SlideShare ist ein Scribd-Unternehmen logo
1 von 20
ASME SECTION VIII DIV 1
UG-77 Material Identification
• On completed vessel, original identification markings,
or transferred markings or coded markings (traceable
to original) shall be visible on each vessel part
• Any marking method which is acceptable to inspector
• When service conditions prohibit die-stamping, any
method with positive identification may be adopted
• When original markings are unavoidably cut, coded
markings may be adopted which shall be described in
QC system
UG-78 Repair of defects in materials
• Method & extent of repair shall be acceptable to
inspector
• Defective material that cannot be satisfactorily
repaired shall be rejected
UG-84 Charpy Impact Tests
• Production Test Coupons
– Test plate shall be from one of heats of vessel
– For category A joint, test plate shall, where
practicable, be welded as an extension to end of
production joint
– For category B joint (welded using different welding
procedure than used on category A joints, test plate
shall be welded under production welding
conditions used for vessel, using same type of
equipment and at same location and using same
procedures as used for joint and it shall be welded
concurrently with production welds or as closed to
start of production welding as practicable
UG-84 Charpy Impact Tests
• Production Test Coupon
– One test plate for each welding procedure for
categories A & B
– For automatic or semi automatic welding, one test
plate in each position
– For manual welding, vertical upward welded test
plate qualify for all position.
– If PTC fails to meet the impact requirements, welds
represented shall be unacceptable. Reheat treatment
and retesting or retesting only are permitted.
UW-3 Weld joint category
• Defines the location of a joint in a vessel
• Established for use in specifying joint type and degree
of inspection
• Based on service, material and thickness, special
requirements are specified in code
– Category A
– Category B
– Category C
– Category D
UW-3 Weld joint category
UW-11 Radiographic & Ultrasonic Examination
• Full radiography
– All butt welds in shell and heads of lethal service
vessels
– All butt welds with nominal thickness of weld
exceeds 38 mm or thickness specified elsewhere in
code. Category B & C butt welds in nozzles that
neither exceeds 10” size nor 29 mm wall thickness
do not require radiography
UW-11 Radiographic & Ultrasonic Examination
• Spot Radiography
– Butt welds of type 1 or 2 of table UW-12 which are
not required to be fully radiographed
– If spot radiography is specified for the entire vessel,
RT is not required for category B & C welds in
nozzles or communicating chamber that neither
exceeds NPS 10 nor 29 mm wall thickness
• No Radiography
– No radiography is required when the vessel or vessel
part is designed for external pressure only or when
the joint design complies with UW-12(C)
UW-26 General
• All welding shall be performed in accordance with
Manufacturer’s WPS in accordance with the
requirements of Sec IX
• All welders shall be qualified by Manufacturer in
accordance with the requirements of Sec IX
• Assign welder identification symbol
UW-32 Cleaning of surfaces to be welded
• Surfaces shall be clean and free of scale, rust, oil,
grease, slag, detrimental oxides and other deleterious
foreign material
• When metal is to be deposited over a previously welded
surface, all slag shall be removed by a roughing tool,
chisel, chipping hammer or other suitable means
UW-33 Alignment tolerances
• Alignment of sections at edges shall be such that
maximum offset is not greater than limit given in Table
UW-33
• Allowable offset shall be faired at a 3:1 taper over
width of finished weld, or if necessary, by adding
additional weld metal
UW-35 Finished Long & Circ Joints
UW-37 Miscellaneous Welding Requirements
• Welder & welding operator identification
– Stamp identifying number, letter or symbol on or
adjacent to and at intervals of not more than 1 m
along the welds in steel plates >= 6 mm and for non
ferrous plates >= 13 mm in thickness
– Stencil or other marking in welds in steel plates < 6
mm and for non ferrous plates < 13 mm in
thickness
– Record of welders / WOs employed on each joints
shall be kept
– For multiple welds, tube to tube sheet welds, QA
system shall have a procedure to identify welders or
welding operators
• Imperfections are unacceptable under following
condition
– Any crack or incomplete fusion or penetration
– Any elongated indication which has length greater
than
• 6 mm for t upto 19 mm
• 1/3t for t from 19 mm to 57 mm
• 19 mm for t over 57 mm
UW-51 Radiographic Examination of Welded Joints
UW-52 Spot Examination of Welded Joints
• One spot shall be examined for each 15 m increment
• Sufficient number of spot radiographs shall be taken to
examine welding of each welder or welding operator
• Location of spot shall be chosen by the Inspector
• Radiographs required at specific locations to satisfy
rules of other paragraphs shall not be used to satisfy
the requirements of spot radiography
• Minimum length of spot shall be 6 inch
UW-52 Spot Examination of Welded Joints
• Any crack or lack of fusion/penetration is unacceptable
• Any slag inclusions or cavities
– with length more than 2/3t shall be unacceptable
– If several indications within above limitations are in
line, weld is acceptable if sum of the longest
dimensions of all such indication is not more than t
in length of 6t and if longest indications considered
are separated by at least 3L where L is length of
longest indication
– Max. length of longest indication shall be 19 mm
– Less than 6 mm shall be acceptable
UCS-57 Radiographic Examination
• In addition to UW-11, RT is required for butt welds
which exceed thickness limit specified in Table UCS-57
App 6 - MPE & App 8 - LPE
• Acceptance standard
– All surfaces to be examined shall be free of
• Relevant linear indications
• Relevant rounded indications greater than 5 mm
• Four or more relevant rounded indication in a
line separated by 1.5 mm or less, edge to edge
Appendix 12 Ultrasonic Examination of welds
• Indications characterized as cracks, lack of fusion or
incomplete penetration are unacceptable regardless of
length
• Other imperfections are unacceptable if indications
exceed reference level amplitude and have lengths
which exceed
– 6 mm for t upto 19 mm
– 1/3t for t from 19 mm to 57 mm
– 19 mm for t over 57 mm

