2013 The Way Forward for Smart Grid in Vietnam, Nguyen Vu Quang (EN)
1. ERAV
Electricity Regulatory
Authority of Vietnam
RENEWABLE ENERGY PROJECT DEVELOPMENT
PROGRAM SOUTHEAST ASIA
THE WAY FORWARD FOR SMART GRID IN VIETNAM
Presented by:
ERAV
Electricity Regulatory
Authority of Vietnam
Electricity Regulatory Authority of Vietnam (ERAV)
Ministry of Industry and Trade
Frankfurt am Authority of Vietnam
Electricity RegulatoryMain, 14/11/2013
ERAV
Electricity Regulatory
Authority of Vietnam
1
2. ERAV
Electricity Regulatory
Authority of Vietnam
Content
1. Vietnam Power System Overview
2.
3.
Smart grid development Roadmap
4.
Barriers and keyplayers of Smart Grid
5.
2
Overview of Vietnam’s Smart Grid
On-going projects
3. ERAV
Electricity Regulatory
Authority of Vietnam
Content
1. Vietnam Power System Overview
2.
3.
Smart grid development Roadmap
4.
Barriers and keyplayers of Smart Grid
5.
3
Overview of Vietnam’s Smart Grid
On-going projects
4. ERAV
Electricity Regulatory
Authority of Vietnam
1. Vietnam Power system Overview (1)
MW
Peak Load (1996-2012)
20000
18000
16000
14000
National
12000
10000
North
Central
South
8000
6000
4000
2000
0
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Year
• Average electricity consumption growth rate 2006-2012: 12.2%
• Electricity Consumption in 2012: 105.4 Billion kWh
4
5. ERAV
Electricity Regulatory
Authority of Vietnam
1. Vietnam Power system Overview (2)
• Generation (2012)
Gas thermal
0.07%
Other
0.35%
Gas turbine
34.24%
Oil fired
thermal 0.04%
Import from
China
2.23%
Hydro 43.90%
Coal fired
thermal 18.89%
Total (Million kWh)
120,257
Hydro
52,795
Coal fired thermal
22,716
Oil fired thermal
43
Gas turbine
41,170
Gas thermal
80
Import from China
5
Other
2,676
423
6. ERAV
1. Vietnam Power system Overview (3)
Electricity Regulatory
Authority of Vietnam
•
Generation Installed Capacity (June 2013)
Gas thermal
1.71%
Gas turbine
27.28%
Diesel &
Other
Small hydro 0.51%
3.66%
Hydro
46.29%
Oil fired
thermal
2.01%
Coal fired
thermal
18.78%
Total (MW)
Hydro
Coal fired thermal
Oil fired thermal
27,323
12,647
5,130
550
Gas turbine
7,455
Gas thermal
468
Diesel & Small hydro
6
1,000
Other
139.5
7. ERAV
Electricity Regulatory
Authority of Vietnam
1. Vietnam Power system Overview (4)
• Generation Installed Capacity By Owner (June 2013)
Other IPP
19.63%
Vinacomin
5.43%
BOT 5.42%
EVN 64.11%
PVN 10.83%
Total (MW)
27,323
EVN
PVN
2,958
Vinacomin
1485
BOT
1480
Other IPP
7
17,516
3884
8. ERAV
Electricity Regulatory
Authority of Vietnam
1. Vietnam Power system Overview (5)
• Transmission Network
Import from China
Transmission Voltage
Level: 500kV, 220kV,
110kV
- 500kV: Spine line, 3
region link
- 220kV: Transmission
line in each region, 2
region link
- 110kV: Connected to
220kV Substations or
power plans.
