Jonathan Haynes

3-23-12

British Literature

Ms. Tillery

                                   Product Work Log




Monday, 11/7/11      Activity: I began drawing on          Comment/Suggestions:
4:30-5:30            paper what I want the atv lift to
                     look like.

                     Commentary: Really the only
                     problem I ran into in this stage
                     was drawing the lift at the correct
                     scale. Drew multiple views of the
                     stand.




Total time: 1 hr.
Wednesday,       Activity: I finished drawing the     Comment/Suggestions:
12/14/11         lift on paper, and began designing
7:30-8:15 AM     it on Autodesk Inventor with the
                 help of Ms. Salas.

                 Commentary: The only problem I
                 ran into was figuring out how
                 detailed I can make the design on
                 Inventor. Designed the base of the
                 frame.




Total time: 45
mins.
Thursday,        Activity: Continued to design on      Comment/Suggestions:
12/15/11         inventor. Began working on
7:30-8:15 AM     designing ramps.

                 Commentary: I ran into problems
                 with how the ramps will be
                 incorporated, I decided to have the
                 ramps be removable. Designed
                 frame and ramps.




Total time: 45
mins.
Friday, 12/16/11   Activity: Designed the lift system    Comment/Suggestions:
7:45-8:15 AM       on inventor and finished the rest
                   of the design.

                   Commentary: Decided to only
                   have 2 means of lifting rather than
                   3. Drew up jacks and lift 4x4’s on
                   Inventor.




Total time: 30
mins.
Saturday, 1/21/12    Activity: Went to Home Depot            Comment/Suggestions:
11:00-1:00 PM        and Northern Tool and bought all
                     the material needed for roughly
                     $332.00. I also built the base of the
                     frame.

                     Commentary: I ended up having
                     to use less screws then planed in
                     the frame, but still enough to keep
                     structural integrity. I bought
                     screws, plywood, 4x4’s, 2x10’s,
                     bottle jacks, and a swivel jack.




Total time: 2 hrs.
Saturday, 1/21/12     Activity: I cut all the vertical     Comment/Suggestions:
6:15-8:00 PM          supports for the lift, as well as
                      most of the rest of the frame.

                      Commentary: Came to the
                      conclusion that I could have used
                      2x4’s for some parts of the frame
                      in place of 4x4’s which would
                      have cut down on weight, but I
                      ended up not doing it. Screwed all
                      the vertical supports to the upper
                      base.




Total time: 1 hr 45
mins.
Sunday, 1/22/12       Activity: I screwed together the     Comment/Suggestions:
1:45-5:15 PM          vertical supports to the base of the
                      lift. I also installed the caster
                      wheels.

                      Commentary: Ran into problem
                      with not having enough clearance
                      for the casters to swivel so I had to
                      cut wood out to lock the casters in
                      place.




Total time: 3hrs 30
mins.
Wednesday,           Activity: I cut out the plywood for   Comment/Suggestions:
1/25/12              the base of the stand and got it in
4:30-6:15 PM         place to be screwed down.

                     Commentary: This was a pretty
                     smooth day, I didn’t run into any
                     problems. Cut notches out of the
                     corners of the plywood to fit
                     around the frame 4x4’s.




Total time: 1hr 45
mins.
Friday, 1/27/12      Activity: I secured the rest of the   Comment/Suggestions:
5:15-6:45 PM         frame to the base, and added 2
                     center supports.

                     Commentary: I had to use leg bolts
                     on the end of the stand with the
                     casters to take on the extra weight
                     of the stand when being moved.
                     Screwed down the frame to the
                     existing base.




Total time: 1hr 30
mins.
Saturday, 1/28/12   Activity: I began to work out how       Comment/Suggestions:
11:30-12:00 PM      the lift system will work.

                    Commentary: Decided to have
                    “doors” under the jacks so that
                    when the jacks/lift isn’t in use I
                    will be able to lower the lift 4x4 to
                    be flush with the stand and be out
                    of the way.




Total time: 30
mins.
Sunday, 1/29/12        Activity: Got the plywood for the      Comment/Suggestions:
2:30-6:15 PM           top of the stand tacked down. As
                       well as got the center jack ready
                       and the wheel/lifter that I will use
                       to lift the stand to move it.

