SlideShare ist ein Scribd-Unternehmen logo
1 von 22
FACADE



         HPR INTEGRATED DESIGN                                                                Presentation #4:
             Jeremy Heilman
             CONSTRUCTION
                                                   Nico Pugliese
                                                   LIGHTING/ELECTRICAL
                                                                                                 Proposal
             Josh Progar
             STRUCTURAL
                                                   James Rodgers
                                                   MECHANICAL
                                                                                         Penn State Ice Hockey Arena
                                                                                             The Pennsylvania State University



                         Mission Statement:
    HPR Integrated Design combines innovative, cutting edge concepts with a
 collaborative multi-disciplinary approach through the utilization of state-of-the-art
BIM technologies to exceed owner expectations both in system efficiencies and the
             enrichment of the human experience within its aesthetic.
Agenda           BIM Uses
                                                    HPR Integrated Design’s Project Touchstones for the
                                                                   Penn State Ice Arena
                                                    Improve the Game Day experience for both the fans and players
                                                    Create an environment that fosters hockey excellence
                                                    Minimize the amount of energy the facility consumes
                                                    Create an architecturally recognizable facility
                                                    Maximize value with minimizing cost
                                                    Earn a LEED Gold rating




    MILESTONES      Required by Contract

                    Used for this Stage of design
BIM Uses & Process
BIM PROCESS




Daylighting




    Electrical   COORDINATED BIM MODEL
Redesign Focuses
Approach


 Air Handler Relocation                                                                      Club Level


and Event Level Redesign
REASON: -Reduce duct size and length
             -Reduce fan energy and use smaller air handling units
             -Limit the number of shafts and there sizes.                                                     Concourse Level


                                                     Mt. Nittany Room—Rm. 230
                                                                                                                                           AHU-6: Energy Recovery Unit
                                                                                                                                           Carrier 39MW050
                                                                                                                                           Serves Event Level– Weight Room
                                                                                                                                           20,000 Peak CFM
                                                                                                                                           8’-0” W x 13’-2” L x 7’-1” H




                                                                                                                                                                             AHU-5: Air Handler
                                                                                                                                                                             Carrier 39MW061
                                                      8’-0”             Commissary—Rm. 163
Design Constraints                                                                              Event Level
                                                                                                                                                                             Serves Event Level Lobby &
                                                                                                                                                                             Administration
                                                                                                                                                                             25,000 CFM Supply
                                                                                                                                                                             9’-9” W x 30’-3” L x 8’-6” H
Approach


 Air Handler Relocation
                                    Mt. Nittany Room—Rm. 230

                                                                                                     Mt. Nittany Room—Rm. 230



                                                                         20” THICK. TWO WAY


and Event Level Redesign   AHU–6
                                                                         SLAB—CONSERVATIVE


                                                                                                                              1’-8”
                                                                                                                                                                                 MAIN CONCOURSE
                                                                                                                                                                                 LEVEL


                                                               AHU–5                                                                                       0’-7” CLR.

                                                                                                2’-0” CLR.

                                                                                                                      9’-6”
                                                                                                                                                  AHU–5
                                                                                              AHU–6

                            8’-0”                Commissary—Rm. 163
                                                                                                                                                                        20’-9”
            AHU-6                                                                                                             1’-8”

                                                                         20” THICK. TWO WAY                                       4” THICK VIBRATION
                                                                         SLAB—CONSERVATIVE                                        ISOLATORS


    AHU-5                                                                                                             8’-0”           Commissary—Rm. 163




                                                                                                                                                                                     EVENT LEVEL
Access Layout
                                                                                                     Approach


 Air Handler Relocation                             AHU-6
                                                                             PROPOSED ACCESS POINT


                                                                                                                                  AHU-6
                                                                                                                                                     RA—PLENUM
                                                                                                                                                                   EA FROM AHU-6




and Event Level Redesign                   44’-0”
                                                                                                         SA FROM AHU 5



                                                                                                                         44’-0”
                                                                     AHU-5
                                                                                                                                  OA TO AHU-6        AHU-5




                           AHU-6
                                                                                                         OA TO AHU 5&6            OA TO AHU-5



                                                            29’-6”
                                                                                                                                            29’-6”
                   AHU-5




                                                                                                                                                        EA FROM AHU-5
                                                                                                         Multisport Complex
Approach


        Roof Profile Redesign
REASON: -Maximize the efficiency of the structural system to reduce cost
                -Integrate the mechanical, lighting, and catwalk systems to optimize the
performance of each
                -Create a clean and attractive ceiling area

