• KHALEEQ AHMAD
E-mail: khaleeq_mughal786@yahoo.com
Cell: +923336367204
JOB PROFILEJOB PROFILE ASAS POWER PLANT OPERATORPOWER PLANT OPERATOR
Having 07years of Operation experience in Power Generation &Desalination
Plants.
Karachi Nuclear Power Plant:
Presently working in Kararchi Nuclear Power Plant as Plant Operator from 2009 to
date. Responsible for Control Room Operations, with initial career as Field Operator on,
The Versatile Plant with. . .
• Canadian Pressurized Heavy Water Reactor-Boilers System,
• 137 MW Steam Turbine HITACHI +Extraction Steam-Feed Heaters,
• 1600 m3/day capacity MED Plant with (DCS),
• Hydrogen Cooled Generator,
• BOP and Auxiliaries …..
• Main Sea water Intake system, Seawater as Raw water,
• Compression Chillers, Close Loop Cooling Water Systems,
• RO, WTP Regeneration, MED Plant De-min/Re-min Operation,
• Air Compressors, Air Dryers, Fan-Coil Units,
• Reactor-specific Cooling and Support Systems,
• 132KV Output System, 3*1.2MW Diesel Generators.
• Manual Startup of Steam Turbine and Auxiliary Systems Locally.
Responsibility Details:
Control Room:
• Startup/shut down of GT/ST, monitoring of parameters and actions accordingly during all
other states of System.
• Boiler level, Condensate n Heaters & Reserve Feed-water Control.
• 220/132 KV line isolation and 11KV/4.16KV system operation.
• Operation/Synchronism of Standby Diesel generators.
• Safe Operation of Plant safety and support systems.
• LOTO procedures for PTW and Emergency Operating Procedures (EOP).
• Call up cards and routine checks, log books, data sheets, surveillance sheets, equipment
running hour and document movement record etc.
• Participated in long shutdown activities.
• Pre-start checks, Re-commissioning after major over hauling, low load test and full
load test, protection test.
WORK CONTROL OFFICE
• Understand of flow diagram and elementary logic diagram
• Isolations / deisolation of plant system as per PTW.
• Post maintenance testing of individual equipments as per recommended test
procedures.
• Check list of industrial safety measures for specific job.
• Maintain equipment maintenance data after and before maintenance of the
equipment.
• Isolation & de-isolation of 400 Volt Breakers (Megnablast, Ak225, Ak-125
and vacuum circuit breaker.)
Field Operations:
• Routine work on Gas Turbine and Steam Turbines and sub-systems.
• Troubleshooting and Call-up operation of Auxiliaries.
• Reporting Abnormalities, and Deficiencies, raising work requests (WR).
• Degassing and re-gassing operation of Hydrogen cooled generator.
• Operation of Canal Water Treatment, Clarifiers, Valve less Filters.
• Operations of Sea water Intake system, seawater feed system (KANUPP).
• Isolation / De-isolation of equipment for PTW.
• BOP systems i.e. PLC based Chillers, Air compressor/Dryers.
• Chlorination plant, Ferrous Sulfate addition system.
• Station GIS equipment and Deluge system operation.
• Station batteries and Standby Gen-set (Emergency) operation.
• WTPs Operation /Regeneration (Ion Exchange Columns).
• Reverse Osmosis desalination plants operation.
• Operation of MED Re-boiler and its auxiliary systems i.e. vacuum system, Chemical
Injection system, Acid Cleaning system, Feed water Treatment system.
• Industrial safety equipment and accessories (PPEs & fire extinguishers).
EEDUCATIONDUCATION
2017 B.E (Mechanical Engineering)
DHA SUFFA University
2009 POST DIPLOMA
Post Diploma in Nuclear Power Engineering from Karachi Institute Of
Power Engineering.
2008 DIPLOMA OF ASSOCIATE ENGINEERING
D.A.E (Mechanical) from Govt- Polytechnic Layyah
2005 Matriculationfrom(Board of Intermediate &Secondery Education
DG Khan)
PPERSONALERSONAL DDETAILSETAILS
Nationality Pakistani
Date of Birth 18-03-1990
Marital status Single
CNIC No 32202-8503500-5
Address House No. C-8 Phase II Kanupp Colony
Hawks Bay road, Mari Pur Karachi, Pakistan.
•• EEXTRAXTRA CCURRICULARURRICULAR
• Reading Books.
• Technical/Social Discussion with Colleagues.
• Traveling and Exploring new places.
• Music +Internet.
• Play cricket.
FFIREIRE FIGHTINGFIGHTING
• Participating in fire drill call up cards & basic training time to time arranged by our Fire
department.