Weitere ähnliche Inhalte

Was ist angesagt?

Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questionsKarthik Banari
 
Procedure qualification
Procedure qualificationProcedure qualification
Procedure qualificationvaasuBandaru
 
what is process piping
what is process pipingwhat is process piping
what is process pipingVarun Patel
 
criteria of weld defects
criteria of weld defects criteria of weld defects
criteria of weld defects Saqib Rasool
 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixmayank0738
 
Piping sample report
Piping sample reportPiping sample report
Piping sample reportram111eg
 
Introduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdfIntroduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdfdeckyantony
 
How to review wps part 1 (mau company)
How to review wps part 1 (mau company)How to review wps part 1 (mau company)
How to review wps part 1 (mau company)Mohamed Farouk
 
ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfPKNanavati
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2Jithu John
 
Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Ramdani Diningrat
 
Process piping fundamentals, codes and standards module 1
Process piping fundamentals, codes and standards    module 1Process piping fundamentals, codes and standards    module 1
Process piping fundamentals, codes and standards module 1BHARAT BELLAD
 
Piping welding notes for beginners
Piping welding notes for beginnersPiping welding notes for beginners
Piping welding notes for beginnersMOHAMMAD ATIF ALI
 
Piping training-course
Piping training-coursePiping training-course
Piping training-coursepdmsguy
 
B31.3 process piping course 02 metallic pipe &amp; fitting selection
B31.3 process piping course   02 metallic pipe &amp; fitting selectionB31.3 process piping course   02 metallic pipe &amp; fitting selection
B31.3 process piping course 02 metallic pipe &amp; fitting selectionAhmedhelal_Metito Helal
 
Slip on flange welding according TO asme b31.3
Slip on flange welding according TO asme b31.3Slip on flange welding according TO asme b31.3
Slip on flange welding according TO asme b31.3Amr Soliman
 
Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013leo040490
 

Was ist angesagt? (20)

Qc piping guide
Qc piping guideQc piping guide
Qc piping guide
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questions
 
Procedure qualification
Procedure qualificationProcedure qualification
Procedure qualification
 
what is process piping
what is process pipingwhat is process piping
what is process piping
 
criteria of weld defects
criteria of weld defects criteria of weld defects
criteria of weld defects
 
Presentation on SECVIII
Presentation on SECVIIIPresentation on SECVIII
Presentation on SECVIII
 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ix
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
 
Introduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdfIntroduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdf
 