  N-S Section – New Roof Profile                         N-S Section – Lighting
                                                         Incident Angle Reflection
                                                                                                                                               Bryce Jordan Center
                                                                                                                Beaver Stadium



                        60’ Clear (To Bottom Of Steel)




                             Design Constraints                                            Multisport Complex                    Holuba Hall
Approach


        Roof Profile Redesign
REASON: -Maximize the efficiency of the structural system to reduce cost
                -Integrate the mechanical, lighting, and catwalk systems to optimize the
performance of each
                -Create a clean and attractive ceiling area

  N-S Section – New Roof Profile                         N-S Section – Lighting
                                                         Incident Angle Reflection
                                                                                                                                               Bryce Jordan Center
                                                                                                                Beaver Stadium



                        60’ Clear (To Bottom Of Steel)




                             Design Constraints                                            Multisport Complex                    Holuba Hall
Enhance student entrance
                                                                                                                    Create a prominent entrance (Globe)            Approach



 Façade Redesign
REASON: We believe we can maintain the original intent of the east façade
(to create an impressive view from University Drive as well as a view out to Mt.
 Nittany and the Bryce Jordan Center) while enhancing the prominence of the
             entrances as well as reducing thermal loads and cost.




                                             View to Mt. Nittany
                                             Off glass at 15o




                                                                                                                                       Translate the pattern of
                                 Design Constraints                                               Louvers added for AHU 5 & 6          repeating glass and brick
Team & Individual Focus Schedules
KEY MILESTONES:

January     27th,   2012:                                               March 26th, 2012:
                                                                        All Redesign Focuses Completed.
Initial Architectural Modeling Completed



February     13th,   2012:                                              April 4th, 2012:
Air Handler Relocation & Event Level Design Completed                   Final Report Submission



March 2nd, 2012:                                                        April 9th, 2012:
Initial Clash Detection & Value Engineering                             Final Presentation


                                                        Team Schedule
Redesign Focus Schedules




AIR HANDLER RELOCATION & EVENT LEVEL REDESIGN   MAIN ARENA ROOF SYSTEMS   FAÇADE REDESIGN
Scheduled Timeline
MILESTONE: Architectural Modeling Completed

                            Progress

                            Air Handler Relocation




                            Arena Roof Systems                                                                                              Design Authoring, Structural
                                                     Two Way Flooring Redesign & Arena Roof Modeling




                                                                                                                         MAJOR BIM USE(S)
                                                                                                                                            Analysis




                                                                                                              SOFTWARE
                                                                                                                                            Design Authoring, Lighting
                                                     Event Level Daylighting & Electrical Load Calculations
                                                                                                                                            Analysis
                           Façade Redesign                                                                                                  Design Authoring, Mechanical
                                                     Event Level Load Calcs, AHU & Ductwork Sizing                                          Analysis


Friday, January        27th,   2012
                                                     Existing Conditions Estimate & Scheduling Analysis                                     Cost Estimation, 4D Modeling
MILESTONE: Air Handler Relocation Completed

                            Progress

                            Air Handler Relocation




                            Arena Roof Systems                                                                                                Structural Analysis
                                                     Gravity Column Redesign & Long Span Truss Design




                                                                                                                           MAJOR BIM USE(S)
                                                                                                                SOFTWARE
                                                                                                                                              Design Authoring, Lighting
                                                     Façade Daylighting Controls & Finalize Event Lvl. Design
                                                                                                                                              Analysis
                           Façade Redesign                                                                                                    Design Authoring, Mechanical
                                                     Finalize Event Level Designs & AHU Relocations                                           Analysis


Tuesday, February        13th,   2012
                                                     LEED Analysis & Crane Placement Study                                                    Site Utilization, LEED Analysis
MILESTONE: Initial Clash Detection & Value Eng.

                              Progress

                              Air Handler Relocation




                             Arena Roof Systems                                                                                             Design Authoring, Structural
                                                       Long Span Truss Design & Façade Glazing Analysis




                                                                                                                         MAJOR BIM USE(S)
                                                                                                                                            Analysis, 3D Coordination




                                                                                                              SOFTWARE
                                                                                                                                            Design Authoring, Lighting
                                                       Arena Lighting Layout & Finalize Electrical Redesign
                                                                                                                                            Analysis
                             Façade Redesign                                                                                                Design Authoring, Mechanical
                                                       Main Arena Mechanical Design & Coordination                                          Analysis, 3D Coordination


