concentrate on elements we need,
       and come to mutual understanding
Thanks for Your attention!
  P.S. You got to know the passage of our book «Some Essays About Management»
The book is available in whole on the page «Vision» of our site www.kommandcore.com
Lively management of projects

Weitere ähnliche Inhalte

Ähnlich wie (3) Essay «Structuring Chaos»

Project organization.pptx
Project organization.pptxProject organization.pptx
Project organization.pptxSerkinBaleros1
 
organizational structures 3
organizational structures 3organizational structures 3
organizational structures 3Muhammad Niqash
 
10 me667 chap3 organizing and staffing
10 me667 chap3 organizing and staffing10 me667 chap3 organizing and staffing
10 me667 chap3 organizing and staffingPavan Kumar
 
Principles of architecture
Principles of architecturePrinciples of architecture
Principles of architectureAkshay Bagai
 
UNIT II STUDY GUIDE Project Governance and TeamEach of thes.docx
 UNIT II STUDY GUIDE Project Governance and TeamEach of thes.docx UNIT II STUDY GUIDE Project Governance and TeamEach of thes.docx
UNIT II STUDY GUIDE Project Governance and TeamEach of thes.docxgertrudebellgrove
 
Research Paper On Primavera
Research Paper On PrimaveraResearch Paper On Primavera
Research Paper On PrimaveraGina Buck
 
ACE-FUELS- 801- PROJECT MGT for real estate
ACE-FUELS- 801- PROJECT MGT for real estateACE-FUELS- 801- PROJECT MGT for real estate
ACE-FUELS- 801- PROJECT MGT for real estatehando2845
 
Pm Session 9
Pm Session 9Pm Session 9
Pm Session 9dmdk12
 
University of Athens - Advanced project management_sample text
University of Athens - Advanced project management_sample textUniversity of Athens - Advanced project management_sample text
University of Athens - Advanced project management_sample textTriantafyllos Katsarelis
 
Project Management vdhsjsjskskaannzbdnsj
Project Management vdhsjsjskskaannzbdnsjProject Management vdhsjsjskskaannzbdnsj
Project Management vdhsjsjskskaannzbdnsjmarielgalos28
 
Definition Of Project Management
Definition Of Project ManagementDefinition Of Project Management
Definition Of Project ManagementMostafa Ewees
 
A Project On The Project Life Cycle
A Project On The Project Life CycleA Project On The Project Life Cycle
A Project On The Project Life CycleDeb Birch
 
COMMUNICATION, COLLABORATION, AND TEAMWORK ARE INCREASINGLY IMPORTANT FOR THE...
COMMUNICATION, COLLABORATION, AND TEAMWORK ARE INCREASINGLY IMPORTANT FOR THE...COMMUNICATION, COLLABORATION, AND TEAMWORK ARE INCREASINGLY IMPORTANT FOR THE...
COMMUNICATION, COLLABORATION, AND TEAMWORK ARE INCREASINGLY IMPORTANT FOR THE...Hirak Kocharee
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project ManagementMahesh Bendigeri
 

Ähnlich wie (3) Essay «Structuring Chaos» (20)

Project organization.pptx
Project organization.pptxProject organization.pptx
Project organization.pptx
 
organizational structures 3
organizational structures 3organizational structures 3
organizational structures 3
 
10 me667 chap3 organizing and staffing
10 me667 chap3 organizing and staffing10 me667 chap3 organizing and staffing
10 me667 chap3 organizing and staffing
 
Multi projects
Multi projectsMulti projects
Multi projects
 
Principles of architecture
Principles of architecturePrinciples of architecture
Principles of architecture
 
PMCONNECT
PMCONNECTPMCONNECT
PMCONNECT
 
UNIT II STUDY GUIDE Project Governance and TeamEach of thes.docx
 UNIT II STUDY GUIDE Project Governance and TeamEach of thes.docx UNIT II STUDY GUIDE Project Governance and TeamEach of thes.docx
UNIT II STUDY GUIDE Project Governance and TeamEach of thes.docx
 
Research Paper On Primavera
Research Paper On PrimaveraResearch Paper On Primavera
Research Paper On Primavera
 
Chap 3 Organization Structure
Chap 3 Organization StructureChap 3 Organization Structure
Chap 3 Organization Structure
 
