SlideShare ist ein Scribd-Unternehmen logo
1 von 2
Downloaden Sie, um offline zu lesen
POSITIVE TRAIN CONTROL (PTC)
 JCMB Technology Inc.
195 St-Francois-Xavier, Delson, QC
Phone 450.632.5844 • Fax 450.632.3207
Positive Train Control (PTC) requires accurate GIS data (tracks, features, and clearance points) modeled
according to PTC specifications. JCMB Technology was involved in the rail network data enrichment
process for Canadian National Railway a Class I railroad and was requested to assist their GIS
department to increase the location precision of their tracks and track features, as well as, the
accuracy of the related attribute data. Multiple sources of data were provided with a source priority
list to assure the most precise and up to date information.
Rail network track adjustment or capture requires tracks to be perfectly positioned. Equipment is then
aligned perpendicular to the track using an orthophoto base map. Every subdivision is enriched to the
level of accuracy required by the Federal Railway Administration’s (FRA) PTC implementation standards.
There are many steps required to assure track and feature accuracy. Below are some of the tasks JCMB
Technology performed in assuring the required level of accuracy of track and feature location for PTC
implementation.
GIS activities performed for Positive Train Control Implementation:
 Validated feature existence and location using the field survey for each PTC subdivision
 Track and wayside features accuracy requirements met using:
1. High accuracy ortho-imagery
2. High resolution oblique imagery
3. LIDAR data
 The maximum permissible speed & permanent speed limits initial capture
 Method of operations initial capture
 Method of operations adjustment
 Validated and integrated multiple source data
 Rail network track adjustment and capture to track center
 The central assets repository relationship and calibration nodes for each milepost
 Intermediate milepost values (references) for track side features (panels, bungalows, etc.)
 Insulated joints and their central assets repository relationship
 Train control signs in PTC territory mark limits and method of operation
POSITIVE TRAIN CONTROL (PTC)
 JCMB Technology Inc.
195 St-Francois-Xavier, Delson, QC
Phone 450.632.5844 • Fax 450.632.3207
The FRA requires all rail traffic running through high volume/ risk subdivisions in the US to be
compliant with the PTC implementation standards. JCMB Technology has worked very closely with our
clients both onsite and via remote desktop to assure constant contact and seamless integration of their
GIS data in the effort to eliminate any possibility of error for this high level project.
JCMB Technology are hands’ on data specialists with experienced GIS technicians and developers. We
cater to the needs of our clients in providing solutions tailored to their needs. There are no problems
too big or small for our team.
If you require full enrichment or are in need of data specialists to pinpoint anomalies within your
database, JCMB Technology has over 20 years experience in providing quality data, and would take
great pleasure in assisting you.
For more Information please call 450-632-5844 ext. 237 or email john.gauthier@jcmb.com
 Central assets relationship class for speed limit signage
 Relationship tables link different track segments to form one route between subdivisions
 Correction of turnout identification and missed or inaccurately captured switches
 Derails need to be enriched for PTC Implementation
 Densification and elevation attributes are linked to data prior to QC process and delivery
 Linear Reference System (LRS) datum refresh
 A QA/QC acceptance criterion requires visually verifying all track and feature locations as
well as the maximum permissible speed & permanent speed limits and track rules associated
with them
 Automated scripts and manual attribution of the Train Management Dispatching system
(TMDS) track names
 Normal and reverse clearance points reporting
 Device identification and attribute matching for PTC integration

Weitere ähnliche Inhalte

Was ist angesagt?

Sunil Saini_RF Engineer UPDATED
Sunil Saini_RF Engineer UPDATEDSunil Saini_RF Engineer UPDATED
Sunil Saini_RF Engineer UPDATEDsunil Saini
 
aniruddh khare resume (1)
aniruddh khare resume (1)aniruddh khare resume (1)
aniruddh khare resume (1)aniruddh khare
 
RF Optimization Engineer Resume.docx
RF Optimization Engineer Resume.docxRF Optimization Engineer Resume.docx
RF Optimization Engineer Resume.docxMonsuru Okekunle
 
Adding capacity on the Steel Railway - Railway Gazette International
Adding capacity on the Steel Railway - Railway Gazette InternationalAdding capacity on the Steel Railway - Railway Gazette International
Adding capacity on the Steel Railway - Railway Gazette InternationalMRS Logística
 
Hussain Nahdi CV - Copy
Hussain Nahdi CV  - CopyHussain Nahdi CV  - Copy
Hussain Nahdi CV - Copyhussain nahdi
 
Real Time Passenger Information, Brendan O'Brien, Dublin City Council
Real Time Passenger Information, Brendan O'Brien, Dublin City Council Real Time Passenger Information, Brendan O'Brien, Dublin City Council
Real Time Passenger Information, Brendan O'Brien, Dublin City Council Dublinked .
 