Friday, March       2nd,   2012
                                                       Update Cost, Schedule & Perform Clash Detection                                      3D Coordination, Cost
                                                                                                                                            Estimation, 4D Modeling
MILESTONE: Redesign Focuses Completed

                         Progress

                           Air Handler Relocation




                         Arena Roof Systems                                                                                           Structural Analysis, 3D
                                                    Column Analysis & Façade Analysis/Redesign




                                                                                                                   MAJOR BIM USE(S)
                                                                                                                                      Coordination




                                                                                                        SOFTWARE
                                                                                                                                      Design Authoring, Lighting
                                                    Finalize Arena Lighting Design & Façade Redesign
                                                                                                                                      Analysis
                         Façade Redesign                                                                                              Design Authoring, Mechanical
                                                    Main Arena Mechanical & Life Safety Designs                                       Analysis, 3D Coordination


Monday, March      26th,   2012
                                                    Finalize Cost Estimates, Schedule & LEED Analysis                                 3D Coordination, Cost
                                                                                                                                      Estimation, 4D Modeling
MILESTONE: Final Report Submission

                           Progress

                           Air Handler Relocation




                          Arena Roof Systems                                                              None.
                                                    Finalize Final Report




                                                                                       MAJOR BIM USE(S)
                                                                            SOFTWARE
                                                                                                          None.
                                                    Finalize Final Report
                          Façade Redesign                                                                 None.
                                                    Finalize Final Report


Wednesday, April       4th,   2012
                                                    Finalize Final Report                                 None.
MILESTONE: Final Presentation

                           Progress

                           Air Handler Relocation




                          Arena Roof Systems                                                                               None.
                                                    Finalize & Practice Final Presentation




                                                                                                        MAJOR BIM USE(S)
                                                                                             SOFTWARE
                                                                                                                           None.
                                                    Finalize & Practice Final Presentation
                          Façade Redesign                                                                                  None.
                                                    Finalize & Practice Final Presentation


Monday, April     9th,   2012
                                                    Finalize & Practice Final Presentation                                 None.
FACADE




                                        Presentation #4:
                                           Thank You
                                     Questions & Comments
               Mt. Nittany Room—
               Rm. 230
                                    Penn State Ice Hockey Arena
                                        The Pennsylvania State University
         AHU                AHU
         –6                 –5

         8’-          Commissary—
         0”           Rm. 163

Weitere ähnliche Inhalte

Was ist angesagt?

Improving climate change adaptation capacity of communities through integrate...
Improving climate change adaptation capacity of communities through integrate...Improving climate change adaptation capacity of communities through integrate...
Improving climate change adaptation capacity of communities through integrate...ILRI
 
Offset webinar 4 10_12
Offset webinar 4 10_12Offset webinar 4 10_12
Offset webinar 4 10_12dlogsdon
 
Project Management Profile
Project Management ProfileProject Management Profile
Project Management ProfileColin Harrop
 
USGBC Green Building Expo Smr
USGBC Green Building Expo SmrUSGBC Green Building Expo Smr
USGBC Green Building Expo Smrciennaleung
 
Onshore Windfarm Part 2
Onshore Windfarm Part 2Onshore Windfarm Part 2
Onshore Windfarm Part 2Grant Elder
 

Was ist angesagt? (6)

Improving climate change adaptation capacity of communities through integrate...
Improving climate change adaptation capacity of communities through integrate...Improving climate change adaptation capacity of communities through integrate...
Improving climate change adaptation capacity of communities through integrate...
 
Offset webinar 4 10_12
Offset webinar 4 10_12Offset webinar 4 10_12
Offset webinar 4 10_12
 
Project Management Profile
Project Management ProfileProject Management Profile
Project Management Profile
 
Trimax
TrimaxTrimax
Trimax
 
USGBC Green Building Expo Smr
USGBC Green Building Expo SmrUSGBC Green Building Expo Smr
USGBC Green Building Expo Smr
 
Onshore Windfarm Part 2
Onshore Windfarm Part 2Onshore Windfarm Part 2
Onshore Windfarm Part 2
 

Andere mochten auch

Architype - Adopting BIM - An Architect's Perspective
Architype - Adopting BIM - An Architect's PerspectiveArchitype - Adopting BIM - An Architect's Perspective
Architype - Adopting BIM - An Architect's PerspectiveElrond Burrell
 
Designing with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsDesigning with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsReshma Philip
 
Architype - Delivering Radical Low Energy Performance with BIM
Architype - Delivering Radical Low Energy Performance with BIMArchitype - Delivering Radical Low Energy Performance with BIM
Architype - Delivering Radical Low Energy Performance with BIMElrond Burrell
 