More Related Content

What's hot

Conversant Machinery and Equipment
Conversant Machinery and EquipmentConversant Machinery and Equipment
Conversant Machinery and Equipment
Jason Tobbell
 
HPL Report on Pumps in IOP by Subham Shit [Final]
HPL Report on Pumps in IOP by Subham Shit [Final]HPL Report on Pumps in IOP by Subham Shit [Final]
HPL Report on Pumps in IOP by Subham Shit [Final]
Subham Shit
 
Advanced Power Reactor 1400 MWe
Advanced Power Reactor 1400 MWe  Advanced Power Reactor 1400 MWe
Advanced Power Reactor 1400 MWe
Power System Operation
 
Produced water treatment_presentation
Produced water treatment_presentationProduced water treatment_presentation
Produced water treatment_presentation
Sakhr R&D Center
 
ExcavatorEngBroch_1615_08_14web
ExcavatorEngBroch_1615_08_14webExcavatorEngBroch_1615_08_14web
ExcavatorEngBroch_1615_08_14web
Hamy Tejeda
 
Ener-tec, Inc. - Water/oil presentation
Ener-tec, Inc. - Water/oil presentationEner-tec, Inc. - Water/oil presentation
Ener-tec, Inc. - Water/oil presentation
Jonathan Shroyer
 

What's hot (20)

Conversant Machinery and Equipment
Conversant Machinery and EquipmentConversant Machinery and Equipment
Conversant Machinery and Equipment
 
HPL Report on Pumps in IOP by Subham Shit
HPL Report on Pumps in IOP by Subham ShitHPL Report on Pumps in IOP by Subham Shit
HPL Report on Pumps in IOP by Subham Shit
 
HPL Report on Pumps in IOP by Subham Shit [Final]
HPL Report on Pumps in IOP by Subham Shit [Final]HPL Report on Pumps in IOP by Subham Shit [Final]
HPL Report on Pumps in IOP by Subham Shit [Final]
 
Advanced Power Reactor 1400 MWe
Advanced Power Reactor 1400 MWe  Advanced Power Reactor 1400 MWe
Advanced Power Reactor 1400 MWe
 
Produced water treatment_presentation
Produced water treatment_presentationProduced water treatment_presentation
Produced water treatment_presentation
 
Power Generation: Combined Cycle
Power Generation: Combined CyclePower Generation: Combined Cycle
Power Generation: Combined Cycle
 
SMR-160. A Safe and Secure Nuclear Energy Future for Ukraine
SMR-160. A Safe and Secure Nuclear Energy Future for UkraineSMR-160. A Safe and Secure Nuclear Energy Future for Ukraine
SMR-160. A Safe and Secure Nuclear Energy Future for Ukraine
 
Appsolu
AppsoluAppsolu
Appsolu
 
OCP Tech Week Immersion Cooling Optimized IT platforms
OCP Tech Week Immersion Cooling Optimized IT platformsOCP Tech Week Immersion Cooling Optimized IT platforms
OCP Tech Week Immersion Cooling Optimized IT platforms
 
RamCV1
RamCV1RamCV1
RamCV1
 
The Role of HVAC in Achieving High Performance Goals
The Role of HVAC in Achieving High Performance GoalsThe Role of HVAC in Achieving High Performance Goals
The Role of HVAC in Achieving High Performance Goals
 
Kaveri engine- Kaveri Engine DRDO
Kaveri engine- Kaveri Engine DRDOKaveri engine- Kaveri Engine DRDO
Kaveri engine- Kaveri Engine DRDO
 
SMR-160. A Safe and Secure Nuclear Energy Future for Ukraine. General Informa...
SMR-160. A Safe and Secure Nuclear Energy Future for Ukraine. General Informa...SMR-160. A Safe and Secure Nuclear Energy Future for Ukraine. General Informa...
SMR-160. A Safe and Secure Nuclear Energy Future for Ukraine. General Informa...
 