How to review wps part 1 (mau company)
How to review wps part 1 (mau company)How to review wps part 1 (mau company)
How to review wps part 1 (mau company)
 
Pwht1
Pwht1Pwht1
Pwht1
 
ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdf
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2
 
Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1
 
Process piping fundamentals, codes and standards module 1
Process piping fundamentals, codes and standards    module 1Process piping fundamentals, codes and standards    module 1
Process piping fundamentals, codes and standards module 1
 
Piping welding notes for beginners
Piping welding notes for beginnersPiping welding notes for beginners
Piping welding notes for beginners
 
Piping training-course
Piping training-coursePiping training-course
Piping training-course
 
B31.3 process piping course 02 metallic pipe &amp; fitting selection
B31.3 process piping course   02 metallic pipe &amp; fitting selectionB31.3 process piping course   02 metallic pipe &amp; fitting selection
B31.3 process piping course 02 metallic pipe &amp; fitting selection
 
Slip on flange welding according TO asme b31.3
Slip on flange welding according TO asme b31.3Slip on flange welding according TO asme b31.3
Slip on flange welding according TO asme b31.3
 
Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013
 

Andere mochten auch

Pressure vessel manufacturing
Pressure vessel manufacturingPressure vessel manufacturing
Pressure vessel manufacturingphysics101
 
Pressure vessels
Pressure vessels  Pressure vessels
Pressure vessels GPTraining
 
Vessel fabrication sequence
Vessel fabrication sequenceVessel fabrication sequence
Vessel fabrication sequenceCameron
 
Radiographic interpretation
Radiographic interpretationRadiographic interpretation
Radiographic interpretationmoix rafiq
 
Weld ability of the new generation stainless steels
Weld ability of the new generation stainless steelsWeld ability of the new generation stainless steels
Weld ability of the new generation stainless steelsJithu John
 
Design by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselDesign by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselAnalyzeForSafety
 

Andere mochten auch (10)

Pressure vessels
Pressure vesselsPressure vessels
Pressure vessels
 
Pressure vessel manufacturing
Pressure vessel manufacturingPressure vessel manufacturing
Pressure vessel manufacturing
 
Pressure vessel types
Pressure vessel typesPressure vessel types
Pressure vessel types
 
Pressure vessels
Pressure vessels  Pressure vessels
Pressure vessels
 
Shell rolling procedure
Shell rolling procedureShell rolling procedure
Shell rolling procedure
 
Vessel fabrication sequence
Vessel fabrication sequenceVessel fabrication sequence
Vessel fabrication sequence
 
Radiographic interpretation
Radiographic interpretationRadiographic interpretation
Radiographic interpretation
 
Weld ability of the new generation stainless steels
Weld ability of the new generation stainless steelsWeld ability of the new generation stainless steels
Weld ability of the new generation stainless steels
 
Rt Acceptance
Rt AcceptanceRt Acceptance
Rt Acceptance
 
Design by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselDesign by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vessel
 

Ähnlich wie Asme sec viii div 1 s

asmesecviiidiv2-140726082839-phpapp01.pdf
asmesecviiidiv2-140726082839-phpapp01.pdfasmesecviiidiv2-140726082839-phpapp01.pdf
asmesecviiidiv2-140726082839-phpapp01.pdfNithinGanesh3
 
WELDING PROCEDURES and WELDERS QUALIFICATION .ppt
WELDING PROCEDURES and WELDERS QUALIFICATION .pptWELDING PROCEDURES and WELDERS QUALIFICATION .ppt
WELDING PROCEDURES and WELDERS QUALIFICATION .pptmohammed194284
 
86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.ppt86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.pptpeter770054
 
WPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfWPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfmounirbonnois
 
Important qualification ranges must know about welder performance
Important qualification ranges must know about welder performanceImportant qualification ranges must know about welder performance
Important qualification ranges must know about welder performanceWeld Maniac
 
Welding works in steel piping
Welding works in steel pipingWelding works in steel piping
Welding works in steel pipingAkshay Toraskar
 
Good practices in PSC work.ppt
Good practices in PSC work.pptGood practices in PSC work.ppt
Good practices in PSC work.pptssusercaf1a41
 
Pipe wizard olympus
Pipe wizard olympusPipe wizard olympus
Pipe wizard olympusSungsoo Han
 