Passivhaus primary schools and how architects can drive their adoption
Passivhaus primary schools and how architects can drive their adoptionPassivhaus primary schools and how architects can drive their adoption
Passivhaus primary schools and how architects can drive their adoptionElrond Burrell
 
Designing & Learning from Passivhaus Education Buildings
Designing & Learning from Passivhaus Education BuildingsDesigning & Learning from Passivhaus Education Buildings
Designing & Learning from Passivhaus Education BuildingsElrond Burrell
 
PASSIVHAUS IN PLAIN ENGLISH & MORE. The story behind the blog.
PASSIVHAUS IN PLAIN ENGLISH & MORE. The story behind the blog.PASSIVHAUS IN PLAIN ENGLISH & MORE. The story behind the blog.
PASSIVHAUS IN PLAIN ENGLISH & MORE. The story behind the blog.Elrond Burrell
 
Bim and integrated design
Bim and integrated designBim and integrated design
Bim and integrated designAnkit Singhai
 
Passivhaus: Sacrificing Natural Materials for Energy Efficiency?
Passivhaus: Sacrificing Natural Materials for Energy Efficiency?Passivhaus: Sacrificing Natural Materials for Energy Efficiency?
Passivhaus: Sacrificing Natural Materials for Energy Efficiency?Elrond Burrell
 
5 things to know about Passivhaus
5 things to know about Passivhaus5 things to know about Passivhaus
5 things to know about PassivhausElrond Burrell
 
Mind the Gap - What can Passive House Design teach us about closing the build...
Mind the Gap - What can Passive House Design teach us about closing the build...Mind the Gap - What can Passive House Design teach us about closing the build...
Mind the Gap - What can Passive House Design teach us about closing the build...Elrond Burrell
 
Architype - Passive Beyond The House
Architype - Passive Beyond The HouseArchitype - Passive Beyond The House
Architype - Passive Beyond The HouseElrond Burrell
 
Designing with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsDesigning with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsReshma Philip
 
Architype - Standardised Passivhaus Schools, Ecobuild UK 2014
Architype - Standardised Passivhaus Schools, Ecobuild UK 2014Architype - Standardised Passivhaus Schools, Ecobuild UK 2014
Architype - Standardised Passivhaus Schools, Ecobuild UK 2014Elrond Burrell
 
Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014
Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014
Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014Elrond Burrell
 
Designign fully glazed buildings that can be easily cleaned and maintained
Designign fully glazed buildings that can be easily cleaned and maintainedDesignign fully glazed buildings that can be easily cleaned and maintained
Designign fully glazed buildings that can be easily cleaned and maintainedReshma Philip
 
International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5Saad Al Jabri
 
RIBA Part 3 Course: BIM Overview + Application
RIBA Part 3 Course: BIM Overview + ApplicationRIBA Part 3 Course: BIM Overview + Application
RIBA Part 3 Course: BIM Overview + ApplicationElrond Burrell
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionReshma Philip
 
Sustainable Passivhaus School Design
Sustainable Passivhaus School DesignSustainable Passivhaus School Design
Sustainable Passivhaus School DesignElrond Burrell
 

Andere mochten auch (20)

Architype - Adopting BIM - An Architect's Perspective
Architype - Adopting BIM - An Architect's PerspectiveArchitype - Adopting BIM - An Architect's Perspective
Architype - Adopting BIM - An Architect's Perspective
 
M Simpson coursework
M Simpson courseworkM Simpson coursework
M Simpson coursework
 
Designing with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsDesigning with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratings
 
Architype - Delivering Radical Low Energy Performance with BIM
Architype - Delivering Radical Low Energy Performance with BIMArchitype - Delivering Radical Low Energy Performance with BIM
Architype - Delivering Radical Low Energy Performance with BIM
 
Passivhaus primary schools and how architects can drive their adoption
Passivhaus primary schools and how architects can drive their adoptionPassivhaus primary schools and how architects can drive their adoption
Passivhaus primary schools and how architects can drive their adoption
 
Designing & Learning from Passivhaus Education Buildings
Designing & Learning from Passivhaus Education BuildingsDesigning & Learning from Passivhaus Education Buildings
Designing & Learning from Passivhaus Education Buildings
 
PASSIVHAUS IN PLAIN ENGLISH & MORE. The story behind the blog.
PASSIVHAUS IN PLAIN ENGLISH & MORE. The story behind the blog.PASSIVHAUS IN PLAIN ENGLISH & MORE. The story behind the blog.
PASSIVHAUS IN PLAIN ENGLISH & MORE. The story behind the blog.
 
