SlideShare ist ein Scribd-Unternehmen logo
1 von 7
Downloaden Sie, um offline zu lesen
Re: what documents are used to write testcase for integration testing and system
testing?
generally to write test cases we use UCD(use case
document), Business rules and DDD(data design
document).Generally Use cases are derived from SRS(s/w Req
spec)
for writing integration testcases,we use high level design
document(HLD) and for writing system testcases,we use
URD/SRS
Re: Describe components of a typical test plan, such as tools for interactive products
and for database products, as well as cause-and-effect graphs and data-flow
diagrams.
As for IEEE829 standards test plan has following format
1.Project_id
2.Description
3.Test items
4.Features to be tested
5.Features to be not tested
6.Test Environment
7.Entry cryteria
8.Approach
9.Exit cryteria
10.Staff and training
11.Test deliverables
12.Date and time
13.Risk anlysis
14.Approvals
Re: What are cookies and how to test cookies
Cookie is small information stored in text file on user’s
hard drive by web server. This information is later used by
web browser to retrieve information from that machine.
Generally cookie contains personalized user data or
information that is used to communicate between different
web pages.
Test the application by enabling or disabling the cookies
in your browser options. Test if the cookies are encrypted
before writing to user machine. If you are testing the
session cookies (i.e. cookies expire after the sessions
ends) check for login sessions and user stats after session
end. Check effect on application security by deleting the
cookies.
Re: If tester had written test cases for application, then in next build if same features
are modified with some changes. Then Should I have to write test cases for the same
features to verify new expected results.OR What should I do?
In this case you will have to do regression testing.
Regression testing: Testing of previously tested program
following modifiaction to endure that defects have not been
introduced or uncovered in unchanged areas of software as a
result of the changes made. It is performed when the
software or its environment is changed.
You will have to write only new test cases for the new
features added. Will have to run new and old test cases
together.
Re: what are the duties of Quality Assurance engineer and QA Tester?plzzz answer
as soon as possible thanku
Duties of a QA Engg.
Generally a QA Engineer and a QA Tester would mean the same
in real time environments.
However, when it comes to hierarch levels..
QA Manager will have QA Test Lead under him and QA Test
Engineers under the lead..
General Duties of the QA would be:
1. To collect all the docs like: BRD(business req doc),
technical tp, functional tp from the management or QA
manager.
2. To review the above docs.
3. To moderate the FTR (Formal Technical Reviews)
4. To write RTM
5. Design Test Cases.
6. Once the build release to QA, begin the testing
7. Log the defects in teh Defect tracking tool.
8. Conduct client meetings.., review defects with the dev
team and demo the defects to the developers if required.
The above are in general and can be disscussed in detail
further.
Re: tell about build process???how do u get abuild?? what u l do when u get a
build??
Lead or Feature set lead or Module lead or Project lead
will provide the Build release team (BRT) with the files
to be used for making a build. The BRT makes the build and
gives it back to Development team, the builds goes through
several rounds of alpha testing (which includes unit
testing) based on the Test cases (they are influenced by
the TC's of Quality Testing team). Once the build passes
the alpha testing (n rounds) then the build files are
provided back to BRT with fixes and then the BRT creates a
new Beta build to be forwarded to the Testing team along
with the release build notes (which carries information on
the bug fixes/patches/quick fixes/product components
version numbers etc). Testing team performs the
Smoke/Sanity test on the Beta build and verifies whether
the major functionalities are working or not so that they
can send the build approval mail saying that "the build is
accepted/rejected due to X bugs (with priorit/severity)".
If the build is approved for further testing then the bugs
mentioned in the release build notes are validated and
finally after the testing completion (this includes test
strategy as per test plan, for e.g, Functional, regression,
adhoc testing etc..) the testing completion report of the
Beta build is sent.
Re: how can u map SDLC With STLC
Re: how can u map SDLC With STLC
Yes SDLC can be maped to STLC with the help of V model.
I have tried to show it
1. Requirement Specifications ----------> Acceptance Test
Acceptance TP Cases
2. Functional design -------------------> System Test Cases
System TP
3. Detailed design ------------------->Integrated Test Cases
Integrated TP
4. Program Specifications--------------->Unit Test Cases
Unit TP
TP refers to Test Plan and not Time Pass :)
So in each of the phases of SDLC , we start planning and
writing Test Cases accordingly,this is how u map SDLC with
STLC.
Hope my answer was fruitful to you
TEST PLAN
Test plan: a software project test plan is a document that describes the objectives, scope, approach,
and focus of a software testing effort. Objective product overview relevant document, standards, legal