8
Export to Cambodia
9. ERAV
Electricity Regulatory
Authority of Vietnam
1. Vietnam Power system Overview (6)
• Transmission Network and peak load of Power
Companies (PCs) in 2012
500, 220kV transmission line
EVN
NPC
8905 MW
EVN
HNPC
2218 MW
9
Import From China 1000 MW
EVN CPC
2050 MW
EVN
SPC
9587 MW
EVN HCMPC
3625 MW
Export To Cambodia 175MW
10. ERAV
Electricity Regulatory
Authority of Vietnam
1. Vietnam Power system Overview (7)
• Network overview in 2012
U« n g B
Ý
P í cLong
h-
RURAL
ELECTRIFICATION
6KV(2,9%)
10KV(14%)
15KV(12.1%)
22KV(44,6%)
35KV(26,2%)
220V
10
District
TG: 3589 MVA
218.424 km 32.715 MVA
100%
100%
Village
159,627 km
Province
98.8%
Rural HHs
96.5%
12. ERAV
Electricity Regulatory
Authority of Vietnam
1. Vietnam Power system Overview (8)
Master Plan period of 2011- 2030 (2)
2. Volume of Transmission Network to be constructed
Category
Unit
2011-2015 2016-2020 2020-2025 2026-2030
500kV Substation
MVA
17,100
26,750
24,400
20,400
220kV Substation
MVA
35,863
39,063
42,775
53,250
500kV Transmission Line
km
3,833
4,539
2,234
2,724
220kV Transmission Line
km
10,637
5,305
5,552
5,020
3. Total Generation Installed Capacity
2013 (as of June)
2,020
2,030
12,647
17,325
17,325
0
1,800
5,725
Coal/Oil Fired Thermal
6,148
36,000
75,750
Gas Turbine
7,455
12,375
17,325
RE and Other
1,139
4,200
13,800
0
1,000
9,700
Import
1,000
2,300
7,175
Total
28,389
75,000
146,800
Category
Hydro
Pump Storage
Nuclear
12
13. ERAV
Electricity Regulatory
Authority of Vietnam
1. Vietnam Power system Overview (8)
Master Plan period of 2011- 2030 (3)
2. Investment Required
13
20262030
20112030
22.076
28.830
27.005
32.441
110.352
5.766
5.401
6.482
5.518
7.245
10.523
12.345
15.868
45.981
2.105
2.469
3.174
2.299
29.321
39.353
39.349
48.280
156.303
5.864
III- Total
Capital/annual average
(Bill.USD) (III=I+II)
20212025
1.449
II- Network: Total
Capital/annual average
(Bill.USD)
20162020
4.415
Period
I- Generation: Total
Capital/annual average
(Bill.USD)
20112015
7.871
7.870
9.656
7.815
14. 1. Vietnam Power system Overview (8)
ERAV
Master Plan period of 2011- 2030 (4)
Electricity Regulatory
Authority of Vietnam
3. Requirement for Modernization of Power System :
Modernization of dispatching of power system
Modernization of communication of power system
Modernization of control and automation of power system
Modernization of Demand Management; Demand-Side
Response (DSR) program implementation
4. Requirement for Information Technology of Power
System:
14
Information technology required for power system operation
Information technology required for power market operation
Information system for system and market operation
15. ERAV
Electricity Regulatory
Authority of Vietnam
Content
1. Vietnam Power System Overview
2.
3.
Smart grid development Roadmap
4.
Barriers and keyplayers of Smart Grid
5.
15
Overview of Vietnam’s Smart Grid
On-going projects
16. ERAV
Electricity Regulatory
Authority of Vietnam
2. Overview of Vietnam’s Smart Grid
The needs of Smart Grid:
Investment stressed
Import energy
Increasing of electricity quality and reliability
Social views of electricity pricing policy
Vietnamsese power market
Reduce of GHG
16
17. ERAV
Electricity Regulatory
Authority of Vietnam
2. Overview of Vietnam’s Smart Grid (1)
Applications applied by National Load Dispatch Center,
National Transmission Company and Distribution
Companies:
o SCADA/EMS/DMS at NLDC, PCs, and grid automation;
o TOU – Time Of Usage;
o AMR and load research;
o Billing and;
o Customer Service Center.
Applications are intend to apply:
o Outage management;
o Unmaned substation;
o Upgrading of information and metering data transmission system;
o Wide - area grid monitoring;
17
o Using all functions of EMS, DMS.
18. ERAV
Electricity Regulatory
Authority of Vietnam
2. Overview of Vietnam’s Smart Grid (2)
• Accessment on existing situation:
o The grid in general is not modern, not synchronization, low
automation level.
o Information and Communication Infrastructure is not complete
(SCADA/EMS is work now, but some substation lack of Remote
Terminal Unit, tele-reading meter install with unstable data
link…)
o Lack of infrastructure and legal framework to implement smart
grid applications for end-user (i.e.: incentives for customer who
participated in the demand-side response program...)
o Lack of technical standards for applications (i.e: smart
distribution grid structure, ICT, integration of RE t distribution
grid…)
o Electricity tariff is not fully reflected the cost; lack of
investment…
18
19. ERAV
Electricity Regulatory
Authority of Vietnam
2. Overview of Vietnam’s Smart Grid (3)
Some milestones:
21 Jul
2011
March
2012
8 Nov
2012
In the Master Plan VII, PM had assigned MOIT
to develop Smart Grid Program
ERAV (subsidiary of MOIT) developed the Smart Grid Project
and Implementation Roadmap
PM approved the Smart Grid Program- 3 phases Roadmap
Minister of MOIT established the SG
development Steering Committee in Vietnam
17 Jan
2013
19 Mar
2013
19
Committee Regulation and
the Operation plan of 2013
20. ERAV
Electricity Regulatory
Authority of Vietnam
2. Overview of Vietnam’s Smart Grid (4)
MOIT
MOF
MPI
MOST
MOC
Smart Grid Development Steering
Committee
ERAV
EVN
20
EVN
NPT
EVN
NLDC
EVN
PCs
21. ERAV
Electricity Regulatory
Authority of Vietnam
Content
1. Vietnam Power System Overview
2.
3.
Smart grid development Roadmap
4.
