Description:
Noble Fire, known as Don Park Fire, is the leading fabricator of sprinkler heads in Ontario.
Noble Fire produces Sprinkler Systems for both residential and commercial industries as
per the NFPA and Ontario Building Code standards
Noble Fire is requesting a quote to design, build and integrate preselected Cypress
Welding & Plasma Burning machines as per Noble Fire requirements. It is the
responsibility of the machine builder/integrator to become familiar with all Noble Fire
production environment plant conditions.
STANDARDS & REGULATIONS:
The machines and integration of the machines must fully comply with:
 Ontario Health Safety Act
 National Fire Protection Association (NFPA)
 National Standard for Sprinkler System Design (FC 403 )
 CSA Certified
 Ontario Building Code
The type of outlets and quality Noble Fire produces are shown below:
Page 3 of 11 Noble Fire RFQ 7 November 2012
Production Processes
The production requirement is to be able to burn and weld a minimum
DESIRED EQUIPMENT INTEGRATION
Noble Fire would like to integrate the following equipment into their
production facility:
1. CYPRESS CWE-1500-MG Circle Welder With Remote
2. CB-1P Plasma Circle Burner
Noble Fire Production requirement is 900 welded outlets/day
Based The Cypress Machine Capability is 6-10 seconds for cutting and 15-20
seconds for welding. Therefore the total combined cycle time = 30 seconds
Therefore the Cypress Capacity should be the following:
Integrated at our facility with our pipe bench by machine builder/integrator
The pipe rack system we have is shown below in a front view & side view
Cycle Time Analysis
Cutting Time
(sec)
Welding Time
(Sec)
Total Time
(Sec)
Outlets/
Min Outlets/Hr
Outlets/Shift
(8Hrs)
Outlets/
Week
Outlets/
Month Outlets/Year
Burn + Weld 2 Cycles 10 20 30 2 120 960 4,800 19,200 230,400
Burn/Weld in 1cycle 10 20 20 3 180 1440 7,200 28,800 345,600
CYPRESS MACHINE CAPACITY EXPECTATION
Page 4 of 11 Noble Fire RFQ 7 November 2012
SIDE VIEW OF THE PIPE BENCH RACK
Page 5 of 11 Noble Fire RFQ 7 November 2012
Run-Off Acceptance Criteria
Machine acceptance at Machine builder facility is defined as per below:
 Min 8 hr run time at supplier facility prior to shipping, demonstrating a 95%
Machine Efficiency with a total of 1300 good welded outlets
 Max downtime of 1%
 Quality—Min 99.9% Quality validated by leak testing using air and die
penetrate testing as per Noble Fire standards & specifications
 Max changeover time = 5 min
 Full CSA certification and compliance
 Full OHSA compliance by machine builder/integrator and approval to use
without a PSHR required under 851 OHSA section 7
 Ventilation and Air Quality Testing results to be provided prior to any
acceptance indicating the minimum ventilation speed is 0.5 m/s as per
Government Canada Welding Regulation
 Full compliance to section 5.48 of the OHS Regulation approval regarding
ventilation and OEL
Acceptance at Noble Fire Criteria:
 Min 8 hr run time at Noble Fire facility same 95% Machine Efficiency with a
total of 1300 good welded outlets
 Max downtime of 1%
 Quality—Min 99.9% Quality validated by leak testing using air and die
penetrate testing as per Noble Fire standards & specifications
 Max changeover time = 5 min
Page 6 of 11 Noble Fire RFQ 7 November 2012
Documents required:
 User manuals and drawings
 PM schedule and parts needed to be inspected
 Proposed PM service plan
 Parts submission Warranty from Cypress
DELIVERY
Required delivery is 8-10 weeks. If longer lead time is needed then options
need to be submitted on how to reduced the delivery time and what Noble Fire
can do to assist.
ON SITE ASSISTANCE:
All prices must include full On-Site assistance and support until the final
acceptance is achieved. No additional costs nor charges.
Payment terms:
1. 25% with Purchase Order
2. 50% after acceptance at supplier facility as per above
3. 15% after approval at Noble Fire facility
4. 10% after 30 days as assurance for any premature integration and/or
warranty issues
Reference Cypress Equipment and design below shown;
Page 7 of 11 Noble Fire RFQ 7 November 2012
Page 8 of 11 Noble Fire RFQ 7 November 2012
Page 9 of 11 Noble Fire RFQ 7 November 2012
Sequence of Operation
Position your pipe and move the CB-1P along the pipe to cut smooth, accurate holes. Position the CW-5 with a step
adapter on the fitting and make the contour weld.
Page 10 of 11 Noble Fire RFQ 7 November 2012
Please provide quote ASAP attention to Julian Kalac.
Thank you very much
Page 11 of 11 Noble Fire RFQ 7 November 2012
Sincerely,
Julian Kalac, P.Eng.