requirements traceability requirement overall project organization and personnel contact-
info/responsibility assumption and dependencies risk analysis testing priorities and focus scope and
limitation test outline: decomposition of test approach by test type, feature, functionalities, modules
etc. Test environment configuration management process test tools to be used including version,
patches etc problem tracking and resolution project test metrics entry and exit criteria test suspension
and restart criteria. Personnel allocation and pertaining needs outside test organizations to be utilized
with purpose, responsibilities, deliverables etc. Etc. Open issues
a software project test plan is a document that describes the objectives, scope, approach, and focus of
a software testing effort. The process of preparing a test plan is a useful way to think through the
efforts needed to validate the acceptability of a software product. The completed document will help
people outside the test group understand the 'why' and 'how' of product validation. It should be
thorough enough to be useful but not so thorough that no one outside the test group will read it. A test
plan states what the items to be tested are, at what level they will be tested, what sequence they are to
be tested in, how the test strategy will be applied to the testing of each item, and describes the test
environment. A test plan should ideally be organisation wide, being applicable to all of an
organisations software developments. The objective of each test plan is to provide a plan for
verification, by testing the software, the software produced fulfils the functional or design statements
of the appropriate software specification. In the case of acceptance testing and system testing, this
generally means the functional specification. The first consideration when preparing the test plan is
who the intended audience is – i.e. The audience for a unit test plan would be different, and thus the
content would have to be adjusted accordingly. You should begin the test plan as soon as possible.
Generally it is desirable to begin the master test plan as the same time the requirements documents
and the project plan are being developed. Test planning can (and should) have an impact on the
project plan. Even though plans that are written early will have to be changed during the course of the
development and testing, but that is important, because it records the progress of the testing and helps
planners become more proficient.
Test Plan Format:
Test Plan ID: Unique number of name for future reference.
Introduction: About Project & Testing
Test Items: Names of all modules in that project
Features to be Tested: Names of modules to prepare test cases for testing.
Features not to be Tested: Names of modules to copy test cases from test case data base.
3, 4, 5 specifies "what to test?"
Approach: Selected list of test factors by Project Manager and select list of testing techniques to be
applied.
Entry Criteria:
Testing environment establised
Test cases prepared
Received build from developers
Suspension Criteria:
Testing environment is not working due to repair
sudden changes in customer requirements
pending defects are more
Exit Criteria:
all modules tested
all types of tests applied
all major bugs resolved
Test Environment: Required software and hardware to conduct testing on this project including
testing tools.
Test Deliverables: List of documents to be prepared by testing engineers.
6 to 11 specifies "how to test?"
Staff & Training Needs: Names of selected test engineers and required number of training sessions.
Responsibilities: Work allotments to above selected test engineers
12 & 13 specifies "who to test?"
Schedule: Dates and time
14 specifies "when to test?"
Risks & Mitigation: The list of risks and solutions to overcome.
Approvals: Signatures of test lead and project manager.
AGILE TESTING USES
Testing from the beginning of the project and continually testing throughout the project lifecycle is
thebasis of agile testing. If we can work with the customer to help him specify his requirements in
terms oftests it makes them completely unambiguous, the tests either pass or they don’t.
If our coders only writecode to pass tests, we can be sure of one hundred percent test coverage. Most
of all, if we keep ourtesters, developers and customers (or customer representatives) in constant face-
to-face communicationwith each other, we can eradicate most of the errors caused by us climbing the
ladder of inference.
Breaking our projects into smaller chunks of work and iterating them will give us frequent feedback
on the current state of the project.There are many teams now using agile testing techniques to
improve the quality of their products andhaving great success.
There is some investment in training required and changes to the workspace are necessary to allow
customers, testers, and developers to work side-by-side but these are a small price to pay for the
advantages gained.The most difficult thing for most teams is shifting the perception of the test team
competing with thedevelopers where their focus is detecting faults and preventing poor quality
products from being released.The new, agile testing, paradigm is the test team collaborating with the
developers to build quality in from the start and release robust products that deliver the best possible
business value for the customer.

