Operations Management Session 7 –  JIT and Lean Operations
Outline ,[object Object],[object Object],[object Object],[object Object],[object Object]
Outline – Continued ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Outline – Continued ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Outline – Continued ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Learning Objectives ,[object Object],[object Object],[object Object],[object Object],[object Object]
Learning Objectives ,[object Object],[object Object],[object Object]
Toyota Motor Corporation ,[object Object],[object Object],[object Object],[object Object]
Toyota Motor Corporation ,[object Object],[object Object],[object Object],[object Object],[object Object]
Just-In-Time, TPS, and  Lean Operations ,[object Object],[object Object],[object Object]
Just-In-Time, TPS, and  Lean Operations ,[object Object],[object Object],[object Object]
Eliminate Waste ,[object Object],[object Object]
Ohno’s Seven Wastes ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Eliminate Waste ,[object Object],[object Object],[object Object]
The 5 Ss ,[object Object],[object Object],[object Object],[object Object],[object Object]
The 5 Ss ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Remove Variability ,[object Object],[object Object],[object Object],[object Object]
Sources of Variability ,[object Object],[object Object],[object Object]
Sources of Variability ,[object Object],[object Object],[object Object],Both JIT and inventory reduction are effective tools in identifying causes of variability
Improve Throughput ,[object Object],[object Object],[object Object]
Improve Throughput ,[object Object],[object Object],[object Object]
Just-In-Time (JIT) ,[object Object],[object Object],[object Object],[object Object]
JIT and Competitive Advantage Figure 16.1
JIT and Competitive Advantage Figure 16.1
JIT Partnerships ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
JIT Partnerships Figure 16.2
Concerns of Suppliers ,[object Object],[object Object],[object Object],[object Object],[object Object]
JIT Layout Table 16.1 Reduce waste due to movement JIT Layout Tactics Build work cells for families of products Include a large number operations in a small area Minimize distance Design little space for inventory Improve employee communication Use poka-yoke devices Build flexible or movable equipment Cross-train workers to add flexibility
Distance Reduction ,[object Object],[object Object],[object Object]
Increased Flexibility ,[object Object],[object Object],[object Object]
Impact on Employees ,[object Object],[object Object],[object Object]
Reduced Space and Inventory ,[object Object],[object Object]
Inventory Inventory is at the minimum level necessary to keep operations running Table 16.2 JIT Inventory Tactics Use a pull system to move inventory Reduce lot sizes Develop just-in-time delivery systems with suppliers Deliver directly to point of use Perform to schedule Reduce setup time Use group technology
Reduce Variability Inventory level Figure 16.3 Process downtime Scrap Setup time Late deliveries Quality problems
Reduce Variability Inventory level Scrap Setup time Late deliveries Quality problems Process downtime Figure 16.3
Reduce Lot Sizes Figure 16.4 200  – 100  – Inventory Time Q 2 When average order size = 100 average inventory is 50 Q 1 When average order size = 200 average inventory is 100
Reduce Lot Sizes ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Lot Size Example D = Annual demand = 400,000 units d = Daily demand = 400,000/250 = 1,600 per day p = Daily production rate = 4,000 units Q = EOQ desired = 400 H = Holding cost = $20 per unit S = Setup cost (to be determined) Setup time = $2.40/($30/hour) = 0.08 hr = 4.8 minutes Q = 2DS H(1 - d/p) Q 2  = 2DS H(1 - d/p) S =  =  = $2.40 (Q 2 )(H)(1 - d/p) 2D (3,200,000)(0.6) 800,000
Reduce Setup Costs ,[object Object],[object Object],[object Object]
Lower Setup Costs Figure 16.5 Sum of ordering and holding costs Holding cost Setup cost curves (S 1 , S 2 ) T 1 S 1 T 2 S 2 Cost Lot size
Reduce Setup Times Figure 16.6 Use one-touch system to eliminate adjustments (save 10 minutes) Step 4 Step 5 Training operators and standardizing work procedures (save 2 minutes) Initial Setup Time Step 2 Move material closer and improve material handling (save 20 minutes) Step 1 Separate setup into preparation and actual setup, doing as much as possible while the machine/process is operating  (save 30 minutes) Step 3 Standardize and improve tooling (save 15 minutes) 90 min  — 60 min  — 45 min  — 25 min  — 15 min  — 13 min  — — Repeat cycle until subminute setup is achieved Step 6
JIT Scheduling ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
JIT Scheduling Table 16.3 Better scheduling improves performance JIT Scheduling Tactics Communicate schedules to suppliers Make level schedules Freeze part of the schedule Perform to schedule Seek one-piece-make and one-piece move Eliminate waste Produce in small lots Use kanbans Make each operation produce a perfect part
Level Schedules ,[object Object],[object Object],[object Object],[object Object]
Scheduling Small Lots Figure 16.7 A B C A A A B B B B B C JIT Level Material-Use Approach A C A A A B B B B B C C B B B B A A Large-Lot Approach Time
Kanban ,[object Object],[object Object],[object Object],[object Object]
Kanban ,[object Object],[object Object],Figure 16.8 Part numbers mark location Signal marker on boxes
Kanban Figure 16.9 Purchased Parts Supplier Work cell Raw Material Supplier Kanban Sub-assembly Ship Kanban Kanban Kanban Kanban Finished goods Customer order Final assembly Kanban
Advantages of Kanban ,[object Object],[object Object],[object Object],[object Object]
Quality ,[object Object],[object Object],[object Object],[object Object]
JIT Quality Tactics Table 16.4 Use statistical process control Empower employees Build fail-safe methods (poka-yoke, checklists, etc.) Expose poor quality with small lot JIT Provide immediate feedback
Toyota Production System ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Toyota Production System ,[object Object],[object Object],[object Object],[object Object],[object Object]
Lean Operations ,[object Object],[object Object],[object Object]
Building a Lean Organization ,[object Object],[object Object],[object Object],[object Object],[object Object]
Building a Lean Organization ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
JIT in Services ,[object Object],[object Object],[object Object],[object Object],[object Object]