DP acco. to DS1-converti.pptx
DP acco. to DS1-converti.pptxDP acco. to DS1-converti.pptx
DP acco. to DS1-converti.pptxmajdijerbi3
 
Methodology Of Fabrication_R4_19.08.16.pptx
Methodology Of Fabrication_R4_19.08.16.pptxMethodology Of Fabrication_R4_19.08.16.pptx
Methodology Of Fabrication_R4_19.08.16.pptxharmanpnrgroup
 
Weld Defects
Weld DefectsWeld Defects
Weld Defectsadminn2
 
Welding — arc stud welding of metallic
Welding — arc stud welding of metallicWelding — arc stud welding of metallic
Welding — arc stud welding of metallicsai anjaneya
 
Asmesectionix
Asmesectionix Asmesectionix
Asmesectionix Nuri Cesur
 
01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976Southern Railway
 
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...Thorne & Derrick International
 
L&T Valves - Role of NDT in Valve Industries
L&T Valves - Role of NDT in Valve IndustriesL&T Valves - Role of NDT in Valve Industries
L&T Valves - Role of NDT in Valve IndustriesBabu Kuriakose
 

Ähnlich wie Asme sec viii div 1 s (20)

asmesecviiidiv2-140726082839-phpapp01.pdf
asmesecviiidiv2-140726082839-phpapp01.pdfasmesecviiidiv2-140726082839-phpapp01.pdf
asmesecviiidiv2-140726082839-phpapp01.pdf
 
WELDING PROCEDURES and WELDERS QUALIFICATION .ppt
WELDING PROCEDURES and WELDERS QUALIFICATION .pptWELDING PROCEDURES and WELDERS QUALIFICATION .ppt
WELDING PROCEDURES and WELDERS QUALIFICATION .ppt
 
86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.ppt86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.ppt
 
WPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfWPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdf
 
Piping bv
Piping bvPiping bv
Piping bv
 
Important qualification ranges must know about welder performance
Important qualification ranges must know about welder performanceImportant qualification ranges must know about welder performance
Important qualification ranges must know about welder performance
 
Welding works in steel piping
Welding works in steel pipingWelding works in steel piping
Welding works in steel piping
 
Good practices in PSC work.ppt
Good practices in PSC work.pptGood practices in PSC work.ppt
Good practices in PSC work.ppt
 
Pipe wizard olympus
Pipe wizard olympusPipe wizard olympus
Pipe wizard olympus
 
DP acco. to DS1-converti.pptx
DP acco. to DS1-converti.pptxDP acco. to DS1-converti.pptx
DP acco. to DS1-converti.pptx
 
Methodology Of Fabrication_R4_19.08.16.pptx
Methodology Of Fabrication_R4_19.08.16.pptxMethodology Of Fabrication_R4_19.08.16.pptx
Methodology Of Fabrication_R4_19.08.16.pptx
 
Weld Defects
Weld DefectsWeld Defects
Weld Defects
 
Welding — arc stud welding of metallic
Welding — arc stud welding of metallicWelding — arc stud welding of metallic
Welding — arc stud welding of metallic
 
Asmesectionix
Asmesectionix Asmesectionix
Asmesectionix
 
01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976
 
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
 
ASTM E190
ASTM E190ASTM E190
ASTM E190
 
Mast testing ppt
Mast testing pptMast testing ppt
Mast testing ppt
 
Module 5
Module 5Module 5
Module 5
 
L&T Valves - Role of NDT in Valve Industries
L&T Valves - Role of NDT in Valve IndustriesL&T Valves - Role of NDT in Valve Industries
L&T Valves - Role of NDT in Valve Industries
 

Mehr von Jithu John

2. Pharmacokinetics and dynamics - KK.pptx
2. Pharmacokinetics and dynamics - KK.pptx2. Pharmacokinetics and dynamics - KK.pptx
2. Pharmacokinetics and dynamics - KK.pptxJithu John
 
9 belzona-2 - compliant repairs
9 belzona-2 - compliant repairs9 belzona-2 - compliant repairs
9 belzona-2 - compliant repairsJithu John
 
