Stakeholder Analysis 
Copyright © 2007 SAP AG. All rights reserved 
1 
Contents 
Introduction........................................................................................................................................... 2 
Purpose ........................................................................................................................................ 2 
Objective of Stakeholder Analysis ................................................................................................. 2 
Scope of Stakeholder Analysis...................................................................................................... 2 
The Approach........................................................................................................................................ 3 
1. Identify/Confirm Stakeholder Groups ......................................................................................... 3 
2. Identify / Review Stakeholder Expectations/Needs..................................................................... 4 
3. Agree on Actions to Meet Needs and Expectations.................................................................... 4 
4. Use findings for Risk Assessment and Communication Planning ............................................... 5 
5. Update OCM plan and execute activities ................................................................................... 5 
Example of Stakeholder Groups .......................................................................................................... 5 
The Stakeholder Needs and Expectations........................................................................................... 6 
Stakeholder.............................................................................................................................. 6 
Expectations/Needs ................................................................................................................. 6 
Measures................................................................................................................................. 6 
End Users ................................................................................................................................ 6 
Steering Committee Members .................................................................................................. 7 
Business Unit Managers........................................................................................................... 7 
The Action Plans................................................................................................................................... 9 
End Users ...............................................................................................................................10 
Steering Group Members ........................................................................................................10 
Business Unit Managers..........................................................................................................10 
Reporting Users ......................................................................................................................10 
Indirect Users..........................................................................................................................11 
Expert Users ...........................................................................................................................11 
The Project Team....................................................................................................................11 
Customers and Suppliers ........................................................................................................11
Stakeholder Analysis 
Copyright © 2007 SAP AG. All rights reserved 
2 
Introduction 
This accelerator serves as an example and a how­to document. 
Purpose 
Many people are affected by a project, and in return may also influence the project. All people directly and 
indirectly involved in the project are called stakeholders. A stakeholder group is a set of people who have 
similar needs in relation to the project. Of course it would not be possible to interact with each stakeholder 
on an individual basis but by grouping stakeholders, their needs can be addressed in an efficient and 
effective manner. 
Stakeholder Analysis is the process that:
· Is intended for group stakeholders
· Understands what stakeholders expect from the project and what they need in relation to potential 
risks
· Identifies actions to minimize project risks and maximize benefits by working with the stakeholders. 
The purpose of this document is to outline a strategy for conducting stakeholder analysis on the project. 
The objective of this strategy is to define:
· Guiding principles for conducting stakeholder analysis, planning and monitoring stakeholder actions
· Key stakeholder groups impacted by and influencing the Project
· Stakeholder expectations by group, how they can be measured, and a summary of project tasks and 
milestones that will need to be put in place to satisfy stakeholder expectations if they represent a 
project risk 
Objective of Stakeholder Analysis 
Stakeholder analysis ensures that every stakeholder has been considered when conducting risk 
assessment work and action planning. In some cases, the risks or benefits associated with a particular 
group may be minimal, and further action may not be required, but it is important to assess all potential 
groups to ensure that all possible risks are identified. 
By analyzing stakeholders, we can ensure that all the activities that need to be entered in the Change Plan 
are identified across every area affected or influencing groups of people. 
Scope of Stakeholder Analysis 
The stakeholder analysis will cover all businesses affected by the project implementation (for example, 