Was ist angesagt? (19)

CV
CVCV
CV
 
Harpreet Singh Resume
Harpreet Singh ResumeHarpreet Singh Resume
Harpreet Singh Resume
 
Sunil Saini_RF Engineer UPDATED
Sunil Saini_RF Engineer UPDATEDSunil Saini_RF Engineer UPDATED
Sunil Saini_RF Engineer UPDATED
 
Engr Abdul Samad CV
Engr Abdul Samad CVEngr Abdul Samad CV
Engr Abdul Samad CV
 
aniruddh khare resume (1)
aniruddh khare resume (1)aniruddh khare resume (1)
aniruddh khare resume (1)
 
Alia khan1
Alia khan1Alia khan1
Alia khan1
 
RF Optimization Engineer Resume.docx
RF Optimization Engineer Resume.docxRF Optimization Engineer Resume.docx
RF Optimization Engineer Resume.docx
 
Adding capacity on the Steel Railway - Railway Gazette International
Adding capacity on the Steel Railway - Railway Gazette InternationalAdding capacity on the Steel Railway - Railway Gazette International
Adding capacity on the Steel Railway - Railway Gazette International
 
Hussain Nahdi CV - Copy
Hussain Nahdi CV  - CopyHussain Nahdi CV  - Copy
Hussain Nahdi CV - Copy
 
Technologies Overview Feb 2014
Technologies Overview Feb 2014Technologies Overview Feb 2014
Technologies Overview Feb 2014
 
Resume
ResumeResume
Resume
 
Deepak patel
Deepak patelDeepak patel
Deepak patel
 
Real Time Passenger Information, Brendan O'Brien, Dublin City Council
Real Time Passenger Information, Brendan O'Brien, Dublin City Council Real Time Passenger Information, Brendan O'Brien, Dublin City Council
Real Time Passenger Information, Brendan O'Brien, Dublin City Council
 
CV(M.Javed )
CV(M.Javed )CV(M.Javed )
CV(M.Javed )
 
NeerajKumarGupta_CV
NeerajKumarGupta_CVNeerajKumarGupta_CV
NeerajKumarGupta_CV
 
pankaj resume
pankaj resumepankaj resume
pankaj resume
 
DIPU CV
DIPU CVDIPU CV
DIPU CV
 
updated resume (1)
updated resume (1)updated resume (1)
updated resume (1)
 
said bacha cv
said bacha cvsaid bacha cv
said bacha cv
 

Andere mochten auch

Nota firefox os t españa vfinal250213
Nota firefox os t españa vfinal250213Nota firefox os t españa vfinal250213
Nota firefox os t españa vfinal250213Telefonica Catalunya
 
Klöckner & Co - Roadshow Presentation April 2011
Klöckner & Co - Roadshow Presentation April 2011Klöckner & Co - Roadshow Presentation April 2011
Klöckner & Co - Roadshow Presentation April 2011Klöckner & Co SE
 
Aplicaciones para móviles
Aplicaciones para móviles Aplicaciones para móviles
Aplicaciones para móviles Jocrisol
 
NACS Newsletter II CEBH
NACS Newsletter II CEBHNACS Newsletter II CEBH
NACS Newsletter II CEBHAminah Sheikh
 
Elementos para diseñar una empresa de innovación de impacto
Elementos para diseñar una empresa de innovación de impactoElementos para diseñar una empresa de innovación de impacto
Elementos para diseñar una empresa de innovación de impactoPaula Cardenau
 
CAPI PISOS AMARILLOS DE ECIJA
CAPI PISOS AMARILLOS DE ECIJACAPI PISOS AMARILLOS DE ECIJA
CAPI PISOS AMARILLOS DE ECIJAnuryjuande
 