2 eliminate hidden riskof cui
2 eliminate hidden riskof cui2 eliminate hidden riskof cui
2 eliminate hidden riskof cuiJithu John
 
Oil refinery processes
Oil refinery processesOil refinery processes
Oil refinery processesJithu John
 
Asme sec. ix bkr - 051010
Asme sec. ix   bkr - 051010Asme sec. ix   bkr - 051010
Asme sec. ix bkr - 051010Jithu John
 
Saudi aramco standards
Saudi aramco standardsSaudi aramco standards
Saudi aramco standardsJithu John
 
100661266 cswip-3-1-2009
100661266 cswip-3-1-2009100661266 cswip-3-1-2009
100661266 cswip-3-1-2009Jithu John
 
61769477 welding-inspection-cswip-gud
61769477 welding-inspection-cswip-gud61769477 welding-inspection-cswip-gud
61769477 welding-inspection-cswip-gudJithu John
 
Welding qualification a
Welding qualification aWelding qualification a
Welding qualification aJithu John
 

Mehr von Jithu John (12)

2. Pharmacokinetics and dynamics - KK.pptx
2. Pharmacokinetics and dynamics - KK.pptx2. Pharmacokinetics and dynamics - KK.pptx
2. Pharmacokinetics and dynamics - KK.pptx
 
my ppt.pptx
my ppt.pptxmy ppt.pptx
my ppt.pptx
 
9 belzona-2 - compliant repairs
9 belzona-2 - compliant repairs9 belzona-2 - compliant repairs
9 belzona-2 - compliant repairs
 
2 eliminate hidden riskof cui
2 eliminate hidden riskof cui2 eliminate hidden riskof cui
2 eliminate hidden riskof cui
 
Oil refinery processes
Oil refinery processesOil refinery processes
Oil refinery processes
 
Asme sec. ix bkr - 051010
Asme sec. ix   bkr - 051010Asme sec. ix   bkr - 051010
Asme sec. ix bkr - 051010
 
Saudi aramco standards
Saudi aramco standardsSaudi aramco standards
Saudi aramco standards
 
Alignment
AlignmentAlignment
Alignment
 
100661266 cswip-3-1-2009
100661266 cswip-3-1-2009100661266 cswip-3-1-2009
100661266 cswip-3-1-2009
 
61769477 welding-inspection-cswip-gud
61769477 welding-inspection-cswip-gud61769477 welding-inspection-cswip-gud
61769477 welding-inspection-cswip-gud
 
Weld defects
Weld defectsWeld defects
Weld defects
 
Welding qualification a
Welding qualification aWelding qualification a
Welding qualification a
 

Kürzlich hochgeladen

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...Health
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxnuruddin69
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 

Kürzlich hochgeladen (20)