Bim and integrated design
Bim and integrated designBim and integrated design
Bim and integrated design
 
Passivhaus: Sacrificing Natural Materials for Energy Efficiency?
Passivhaus: Sacrificing Natural Materials for Energy Efficiency?Passivhaus: Sacrificing Natural Materials for Energy Efficiency?
Passivhaus: Sacrificing Natural Materials for Energy Efficiency?
 
5 things to know about Passivhaus
5 things to know about Passivhaus5 things to know about Passivhaus
5 things to know about Passivhaus
 
Mind the Gap - What can Passive House Design teach us about closing the build...
Mind the Gap - What can Passive House Design teach us about closing the build...Mind the Gap - What can Passive House Design teach us about closing the build...
Mind the Gap - What can Passive House Design teach us about closing the build...
 
Architype - Passive Beyond The House
Architype - Passive Beyond The HouseArchitype - Passive Beyond The House
Architype - Passive Beyond The House
 
Designing with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsDesigning with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratings
 
Architype - Standardised Passivhaus Schools, Ecobuild UK 2014
Architype - Standardised Passivhaus Schools, Ecobuild UK 2014Architype - Standardised Passivhaus Schools, Ecobuild UK 2014
Architype - Standardised Passivhaus Schools, Ecobuild UK 2014
 
Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014
Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014
Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014
 
Designign fully glazed buildings that can be easily cleaned and maintained
Designign fully glazed buildings that can be easily cleaned and maintainedDesignign fully glazed buildings that can be easily cleaned and maintained
Designign fully glazed buildings that can be easily cleaned and maintained
 
International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5
 
RIBA Part 3 Course: BIM Overview + Application
RIBA Part 3 Course: BIM Overview + ApplicationRIBA Part 3 Course: BIM Overview + Application
RIBA Part 3 Course: BIM Overview + Application
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuction
 
Sustainable Passivhaus School Design
Sustainable Passivhaus School DesignSustainable Passivhaus School Design
Sustainable Passivhaus School Design
 

Ähnlich wie HPR Integrated Design - BIM/IPD Proposal Presentation

Mae senior design poster rev b
Mae senior design poster rev bMae senior design poster rev b
Mae senior design poster rev bLiamRamsay
 
Analysis of Newly Designed Airfoil for Micro-Capacity Wind Turbine using Qbla...
Analysis of Newly Designed Airfoil for Micro-Capacity Wind Turbine using Qbla...Analysis of Newly Designed Airfoil for Micro-Capacity Wind Turbine using Qbla...
Analysis of Newly Designed Airfoil for Micro-Capacity Wind Turbine using Qbla...IRJET Journal
 
High Performance Building Design Strategies
High Performance Building Design StrategiesHigh Performance Building Design Strategies
High Performance Building Design StrategiesASHRAE Region VI
 
RackForce GigaCenter Green Lessons 1.8
RackForce GigaCenter Green Lessons 1.8RackForce GigaCenter Green Lessons 1.8
RackForce GigaCenter Green Lessons 1.8Brian Fry
 
Comprenhensive Utilities & Energy Management
Comprenhensive Utilities & Energy ManagementComprenhensive Utilities & Energy Management
Comprenhensive Utilities & Energy Managementleswilliams93
 
Produceer met minder engergie economisch en ecologisch verspanen - jef loen...
Produceer met minder engergie   economisch en ecologisch verspanen - jef loen...Produceer met minder engergie   economisch en ecologisch verspanen - jef loen...
Produceer met minder engergie economisch en ecologisch verspanen - jef loen...Sirris
 
Energy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO ApplicationsEnergy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO ApplicationsIQPC
 
PCTY 2012, IBM Smarter Buildings v. Claire Penny
PCTY 2012, IBM Smarter Buildings v. Claire PennyPCTY 2012, IBM Smarter Buildings v. Claire Penny
PCTY 2012, IBM Smarter Buildings v. Claire PennyIBM Danmark
 
Thermal Management Enabling Enhanced
Thermal Management Enabling EnhancedThermal Management Enabling Enhanced
Thermal Management Enabling EnhancedAlcatel-Lucent
 
LSGC | LED Lighting for Petrol Stations
LSGC | LED Lighting for Petrol StationsLSGC | LED Lighting for Petrol Stations
LSGC | LED Lighting for Petrol StationsDanielle Kole
 