during the Wave 1 ­ Operations and also Wave 2 ­ Sales). Further implementations will require a re­ 
evaluation of the strategy.
Stakeholder Analysis 
Copyright © 2007 SAP AG. All rights reserved 
3 
The Approach 
Diagram 1 outlines the broad approach to stakeholder analysis conducted. 
Identify/Confirm 
Stakeholder 
Groups 
Identify/Confirm 
Stakeholder 
Groups 
Identify/Review 
Stakeholder 
Group Needs and 
Expectations 
Identify/Review 
Stakeholder 
Group Needs and 
Expectations 
Agree on actions 
to meet 
Stakeholder 
Needs and 
Expectations 
Agree on actions 
to meet 
Stakeholder 
Needs and 
Expectations 
Use findings for 
Risk Assessment 
and 
Communication 
Planning 
Use findings for 
Risk Assessment 
and 
Communication 
Planning 
Update the OCM 
Plan 
Update the OCM 
Plan 
Diagram 1: The Stakeholder Approach 
1. Identify/Confirm Stakeholder Groups 
The purpose of this activity is to ensure that the correct groupings of stakeholders have been identified for 
the Project. The following questions helped identify an initial list of stakeholder groups:
· What are the user groups by process area or department?
· Which groups of people are/will the users interact with and subsequently need to be made aware of 
the changes?
· Who in the organization will need to commit resources and take ownership during the project?
· Who in the organization will need to provide specialist support in aligning the organization or its 
facilities?
· Who in the organization do the users report to? Who needs to approve/provide resource for realizing 
the new way of doing business, such as training end users?
· Who are the key external customers, suppliers and other third parties (for example, unions) and how 
are they affected? 
Example 
Workshops were conducted with representatives from all the businesses affected, with the Process 
Team Leader from every area. From the brainstormed lists, groupings of stakeholders were 
identified based on the following criteria.
· People who are likely to have similar training requirements
· People who are likely to have similar involvement with the project
· People who are likely to have similar communication requirements
· People who are likely to provide similar supporting activities
Stakeholder Analysis 
Copyright © 2007 SAP AG. All rights reserved 
4
· People who are at similar levels who may need to lead the project
· People who are likely to have similar change issues 
The results of the stakeholder analysis are documented in the Stakeholder Groups section. 
2. Identify / Review Stakeholder Expectations/Needs 
The purpose of this activity is to review each stakeholder group, and determine likely expectations/needs 
at various stages of the project life cycle. To ensure that realistic expectations are identified, measures are 
assigned to them. In addition, priorities are assigned to each of the expectations to ensure that the 
required level of project planning can take place. 
Example 
The Project Team conducted 15 interviews with representatives from every stakeholder group to 
ensure that a fair sample of people was interviewed. 
They were asked the following questions, for each stage of the project life cycle.
· What expectations do you have of the new system and all its components?
· What expectations do you have about your level of support for the Project Team?
· What expectations do you have about communication from the Project Team?
· What are the key issues or concerns that you have about the project?
· If we were to address your expectations, how could they be measured?
· What priorities should we assign to each of your expectations? 
The results of the stakeholder expectations analysis are documented in the Stakeholder 
Expectations section. 
3. Agree on Actions to Meet Needs and Expectations 
The purpose of this activity is to confirm actions that can be used to meet or exceed the needs and 
expectations of affected stakeholder groups. It is also about managing expectations about what cannot be 
achieved, validate assumptions and decisions, and prepare stakeholders for the upcoming changes. The 
findings from the stakeholder analysis typically feed the four main streams of OCM activities, which are 
communication, sponsorship and leadership, business optimization and project team management. Most 
of the stakeholder needs are linked to communication and thus feed particular risks addressed in the 
communication plan but there are other activities, which affect project team management, sponsorship 
and leadership, and organization optimization. 
Example 
The stakeholder groups were explored with program management, Process Team Leaders, the 
Training Managers, and HR management from the businesses. A draft list of needs/expectations 
and actions were compiled and confirmed in telephone interviews with representatives from 
stakeholder groups. 
The list of actions, by stakeholder group can be found in the Action Plan section of this document.
Stakeholder Analysis 
Copyright © 2007 SAP AG. All rights reserved 
5 
4. Use findings for Risk Assessment and Communication Planning 
Some of the stakeholder analysis findings can be used to help with the risk assessment and 
communication planning. 
5. Update OCM plan and execute activities 
The purpose of this activity is to ensure that all findings from the stakeholder analysis, communication 
planning and risk assessment are integrated in the overall change program, as documented on the OCM 
plan. The OCM plan then ensures that activities are executed and their effectiveness is measured. In 
many cases this will require confirmation and validation of the stakeholder analysis throughout the project 
implementation. 
Example of Stakeholder Groups 
Diagram 2: The Stakeholder Groups 
End Users are the drivers of the SAP system ­ using transactions to input data and creating documents to 