Boletín Gente emi #44
Boletín Gente emi #44Boletín Gente emi #44
Boletín Gente emi #44grupoemi
 
Revista Internity Vodafone Septiembre 2012 (1)
Revista Internity Vodafone Septiembre 2012 (1)Revista Internity Vodafone Septiembre 2012 (1)
Revista Internity Vodafone Septiembre 2012 (1)Internity.es
 
Vortrag Hans-Peter Vogt: Blended Learning mit UO an der BFS BBB
Vortrag Hans-Peter Vogt: Blended Learning mit UO an der BFS BBBVortrag Hans-Peter Vogt: Blended Learning mit UO an der BFS BBB
Vortrag Hans-Peter Vogt: Blended Learning mit UO an der BFS BBBerzBern
 
Hol tart a magyar mobilpiac?
Hol tart a magyar mobilpiac?Hol tart a magyar mobilpiac?
Hol tart a magyar mobilpiac?IAB Hungary
 
Amour Singapore 2016 Press Release_EN_12July2016[2]
Amour Singapore 2016 Press Release_EN_12July2016[2]Amour Singapore 2016 Press Release_EN_12July2016[2]
Amour Singapore 2016 Press Release_EN_12July2016[2]Trang Do
 
ENTRENADORES PARA UN ALTO RENDIMIENTO: METODOLOGÍA LINCE®
ENTRENADORES PARA UN ALTO RENDIMIENTO: METODOLOGÍA LINCE®ENTRENADORES PARA UN ALTO RENDIMIENTO: METODOLOGÍA LINCE®
ENTRENADORES PARA UN ALTO RENDIMIENTO: METODOLOGÍA LINCE®Programa LINCE
 
Open Finance und Participatory Online Budgeting Apps: Politisches Crowdsourci...
Open Finance und Participatory Online Budgeting Apps: Politisches Crowdsourci...Open Finance und Participatory Online Budgeting Apps: Politisches Crowdsourci...
Open Finance und Participatory Online Budgeting Apps: Politisches Crowdsourci...Matthias Stürmer
 
Ips10 Optical inspection for small bores, by Jenoptik
Ips10  Optical inspection for small bores, by JenoptikIps10  Optical inspection for small bores, by Jenoptik
Ips10 Optical inspection for small bores, by JenoptikHommel Etamic (Jenoptik)
 
Building Viral Social Experiences
Building Viral Social ExperiencesBuilding Viral Social Experiences
Building Viral Social ExperiencesJonathan LeBlanc
 
Wie Onlinevideo die Kommunikation verändert
Wie Onlinevideo die Kommunikation verändertWie Onlinevideo die Kommunikation verändert
Wie Onlinevideo die Kommunikation verändertAlexis Johann
 
Comunidad valenciana
Comunidad valencianaComunidad valenciana
Comunidad valencianaOLGAMARIAJOSE
 
Villas summer catalogue - 2011
Villas summer catalogue  - 2011Villas summer catalogue  - 2011
Villas summer catalogue - 2011chooseyourdream
 

Andere mochten auch (20)

Nota firefox os t españa vfinal250213
Nota firefox os t españa vfinal250213Nota firefox os t españa vfinal250213
Nota firefox os t españa vfinal250213
 
Klöckner & Co - Roadshow Presentation April 2011
Klöckner & Co - Roadshow Presentation April 2011Klöckner & Co - Roadshow Presentation April 2011
Klöckner & Co - Roadshow Presentation April 2011
 
Aplicaciones para móviles
Aplicaciones para móviles Aplicaciones para móviles
Aplicaciones para móviles
 
Nuevo catalogo
Nuevo catalogoNuevo catalogo
Nuevo catalogo
 
NACS Newsletter II CEBH
NACS Newsletter II CEBHNACS Newsletter II CEBH
NACS Newsletter II CEBH
 
Elementos para diseñar una empresa de innovación de impacto
Elementos para diseñar una empresa de innovación de impactoElementos para diseñar una empresa de innovación de impacto
Elementos para diseñar una empresa de innovación de impacto
 
CAPI PISOS AMARILLOS DE ECIJA
CAPI PISOS AMARILLOS DE ECIJACAPI PISOS AMARILLOS DE ECIJA
CAPI PISOS AMARILLOS DE ECIJA
 
Boletín Gente emi #44
Boletín Gente emi #44Boletín Gente emi #44
Boletín Gente emi #44
 