Weitere ähnliche Inhalte

Was ist angesagt?

Manual testing concepts course 1
Manual testing concepts course 1Manual testing concepts course 1
Manual testing concepts course 1Raghu Kiran
 
Basic interview questions for manual testing
Basic interview questions for manual testingBasic interview questions for manual testing
Basic interview questions for manual testingJYOTI RANJAN PAL
 
Interview questions for manual testing technology.
Interview questions for manual testing technology.Interview questions for manual testing technology.
Interview questions for manual testing technology.Vinay Agnihotri
 
Manual testing interview questions and answers
Manual testing interview questions and answersManual testing interview questions and answers
Manual testing interview questions and answerskaranmca
 
Manual testing interview questions and answers
Manual testing interview questions and answersManual testing interview questions and answers
Manual testing interview questions and answersTestbytes
 
Manual Testing Material by Durgasoft
Manual Testing Material by DurgasoftManual Testing Material by Durgasoft
Manual Testing Material by DurgasoftDurga Prasad
 
Manual software-testing-interview-questions-with-answers
Manual software-testing-interview-questions-with-answersManual software-testing-interview-questions-with-answers
Manual software-testing-interview-questions-with-answersSachin Gupta
 
Manual testing interview question by INFOTECH
Manual testing interview question by INFOTECHManual testing interview question by INFOTECH
Manual testing interview question by INFOTECHPravinsinh
 
Software Testing Life Cycle
Software Testing Life CycleSoftware Testing Life Cycle
Software Testing Life Cyclegueste730d5
 
Defect life cycle and Defect Status Life Cycle
Defect life cycle and Defect Status Life CycleDefect life cycle and Defect Status Life Cycle
Defect life cycle and Defect Status Life Cyclepavansmiles
 
Mobile Application Testing
Mobile Application TestingMobile Application Testing
Mobile Application TestingNoor Orfahly
 
What Is Functional Testing?
What Is Functional Testing?What Is Functional Testing?
What Is Functional Testing?QA InfoTech
 
Manual Testing Notes
Manual Testing NotesManual Testing Notes
Manual Testing Notesguest208aa1
 
52892006 manual-testing-real-time
52892006 manual-testing-real-time52892006 manual-testing-real-time
52892006 manual-testing-real-timeSunil Pandey
 
Sample test-plan-template
Sample test-plan-templateSample test-plan-template
Sample test-plan-templateamikdamaru
 
Software testing and quality assurance
Software testing and quality assuranceSoftware testing and quality assurance
Software testing and quality assuranceTOPS Technologies
 
ISTQB - Software development life cycle
ISTQB - Software development life cycleISTQB - Software development life cycle
ISTQB - Software development life cycleHoangThiHien1
 

Was ist angesagt? (20)

Manual testing concepts course 1
Manual testing concepts course 1Manual testing concepts course 1
Manual testing concepts course 1
 
Basic interview questions for manual testing
Basic interview questions for manual testingBasic interview questions for manual testing
Basic interview questions for manual testing
 
Interview questions for manual testing technology.
Interview questions for manual testing technology.Interview questions for manual testing technology.
Interview questions for manual testing technology.
 
Manual testing interview questions and answers
Manual testing interview questions and answersManual testing interview questions and answers
Manual testing interview questions and answers
 
Manual testing interview questions and answers
Manual testing interview questions and answersManual testing interview questions and answers
Manual testing interview questions and answers
 
Introduction & Manual Testing
Introduction & Manual TestingIntroduction & Manual Testing
Introduction & Manual Testing
 
Manual Testing Material by Durgasoft
Manual Testing Material by DurgasoftManual Testing Material by Durgasoft
Manual Testing Material by Durgasoft
 
Manual software-testing-interview-questions-with-answers
Manual software-testing-interview-questions-with-answersManual software-testing-interview-questions-with-answers
Manual software-testing-interview-questions-with-answers
 
Manual testing interview question by INFOTECH
Manual testing interview question by INFOTECHManual testing interview question by INFOTECH
Manual testing interview question by INFOTECH
 
Testing fundamentals
Testing fundamentalsTesting fundamentals
Testing fundamentals
 
Software Testing Life Cycle
Software Testing Life CycleSoftware Testing Life Cycle
Software Testing Life Cycle
 
Defect life cycle and Defect Status Life Cycle
Defect life cycle and Defect Status Life CycleDefect life cycle and Defect Status Life Cycle
Defect life cycle and Defect Status Life Cycle
 
Mobile Application Testing
Mobile Application TestingMobile Application Testing
Mobile Application Testing
 
What Is Functional Testing?
What Is Functional Testing?What Is Functional Testing?
What Is Functional Testing?
 