Low energy air filters facilities show 2010
Low energy air filters facilities show 2010Low energy air filters facilities show 2010
Low energy air filters facilities show 2010Simply Marcomms
 
神州数码 Jason pan future_clouddatacenterv2
神州数码 Jason pan future_clouddatacenterv2神州数码 Jason pan future_clouddatacenterv2
神州数码 Jason pan future_clouddatacenterv2colderboy17
 
Electricity demand side management and end use efficiency
Electricity demand side management and end use efficiencyElectricity demand side management and end use efficiency
Electricity demand side management and end use efficiencyD.Pawan Kumar
 
How to be green in the cloud
How to be green in the cloudHow to be green in the cloud
How to be green in the cloudVMEngine
 
Power of CFD simulation.pptx
Power of CFD simulation.pptxPower of CFD simulation.pptx
Power of CFD simulation.pptxrameshbabu91988
 
CRIF Final Presentation, Camco
CRIF Final Presentation, CamcoCRIF Final Presentation, Camco
CRIF Final Presentation, Camcocrifcambs
 
Fma congress walk talk 12.3.2012
Fma congress walk talk 12.3.2012Fma congress walk talk 12.3.2012
Fma congress walk talk 12.3.2012Lisa Barnard
 

Ähnlich wie HPR Integrated Design - BIM/IPD Proposal Presentation (20)

Mae senior design poster rev b
Mae senior design poster rev bMae senior design poster rev b
Mae senior design poster rev b
 
Analysis of Newly Designed Airfoil for Micro-Capacity Wind Turbine using Qbla...
Analysis of Newly Designed Airfoil for Micro-Capacity Wind Turbine using Qbla...Analysis of Newly Designed Airfoil for Micro-Capacity Wind Turbine using Qbla...
Analysis of Newly Designed Airfoil for Micro-Capacity Wind Turbine using Qbla...
 
High Performance Building Design Strategies
High Performance Building Design StrategiesHigh Performance Building Design Strategies
High Performance Building Design Strategies
 
RackForce GigaCenter Green Lessons 1.8
RackForce GigaCenter Green Lessons 1.8RackForce GigaCenter Green Lessons 1.8
RackForce GigaCenter Green Lessons 1.8
 
Wba4 Qoe En Tech
Wba4 Qoe En TechWba4 Qoe En Tech
Wba4 Qoe En Tech
 
Comprenhensive Utilities & Energy Management
Comprenhensive Utilities & Energy ManagementComprenhensive Utilities & Energy Management
Comprenhensive Utilities & Energy Management
 
Produceer met minder engergie economisch en ecologisch verspanen - jef loen...
Produceer met minder engergie   economisch en ecologisch verspanen - jef loen...Produceer met minder engergie   economisch en ecologisch verspanen - jef loen...
Produceer met minder engergie economisch en ecologisch verspanen - jef loen...
 
Energy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO ApplicationsEnergy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO Applications
 
PCTY 2012, IBM Smarter Buildings v. Claire Penny
PCTY 2012, IBM Smarter Buildings v. Claire PennyPCTY 2012, IBM Smarter Buildings v. Claire Penny
PCTY 2012, IBM Smarter Buildings v. Claire Penny
 
Sd2007 Drawings Darmstadt
Sd2007 Drawings DarmstadtSd2007 Drawings Darmstadt
Sd2007 Drawings Darmstadt
 
Thermal Management Enabling Enhanced
Thermal Management Enabling EnhancedThermal Management Enabling Enhanced
Thermal Management Enabling Enhanced
 
LSGC | LED Lighting for Petrol Stations
LSGC | LED Lighting for Petrol StationsLSGC | LED Lighting for Petrol Stations
LSGC | LED Lighting for Petrol Stations
 
Dfma
DfmaDfma
Dfma
 
Low energy air filters facilities show 2010
Low energy air filters facilities show 2010Low energy air filters facilities show 2010
Low energy air filters facilities show 2010
 
神州数码 Jason pan future_clouddatacenterv2
神州数码 Jason pan future_clouddatacenterv2神州数码 Jason pan future_clouddatacenterv2
神州数码 Jason pan future_clouddatacenterv2
 
Electricity demand side management and end use efficiency
Electricity demand side management and end use efficiencyElectricity demand side management and end use efficiency
Electricity demand side management and end use efficiency
 
How to be green in the cloud
How to be green in the cloudHow to be green in the cloud
How to be green in the cloud
 
Power of CFD simulation.pptx
Power of CFD simulation.pptxPower of CFD simulation.pptx
Power of CFD simulation.pptx
 