Revista Internity Vodafone Septiembre 2012 (1)
Revista Internity Vodafone Septiembre 2012 (1)Revista Internity Vodafone Septiembre 2012 (1)
Revista Internity Vodafone Septiembre 2012 (1)
 
PredimensionadoElectricidadRBT
PredimensionadoElectricidadRBTPredimensionadoElectricidadRBT
PredimensionadoElectricidadRBT
 
Vortrag Hans-Peter Vogt: Blended Learning mit UO an der BFS BBB
Vortrag Hans-Peter Vogt: Blended Learning mit UO an der BFS BBBVortrag Hans-Peter Vogt: Blended Learning mit UO an der BFS BBB
Vortrag Hans-Peter Vogt: Blended Learning mit UO an der BFS BBB
 
Hol tart a magyar mobilpiac?
Hol tart a magyar mobilpiac?Hol tart a magyar mobilpiac?
Hol tart a magyar mobilpiac?
 
Amour Singapore 2016 Press Release_EN_12July2016[2]
Amour Singapore 2016 Press Release_EN_12July2016[2]Amour Singapore 2016 Press Release_EN_12July2016[2]
Amour Singapore 2016 Press Release_EN_12July2016[2]
 
ENTRENADORES PARA UN ALTO RENDIMIENTO: METODOLOGÍA LINCE®
ENTRENADORES PARA UN ALTO RENDIMIENTO: METODOLOGÍA LINCE®ENTRENADORES PARA UN ALTO RENDIMIENTO: METODOLOGÍA LINCE®
ENTRENADORES PARA UN ALTO RENDIMIENTO: METODOLOGÍA LINCE®
 
Open Finance und Participatory Online Budgeting Apps: Politisches Crowdsourci...
Open Finance und Participatory Online Budgeting Apps: Politisches Crowdsourci...Open Finance und Participatory Online Budgeting Apps: Politisches Crowdsourci...
Open Finance und Participatory Online Budgeting Apps: Politisches Crowdsourci...
 
Ips10 Optical inspection for small bores, by Jenoptik
Ips10  Optical inspection for small bores, by JenoptikIps10  Optical inspection for small bores, by Jenoptik
Ips10 Optical inspection for small bores, by Jenoptik
 
Building Viral Social Experiences
Building Viral Social ExperiencesBuilding Viral Social Experiences
Building Viral Social Experiences
 
Wie Onlinevideo die Kommunikation verändert
Wie Onlinevideo die Kommunikation verändertWie Onlinevideo die Kommunikation verändert
Wie Onlinevideo die Kommunikation verändert
 
Comunidad valenciana
Comunidad valencianaComunidad valenciana
Comunidad valenciana
 
Villas summer catalogue - 2011
Villas summer catalogue  - 2011Villas summer catalogue  - 2011
Villas summer catalogue - 2011
 

Ähnlich wie Rail Marketing doc PTC-Final

Resume_rahul kumar singhRF Engineer
Resume_rahul kumar singhRF EngineerResume_rahul kumar singhRF Engineer
Resume_rahul kumar singhRF Engineerrahul singh
 
Early-stage topological and technological choices for TSN-based communication...
Early-stage topological and technological choices for TSN-based communication...Early-stage topological and technological choices for TSN-based communication...
Early-stage topological and technological choices for TSN-based communication...RealTime-at-Work (RTaW)
 
VTA Priority Report Summer 2016 - Paperless CoR Speed Compliance- Fleet Effect
VTA Priority Report Summer 2016 - Paperless CoR Speed Compliance- Fleet EffectVTA Priority Report Summer 2016 - Paperless CoR Speed Compliance- Fleet Effect
VTA Priority Report Summer 2016 - Paperless CoR Speed Compliance- Fleet EffectJohn Tsoucalas
 
Resume Lelin Kumar singh
Resume Lelin Kumar singhResume Lelin Kumar singh
Resume Lelin Kumar singhlelin singh
 
SANTOSH_TELECOM_CV_2
SANTOSH_TELECOM_CV_2SANTOSH_TELECOM_CV_2
SANTOSH_TELECOM_CV_2santosh verma
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experiencelakshman vatada
 