High-speed balancing, Sulzer Technical Review, 2009
High-speed balancing, Sulzer Technical Review, 2009High-speed balancing, Sulzer Technical Review, 2009
High-speed balancing, Sulzer Technical Review, 2009
 
ExcavatorEngBroch_1615_08_14web
ExcavatorEngBroch_1615_08_14webExcavatorEngBroch_1615_08_14web
ExcavatorEngBroch_1615_08_14web
 
Power supply
Power supplyPower supply
Power supply
 
From Waste to Alternative Fuel
From Waste to Alternative FuelFrom Waste to Alternative Fuel
From Waste to Alternative Fuel
 
Ener-tec, Inc. - Water/oil presentation
Ener-tec, Inc. - Water/oil presentationEner-tec, Inc. - Water/oil presentation
Ener-tec, Inc. - Water/oil presentation
 
Juliet Joseph
Juliet JosephJuliet Joseph
Juliet Joseph
 
Ghulam Farid cv
Ghulam Farid cvGhulam Farid cv
Ghulam Farid cv
 

Viewers also liked (11)

Susee CV
Susee CVSusee CV
Susee CV
 
fasy update cv
fasy update cvfasy update cv
fasy update cv
 
Engr Saad
Engr SaadEngr Saad
Engr Saad
 
NEW CV AM BLESSED
NEW CV AM BLESSEDNEW CV AM BLESSED
NEW CV AM BLESSED
 
DAJ-CV-DDS-Jan 2016
DAJ-CV-DDS-Jan 2016DAJ-CV-DDS-Jan 2016
DAJ-CV-DDS-Jan 2016
 
Cv director de operaciones guillermo lópez 2016
Cv  director de operaciones   guillermo lópez 2016Cv  director de operaciones   guillermo lópez 2016
Cv director de operaciones guillermo lópez 2016
 
PTW_CV
PTW_CVPTW_CV
PTW_CV
 
my new singapore CV.
my new singapore CV.my new singapore CV.
my new singapore CV.
 
HARRISON singapore cv
HARRISON singapore cvHARRISON singapore cv
HARRISON singapore cv
 
Arif letest cv
Arif letest cvArif letest cv
Arif letest cv
 
CV Elchin Huseynov 1
CV Elchin Huseynov 1CV Elchin Huseynov 1
CV Elchin Huseynov 1
 

Similar to CV khaleeq

relevant experience
relevant experiencerelevant experience
relevant experience
Raja Ram
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator Training
Vedant Sumaria
 
LUNDIN WEBINAR PRESENTATION
LUNDIN WEBINAR PRESENTATIONLUNDIN WEBINAR PRESENTATION
LUNDIN WEBINAR PRESENTATION
MINETEK
 
Qudrat Ullah Resume
Qudrat Ullah ResumeQudrat Ullah Resume
Qudrat Ullah Resume
Qudrat Ullah
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
Nipak Banerjee
 
Psi process equipment_2013_5_13
Psi process equipment_2013_5_13Psi process equipment_2013_5_13
Psi process equipment_2013_5_13
John Corkery
 

Similar to CV khaleeq (20)

relevant experience
relevant experiencerelevant experience
relevant experience
 
Field Production Operator CV
Field Production Operator CVField Production Operator CV
Field Production Operator CV
 
lemirandacv
lemirandacvlemirandacv
lemirandacv
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator Training
 
LUNDIN WEBINAR PRESENTATION
LUNDIN WEBINAR PRESENTATIONLUNDIN WEBINAR PRESENTATION
LUNDIN WEBINAR PRESENTATION
 
Khan Bahadar CV
Khan Bahadar  CVKhan Bahadar  CV
Khan Bahadar CV
 
Qudrat Ullah Resume
Qudrat Ullah ResumeQudrat Ullah Resume
Qudrat Ullah Resume
 
Awt presentation 2019 sea water systems- rev november 2019
Awt presentation 2019 sea water systems- rev november 2019Awt presentation 2019 sea water systems- rev november 2019
Awt presentation 2019 sea water systems- rev november 2019
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
 
job des
job desjob des
job des
 
Global Perspective on the Future of Subsea Technology
Global Perspective on the Future of Subsea TechnologyGlobal Perspective on the Future of Subsea Technology
Global Perspective on the Future of Subsea Technology
 
Rex Scott 2016-11-03 resume
Rex Scott 2016-11-03 resumeRex Scott 2016-11-03 resume
Rex Scott 2016-11-03 resume
 
Operation and maintanance
Operation and maintananceOperation and maintanance
Operation and maintanance
 
Maximize subcritical hours with adiabatic technology
Maximize subcritical hours with adiabatic technologyMaximize subcritical hours with adiabatic technology
Maximize subcritical hours with adiabatic technology
 
Fire irrig ps
Fire irrig psFire irrig ps
Fire irrig ps
 
Fire irrig ps
Fire irrig psFire irrig ps
Fire irrig ps
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
 
SURESH CCR & FIELD OPERATOR
SURESH CCR & FIELD OPERATORSURESH CCR & FIELD OPERATOR
SURESH CCR & FIELD OPERATOR
 
Psi process equipment_2013_5_13
Psi process equipment_2013_5_13Psi process equipment_2013_5_13
Psi process equipment_2013_5_13
 