ACE-FUELS- 801- PROJECT MGT for real estate
ACE-FUELS- 801- PROJECT MGT for real estateACE-FUELS- 801- PROJECT MGT for real estate
ACE-FUELS- 801- PROJECT MGT for real estate
 
Pm Session 9
Pm Session 9Pm Session 9
Pm Session 9
 
University of Athens - Advanced project management_sample text
University of Athens - Advanced project management_sample textUniversity of Athens - Advanced project management_sample text
University of Athens - Advanced project management_sample text
 
Project Management vdhsjsjskskaannzbdnsj
Project Management vdhsjsjskskaannzbdnsjProject Management vdhsjsjskskaannzbdnsj
Project Management vdhsjsjskskaannzbdnsj
 
Definition Of Project Management
Definition Of Project ManagementDefinition Of Project Management
Definition Of Project Management
 
Ch02
Ch02Ch02
Ch02
 
A Project On The Project Life Cycle
A Project On The Project Life CycleA Project On The Project Life Cycle
A Project On The Project Life Cycle
 
Chap003
Chap003Chap003
Chap003
 
COMMUNICATION, COLLABORATION, AND TEAMWORK ARE INCREASINGLY IMPORTANT FOR THE...
COMMUNICATION, COLLABORATION, AND TEAMWORK ARE INCREASINGLY IMPORTANT FOR THE...COMMUNICATION, COLLABORATION, AND TEAMWORK ARE INCREASINGLY IMPORTANT FOR THE...
COMMUNICATION, COLLABORATION, AND TEAMWORK ARE INCREASINGLY IMPORTANT FOR THE...
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project Management
 
Project management – standard for today´s modern company
Project management – standard for today´s modern companyProject management – standard for today´s modern company
Project management – standard for today´s modern company
 

Mehr von Vadim Salnikov

My Goal Is PMP Certificate!..
My Goal Is PMP Certificate!..My Goal Is PMP Certificate!..
My Goal Is PMP Certificate!..Vadim Salnikov
 
3 D – Management Constructor
3 D – Management Constructor3 D – Management Constructor
3 D – Management ConstructorVadim Salnikov
 
Creation And Design Of Documents
Creation And Design Of DocumentsCreation And Design Of Documents
Creation And Design Of DocumentsVadim Salnikov
 
Do You Manage The Project Or Does The Project Manage You?
Do You Manage The Project Or Does The Project Manage You?Do You Manage The Project Or Does The Project Manage You?
Do You Manage The Project Or Does The Project Manage You?Vadim Salnikov
 
Why Project Management Is «Lively»
Why Project Management Is «Lively»Why Project Management Is «Lively»
Why Project Management Is «Lively»Vadim Salnikov
 
Lively Management Of Projects
Lively Management Of ProjectsLively Management Of Projects
Lively Management Of ProjectsVadim Salnikov
 
(6) Essay «Why KommandCore Is Like This»
(6) Essay «Why KommandCore Is Like This»(6) Essay «Why KommandCore Is Like This»
(6) Essay «Why KommandCore Is Like This»Vadim Salnikov
 
(2) Essay «Language, Creating Our Reality»
(2) Essay «Language, Creating Our Reality»(2) Essay «Language, Creating Our Reality»
(2) Essay «Language, Creating Our Reality»Vadim Salnikov
 
(1) Essay «Reflections On Management»
(1) Essay «Reflections On Management»(1) Essay «Reflections On Management»
(1) Essay «Reflections On Management»Vadim Salnikov
 

Mehr von Vadim Salnikov (10)

My Goal Is PMP Certificate!..
My Goal Is PMP Certificate!..My Goal Is PMP Certificate!..
My Goal Is PMP Certificate!..
 
Multiuser Computer
Multiuser ComputerMultiuser Computer
Multiuser Computer
 
3 D – Management Constructor
3 D – Management Constructor3 D – Management Constructor
3 D – Management Constructor
 
Creation And Design Of Documents
Creation And Design Of DocumentsCreation And Design Of Documents
Creation And Design Of Documents
 
Do You Manage The Project Or Does The Project Manage You?
Do You Manage The Project Or Does The Project Manage You?Do You Manage The Project Or Does The Project Manage You?
Do You Manage The Project Or Does The Project Manage You?
 