                       Commentary: Ran into little
                       problem with plywood fitting up
                       correctly because the stand wasn’t
                       perfectly square. Cut holes out of
                       plywood for the lift 4x4’s.




Total time: 3 hrs 45
mins.
Monday, 1/30/12     Activity: Had to remount the         Comment/Suggestions:
5:30-6:30 PM        wheel that lifted the stand.

                    Commentary: The wheel didn’t
                    have enough clearance to rotate so
                    I had to mount it further out. I
                    mounted a 2x10 to the existing
                    2x10, than had to mount 2 2x4’s to
                    that to make the lift stick out
                    further.




Total time: 1 hr.
Wednesday,            Activity: Finished up the center     Comment/Suggestions:
2/1/12 6:00-7:15      jack by building the “door” and
PM                    making a place to hold the jack in
                      place.

                      Commentary: The jack would rest
                      on the “door”, when the lift 4x4
                      needed to be out of the way, you
                      would move the jack, and open
                      the door, which the 4x4 would
                      drop into.




Total time: 1 hr 15
mins.
Saturday, 2/4/12       Activity: Started the front lift and   Comment/Suggestions:
11:40-2:00 PM          also cut the boards to fill in the
                       gaps when riding my quad onto
                       the lift.

                       Commentary: It was difficult
                       starting the front lift because it
                       needed to be as close to in-line
                       with the center jack as possible.
                       Built the base that the front jack
                       would rest on.




Total time: 2 hrs 20
mins.
Sunday, 2/5/12        Activity: Cut the ramps to length    Comment/Suggestions:
5:00-6:30 PM          and fixed up how they are going to
                      latch onto the stand when in use.

                      Commentary: Ran into problem
                      with ramps possibly not being
                      strong enough were they latch
                      onto the stand. Also stuck sand
                      paper to ramps for added traction.




Total time: 1 hr 30
mins.
Friday, 2/17/12      Activity: Finished up the front     Comment/Suggestions:
5:00-7:00 PM         jack, including its “door” for when
                     the lift is not in use.

                     Commentary: Door didn’t want to
                     line up perfectly cause of being
                     un-square. Cut out of plywood the
                     shape of the jack to hold it in
                     place.




Total time: 2 hrs.
Monday, 2/20/12       Activity: Installed metal L            Comment/Suggestions:
1:20-2:50 PM          brackets on the ramps to fix
                      problem of them not being strong
                      enough. Finished the front lift and
                      got the blocks done that will stop
                      the four wheeler when rode on the
                      ramp.

                      Commentary: Had a hard time
                      getting the jack and 4x4 to fit up
                      while still being straight up and
                      down. Cut out the notch in 4x4 for
                      front lift that the frame of my quad
                      will rest on.




Total time: 1 hr 30
mins.
Tuesday, 2/21/12       Activity: Finished the lift. Cut and   Comment/Suggestions:
11:30-4:00 PM          screwed down the corner pieces to
                       make it more stable. Made a fold-
                       out step.

                       Commentary: Little problem with
                       the step, trying to make it come
                       out far enough and also be able to
                       fold back up without having to
                       alter the corner pieces too much.
                       Cut corner pieces to strengthen the
                       frame.




Total time: 4 hrs 30
mins.

Weitere ähnliche Inhalte

Ähnlich wie Jonathan's product work log

Senior Project Product Work Log
Senior Project Product Work Log Senior Project Product Work Log
Senior Project Product Work Log hulen135
 
Product work log
Product work logProduct work log
Product work logJSchop
 
Product work log template 2011 12
Product work log template 2011 12Product work log template 2011 12
Product work log template 2011 12Pocchio505
 
Product Work Log
Product Work LogProduct Work Log
Product Work LogAnnaelis
 
Senior Project Product Work Log
Senior Project Product Work LogSenior Project Product Work Log
Senior Project Product Work LogDaniel Barcus
 
Product work log template 2011 12
Product work log template 2011 12Product work log template 2011 12
Product work log template 2011 12a-fugate
 
Product work log
Product work log Product work log
Product work log armybrat94
 
Steven Todd Project Work Log
Steven Todd Project Work LogSteven Todd Project Work Log
Steven Todd Project Work LogStevenTodd2308
 