Weitere ähnliche Inhalte

Was ist angesagt?

Supply Chain Best Practices
Supply Chain Best PracticesSupply Chain Best Practices
Supply Chain Best Practices
Tom Craig
 

Was ist angesagt? (20)

Supply Chain Best Practices
Supply Chain Best PracticesSupply Chain Best Practices
Supply Chain Best Practices
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Independent demand inventory
Independent demand inventoryIndependent demand inventory
Independent demand inventory
 
JIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTJIT- JUST IN TIME PPT
JIT- JUST IN TIME PPT
 
Process view of scm & value chain analysis
Process view of scm & value chain analysisProcess view of scm & value chain analysis
Process view of scm & value chain analysis
 
Coordination in a supply chain
Coordination in a supply chainCoordination in a supply chain
Coordination in a supply chain
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Just in time
Just in timeJust in time
Just in time
 
Design of supply chain networks
Design of supply chain networksDesign of supply chain networks
Design of supply chain networks
 
Aggregate Planning Report
Aggregate Planning ReportAggregate Planning Report
Aggregate Planning Report
 
Principle 4 heijunka
Principle 4 heijunkaPrinciple 4 heijunka
Principle 4 heijunka
 
logistics Performance and Benchmarking
logistics Performance and Benchmarkinglogistics Performance and Benchmarking
logistics Performance and Benchmarking
 
Just in Time and Lean Manufacturing
Just in Time and Lean ManufacturingJust in Time and Lean Manufacturing
Just in Time and Lean Manufacturing
 
The bullwhip effect
The bullwhip effectThe bullwhip effect
The bullwhip effect
 
Capacity Management
Capacity ManagementCapacity Management
Capacity Management
 
Lean logistics and warehousing final
Lean logistics and warehousing finalLean logistics and warehousing final
Lean logistics and warehousing final
 
SUPPLY CHAIN STRATEGIES
SUPPLY CHAIN STRATEGIESSUPPLY CHAIN STRATEGIES
SUPPLY CHAIN STRATEGIES
 
Heizer 12
Heizer 12Heizer 12
Heizer 12
 
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & Forecasting
 

Andere mochten auch

37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
sashi prabhu
 
4.the dynamic warehousing design and layout
4.the dynamic warehousing  design and layout4.the dynamic warehousing  design and layout
4.the dynamic warehousing design and layout
Rahul Verma
 

Andere mochten auch (20)

Just In Time (JIT) Systems
Just In Time (JIT) SystemsJust In Time (JIT) Systems
Just In Time (JIT) Systems
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
 
19
1919
19
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
 
Jit principles
Jit principlesJit principles
Jit principles
 
Just In Time - Operations Management
Just In Time - Operations ManagementJust In Time - Operations Management
Just In Time - Operations Management
 
JIT
JITJIT
JIT
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
 
Kaizen Philosophy
Kaizen PhilosophyKaizen Philosophy
Kaizen Philosophy
 
Warehouse
WarehouseWarehouse
Warehouse
 
Warehousing
WarehousingWarehousing
Warehousing
 
Lean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production SystemLean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production System
 
5S
5S5S
5S
 
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)
 
Just in time
Just in timeJust in time
Just in time
 
4.the dynamic warehousing design and layout
4.the dynamic warehousing  design and layout4.the dynamic warehousing  design and layout
4.the dynamic warehousing design and layout
 
mHealth - how to make Wireless Healthcare work
mHealth - how to make Wireless Healthcare workmHealth - how to make Wireless Healthcare work
mHealth - how to make Wireless Healthcare work
 