Review on IoT Based Bus Scheduling System using Wireless Sensor Network
Review on IoT Based Bus Scheduling System using Wireless Sensor NetworkReview on IoT Based Bus Scheduling System using Wireless Sensor Network
Review on IoT Based Bus Scheduling System using Wireless Sensor NetworkIRJET Journal
 
CBTC-IEEE-Standard-1474.2-_-3.pdf
CBTC-IEEE-Standard-1474.2-_-3.pdfCBTC-IEEE-Standard-1474.2-_-3.pdf
CBTC-IEEE-Standard-1474.2-_-3.pdfAnoop Mishra
 
TeleArc's Integrated Revenue Maximization Analytics
TeleArc's Integrated Revenue Maximization AnalyticsTeleArc's Integrated Revenue Maximization Analytics
TeleArc's Integrated Revenue Maximization AnalyticsRatan Agarwal
 
Redline Bats M Econnect
Redline Bats M EconnectRedline Bats M Econnect
Redline Bats M Econnectguest89f4d134
 
Telecom Project Services - Pre-launch SSD / SSV
Telecom Project Services - Pre-launch SSD / SSVTelecom Project Services - Pre-launch SSD / SSV
Telecom Project Services - Pre-launch SSD / SSVAmar Uppalapati
 
Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)vikrant tiwari
 
ROLE OF DIGITAL SIMULATION IN CONFIGURING NETWORK PARAMETERS
ROLE OF DIGITAL SIMULATION IN CONFIGURING NETWORK PARAMETERSROLE OF DIGITAL SIMULATION IN CONFIGURING NETWORK PARAMETERS
ROLE OF DIGITAL SIMULATION IN CONFIGURING NETWORK PARAMETERSDeepak Shankar
 

Ähnlich wie Rail Marketing doc PTC-Final (20)

Resume_rahul kumar singhRF Engineer
Resume_rahul kumar singhRF EngineerResume_rahul kumar singhRF Engineer
Resume_rahul kumar singhRF Engineer
 
Job Description
Job DescriptionJob Description
Job Description
 
N.AHSAN
N.AHSANN.AHSAN
N.AHSAN
 
Rabi Kumar Purohita
Rabi Kumar PurohitaRabi Kumar Purohita
Rabi Kumar Purohita
 
SK_RF ENGR@NETKOM 2016
SK_RF ENGR@NETKOM 2016SK_RF ENGR@NETKOM 2016
SK_RF ENGR@NETKOM 2016
 
CV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdfCV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdf
 
Early-stage topological and technological choices for TSN-based communication...
Early-stage topological and technological choices for TSN-based communication...Early-stage topological and technological choices for TSN-based communication...
Early-stage topological and technological choices for TSN-based communication...
 
VTA Priority Report Summer 2016 - Paperless CoR Speed Compliance- Fleet Effect
VTA Priority Report Summer 2016 - Paperless CoR Speed Compliance- Fleet EffectVTA Priority Report Summer 2016 - Paperless CoR Speed Compliance- Fleet Effect
VTA Priority Report Summer 2016 - Paperless CoR Speed Compliance- Fleet Effect
 
Resume Lelin Kumar singh
Resume Lelin Kumar singhResume Lelin Kumar singh
Resume Lelin Kumar singh
 
SANTOSH_TELECOM_CV_2
SANTOSH_TELECOM_CV_2SANTOSH_TELECOM_CV_2
SANTOSH_TELECOM_CV_2
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experience
 
Review on IoT Based Bus Scheduling System using Wireless Sensor Network
Review on IoT Based Bus Scheduling System using Wireless Sensor NetworkReview on IoT Based Bus Scheduling System using Wireless Sensor Network
Review on IoT Based Bus Scheduling System using Wireless Sensor Network
 
CBTC-IEEE-Standard-1474.2-_-3.pdf
CBTC-IEEE-Standard-1474.2-_-3.pdfCBTC-IEEE-Standard-1474.2-_-3.pdf
CBTC-IEEE-Standard-1474.2-_-3.pdf
 
TeleArc's Integrated Revenue Maximization Analytics
TeleArc's Integrated Revenue Maximization AnalyticsTeleArc's Integrated Revenue Maximization Analytics
TeleArc's Integrated Revenue Maximization Analytics
 