CRIF Final Presentation, Camco
CRIF Final Presentation, CamcoCRIF Final Presentation, Camco
CRIF Final Presentation, Camco
 
Fma congress walk talk 12.3.2012
Fma congress walk talk 12.3.2012Fma congress walk talk 12.3.2012
Fma congress walk talk 12.3.2012
 

Kürzlich hochgeladen

ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEaurabinda banchhor
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
TEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxTEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxruthvilladarez
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 

Kürzlich hochgeladen (20)

ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSE
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
TEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxTEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docx
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 

HPR Integrated Design - BIM/IPD Proposal Presentation

  • 1. FACADE HPR INTEGRATED DESIGN Presentation #4: Jeremy Heilman CONSTRUCTION Nico Pugliese LIGHTING/ELECTRICAL Proposal Josh Progar STRUCTURAL James Rodgers MECHANICAL Penn State Ice Hockey Arena The Pennsylvania State University Mission Statement: HPR Integrated Design combines innovative, cutting edge concepts with a collaborative multi-disciplinary approach through the utilization of state-of-the-art BIM technologies to exceed owner expectations both in system efficiencies and the enrichment of the human experience within its aesthetic.
  • 2. Agenda BIM Uses HPR Integrated Design’s Project Touchstones for the Penn State Ice Arena Improve the Game Day experience for both the fans and players Create an environment that fosters hockey excellence Minimize the amount of energy the facility consumes Create an architecturally recognizable facility Maximize value with minimizing cost Earn a LEED Gold rating MILESTONES Required by Contract Used for this Stage of design
  • 3. BIM Uses & Process
  • 4. BIM PROCESS Daylighting Electrical COORDINATED BIM MODEL
  • 6. Approach Air Handler Relocation Club Level and Event Level Redesign REASON: -Reduce duct size and length -Reduce fan energy and use smaller air handling units -Limit the number of shafts and there sizes. Concourse Level Mt. Nittany Room—Rm. 230 AHU-6: Energy Recovery Unit Carrier 39MW050 Serves Event Level– Weight Room 20,000 Peak CFM 8’-0” W x 13’-2” L x 7’-1” H AHU-5: Air Handler Carrier 39MW061 8’-0” Commissary—Rm. 163 Design Constraints Event Level Serves Event Level Lobby & Administration 25,000 CFM Supply 9’-9” W x 30’-3” L x 8’-6” H
  • 7. Approach Air Handler Relocation Mt. Nittany Room—Rm. 230 Mt. Nittany Room—Rm. 230 20” THICK. TWO WAY and Event Level Redesign AHU–6 SLAB—CONSERVATIVE 1’-8” MAIN CONCOURSE LEVEL AHU–5 0’-7” CLR. 2’-0” CLR. 9’-6” AHU–5 AHU–6 8’-0” Commissary—Rm. 163 20’-9” AHU-6 1’-8” 20” THICK. TWO WAY 4” THICK VIBRATION SLAB—CONSERVATIVE ISOLATORS AHU-5 8’-0” Commissary—Rm. 163 EVENT LEVEL
  • 8. Access Layout Approach Air Handler Relocation AHU-6 PROPOSED ACCESS POINT AHU-6 RA—PLENUM EA FROM AHU-6 and Event Level Redesign 44’-0” SA FROM AHU 5 44’-0” AHU-5 OA TO AHU-6 AHU-5 AHU-6 OA TO AHU 5&6 OA TO AHU-5 29’-6” 29’-6” AHU-5 EA FROM AHU-5 Multisport Complex
  • 9. Approach Roof Profile Redesign REASON: -Maximize the efficiency of the structural system to reduce cost -Integrate the mechanical, lighting, and catwalk systems to optimize the performance of each -Create a clean and attractive ceiling area N-S Section – New Roof Profile N-S Section – Lighting Incident Angle Reflection Bryce Jordan Center Beaver Stadium 60’ Clear (To Bottom Of Steel) Design Constraints Multisport Complex Holuba Hall
  • 10. Approach Roof Profile Redesign REASON: -Maximize the efficiency of the structural system to reduce cost -Integrate the mechanical, lighting, and catwalk systems to optimize the performance of each -Create a clean and attractive ceiling area N-S Section – New Roof Profile N-S Section – Lighting Incident Angle Reflection Bryce Jordan Center Beaver Stadium 60’ Clear (To Bottom Of Steel) Design Constraints Multisport Complex Holuba Hall
