Seven years’ experience as supervisor in the nuclear plant industry. Demonstrated talent directing and
supervising for various crafts with the plant during outage and non-outage durations. Strong leadership
qualities, able to take charge and complete tasks in a timely manner. In construction industry superintendent,
program manager supervised craft, measured to erasure proper materials, managed sub-contractors to
erasure activities were performed correctly and on schedule.
Tag-out Requirements
OSHA 30 Certified
Work Orders
Ramp Supervisor
EXPERIENCE
Enforce safety regulations by directing craft consisting up to teams of 250.
Confer with other supervisors to coordinate operations and activities within or between
departments.
Construction of new unit two ramp, hand rails though out the plant, construction of blow down
building stairways etc.
Interpret specifications, blueprints, job orders, and company policies and procedures for workers.
Read work orders, production schedules, and other reports to determine production requirements.
Requisition materials, supplies, and equipment parts for all craft teams.
EMPLOYMENT HISTORY
Task Manager
10/2015-11/2015 Lutech Resources/CBI Houston, TX
Coordinate items going in and out of the Reactor Building during refuel outage at Three
Mile Island Nuclear Station.
Inspection of cleanliness
Coordinate work groups – Iron workers, Boiler Makers, Laborers, and Operators.
Mob and demob items were ahead of schedule.
2. Field Coordinator Lutech Resources Houston, TX
08/2015-10/2015
Oversite for all activities at the U3 Condensate Storage Tank (CST) during outage at Peach Bottom
Atomic Power Station in Delta PA.
Manufactured and installed new stand pipe and supports for inside CST. Access by cutting a hole
in the roof, when completed replaced with new piece
Manufactured non Q and Q materials for installation of cross over pipping, from J nozzle with new
T and spool piece to K nozzle with 20” elbolet welded in.
Manufactured new supports, pipping and install, to replace obsolete torus level switches in U3
core spray room.
Disconnect and ran new wiring in the control room, core spray room, and cable spread room.
Oversite of Boiler Makers, Pipe Fitters, Electricians, and Carpenters.
Ramp Coordinator
03/2015-04/2015 Day&ZimmermannNPSINC Lancaster,PA
Supervisedall materialsinandoutof containment,atPortSt Lucie nuclearpowerstation.
Supervisedworkinthe trenches,screens,reactiondraintank,SItrenches,etc.
Supervisedmovementof material insidecontainment.
Field Coordinator
09/2014-11/2014 Lutech Resources Hustion,TX
Oversightall activitiesinthe drywell duringoutage atPeachBottomAtomicPowerStationin
DeltaPA
Modify Main stream line inside containment.
Removal of snubbers and installation of eight new snubbers with attachments
Replace spring cans, pipe supports, feed water supports, installation steam deflector,
Reinforcements various drywall steal connections, mirror insulation, shielding, and scaffold
Removal.
Supervisor
03/2014-04/2014 Day&ZimmermannNPSINC Lancaster,PA
Supervisedall activitiesduringoutage inTurkeyPoint.Responsibleforall workinthe RCA.
SupervisedBoilerMakers,IronWorkersand Laborersforall materialsgoinginandoutof containment
Supervisor CB&I Willington, IL
10/2013-11/2013
Directlysuperviseditemsgoinginandoutof containment.
Directed40 day schedule ontime foroutage at Three Mile IslandinPA
3. Supervisor
04/2013-06/2013 CB&I Willington,IL
Supervisedfuel movementcampaign,Boilermakers.
SupervisedIron-workersonLshape door.
Responsible forUnit-1FHBand variousotherassignments
Supervisor
03/2013-04/2013 Day&Zimmerman NPS INC Lancaster, PA
Supervised Laborers, Painters and Masons at DC Cook in Michigan.
30 hr OSHA Course and passed on 2/22/201
Supervisor
06/2011-11/2012 Shaw-Stone&Webster Baton Rouge, LA
Supervisor of the ramp during outage in Port St Lucie and Turkey Point.
Fin Team supervised Laborers, Operators, Iron-workers and Teamsters in Port St Lucie.
Supervisor
06/2009-07/2011 Day&Zimmerman NPS INC Lancaster, PA
Supervisor of Iron-workers.
Supervised all activities at ramp during outages at Port St Lucie and Turkey Point.
Responsible for all work in the RCA.
Supervised, Boiler Makers, Carpenters, Laborers, Operators and teamsters.
Manager
05/2006-05/2009 Hill Contracting Sayville, NY
Responsible for day to day operations with home improvement, siding, windows, roofing, and
sales.
Estimating and overseeing three to four crews per day.
Increased sales in one year by 100%.
All projects produced a profit.
Project Engineer
06/2004-08/2006 Tecnico Corporation Chesapeake, VA
Responsible forthe startupmanufacturingof wall systemsandmetal joinerdoorsoperationsforU.S Navy
Ships.
Sales, estimating, and material purchase for new products.
Negotiated purchase of equipment.
Supervised set up and operations.
4. Vice President, General Manager
09/1989-08/2004 Advanced Structures Corporation Deer Park, NY
Responsible for all sales for the parent company and all its subsidiary companies.
Managed all estimating, purchasing, manufacturing and program management of the company.
Securedmilliondollarcontractwithvariousmajorshipyards,one withNewportNews Shipyard for 18000
Metal joiner doors for the USS Ronald Reagan CVN-76 Aircraft Carrier.
AcquiredmilliondollarcontractsfromBathIron WorksCorporationforall wall systems,floorsystemsand
metal joiner doors for DDG-51 program.
Northrop Grumman Ship Systems Ingalls Operations for wall systems, metal joiner doors for the DDG-51
program.
Securedcontracts for all ship overhaul programson board U.S Naval Shipson East, West, and Gulf Coast.
In the year of 2003 I achieved record sales and profit from the prior fifteen years.
OCCUPATIONAL LICENSES & CERTIFICATES
Certification Title Issuing Organization Completion Date
OSHA 30 Construction Industry 360 Training 02/2013