Software testing
Software testingSoftware testing
Software testing
 
Manual Testing Notes
Manual Testing NotesManual Testing Notes
Manual Testing Notes
 
52892006 manual-testing-real-time
52892006 manual-testing-real-time52892006 manual-testing-real-time
52892006 manual-testing-real-time
 
Sample test-plan-template
Sample test-plan-templateSample test-plan-template
Sample test-plan-template
 
Software testing and quality assurance
Software testing and quality assuranceSoftware testing and quality assurance
Software testing and quality assurance
 
ISTQB - Software development life cycle
ISTQB - Software development life cycleISTQB - Software development life cycle
ISTQB - Software development life cycle
 

Andere mochten auch

Case study-loan-processing-test-plan
Case study-loan-processing-test-planCase study-loan-processing-test-plan
Case study-loan-processing-test-planAarush Sharma
 
Tutorial 2 a141-answer
Tutorial 2 a141-answerTutorial 2 a141-answer
Tutorial 2 a141-answerkim rae KI
 
Payment gateway testing
Payment gateway testingPayment gateway testing
Payment gateway testingAtul Pant
 
How to test payment gateway functionality
How to test payment gateway functionalityHow to test payment gateway functionality
How to test payment gateway functionalityTrupti Jethva
 
Complete guide to manual testing@uma
Complete guide to manual  testing@umaComplete guide to manual  testing@uma
Complete guide to manual testing@umaUma Sapireddy
 

Andere mochten auch (6)

Case study-loan-processing-test-plan
Case study-loan-processing-test-planCase study-loan-processing-test-plan
Case study-loan-processing-test-plan
 
Tutorial 2 a141-answer
Tutorial 2 a141-answerTutorial 2 a141-answer
Tutorial 2 a141-answer
 
Payment gateway testing
Payment gateway testingPayment gateway testing
Payment gateway testing
 
How to test payment gateway functionality
How to test payment gateway functionalityHow to test payment gateway functionality
How to test payment gateway functionality
 
Complete guide to manual testing@uma
Complete guide to manual  testing@umaComplete guide to manual  testing@uma
Complete guide to manual testing@uma
 
Manual testing ppt
Manual testing pptManual testing ppt
Manual testing ppt
 

Ähnlich wie manual-testing

Ähnlich wie manual-testing (20)

stlc
stlcstlc
stlc
 
stlc
stlcstlc
stlc
 
Quality Assurance Process
Quality Assurance ProcessQuality Assurance Process
Quality Assurance Process
 
SOFTWARE TESTING
SOFTWARE TESTINGSOFTWARE TESTING
SOFTWARE TESTING
 
Test planning
Test planningTest planning
Test planning
 
Aim (A).pptx
Aim (A).pptxAim (A).pptx
Aim (A).pptx
 
38475471 qa-and-software-testing-interview-questions-and-answers
38475471 qa-and-software-testing-interview-questions-and-answers38475471 qa-and-software-testing-interview-questions-and-answers
38475471 qa-and-software-testing-interview-questions-and-answers
 
QACampus PPT (STLC)
QACampus PPT (STLC)QACampus PPT (STLC)
QACampus PPT (STLC)
 
Learn software testing with tech partnerz 3
Learn software testing with tech partnerz 3Learn software testing with tech partnerz 3
Learn software testing with tech partnerz 3
 
Testing documents
Testing documentsTesting documents
Testing documents
 
Test plan
Test planTest plan
Test plan
 
Introduction to testing.
Introduction to testing.Introduction to testing.
Introduction to testing.
 
Stlc phases.
Stlc phases.Stlc phases.
Stlc phases.
 