run the business. 
The Steering Committee (Group) are a group of business and project directors who have responsibility 
for governing the project and providing high level direction. 
Business Managers are senior representatives of the businesses areas affected by the new system. 
They primarily provide resources and users to support the project. 
Reporting Users (for example, Cost Center Managers) will use the system on an occasional basis to 
produce reports. 
Indirect Users are users that may not be going live in the system but are affected by other areas in terms 
of procedural or more indirect change. 
The XXXXX Organization 
Businesses 
Affected 
Businesses 
Not Directly 
Affected 
End Users  Business 
Managers 
Steering 
Group 
External 
Stakeholders 
Reporting 
Users 
Customers 
Suppliers 
Indirect 
Users
Stakeholder Analysis 
Copyright © 2007 SAP AG. All rights reserved 
6 
Expert Users are representatives from the business areas either full or part time on the project who 
provide business input to the project. This includes involvement in design decisions and transferring 
knowledge gained to users during training after support after Going Live and support. 
The Project Team includes full time personnel who perform project activities including consultants and 
people seconded from the businesses. 
Customers and Suppliers are those external groups affected by the new system in terms of changes to 
procedures, systems and /or external documents (such as Invoices). 
The Stakeholder Needs and Expectations 
Stakeholder  Expectations/Needs  Measures 
End Users  §  To be kept informed of 
project activities that will 
affect them 
§  To be told the benefits of 
the new system in relation 
to their own department 
§  To understand key activities 
of the project at a high level, 
for example, legacy system 
cut off and system Go Live 
date 
§  To know the benefits they 
are going to get from the 
new system 
§  To understand the business 
areas that the SAP software 
will be supporting 
§  To have an awareness of 
when job related changes 
will come into effect 
§  To feel that their business 
has been included in design 
decisions by a 
representative from their 
area attending workshops 
§  To feel assured that they 
are going to get trained and 
educated in the new system 
procedures and 
transactions to allow them 
to perform in the new 
environment 
§  Percentage of users who 
have had an update at 
each project phase 
§  Number of functionality 
demonstrations and 
questions and answer 
workshops 
§  Percentage of questions 
and issues resolved by the 
project at any given time 
§  Percentage of business 
areas represented at 
process design workshops 
§  Number of training days 
made available to end 
users
Stakeholder Analysis 
Copyright © 2007 SAP AG. All rights reserved 
7 
Stakeholder  Expectations/Needs  Measures 
Steering Committee 
Members 
§  To be kept informed of high 
level issues and progress of 
the project 
§  To review the scope and 
business benefits of the 
project initially and on the 
basis of exception 
throughout the project 
§  Number of planned 
workshops conducted 
§  Number of unresolved 
issues 
§  Steering Committee 
members able to describe 
project scope and benefits 
Business Unit Managers  §  To be kept informed of any 
issues within the project and 
the progress at a high level 
§  To be able to contribute to 
the scope at a high level 
§  To be informed what is 
expected of them, for 
example, to deal with any 
business issues affecting 
their business area 
§  To have an awareness of 
the project benefits relating 
to the business area and an 
understanding of the 
resource requirements and 
cost implications 
§  Number of briefing 
sessions made available 
to business unit managers 
at each project phase 
§  Number of business 
issues resolved by the 
business areas / the 
number outstanding at 
each phase 
§  Survey results indicating 
preparedness and 
understanding of their staff 
Reporting Users  §  To understand the benefits 
of new SAP system 
reporting functionality and 
the movement away from 
traditional paper based 
reports 
§  To understand the 
deliverables required from 
them at a high level and the 
changes to their area 
§  To feel that their business 
has been included in the 
design decisions by 
representatives attending 
workshops 
§  To feel assured that they 
are going to get trained and 
educated in the new system 
and procedures 
§  To know the responsibilities 
of those involved in the 
reporting processes and to 
§  Percentage of users who 
have had an update at 
each project phase 
§  Number of functionality 
demonstrations and 
questions and answer 
workshops 
§  Percentage of questions 
and issues resolved by the 
project at any given time 
§  Percentage of business 
areas represented at 
process design workshops 
§  Number of training days 
made available to end 
users
Stakeholder Analysis 
Copyright © 2007 SAP AG. All rights reserved 
8 
Stakeholder  Expectations/Needs  Measures 
be aware of the process 
and time schedules for any 
changes 
Indirect Users  §  To be informed of changes 
to their area by 
understanding high level 
plans and having key 
outcomes highlighted for 
them during the project 
§  To understand the benefits 
of the new procedures and 
the usage of the new 
system 
§  To know the responsibilities 
of those involved and be 
aware of the process and 
time schedules for change 
§  To feel that their business 
has been included in the 
design decisions by 
representatives attending 
workshops 
§  Number of 
communications 
distributed 
§  Number of indirect users 
involved in the design 
workshops 
§  Number of issues 
outstanding relating to the 
indirect procedures in the 
design 
Expert Users  §  To understand project 