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

Asme sec viii div 1 s

  • 2. UG-77 Material Identification • On completed vessel, original identification markings, or transferred markings or coded markings (traceable to original) shall be visible on each vessel part • Any marking method which is acceptable to inspector • When service conditions prohibit die-stamping, any method with positive identification may be adopted • When original markings are unavoidably cut, coded markings may be adopted which shall be described in QC system
  • 3. UG-78 Repair of defects in materials • Method & extent of repair shall be acceptable to inspector • Defective material that cannot be satisfactorily repaired shall be rejected
  • 4. UG-84 Charpy Impact Tests • Production Test Coupons – Test plate shall be from one of heats of vessel – For category A joint, test plate shall, where practicable, be welded as an extension to end of production joint – For category B joint (welded using different welding procedure than used on category A joints, test plate shall be welded under production welding conditions used for vessel, using same type of equipment and at same location and using same procedures as used for joint and it shall be welded concurrently with production welds or as closed to start of production welding as practicable
  • 5. UG-84 Charpy Impact Tests • Production Test Coupon – One test plate for each welding procedure for categories A & B – For automatic or semi automatic welding, one test plate in each position – For manual welding, vertical upward welded test plate qualify for all position. – If PTC fails to meet the impact requirements, welds represented shall be unacceptable. Reheat treatment and retesting or retesting only are permitted.
  • 6. UW-3 Weld joint category • Defines the location of a joint in a vessel • Established for use in specifying joint type and degree of inspection • Based on service, material and thickness, special requirements are specified in code – Category A – Category B – Category C – Category D
  • 7. UW-3 Weld joint category
  • 8. UW-11 Radiographic & Ultrasonic Examination • Full radiography – All butt welds in shell and heads of lethal service vessels – All butt welds with nominal thickness of weld exceeds 38 mm or thickness specified elsewhere in code. Category B & C butt welds in nozzles that neither exceeds 10” size nor 29 mm wall thickness do not require radiography
  • 9. UW-11 Radiographic & Ultrasonic Examination • Spot Radiography – Butt welds of type 1 or 2 of table UW-12 which are not required to be fully radiographed – If spot radiography is specified for the entire vessel, RT is not required for category B & C welds in nozzles or communicating chamber that neither exceeds NPS 10 nor 29 mm wall thickness • No Radiography – No radiography is required when the vessel or vessel part is designed for external pressure only or when the joint design complies with UW-12(C)
  • 10. UW-26 General • All welding shall be performed in accordance with Manufacturer’s WPS in accordance with the requirements of Sec IX • All welders shall be qualified by Manufacturer in accordance with the requirements of Sec IX • Assign welder identification symbol
  • 11. UW-32 Cleaning of surfaces to be welded • Surfaces shall be clean and free of scale, rust, oil, grease, slag, detrimental oxides and other deleterious foreign material • When metal is to be deposited over a previously welded surface, all slag shall be removed by a roughing tool, chisel, chipping hammer or other suitable means
  • 12. UW-33 Alignment tolerances • Alignment of sections at edges shall be such that maximum offset is not greater than limit given in Table UW-33 • Allowable offset shall be faired at a 3:1 taper over width of finished weld, or if necessary, by adding additional weld metal
  • 13. UW-35 Finished Long & Circ Joints
  • 14. UW-37 Miscellaneous Welding Requirements • Welder & welding operator identification – Stamp identifying number, letter or symbol on or adjacent to and at intervals of not more than 1 m along the welds in steel plates >= 6 mm and for non ferrous plates >= 13 mm in thickness – Stencil or other marking in welds in steel plates < 6 mm and for non ferrous plates < 13 mm in thickness – Record of welders / WOs employed on each joints shall be kept – For multiple welds, tube to tube sheet welds, QA system shall have a procedure to identify welders or welding operators
  • 15. • Imperfections are unacceptable under following condition – Any crack or incomplete fusion or penetration – Any elongated indication which has length greater than • 6 mm for t upto 19 mm • 1/3t for t from 19 mm to 57 mm • 19 mm for t over 57 mm UW-51 Radiographic Examination of Welded Joints
  • 16. UW-52 Spot Examination of Welded Joints • One spot shall be examined for each 15 m increment • Sufficient number of spot radiographs shall be taken to examine welding of each welder or welding operator • Location of spot shall be chosen by the Inspector • Radiographs required at specific locations to satisfy rules of other paragraphs shall not be used to satisfy the requirements of spot radiography • Minimum length of spot shall be 6 inch
  • 17. UW-52 Spot Examination of Welded Joints • Any crack or lack of fusion/penetration is unacceptable • Any slag inclusions or cavities – with length more than 2/3t shall be unacceptable – If several indications within above limitations are in line, weld is acceptable if sum of the longest dimensions of all such indication is not more than t in length of 6t and if longest indications considered are separated by at least 3L where L is length of longest indication – Max. length of longest indication shall be 19 mm – Less than 6 mm shall be acceptable
  • 18. UCS-57 Radiographic Examination • In addition to UW-11, RT is required for butt welds which exceed thickness limit specified in Table UCS-57
  • 19. App 6 - MPE & App 8 - LPE • Acceptance standard – All surfaces to be examined shall be free of • Relevant linear indications • Relevant rounded indications greater than 5 mm • Four or more relevant rounded indication in a line separated by 1.5 mm or less, edge to edge
  • 20. Appendix 12 Ultrasonic Examination of welds • Indications characterized as cracks, lack of fusion or incomplete penetration are unacceptable regardless of length • Other imperfections are unacceptable if indications exceed reference level amplitude and have lengths which exceed – 6 mm for t upto 19 mm – 1/3t for t from 19 mm to 57 mm – 19 mm for t over 57 mm