Testing
TestingTesting
Testing
 
Stlc&Vmodel Ppt
Stlc&Vmodel PptStlc&Vmodel Ppt
Stlc&Vmodel Ppt
 
Testing documents
Testing documentsTesting documents
Testing documents
 
STLC-ppt-1.pptx
STLC-ppt-1.pptxSTLC-ppt-1.pptx
STLC-ppt-1.pptx
 
STLC-ppt-1.pptx
STLC-ppt-1.pptxSTLC-ppt-1.pptx
STLC-ppt-1.pptx
 
Software testing life cycle
Software testing life cycleSoftware testing life cycle
Software testing life cycle
 
Test Report Preparation
Test Report PreparationTest Report Preparation
Test Report Preparation
 

Kürzlich hochgeladen

Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rick Flair
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesThousandEyes
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...AliaaTarek5
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterMydbops
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 

Kürzlich hochgeladen (20)

Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL Router
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 

manual-testing

  • 1. Re: what documents are used to write testcase for integration testing and system testing? generally to write test cases we use UCD(use case document), Business rules and DDD(data design document).Generally Use cases are derived from SRS(s/w Req spec) for writing integration testcases,we use high level design document(HLD) and for writing system testcases,we use URD/SRS Re: Describe components of a typical test plan, such as tools for interactive products and for database products, as well as cause-and-effect graphs and data-flow diagrams. As for IEEE829 standards test plan has following format 1.Project_id 2.Description 3.Test items 4.Features to be tested 5.Features to be not tested 6.Test Environment 7.Entry cryteria 8.Approach 9.Exit cryteria 10.Staff and training 11.Test deliverables 12.Date and time 13.Risk anlysis 14.Approvals Re: What are cookies and how to test cookies
  • 2. Cookie is small information stored in text file on user’s hard drive by web server. This information is later used by web browser to retrieve information from that machine. Generally cookie contains personalized user data or information that is used to communicate between different web pages. Test the application by enabling or disabling the cookies in your browser options. Test if the cookies are encrypted before writing to user machine. If you are testing the session cookies (i.e. cookies expire after the sessions ends) check for login sessions and user stats after session end. Check effect on application security by deleting the cookies. Re: If tester had written test cases for application, then in next build if same features are modified with some changes. Then Should I have to write test cases for the same features to verify new expected results.OR What should I do? In this case you will have to do regression testing. Regression testing: Testing of previously tested program following modifiaction to endure that defects have not been introduced or uncovered in unchanged areas of software as a result of the changes made. It is performed when the software or its environment is changed. You will have to write only new test cases for the new features added. Will have to run new and old test cases together. Re: what are the duties of Quality Assurance engineer and QA Tester?plzzz answer as soon as possible thanku Duties of a QA Engg. Generally a QA Engineer and a QA Tester would mean the same in real time environments. However, when it comes to hierarch levels.. QA Manager will have QA Test Lead under him and QA Test Engineers under the lead.. General Duties of the QA would be: 1. To collect all the docs like: BRD(business req doc),
  • 3. technical tp, functional tp from the management or QA manager. 2. To review the above docs. 3. To moderate the FTR (Formal Technical Reviews) 4. To write RTM 5. Design Test Cases. 6. Once the build release to QA, begin the testing 7. Log the defects in teh Defect tracking tool. 8. Conduct client meetings.., review defects with the dev team and demo the defects to the developers if required. The above are in general and can be disscussed in detail further. Re: tell about build process???how do u get abuild?? what u l do when u get a build?? Lead or Feature set lead or Module lead or Project lead will provide the Build release team (BRT) with the files to be used for making a build. The BRT makes the build and gives it back to Development team, the builds goes through several rounds of alpha testing (which includes unit testing) based on the Test cases (they are influenced by the TC's of Quality Testing team). Once the build passes the alpha testing (n rounds) then the build files are provided back to BRT with fixes and then the BRT creates a new Beta build to be forwarded to the Testing team along with the release build notes (which carries information on the bug fixes/patches/quick fixes/product components version numbers etc). Testing team performs the Smoke/Sanity test on the Beta build and verifies whether the major functionalities are working or not so that they can send the build approval mail saying that "the build is accepted/rejected due to X bugs (with priorit/severity)". If the build is approved for further testing then the bugs mentioned in the release build notes are validated and finally after the testing completion (this includes test strategy as per test plan, for e.g, Functional, regression, adhoc testing etc..) the testing completion report of the Beta build is sent. Re: how can u map SDLC With STLC Re: how can u map SDLC With STLC