activities, timing and the 
outcomes required 
§  To ensure that their 
business requirements have 
been represented in the 
system design 
§  To understand the benefits 
of their involvement in the 
project 
§  To be provided with the 
education of the SAP 
system to perform their 
project activities 
§  To understand and deliver 
key messages back to the 
business 
§  To know exactly when 
training is available and 
which courses are relevant 
§  Number of induction days 
provided on average to 
expert users 
§  Percentage of expert 
users relative to users 
§  Number of communication 
events supported by 
expert users 
§  Number of issues raised 
by expert users about their 
relationship with the 
project 
§  Attendance in testing 
sessions 
The Project Team  §  To understand the plan at a 
high level and the key 
activities and outcomes 
§  To understand their roles 
§  Number of Project Team 
members taken through 
project updates at the start 
of each phase
Stakeholder Analysis 
Copyright © 2007 SAP AG. All rights reserved 
9 
Stakeholder  Expectations/Needs  Measures 
and responsibilities within 
project and team 
§  To understand the level of 
accountability and the 
deliverable responsibilities 
as a team and as 
individuals and how it will 
add value to the business 
§  To provide feedback 
sessions for people inside 
and outside the team during 
the project 
§  Understand the 
expectations about project 
communication and 
managing relationships 
outside of the team 
§  To understand how issues 
can be escalated and feel 
supported 
§  To know what is going to 
happen to them after go live 
§  Number of project roles 
which do not have 
documented accountability 
statements 
§  Number of feedback 
workshops conducted 
§  Number of communication 
events conducted by 
project team members 
§  Staff turnover 
Customers and Suppliers  §  To be informed of the high 
level activity plans which will 
affect them during the 
project 
§  To be informed of changes 
to procedures and 
documentation on the 
project 
§  Number of 
communications that are 
sent out to customers and 
suppliers 
§  Percentage of customers 
and suppliers covered by 
awareness 
communications 
The content of the stakeholder analysis becomes more detailed as the project progresses. Regular updates 
are required and should be planned as part of the OCM Plan. 
The Action Plans 
The following table is only an extract and should be used as an example.
Stakeholder Analysis 
Copyright © 2007 SAP AG. All rights reserved 
10 
Stakeholder  Action  Owner  Date 
Provide communication events covering 
§  Project updates 
§  Benefits 
§  Key activities 
§  Scope of the system 
§  Job related change plans. 
OCM Team 
Add Name 
Feb­ 
2002 
Provide a checklist of businesses to 
ensure that all areas impacted are 
considered when inviting people to 
workshop events. 
Program Manager 
and Process 
Team Leaders 
Add Name 
Feb­ 
2002 
End Users 
Develop communications about training 
events to cover 
§  The types of training available 
§  The timetable 
§  The approach 
§  How to register for a course 
Training Manager 
Add Name 
Mar­ 
2002 
Organize scope review sessions to 
communicate scope and discuss issues 
Integration 
Manager 
Add Name 
Monthly Steering Group 
Members 
Ensure that scope gets on the agenda of 
Steering Group meetings 
Program Manager 
Add Name 
Planned 
Publish a document to communicate the 
design issues process to all businesses 
affected 
Program Manager 
Add Name 
Mar­ 
2002 
Business Unit 
Managers 
Conduct briefing sessions with key 
business unit managers 
Program Manager  Monthly 
Provide communication events covering 
§  Project updates 
§  Benefits 
§  Key activities 
§  Scope of the system 
OCM Team 
Add Name 
Feb­ 
2002 
Reporting Users 
Provide a checklist of businesses to 
ensure that all areas impacted are 
considered when inviting people to 
reporting workshop events. 
Program Manager 
and Process 
Team 
Leaders 
Add Name 
Feb­ 
2002
Stakeholder Analysis 
Copyright © 2007 SAP AG. All rights reserved 
11 
Stakeholder  Action  Owner  Date 
Develop communications about training 
events to cover 
§  The types of training available 
§  The timetable 
§  The approach 
§  How to register for a course 
Training Manager 
Add Name 
Mar­ 
2002 
Provide communication events covering 
§  Project updates 
§  Benefits 
§  Key changes 
§  Scope of the process changes 
Process Team 
Leaders 
Add Name 
Feb­ 
2002 
Provide a checklist of businesses to 
ensure that all areas impacted are 
considered when inviting people to 
reporting workshop events. 
Process Team 
Leaders 
Add Name 
Feb­ 
2002 
Indirect Users 
Publish high level procedure documents on 
the Intranet once they have been bought 
off 
OCM Team and 
Process Team 
Leaders 
Add Name 
Jul­ 
2002 
Develop a training needs analysis and a 
training strategy to cover the education of 
expert users 
Training Manager 
Add Name 
Jul­ 
2002 
Publish lists of SAP training courses which 
are recommended to the businesses for 
their Expert Users 
Training Manger 
Add Name 
May­ 
2002 
Expert Users 
Produce question and answer documents 
for Expert Users to use back in the line 
areas to ensure consistent communication 
OCM Team 
Add Name 
June­ 
2002 
Produce project phase updates to be 
delivered before the last day of the 
previous phase 
OCM Team 
Add Name 
Every 
Phase 
The Project 
Team 
Produce responsibility statements for every 
person on the project team 
Program 
Managers 
Add Name 
Feb­ 
2002 
Create a library of standard material that 
can be used by the project team when 
delivering presentations to the business 
OCM Team 
Add Name 
Mar­ 
2002 
Customers and 
Suppliers 
Provide communication packs for 
customers and suppliers to be tailored and 
used by local businesses impacted 
OCM Team and 
Super Users 
Add Name 
Aug­ 
2002