More Related Content

What's hot

Rotary dryer spare parts
Rotary dryer spare partsRotary dryer spare parts
Rotary dryer spare partsIris Han
 
Airborne Repairs Brochure - Oil & Gas.
Airborne Repairs Brochure - Oil & Gas.Airborne Repairs Brochure - Oil & Gas.
Airborne Repairs Brochure - Oil & Gas.tyson gins
 
Ab 083-const-data-report-piping-systems
Ab 083-const-data-report-piping-systemsAb 083-const-data-report-piping-systems
Ab 083-const-data-report-piping-systemstuankulintau
 
Fire pump-application-packet
Fire pump-application-packetFire pump-application-packet
Fire pump-application-packetbartul zizic
 
How Does Natural Gas Get Safely To Your House
How Does Natural Gas Get Safely To Your HouseHow Does Natural Gas Get Safely To Your House
How Does Natural Gas Get Safely To Your HouseContentAssets
 

What's hot (10)

khaled-2
khaled-2khaled-2
khaled-2
 
Plumbing Project
Plumbing ProjectPlumbing Project
Plumbing Project
 
Rotary dryer spare parts
Rotary dryer spare partsRotary dryer spare parts
Rotary dryer spare parts
 
Airborne Repairs Brochure - Oil & Gas.
Airborne Repairs Brochure - Oil & Gas.Airborne Repairs Brochure - Oil & Gas.
Airborne Repairs Brochure - Oil & Gas.
 
ABEL NGOMANE-NEW
ABEL NGOMANE-NEWABEL NGOMANE-NEW
ABEL NGOMANE-NEW
 
E JIMOH
E JIMOHE JIMOH
E JIMOH
 
2 4 calibration2
2 4 calibration22 4 calibration2
2 4 calibration2
 
Ab 083-const-data-report-piping-systems
Ab 083-const-data-report-piping-systemsAb 083-const-data-report-piping-systems
Ab 083-const-data-report-piping-systems
 
Fire pump-application-packet
Fire pump-application-packetFire pump-application-packet
Fire pump-application-packet
 
How Does Natural Gas Get Safely To Your House
How Does Natural Gas Get Safely To Your HouseHow Does Natural Gas Get Safely To Your House
How Does Natural Gas Get Safely To Your House
 

Similar to RFQ -WELDING

Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Pratap Biswas
 
CNC Parts Sourcing Case Study
CNC Parts Sourcing Case StudyCNC Parts Sourcing Case Study
CNC Parts Sourcing Case StudyJohn William
 
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCXferdinand teodoro
 
Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Nicholas Naing
 
Ve modify-compact-substation
Ve modify-compact-substationVe modify-compact-substation
Ve modify-compact-substationKamran Uddin
 
kizomba A & B FWP engine overhaul project
kizomba A &  B FWP engine overhaul projectkizomba A &  B FWP engine overhaul project
kizomba A & B FWP engine overhaul projectHelio De Oliveira
 
Air Compressor Service Plans by Atlas Copco
Air Compressor Service Plans by Atlas CopcoAir Compressor Service Plans by Atlas Copco
Air Compressor Service Plans by Atlas CopcoAtlasCopcoCompressors
 
Lean Production Capacity Report
Lean Production Capacity ReportLean Production Capacity Report
Lean Production Capacity ReportJulian Kalac P.Eng
 
110KV Substation spec with AnnexuresR.pdf
110KV Substation spec with AnnexuresR.pdf110KV Substation spec with AnnexuresR.pdf
110KV Substation spec with AnnexuresR.pdfKSLDESIGN
 
2 cm-ms-bld-012 - roof fan & natural ventilator
2   cm-ms-bld-012 - roof fan & natural ventilator2   cm-ms-bld-012 - roof fan & natural ventilator
2 cm-ms-bld-012 - roof fan & natural ventilatorMinh Bui Si
 
mexican.pptx
mexican.pptxmexican.pptx
mexican.pptxamjath5
 
Cooling tower, chilling plants ppt
Cooling tower, chilling plants pptCooling tower, chilling plants ppt
Cooling tower, chilling plants pptRajesh Patil
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&INASIM NEZAM
 