Vivek ppt
Vivek pptVivek ppt
Vivek ppt
 

CV khaleeq

  • 1. • KHALEEQ AHMAD E-mail: khaleeq_mughal786@yahoo.com Cell: +923336367204 JOB PROFILEJOB PROFILE ASAS POWER PLANT OPERATORPOWER PLANT OPERATOR Having 07years of Operation experience in Power Generation &Desalination Plants. Karachi Nuclear Power Plant: Presently working in Kararchi Nuclear Power Plant as Plant Operator from 2009 to date. Responsible for Control Room Operations, with initial career as Field Operator on, The Versatile Plant with. . . • Canadian Pressurized Heavy Water Reactor-Boilers System, • 137 MW Steam Turbine HITACHI +Extraction Steam-Feed Heaters, • 1600 m3/day capacity MED Plant with (DCS), • Hydrogen Cooled Generator, • BOP and Auxiliaries ….. • Main Sea water Intake system, Seawater as Raw water, • Compression Chillers, Close Loop Cooling Water Systems, • RO, WTP Regeneration, MED Plant De-min/Re-min Operation, • Air Compressors, Air Dryers, Fan-Coil Units, • Reactor-specific Cooling and Support Systems, • 132KV Output System, 3*1.2MW Diesel Generators. • Manual Startup of Steam Turbine and Auxiliary Systems Locally. Responsibility Details: Control Room: • Startup/shut down of GT/ST, monitoring of parameters and actions accordingly during all other states of System. • Boiler level, Condensate n Heaters & Reserve Feed-water Control. • 220/132 KV line isolation and 11KV/4.16KV system operation. • Operation/Synchronism of Standby Diesel generators. • Safe Operation of Plant safety and support systems. • LOTO procedures for PTW and Emergency Operating Procedures (EOP). • Call up cards and routine checks, log books, data sheets, surveillance sheets, equipment
  • 2. running hour and document movement record etc. • Participated in long shutdown activities. • Pre-start checks, Re-commissioning after major over hauling, low load test and full load test, protection test. WORK CONTROL OFFICE • Understand of flow diagram and elementary logic diagram • Isolations / deisolation of plant system as per PTW. • Post maintenance testing of individual equipments as per recommended test procedures. • Check list of industrial safety measures for specific job. • Maintain equipment maintenance data after and before maintenance of the equipment. • Isolation & de-isolation of 400 Volt Breakers (Megnablast, Ak225, Ak-125 and vacuum circuit breaker.) Field Operations: • Routine work on Gas Turbine and Steam Turbines and sub-systems. • Troubleshooting and Call-up operation of Auxiliaries. • Reporting Abnormalities, and Deficiencies, raising work requests (WR). • Degassing and re-gassing operation of Hydrogen cooled generator. • Operation of Canal Water Treatment, Clarifiers, Valve less Filters. • Operations of Sea water Intake system, seawater feed system (KANUPP). • Isolation / De-isolation of equipment for PTW. • BOP systems i.e. PLC based Chillers, Air compressor/Dryers. • Chlorination plant, Ferrous Sulfate addition system. • Station GIS equipment and Deluge system operation. • Station batteries and Standby Gen-set (Emergency) operation. • WTPs Operation /Regeneration (Ion Exchange Columns). • Reverse Osmosis desalination plants operation. • Operation of MED Re-boiler and its auxiliary systems i.e. vacuum system, Chemical Injection system, Acid Cleaning system, Feed water Treatment system. • Industrial safety equipment and accessories (PPEs & fire extinguishers). EEDUCATIONDUCATION 2017 B.E (Mechanical Engineering) DHA SUFFA University 2009 POST DIPLOMA Post Diploma in Nuclear Power Engineering from Karachi Institute Of Power Engineering. 2008 DIPLOMA OF ASSOCIATE ENGINEERING D.A.E (Mechanical) from Govt- Polytechnic Layyah
  • 3. 2005 Matriculationfrom(Board of Intermediate &Secondery Education DG Khan) PPERSONALERSONAL DDETAILSETAILS Nationality Pakistani Date of Birth 18-03-1990 Marital status Single CNIC No 32202-8503500-5 Address House No. C-8 Phase II Kanupp Colony Hawks Bay road, Mari Pur Karachi, Pakistan. •• EEXTRAXTRA CCURRICULARURRICULAR • Reading Books. • Technical/Social Discussion with Colleagues. • Traveling and Exploring new places. • Music +Internet. • Play cricket. FFIREIRE FIGHTINGFIGHTING • Participating in fire drill call up cards & basic training time to time arranged by our Fire department.