  • 11. Enhance student entrance Create a prominent entrance (Globe) Approach Façade Redesign REASON: We believe we can maintain the original intent of the east façade (to create an impressive view from University Drive as well as a view out to Mt. Nittany and the Bryce Jordan Center) while enhancing the prominence of the entrances as well as reducing thermal loads and cost. View to Mt. Nittany Off glass at 15o Translate the pattern of Design Constraints Louvers added for AHU 5 & 6 repeating glass and brick
  • 12. Team & Individual Focus Schedules
  • 13. KEY MILESTONES: January 27th, 2012: March 26th, 2012: All Redesign Focuses Completed. Initial Architectural Modeling Completed February 13th, 2012: April 4th, 2012: Air Handler Relocation & Event Level Design Completed Final Report Submission March 2nd, 2012: April 9th, 2012: Initial Clash Detection & Value Engineering Final Presentation Team Schedule
  • 14. Redesign Focus Schedules AIR HANDLER RELOCATION & EVENT LEVEL REDESIGN MAIN ARENA ROOF SYSTEMS FAÇADE REDESIGN
  • 16. MILESTONE: Architectural Modeling Completed Progress Air Handler Relocation Arena Roof Systems Design Authoring, Structural Two Way Flooring Redesign & Arena Roof Modeling MAJOR BIM USE(S) Analysis SOFTWARE Design Authoring, Lighting Event Level Daylighting & Electrical Load Calculations Analysis Façade Redesign Design Authoring, Mechanical Event Level Load Calcs, AHU & Ductwork Sizing Analysis Friday, January 27th, 2012 Existing Conditions Estimate & Scheduling Analysis Cost Estimation, 4D Modeling
  • 17. MILESTONE: Air Handler Relocation Completed Progress Air Handler Relocation Arena Roof Systems Structural Analysis Gravity Column Redesign & Long Span Truss Design MAJOR BIM USE(S) SOFTWARE Design Authoring, Lighting Façade Daylighting Controls & Finalize Event Lvl. Design Analysis Façade Redesign Design Authoring, Mechanical Finalize Event Level Designs & AHU Relocations Analysis Tuesday, February 13th, 2012 LEED Analysis & Crane Placement Study Site Utilization, LEED Analysis
  • 18. MILESTONE: Initial Clash Detection & Value Eng. Progress Air Handler Relocation Arena Roof Systems Design Authoring, Structural Long Span Truss Design & Façade Glazing Analysis MAJOR BIM USE(S) Analysis, 3D Coordination SOFTWARE Design Authoring, Lighting Arena Lighting Layout & Finalize Electrical Redesign Analysis Façade Redesign Design Authoring, Mechanical Main Arena Mechanical Design & Coordination Analysis, 3D Coordination Friday, March 2nd, 2012 Update Cost, Schedule & Perform Clash Detection 3D Coordination, Cost Estimation, 4D Modeling
  • 19. MILESTONE: Redesign Focuses Completed Progress Air Handler Relocation Arena Roof Systems Structural Analysis, 3D Column Analysis & Façade Analysis/Redesign MAJOR BIM USE(S) Coordination SOFTWARE Design Authoring, Lighting Finalize Arena Lighting Design & Façade Redesign Analysis Façade Redesign Design Authoring, Mechanical Main Arena Mechanical & Life Safety Designs Analysis, 3D Coordination Monday, March 26th, 2012 Finalize Cost Estimates, Schedule & LEED Analysis 3D Coordination, Cost Estimation, 4D Modeling
  • 20. MILESTONE: Final Report Submission Progress Air Handler Relocation Arena Roof Systems None. Finalize Final Report MAJOR BIM USE(S) SOFTWARE None. Finalize Final Report Façade Redesign None. Finalize Final Report Wednesday, April 4th, 2012 Finalize Final Report None.
  • 21. MILESTONE: Final Presentation Progress Air Handler Relocation Arena Roof Systems None. Finalize & Practice Final Presentation MAJOR BIM USE(S) SOFTWARE None. Finalize & Practice Final Presentation Façade Redesign None. Finalize & Practice Final Presentation Monday, April 9th, 2012 Finalize & Practice Final Presentation None.
  • 22. FACADE Presentation #4: Thank You Questions & Comments Mt. Nittany Room— Rm. 230 Penn State Ice Hockey Arena The Pennsylvania State University AHU AHU –6 –5 8’- Commissary— 0” Rm. 163

Hinweis der Redaktion

  1. Add money shot. We need a third category to base decisions on, cost, sustainability and
  2. Add money shot. We need a third category to base decisions on, cost, sustainability and