Barriers and keyplayers of Smart Grid
5.
21
Overview of Vietnam’s Smart Grid
On-going projects
22. ERAV
Electricity Regulatory
Authority of Vietnam
3. Smart grid development Roadmap
Smart Grid Program
Smart
Transmission
and System
Operation
Subprogram
Smart
Distribution
Network
Subprogram
Smart
Metering
Subprogram
Smart
Customers
Subprogram
Transversal – Social Friendly subprogram
22
1.Phase 1
2. Phase 2
3. Phase 3
23. ERAV
Electricity Regulatory
Authority of Vietnam
3. Smart grid development Roadmap (1)
1.Phase 1
2. Phase 2
3. Phase 3
• Phase 1 (2012 - 2016):
o Enhance power system operation efficiency program: complete the
SCADA/EMS project for NLDC, Install completely the devices to
collect operation data from substations/power plants connected to
110kV grid and above....
o Pilot projects: Advanced Metering Infrastructure (AMI) in HCMC
PC, integration of Renewable Energy Sources in CPC
o Building of regulatory framework: Load research, load control
mechanism, financial mechanism and regulations for smart grid
implementation.
o Develop technical regulations: standards for AMI, automation and
tele-control of substations, integration of RES and distribution smart
grid structure...
o Social Support Program: Dissemination of Smart Grid program for
customer and stakeholders
23
24. ERAV
Electricity Regulatory
Authority of Vietnam
3. Smart grid development Roadmap (2)
1. Phase 1
2. Phase 2
3. Phase 3
• Phase 2 (2017-2022):
o Continue enhance power system operation efficiency program, focus
on distribution network: Deploy SCADA/DMS system for the
distribution power corporations, deploy the automation equipment for
110kV substations, build the Smart Grid implementation capacities
for the distribution power corporation.
o Dissemination of AMI lesson learnt. Extension of AMI system to big
customers in all PCs.
o Integrate distributed generations, new energy generations, and
renewable generations into the network at medium and low voltage;
pilot project for Smart Home, Smart City.
o Build the regulatory framewok for smart grid applications
o Develop the technical regulations: standards of energy storage,
smart appliances.
24
o Social Support Program (continued).
25. ERAV
Electricity Regulatory
Authority of Vietnam
3. Smart grid development Roadmap (3)
1. Phase 1
2. Phase 2
3. Phase 3
• Phase 3 (2022 and upward):
o Continue the Information and Communication Technology
Infrastructure Installation program for distribution network: Deploy
the SCADA/DMS system for all provincial/district power companies
to reach efficient number of MV/LV substations; Develop AMI
system to residential customer, provide customer the opportunities
to trade on the retail competitive market; Continue encouraging the
introduction of distributed generations
o Implement the smart grid applications which allow to electricity
demand-supply balancing in customer level (Smart Homes) with
their own RES; Use of renewable energy widely in distribution grid
with the time-of-usage electricity price mechanism associated with
retail competitive power market..
o Build regulatory framework which allows to deploy smart grid
applications base on existing information technology infrastructure
25
26. ERAV
Electricity Regulatory
Authority of Vietnam
Content
1. Vietnam Power System Overview
2.
3.
Smart grid development Roadmap
4.
Barriers and keyplayers of Smart Grid
5.
26
Overview of Vietnam’s Smart Grid
On-going projects
27. ERAV
Electricity Regulatory
Authority of Vietnam
4. Barriers and keyplayers
Barriers for Smart Grids implementation
International Experience
Economical Barriers for the
investments
Uncertainty about assets
ownership and operation
Lack of technological
standardization
Social refusal for new equipment
or the new staff conditions
27
Communication network
weakness
Impossibility to adapt the utilities
to the new technologies
requirements
28. ERAV
Electricity Regulatory
Authority of Vietnam
4. Barriers and keyplayers (1)
Keyplayers
Utilities
Power market participants
Customer
Government - Regulators
Techno-Service Providers
Others
28
29. ERAV
Electricity Regulatory
Authority of Vietnam
Content
1. Vietnam Power System Overview
2.
3.
Smart grid development Roadmap
4.
Barriers and keyplayers of Smart Grid
5.
29
Overview of Vietnam’s Smart Grid
On-going projects
30. ERAV
Electricity Regulatory
Authority of Vietnam
5. On-going projects
Regulatory framework, technical standards
Wind Grid code: technical
standards for connection of
wind power into the system
Demand-Side Response:
regulation for demand side
response; Pilot DSR
Implementation Project
Advanced Metering
Infrastructure (AMI):
technical standard for AMI
30
31. ERAV
Electricity Regulatory
Authority of Vietnam
5. On-going projects
Infrastructures
New SCADA/EMS system
• The 3rd generation system for System Operator
Pilot Advanced Metering Infrastructure
Pilot Demand Side Response
Automation and tele-control for substations project
Automation and tele-control for generators project
Mini-SCADAs
31