Why Project Management Is «Lively»
Why Project Management Is «Lively»Why Project Management Is «Lively»
Why Project Management Is «Lively»
 
Lively Management Of Projects
Lively Management Of ProjectsLively Management Of Projects
Lively Management Of Projects
 
(6) Essay «Why KommandCore Is Like This»
(6) Essay «Why KommandCore Is Like This»(6) Essay «Why KommandCore Is Like This»
(6) Essay «Why KommandCore Is Like This»
 
(2) Essay «Language, Creating Our Reality»
(2) Essay «Language, Creating Our Reality»(2) Essay «Language, Creating Our Reality»
(2) Essay «Language, Creating Our Reality»
 
(1) Essay «Reflections On Management»
(1) Essay «Reflections On Management»(1) Essay «Reflections On Management»
(1) Essay «Reflections On Management»
 

Kürzlich hochgeladen

(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 

Kürzlich hochgeladen (20)

(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 

(3) Essay «Structuring Chaos»

  • 1. Structuring chaos Passage from «Some Essays About Management» essay 3
  • 2. Earlier we’ve told about a project as a certain system we manage
  • 3. That is why – the project is a whole set (hierarchy) of all project participants and relations between them (structure)
  • 4. Now we’d like to dwell at length on how project is born, how it’s stood out from its surrounding and how it’s organized
  • 5. Why is that important?
  • 6. Because besides an objective of the project, there are many project participants and stakeholders of different levels who are also to be worked with
  • 7. Or there are many important and principal contractors and partners who influence considerably the project success and effectiveness
  • 8. Or it may require gathering of a great number of bits of different knowledge domains (planning, construction, supply, for example, etc.)
  • 9. A really difficult thing in such projects is – to organize all participants and stakeholders
  • 10. Lack of such organization hardly lets passing from project initiation to its planning, needless to say that it also complicates moving to the project objective
  • 11. Well, let’s get it one after another
  • 13. What is the reason of project initiation? Of course – project objective
  • 14. It’s exactly the fact that there is an objective provokes the process of reality structuring
  • 15. The surrounding reality keeps on being the chaos – a super-intricate dynamic system, until project birth
  • 16. And so, such chaos provokes a need in some result
  • 17. And this need of surrounding world converts lastly into an objective [of the project]
  • 18. In surrounding environment the defined objective provokes exigence to create a certain system, a certain mechanism intended to reach the desired objective
  • 19. Finally, thanks to all of that, separate persons start to team up in a distinct and organized entity of people – exactly to what we name a project
  • 20. The objective is the very pivot which holds all participants in project borders and keeps stable the project as a mechanism
  • 21. The project objective is a backbone factor which enables the «birth» of the project as a system
  • 23. Well, now we are in need of a working system
  • 24. The first step in this direction is to outline borders of the project, of all participants and stakeholders entity, people whom we are going to manage
  • 25. Why do we always underline people as project participants, and no companies?
  • 26. It’s just because in our understanding we always work with certain people only
  • 27. Where a certain man works is not principal for us. It’ important that he is taken within our project, it’s to him whom we’ll collaborate with, but not always with his company
  • 28. We outline on our own the borders of our project where we decide whether include or exclude somebody
  • 29. We say these people are included in the project, and we’ll do manage them, but those people are not
  • 30. Why is that so important to manage project borders consciously?
  • 31. ‘Cause project borders represent the very filters which influence directly the thing of how we visualize the project itself
  • 32. Those are the very filters we create artificially for ourselves and for all project participants
  • 33. By means of borders and filters we consciously enlarge or artificially reduce the number of people we are going to manage
  • 34. 3 About project structure and hierarchies
  • 35. We’ve outlined project borders and now we face a super-complicated task – to organize the project, i.e. people who develop and implement it
  • 36. There are two ways of organization when creating a working mechanism – structure and hierarchy
  • 37. We need structuring all people taking part in the project by standing out diverse elements, by connecting them and by bringing accurate and clear hierarchy in their relations
  • 38. In result we reach two basic goals of management: ― by means of structure, we distribute all functions and tasks, which lead to the project objective, between all those who are responsible ― by means of hierarchy we get a mechanism of management and coordination of all participants within the project
  • 39. What’s the use of structuring? What are structures needed for?
  • 40. It depends on that greatly – how our project and our system, as people entity, will move
  • 41. The structure specifies behavior of all project stakeholders Achievement of the project objective depends on whether it’s correct and adequate