Redline Bats M Econnect
Redline Bats M EconnectRedline Bats M Econnect
Redline Bats M Econnect
 
RF_Govind_Dolare_CV
RF_Govind_Dolare_CVRF_Govind_Dolare_CV
RF_Govind_Dolare_CV
 
Telecom Project Services - Pre-launch SSD / SSV
Telecom Project Services - Pre-launch SSD / SSVTelecom Project Services - Pre-launch SSD / SSV
Telecom Project Services - Pre-launch SSD / SSV
 
kismat Resume
kismat Resumekismat Resume
kismat Resume
 
Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)
 
ROLE OF DIGITAL SIMULATION IN CONFIGURING NETWORK PARAMETERS
ROLE OF DIGITAL SIMULATION IN CONFIGURING NETWORK PARAMETERSROLE OF DIGITAL SIMULATION IN CONFIGURING NETWORK PARAMETERS
ROLE OF DIGITAL SIMULATION IN CONFIGURING NETWORK PARAMETERS
 

Rail Marketing doc PTC-Final

  • 1. POSITIVE TRAIN CONTROL (PTC)  JCMB Technology Inc. 195 St-Francois-Xavier, Delson, QC Phone 450.632.5844 • Fax 450.632.3207 Positive Train Control (PTC) requires accurate GIS data (tracks, features, and clearance points) modeled according to PTC specifications. JCMB Technology was involved in the rail network data enrichment process for Canadian National Railway a Class I railroad and was requested to assist their GIS department to increase the location precision of their tracks and track features, as well as, the accuracy of the related attribute data. Multiple sources of data were provided with a source priority list to assure the most precise and up to date information. Rail network track adjustment or capture requires tracks to be perfectly positioned. Equipment is then aligned perpendicular to the track using an orthophoto base map. Every subdivision is enriched to the level of accuracy required by the Federal Railway Administration’s (FRA) PTC implementation standards. There are many steps required to assure track and feature accuracy. Below are some of the tasks JCMB Technology performed in assuring the required level of accuracy of track and feature location for PTC implementation. GIS activities performed for Positive Train Control Implementation:  Validated feature existence and location using the field survey for each PTC subdivision  Track and wayside features accuracy requirements met using: 1. High accuracy ortho-imagery 2. High resolution oblique imagery 3. LIDAR data  The maximum permissible speed & permanent speed limits initial capture  Method of operations initial capture  Method of operations adjustment  Validated and integrated multiple source data  Rail network track adjustment and capture to track center  The central assets repository relationship and calibration nodes for each milepost  Intermediate milepost values (references) for track side features (panels, bungalows, etc.)  Insulated joints and their central assets repository relationship  Train control signs in PTC territory mark limits and method of operation
  • 2. POSITIVE TRAIN CONTROL (PTC)  JCMB Technology Inc. 195 St-Francois-Xavier, Delson, QC Phone 450.632.5844 • Fax 450.632.3207 The FRA requires all rail traffic running through high volume/ risk subdivisions in the US to be compliant with the PTC implementation standards. JCMB Technology has worked very closely with our clients both onsite and via remote desktop to assure constant contact and seamless integration of their GIS data in the effort to eliminate any possibility of error for this high level project. JCMB Technology are hands’ on data specialists with experienced GIS technicians and developers. We cater to the needs of our clients in providing solutions tailored to their needs. There are no problems too big or small for our team. If you require full enrichment or are in need of data specialists to pinpoint anomalies within your database, JCMB Technology has over 20 years experience in providing quality data, and would take great pleasure in assisting you. For more Information please call 450-632-5844 ext. 237 or email john.gauthier@jcmb.com  Central assets relationship class for speed limit signage  Relationship tables link different track segments to form one route between subdivisions  Correction of turnout identification and missed or inaccurately captured switches  Derails need to be enriched for PTC Implementation  Densification and elevation attributes are linked to data prior to QC process and delivery  Linear Reference System (LRS) datum refresh  A QA/QC acceptance criterion requires visually verifying all track and feature locations as well as the maximum permissible speed & permanent speed limits and track rules associated with them  Automated scripts and manual attribution of the Train Management Dispatching system (TMDS) track names  Normal and reverse clearance points reporting  Device identification and attribute matching for PTC integration