Health care jit
Health care jitHealth care jit
Health care jit
 

Ähnlich wie Jit And Lean

Session 8
Session 8Session 8
Session 8
thangv
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
thangv
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
sashi prabhu
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
sashi prabhu
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
Alan Desrocher
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jit
sree19881988
 

Ähnlich wie Jit And Lean (20)

Session 8
Session 8Session 8
Session 8
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
 
Jit
JitJit
Jit
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
 
Lean manufacturing & 6s
Lean manufacturing & 6sLean manufacturing & 6s
Lean manufacturing & 6s
 
Just In Time
Just In TimeJust In Time
Just In Time
 
LEAN MANUFACTURING USES
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
 
Jit
JitJit
Jit
 
Lean manufacturing presentation in pharmaceuticals industry
Lean manufacturing presentation in pharmaceuticals industryLean manufacturing presentation in pharmaceuticals industry
Lean manufacturing presentation in pharmaceuticals industry
 
SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time Reduction
 
Toyota way
Toyota wayToyota way
Toyota way
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jit
 
file000239.pdf
file000239.pdffile000239.pdf
file000239.pdf
 
Make green go green by going lean
Make green go green by going leanMake green go green by going lean
Make green go green by going lean
 
production
productionproduction
production
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
JIT and Lean Manufacturing
JIT and Lean Manufacturing JIT and Lean Manufacturing
JIT and Lean Manufacturing
 

Mehr von Joanmaines

Direcció De Producció I Operacions I Tema I
Direcció De Producció I Operacions I Tema IDirecció De Producció I Operacions I Tema I
Direcció De Producció I Operacions I Tema I
Joanmaines
 
Direcció De Producció I Operacions I Tema Ii
Direcció De Producció I Operacions I Tema IiDirecció De Producció I Operacions I Tema Ii
Direcció De Producció I Operacions I Tema Ii
Joanmaines
 
Direcció De Producció I Operacions I Tema Iii
Direcció De Producció I Operacions I Tema IiiDirecció De Producció I Operacions I Tema Iii
Direcció De Producció I Operacions I Tema Iii
Joanmaines
 
Direcció De Producció I Operacions I Tema Iv
Direcció De Producció I Operacions I Tema IvDirecció De Producció I Operacions I Tema Iv
Direcció De Producció I Operacions I Tema Iv
Joanmaines
 
Direcció De Producció I Operacions I Tema V
Direcció De Producció I Operacions I Tema VDirecció De Producció I Operacions I Tema V
Direcció De Producció I Operacions I Tema V
Joanmaines
 
Direcció De Producció I Operacions I Tema Vi
Direcció De Producció I Operacions I Tema ViDirecció De Producció I Operacions I Tema Vi
Direcció De Producció I Operacions I Tema Vi
Joanmaines
 
Direcció De Producció I Operacions I Tema Viii
Direcció De Producció I Operacions I Tema ViiiDirecció De Producció I Operacions I Tema Viii
Direcció De Producció I Operacions I Tema Viii
Joanmaines
 

Mehr von Joanmaines (17)

Video Case 3 2
Video Case 3 2Video Case 3 2
Video Case 3 2
 
Video Case 4
Video Case 4Video Case 4
Video Case 4
 
Video Case 6 2
Video Case 6 2Video Case 6 2
Video Case 6 2
 
Inventory Management And Mrp Erp
Inventory Management And Mrp   ErpInventory Management And Mrp   Erp
Inventory Management And Mrp Erp
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Location Strategy
Location StrategyLocation Strategy
Location Strategy
 
Process And Layout Strategies
Process And Layout StrategiesProcess And Layout Strategies
Process And Layout Strategies
 
Forecasting And Aggregate Planning
Forecasting And Aggregate PlanningForecasting And Aggregate Planning
Forecasting And Aggregate Planning
 
Operations Strategy
Operations StrategyOperations Strategy
Operations Strategy
 
Operations And Productivity
Operations And ProductivityOperations And Productivity
Operations And Productivity
 
Direcció De Producció I Operacions I Tema I
Direcció De Producció I Operacions I Tema IDirecció De Producció I Operacions I Tema I
Direcció De Producció I Operacions I Tema I
 
Direcció De Producció I Operacions I Tema Ii
Direcció De Producció I Operacions I Tema IiDirecció De Producció I Operacions I Tema Ii
Direcció De Producció I Operacions I Tema Ii
 
Direcció De Producció I Operacions I Tema Iii
Direcció De Producció I Operacions I Tema IiiDirecció De Producció I Operacions I Tema Iii
Direcció De Producció I Operacions I Tema Iii
 