  • 4. Yes SDLC can be maped to STLC with the help of V model. I have tried to show it 1. Requirement Specifications ----------> Acceptance Test Acceptance TP Cases 2. Functional design -------------------> System Test Cases System TP 3. Detailed design ------------------->Integrated Test Cases Integrated TP 4. Program Specifications--------------->Unit Test Cases Unit TP TP refers to Test Plan and not Time Pass :) So in each of the phases of SDLC , we start planning and writing Test Cases accordingly,this is how u map SDLC with STLC. Hope my answer was fruitful to you TEST PLAN Test plan: a software project test plan is a document that describes the objectives, scope, approach, and focus of a software testing effort. Objective product overview relevant document, standards, legal requirements traceability requirement overall project organization and personnel contact- info/responsibility assumption and dependencies risk analysis testing priorities and focus scope and limitation test outline: decomposition of test approach by test type, feature, functionalities, modules etc. Test environment configuration management process test tools to be used including version, patches etc problem tracking and resolution project test metrics entry and exit criteria test suspension and restart criteria. Personnel allocation and pertaining needs outside test organizations to be utilized with purpose, responsibilities, deliverables etc. Etc. Open issues
  • 5. a software project test plan is a document that describes the objectives, scope, approach, and focus of a software testing effort. The process of preparing a test plan is a useful way to think through the efforts needed to validate the acceptability of a software product. The completed document will help people outside the test group understand the 'why' and 'how' of product validation. It should be thorough enough to be useful but not so thorough that no one outside the test group will read it. A test plan states what the items to be tested are, at what level they will be tested, what sequence they are to be tested in, how the test strategy will be applied to the testing of each item, and describes the test environment. A test plan should ideally be organisation wide, being applicable to all of an organisations software developments. The objective of each test plan is to provide a plan for verification, by testing the software, the software produced fulfils the functional or design statements of the appropriate software specification. In the case of acceptance testing and system testing, this generally means the functional specification. The first consideration when preparing the test plan is who the intended audience is – i.e. The audience for a unit test plan would be different, and thus the content would have to be adjusted accordingly. You should begin the test plan as soon as possible. Generally it is desirable to begin the master test plan as the same time the requirements documents and the project plan are being developed. Test planning can (and should) have an impact on the project plan. Even though plans that are written early will have to be changed during the course of the development and testing, but that is important, because it records the progress of the testing and helps planners become more proficient.
  • 6. Test Plan Format: Test Plan ID: Unique number of name for future reference. Introduction: About Project & Testing Test Items: Names of all modules in that project Features to be Tested: Names of modules to prepare test cases for testing. Features not to be Tested: Names of modules to copy test cases from test case data base. 3, 4, 5 specifies "what to test?" Approach: Selected list of test factors by Project Manager and select list of testing techniques to be applied. Entry Criteria: Testing environment establised Test cases prepared Received build from developers Suspension Criteria: Testing environment is not working due to repair sudden changes in customer requirements pending defects are more Exit Criteria: all modules tested all types of tests applied all major bugs resolved Test Environment: Required software and hardware to conduct testing on this project including testing tools. Test Deliverables: List of documents to be prepared by testing engineers. 6 to 11 specifies "how to test?" Staff & Training Needs: Names of selected test engineers and required number of training sessions. Responsibilities: Work allotments to above selected test engineers 12 & 13 specifies "who to test?" Schedule: Dates and time 14 specifies "when to test?" Risks & Mitigation: The list of risks and solutions to overcome. Approvals: Signatures of test lead and project manager.
  • 7. AGILE TESTING USES Testing from the beginning of the project and continually testing throughout the project lifecycle is thebasis of agile testing. If we can work with the customer to help him specify his requirements in terms oftests it makes them completely unambiguous, the tests either pass or they don’t. If our coders only writecode to pass tests, we can be sure of one hundred percent test coverage. Most of all, if we keep ourtesters, developers and customers (or customer representatives) in constant face- to-face communicationwith each other, we can eradicate most of the errors caused by us climbing the ladder of inference. Breaking our projects into smaller chunks of work and iterating them will give us frequent feedback on the current state of the project.There are many teams now using agile testing techniques to improve the quality of their products andhaving great success. There is some investment in training required and changes to the workspace are necessary to allow customers, testers, and developers to work side-by-side but these are a small price to pay for the advantages gained.The most difficult thing for most teams is shifting the perception of the test team competing with thedevelopers where their focus is detecting faults and preventing poor quality products from being released.The new, agile testing, paradigm is the test team collaborating with the developers to build quality in from the start and release robust products that deliver the best possible business value for the customer.