Similar to RFQ -WELDING (20)

Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------
 
CNC Parts Sourcing Case Study
CNC Parts Sourcing Case StudyCNC Parts Sourcing Case Study
CNC Parts Sourcing Case Study
 
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX
 
Air Cooled Ozone Generator for R & D OG # LC models - by Chemtronics.pptx
Air Cooled Ozone Generator for R & D   OG # LC models - by Chemtronics.pptxAir Cooled Ozone Generator for R & D   OG # LC models - by Chemtronics.pptx
Air Cooled Ozone Generator for R & D OG # LC models - by Chemtronics.pptx
 
Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2
 
Ve modify-compact-substation
Ve modify-compact-substationVe modify-compact-substation
Ve modify-compact-substation
 
kizomba A & B FWP engine overhaul project
kizomba A &  B FWP engine overhaul projectkizomba A &  B FWP engine overhaul project
kizomba A & B FWP engine overhaul project
 
14 mq11 02-te-0000-ee0012-0
14 mq11 02-te-0000-ee0012-014 mq11 02-te-0000-ee0012-0
14 mq11 02-te-0000-ee0012-0
 
Air Compressor Service Plans by Atlas Copco
Air Compressor Service Plans by Atlas CopcoAir Compressor Service Plans by Atlas Copco
Air Compressor Service Plans by Atlas Copco
 
Lean Production Capacity Report
Lean Production Capacity ReportLean Production Capacity Report
Lean Production Capacity Report
 
110KV Substation spec with AnnexuresR.pdf
110KV Substation spec with AnnexuresR.pdf110KV Substation spec with AnnexuresR.pdf
110KV Substation spec with AnnexuresR.pdf
 
Dlw report
Dlw  report Dlw  report
Dlw report
 
CGE Profile
CGE ProfileCGE Profile
CGE Profile
 
2 cm-ms-bld-012 - roof fan & natural ventilator
2   cm-ms-bld-012 - roof fan & natural ventilator2   cm-ms-bld-012 - roof fan & natural ventilator
2 cm-ms-bld-012 - roof fan & natural ventilator
 
Tier 4 Generators
Tier 4 GeneratorsTier 4 Generators
Tier 4 Generators
 
mexican.pptx
mexican.pptxmexican.pptx
mexican.pptx
 
Cooling tower, chilling plants ppt
Cooling tower, chilling plants pptCooling tower, chilling plants ppt
Cooling tower, chilling plants ppt
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&I
 
AGP-13-R
AGP-13-RAGP-13-R
AGP-13-R
 
M Imran
M ImranM Imran
M Imran
 

More from Julian Kalac P.Eng

VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.EngJulian Kalac P.Eng
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowJulian Kalac P.Eng
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSJulian Kalac P.Eng
 
Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Julian Kalac P.Eng
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment Julian Kalac P.Eng
 
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS Julian Kalac P.Eng
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVERJulian Kalac P.Eng
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureJulian Kalac P.Eng
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018Julian Kalac P.Eng
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutJulian Kalac P.Eng
 
Custom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverCustom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverJulian Kalac P.Eng
 
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHFCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHJulian Kalac P.Eng
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE Julian Kalac P.Eng
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE Julian Kalac P.Eng
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over timeJulian Kalac P.Eng
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS Julian Kalac P.Eng
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACJulian Kalac P.Eng
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian KalacJulian Kalac P.Eng
 

More from Julian Kalac P.Eng (20)

VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Design for Six Sigma in Automotive
Design for Six Sigma in Automotive
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment
 
Lean logistics
Lean logisticsLean logistics
Lean logistics
 
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag Out
 
Custom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverCustom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeover
 
MWV CONTROL VS SPEC
MWV CONTROL VS SPECMWV CONTROL VS SPEC
MWV CONTROL VS SPEC
 
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHFCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over time
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian Kalac
 

Recently uploaded

Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical trainingGladiatorsKasper
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProRay Yuan Liu
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfShreyas Pandit
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labsamber724300
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 

Recently uploaded (20)

Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision Pro
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdf
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labs
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 