  • 42. Our task is to structure all participants in such a way that all functions and tasks would be distributed and assigned to diverse elements
  • 43. In the capacity of such elements we mean people or groups of people, naturally
  • 44. What is the logics of these elements standing out?
  • 45. It’s very simple – if there is a function or a task, therefore, there must be a separate specialized element for it
  • 46. It’s important that such elements are stood out artificially according to the project requirements
  • 47. A typical mistake – if «natural» borders, for example, employees of the same department, are taken as a basis
  • 48. The technology of these elements fixation in the project is mutual arrangements, which makes the ground to keep in the project all elements we need, such as technologies, council of experts, logistics workgroup, etc.
  • 49. These elements are bricks in the structure of our project, components of mechanism handling all necessary functions and moving us to the project objective
  • 50. But these elements standing out doesn’t let us say: «We’ve created the structure of our project»
  • 51. We’ve prepared only building materials – bricks, which we’ll use to build our structure
  • 52. And now we need mortar to bring them together
  • 53. How to establish relations between separate elements of our structure? And what should these relations be like?
  • 54. Relations. They bring mutual restraints on behavior of objects [project elements], which restrain behavior of elements and make them depend one on another
  • 55. New relations in our project let creating new opportunities and implementing some functions and tasks which are unavailable to implement with separate project elements only
  • 56. The basis for emergence of such relations, i. e. the technology of how to create them is – concluding of mutual arrangements between all stakeholders
  • 57. …Mutual arrangements about subject of relations, about rights and duties
  • 58. That’s arrangements exactly that represent a framework holding the project, cement piecing broken elements in a whole
  • 59. How to shape arrangements?
  • 60. First of all, it’s necessary to reveal interests of project participants and stakeholders and to propose smth. to all of them within our project
  • 61. These arrangements let to distribute rights and duties, to fix all functions and processes and to form project hierarchy (to stand out levels of decision-making for the first)
  • 62. Relying on these arrangements we create all relations we need between project elements
  • 63. From the standpoint of relations shaping, it’s important to have fixed (legitimate) arrangements
  • 64. In result – our project (as entity of people and interrelations between them) is organized
  • 65. No arrangements – no relations We do have fixed arrangements – and the structure of the project does appear
  • 66. Relying on these relations we form communication channels
  • 67. Channels which let through not only information in our project, but – what’s more interesting for us as managers – managerial influences
  • 68. A little remark: legitimate arrangements equal relations, when here these relations equal any number of communication channels, formed on the basis of these relations (arrangements)
  • 69. Why are relations so important?
  • 70. They are important for management They make our project manageable
  • 71. Management is based on communication Transmission of any managerial influence is available when there is a communication channel – direct or by mesne
  • 72. That’s why we’d like to underline it once more : arrangements and relations make the project framework, and communication channels specify organizational design where our project elements are ordered according to certain hierarchy as well as communication channels, designed for information transmission, including managerial influences, are adjusted
  • 73. What principles does the project structure have to be based on?
  • 74. a) Maximal information flow – information exchange should be instant and have the least number of mediatory stages
  • 75. b) Minimal distortions of any information, especially – in case of managerial influences
  • 76. c) Rapid transmission of information which can be reached by large number of direct communication channels
  • 77. d) Centralization within the project when one of project elements (subject of management) has a maximal number of relations and communication channels for effective implementation of his managerial functions
  • 78. e) Flexibility within the project when there is a possibility to replace one element with another on a management or junction position
  • 79. Everyone should define all by oneself what type of structure would be optimal and appropriate for him in his project
  • 80. Anyway, the key instrument or technology of project organization is the ability to provide arrangements
  • 81. The ground for project organization technology is – providing the environment for arrangements making (communication grounds) and managing the process of arrangements making itself
  • 82. At the expense of arrangements we can change borders of the project, concentrate on elements we need, and come to mutual understanding
  • 83. Thanks for Your attention! P.S. You got to know the passage of our book «Some Essays About Management» The book is available in whole on the page «Vision» of our site www.kommandcore.com