Amara Leazer's Hopper Portfolio - IDEAS170
Amara Leazer's Hopper Portfolio - IDEAS170Amara Leazer's Hopper Portfolio - IDEAS170
Amara Leazer's Hopper Portfolio - IDEAS170aleazer
 

Ähnlich wie Jonathan's product work log (14)

Product work log
Product work logProduct work log
Product work log
 
Work Log
Work LogWork Log
Work Log
 
Senior Project Product Work Log
Senior Project Product Work Log Senior Project Product Work Log
Senior Project Product Work Log
 
Work log
Work logWork log
Work log
 
Product work log
Product work logProduct work log
Product work log
 
Project Work Log
Project Work LogProject Work Log
Project Work Log
 
Product work log template 2011 12
Product work log template 2011 12Product work log template 2011 12
Product work log template 2011 12
 
Senior Project Work Log
Senior Project Work LogSenior Project Work Log
Senior Project Work Log
 
Product Work Log
Product Work LogProduct Work Log
Product Work Log
 
Senior Project Product Work Log
Senior Project Product Work LogSenior Project Product Work Log
Senior Project Product Work Log
 
Product work log template 2011 12
Product work log template 2011 12Product work log template 2011 12
Product work log template 2011 12
 
Product work log
Product work log Product work log
Product work log
 
Steven Todd Project Work Log
Steven Todd Project Work LogSteven Todd Project Work Log
Steven Todd Project Work Log
 
Amara Leazer's Hopper Portfolio - IDEAS170
Amara Leazer's Hopper Portfolio - IDEAS170Amara Leazer's Hopper Portfolio - IDEAS170
Amara Leazer's Hopper Portfolio - IDEAS170
 

Kürzlich hochgeladen

Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 

Kürzlich hochgeladen (20)

Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 

Jonathan's product work log

  • 1. Jonathan Haynes 3-23-12 British Literature Ms. Tillery Product Work Log Monday, 11/7/11 Activity: I began drawing on Comment/Suggestions: 4:30-5:30 paper what I want the atv lift to look like. Commentary: Really the only problem I ran into in this stage was drawing the lift at the correct scale. Drew multiple views of the stand. Total time: 1 hr.
  • 2. Wednesday, Activity: I finished drawing the Comment/Suggestions: 12/14/11 lift on paper, and began designing 7:30-8:15 AM it on Autodesk Inventor with the help of Ms. Salas. Commentary: The only problem I ran into was figuring out how detailed I can make the design on Inventor. Designed the base of the frame. Total time: 45 mins.
  • 3. Thursday, Activity: Continued to design on Comment/Suggestions: 12/15/11 inventor. Began working on 7:30-8:15 AM designing ramps. Commentary: I ran into problems with how the ramps will be incorporated, I decided to have the ramps be removable. Designed frame and ramps. Total time: 45 mins.
  • 4. Friday, 12/16/11 Activity: Designed the lift system Comment/Suggestions: 7:45-8:15 AM on inventor and finished the rest of the design. Commentary: Decided to only have 2 means of lifting rather than 3. Drew up jacks and lift 4x4’s on Inventor. Total time: 30 mins.
  • 5. Saturday, 1/21/12 Activity: Went to Home Depot Comment/Suggestions: 11:00-1:00 PM and Northern Tool and bought all the material needed for roughly $332.00. I also built the base of the frame. Commentary: I ended up having to use less screws then planed in the frame, but still enough to keep structural integrity. I bought screws, plywood, 4x4’s, 2x10’s, bottle jacks, and a swivel jack. Total time: 2 hrs.
  • 6. Saturday, 1/21/12 Activity: I cut all the vertical Comment/Suggestions: 6:15-8:00 PM supports for the lift, as well as most of the rest of the frame. Commentary: Came to the conclusion that I could have used 2x4’s for some parts of the frame in place of 4x4’s which would have cut down on weight, but I ended up not doing it. Screwed all the vertical supports to the upper base. Total time: 1 hr 45 mins.
  • 7. Sunday, 1/22/12 Activity: I screwed together the Comment/Suggestions: 1:45-5:15 PM vertical supports to the base of the lift. I also installed the caster wheels. Commentary: Ran into problem with not having enough clearance for the casters to swivel so I had to cut wood out to lock the casters in place. Total time: 3hrs 30 mins.
  • 8. Wednesday, Activity: I cut out the plywood for Comment/Suggestions: 1/25/12 the base of the stand and got it in 4:30-6:15 PM place to be screwed down. Commentary: This was a pretty smooth day, I didn’t run into any problems. Cut notches out of the corners of the plywood to fit around the frame 4x4’s. Total time: 1hr 45 mins.
  • 9. Friday, 1/27/12 Activity: I secured the rest of the Comment/Suggestions: 5:15-6:45 PM frame to the base, and added 2 center supports. Commentary: I had to use leg bolts on the end of the stand with the casters to take on the extra weight of the stand when being moved. Screwed down the frame to the existing base. Total time: 1hr 30 mins.
  • 10. Saturday, 1/28/12 Activity: I began to work out how Comment/Suggestions: 11:30-12:00 PM the lift system will work. Commentary: Decided to have “doors” under the jacks so that when the jacks/lift isn’t in use I will be able to lower the lift 4x4 to be flush with the stand and be out of the way. Total time: 30 mins.
  • 11. Sunday, 1/29/12 Activity: Got the plywood for the Comment/Suggestions: 2:30-6:15 PM top of the stand tacked down. As well as got the center jack ready and the wheel/lifter that I will use to lift the stand to move it. Commentary: Ran into little problem with plywood fitting up correctly because the stand wasn’t perfectly square. Cut holes out of plywood for the lift 4x4’s. Total time: 3 hrs 45 mins.
  • 12. Monday, 1/30/12 Activity: Had to remount the Comment/Suggestions: 5:30-6:30 PM wheel that lifted the stand. Commentary: The wheel didn’t have enough clearance to rotate so I had to mount it further out. I mounted a 2x10 to the existing 2x10, than had to mount 2 2x4’s to that to make the lift stick out further. Total time: 1 hr.
  • 13. Wednesday, Activity: Finished up the center Comment/Suggestions: 2/1/12 6:00-7:15 jack by building the “door” and PM making a place to hold the jack in place. Commentary: The jack would rest on the “door”, when the lift 4x4 needed to be out of the way, you would move the jack, and open the door, which the 4x4 would drop into. Total time: 1 hr 15 mins.
  • 14. Saturday, 2/4/12 Activity: Started the front lift and Comment/Suggestions: 11:40-2:00 PM also cut the boards to fill in the gaps when riding my quad onto the lift. Commentary: It was difficult starting the front lift because it needed to be as close to in-line with the center jack as possible. Built the base that the front jack would rest on. Total time: 2 hrs 20 mins.
  • 15. Sunday, 2/5/12 Activity: Cut the ramps to length Comment/Suggestions: 5:00-6:30 PM and fixed up how they are going to latch onto the stand when in use. Commentary: Ran into problem with ramps possibly not being strong enough were they latch onto the stand. Also stuck sand paper to ramps for added traction. Total time: 1 hr 30 mins.
  • 16. Friday, 2/17/12 Activity: Finished up the front Comment/Suggestions: 5:00-7:00 PM jack, including its “door” for when the lift is not in use. Commentary: Door didn’t want to line up perfectly cause of being un-square. Cut out of plywood the shape of the jack to hold it in place. Total time: 2 hrs.
  • 17. Monday, 2/20/12 Activity: Installed metal L Comment/Suggestions: 1:20-2:50 PM brackets on the ramps to fix problem of them not being strong enough. Finished the front lift and got the blocks done that will stop the four wheeler when rode on the ramp. Commentary: Had a hard time getting the jack and 4x4 to fit up while still being straight up and down. Cut out the notch in 4x4 for front lift that the frame of my quad will rest on. Total time: 1 hr 30 mins.
  • 18. Tuesday, 2/21/12 Activity: Finished the lift. Cut and Comment/Suggestions: 11:30-4:00 PM screwed down the corner pieces to make it more stable. Made a fold- out step. Commentary: Little problem with the step, trying to make it come out far enough and also be able to fold back up without having to alter the corner pieces too much. Cut corner pieces to strengthen the frame. Total time: 4 hrs 30 mins.