RFQ -WELDING

  • 1. Noble Fire Request For Quotation Prepared by Julian Kalac, P.Eng 11/7/2012
  • 2. Page 2 of 11 Noble Fire RFQ 7 November 2012 Description: Noble Fire, known as Don Park Fire, is the leading fabricator of sprinkler heads in Ontario. Noble Fire produces Sprinkler Systems for both residential and commercial industries as per the NFPA and Ontario Building Code standards Noble Fire is requesting a quote to design, build and integrate preselected Cypress Welding & Plasma Burning machines as per Noble Fire requirements. It is the responsibility of the machine builder/integrator to become familiar with all Noble Fire production environment plant conditions. STANDARDS & REGULATIONS: The machines and integration of the machines must fully comply with:  Ontario Health Safety Act  National Fire Protection Association (NFPA)  National Standard for Sprinkler System Design (FC 403 )  CSA Certified  Ontario Building Code The type of outlets and quality Noble Fire produces are shown below:
  • 3. Page 3 of 11 Noble Fire RFQ 7 November 2012 Production Processes The production requirement is to be able to burn and weld a minimum DESIRED EQUIPMENT INTEGRATION Noble Fire would like to integrate the following equipment into their production facility: 1. CYPRESS CWE-1500-MG Circle Welder With Remote 2. CB-1P Plasma Circle Burner Noble Fire Production requirement is 900 welded outlets/day Based The Cypress Machine Capability is 6-10 seconds for cutting and 15-20 seconds for welding. Therefore the total combined cycle time = 30 seconds Therefore the Cypress Capacity should be the following: Integrated at our facility with our pipe bench by machine builder/integrator The pipe rack system we have is shown below in a front view & side view Cycle Time Analysis Cutting Time (sec) Welding Time (Sec) Total Time (Sec) Outlets/ Min Outlets/Hr Outlets/Shift (8Hrs) Outlets/ Week Outlets/ Month Outlets/Year Burn + Weld 2 Cycles 10 20 30 2 120 960 4,800 19,200 230,400 Burn/Weld in 1cycle 10 20 20 3 180 1440 7,200 28,800 345,600 CYPRESS MACHINE CAPACITY EXPECTATION
  • 4. Page 4 of 11 Noble Fire RFQ 7 November 2012 SIDE VIEW OF THE PIPE BENCH RACK
  • 5. Page 5 of 11 Noble Fire RFQ 7 November 2012 Run-Off Acceptance Criteria Machine acceptance at Machine builder facility is defined as per below:  Min 8 hr run time at supplier facility prior to shipping, demonstrating a 95% Machine Efficiency with a total of 1300 good welded outlets  Max downtime of 1%  Quality—Min 99.9% Quality validated by leak testing using air and die penetrate testing as per Noble Fire standards & specifications  Max changeover time = 5 min  Full CSA certification and compliance  Full OHSA compliance by machine builder/integrator and approval to use without a PSHR required under 851 OHSA section 7  Ventilation and Air Quality Testing results to be provided prior to any acceptance indicating the minimum ventilation speed is 0.5 m/s as per Government Canada Welding Regulation  Full compliance to section 5.48 of the OHS Regulation approval regarding ventilation and OEL Acceptance at Noble Fire Criteria:  Min 8 hr run time at Noble Fire facility same 95% Machine Efficiency with a total of 1300 good welded outlets  Max downtime of 1%  Quality—Min 99.9% Quality validated by leak testing using air and die penetrate testing as per Noble Fire standards & specifications  Max changeover time = 5 min
  • 6. Page 6 of 11 Noble Fire RFQ 7 November 2012 Documents required:  User manuals and drawings  PM schedule and parts needed to be inspected  Proposed PM service plan  Parts submission Warranty from Cypress DELIVERY Required delivery is 8-10 weeks. If longer lead time is needed then options need to be submitted on how to reduced the delivery time and what Noble Fire can do to assist. ON SITE ASSISTANCE: All prices must include full On-Site assistance and support until the final acceptance is achieved. No additional costs nor charges. Payment terms: 1. 25% with Purchase Order 2. 50% after acceptance at supplier facility as per above 3. 15% after approval at Noble Fire facility 4. 10% after 30 days as assurance for any premature integration and/or warranty issues Reference Cypress Equipment and design below shown;
  • 7. Page 7 of 11 Noble Fire RFQ 7 November 2012
  • 8. Page 8 of 11 Noble Fire RFQ 7 November 2012
  • 9. Page 9 of 11 Noble Fire RFQ 7 November 2012 Sequence of Operation Position your pipe and move the CB-1P along the pipe to cut smooth, accurate holes. Position the CW-5 with a step adapter on the fitting and make the contour weld.
  • 10. Page 10 of 11 Noble Fire RFQ 7 November 2012 Please provide quote ASAP attention to Julian Kalac. Thank you very much