Direcció De Producció I Operacions I Tema Iv
Direcció De Producció I Operacions I Tema IvDirecció De Producció I Operacions I Tema Iv
Direcció De Producció I Operacions I Tema Iv
 
Direcció De Producció I Operacions I Tema V
Direcció De Producció I Operacions I Tema VDirecció De Producció I Operacions I Tema V
Direcció De Producció I Operacions I Tema V
 
Direcció De Producció I Operacions I Tema Vi
Direcció De Producció I Operacions I Tema ViDirecció De Producció I Operacions I Tema Vi
Direcció De Producció I Operacions I Tema Vi
 
Direcció De Producció I Operacions I Tema Viii
Direcció De Producció I Operacions I Tema ViiiDirecció De Producció I Operacions I Tema Viii
Direcció De Producció I Operacions I Tema Viii
 

Kürzlich hochgeladen

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
SoniaTolstoy
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
fonyou31
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Krashi Coaching
 

Kürzlich hochgeladen (20)

Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 

Jit And Lean

  • 1. Operations Management Session 7 – JIT and Lean Operations
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23. JIT and Competitive Advantage Figure 16.1
  • 24. JIT and Competitive Advantage Figure 16.1
  • 25.
  • 27.
  • 28. JIT Layout Table 16.1 Reduce waste due to movement JIT Layout Tactics Build work cells for families of products Include a large number operations in a small area Minimize distance Design little space for inventory Improve employee communication Use poka-yoke devices Build flexible or movable equipment Cross-train workers to add flexibility
  • 29.
  • 30.
  • 31.
  • 32.
  • 33. Inventory Inventory is at the minimum level necessary to keep operations running Table 16.2 JIT Inventory Tactics Use a pull system to move inventory Reduce lot sizes Develop just-in-time delivery systems with suppliers Deliver directly to point of use Perform to schedule Reduce setup time Use group technology
  • 34. Reduce Variability Inventory level Figure 16.3 Process downtime Scrap Setup time Late deliveries Quality problems
  • 35. Reduce Variability Inventory level Scrap Setup time Late deliveries Quality problems Process downtime Figure 16.3
  • 36. Reduce Lot Sizes Figure 16.4 200 – 100 – Inventory Time Q 2 When average order size = 100 average inventory is 50 Q 1 When average order size = 200 average inventory is 100
  • 37.
  • 38. Lot Size Example D = Annual demand = 400,000 units d = Daily demand = 400,000/250 = 1,600 per day p = Daily production rate = 4,000 units Q = EOQ desired = 400 H = Holding cost = $20 per unit S = Setup cost (to be determined) Setup time = $2.40/($30/hour) = 0.08 hr = 4.8 minutes Q = 2DS H(1 - d/p) Q 2 = 2DS H(1 - d/p) S = = = $2.40 (Q 2 )(H)(1 - d/p) 2D (3,200,000)(0.6) 800,000
  • 39.
  • 40. Lower Setup Costs Figure 16.5 Sum of ordering and holding costs Holding cost Setup cost curves (S 1 , S 2 ) T 1 S 1 T 2 S 2 Cost Lot size
  • 41. Reduce Setup Times Figure 16.6 Use one-touch system to eliminate adjustments (save 10 minutes) Step 4 Step 5 Training operators and standardizing work procedures (save 2 minutes) Initial Setup Time Step 2 Move material closer and improve material handling (save 20 minutes) Step 1 Separate setup into preparation and actual setup, doing as much as possible while the machine/process is operating (save 30 minutes) Step 3 Standardize and improve tooling (save 15 minutes) 90 min — 60 min — 45 min — 25 min — 15 min — 13 min — — Repeat cycle until subminute setup is achieved Step 6
  • 42.
  • 43. JIT Scheduling Table 16.3 Better scheduling improves performance JIT Scheduling Tactics Communicate schedules to suppliers Make level schedules Freeze part of the schedule Perform to schedule Seek one-piece-make and one-piece move Eliminate waste Produce in small lots Use kanbans Make each operation produce a perfect part
  • 44.
  • 45. Scheduling Small Lots Figure 16.7 A B C A A A B B B B B C JIT Level Material-Use Approach A C A A A B B B B B C C B B B B A A Large-Lot Approach Time
  • 46.
  • 47.
  • 48. Kanban Figure 16.9 Purchased Parts Supplier Work cell Raw Material Supplier Kanban Sub-assembly Ship Kanban Kanban Kanban Kanban Finished goods Customer order Final assembly Kanban
  • 49.
  • 50.
  • 51. JIT Quality Tactics Table 16.4 Use statistical process control Empower employees Build fail-safe methods (poka-yoke, checklists, etc.) Expose poor quality with small lot JIT Provide immediate feedback
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.