Weitere ähnliche Inhalte

Was ist angesagt?

Change Readiness Assessment PowerPoint Presentation Slides
Change Readiness Assessment PowerPoint Presentation SlidesChange Readiness Assessment PowerPoint Presentation Slides
Change Readiness Assessment PowerPoint Presentation SlidesSlideTeam
 
Change Management Models Powerpoint Presentation Slides
Change Management Models Powerpoint Presentation SlidesChange Management Models Powerpoint Presentation Slides
Change Management Models Powerpoint Presentation SlidesSlideTeam
 
Forandringsledelse, rationelle og humanistiske forandringsmodeller
Forandringsledelse, rationelle og humanistiske forandringsmodellerForandringsledelse, rationelle og humanistiske forandringsmodeller
Forandringsledelse, rationelle og humanistiske forandringsmodellerPer Guldbrandsen MBA
 
Leading Change Workshop
Leading Change WorkshopLeading Change Workshop
Leading Change WorkshopMichael Barker
 
The Resilient Organization: Adapting to Change in a Challenging World
The Resilient Organization: Adapting to Change in a Challenging WorldThe Resilient Organization: Adapting to Change in a Challenging World
The Resilient Organization: Adapting to Change in a Challenging WorldOlivier Serrat
 
Appreciative Inquiry For Strategic Planning
Appreciative Inquiry For Strategic Planning Appreciative Inquiry For Strategic Planning
Appreciative Inquiry For Strategic Planning Avi Z Liran
 
How to Build Organizational Change Capabilities - Prosci Webinar
How to Build Organizational Change Capabilities - Prosci WebinarHow to Build Organizational Change Capabilities - Prosci Webinar
How to Build Organizational Change Capabilities - Prosci WebinarTim Creasey
 
Prosci Webinar: Auditing Change Management Maturity
Prosci Webinar: Auditing Change Management MaturityProsci Webinar: Auditing Change Management Maturity
Prosci Webinar: Auditing Change Management MaturityProsci ANZ
 
Strategic planning model
Strategic planning modelStrategic planning model
Strategic planning modelBabasab Patil
 
Henry Mintzberg's Ten Schools of Thought on Strategic Management
Henry Mintzberg's Ten Schools of Thought on Strategic ManagementHenry Mintzberg's Ten Schools of Thought on Strategic Management
Henry Mintzberg's Ten Schools of Thought on Strategic ManagementDavid Tracy
 
Strategic thinking (slides)
Strategic thinking (slides)Strategic thinking (slides)
Strategic thinking (slides)Ibrahim Nor
 

Was ist angesagt? (19)

Change Readiness Assessment PowerPoint Presentation Slides
Change Readiness Assessment PowerPoint Presentation SlidesChange Readiness Assessment PowerPoint Presentation Slides
Change Readiness Assessment PowerPoint Presentation Slides
 
Leading and Managing Change
Leading and Managing ChangeLeading and Managing Change
Leading and Managing Change
 
Change Management Models Powerpoint Presentation Slides
Change Management Models Powerpoint Presentation SlidesChange Management Models Powerpoint Presentation Slides
Change Management Models Powerpoint Presentation Slides
 
Forandringsledelse, rationelle og humanistiske forandringsmodeller
Forandringsledelse, rationelle og humanistiske forandringsmodellerForandringsledelse, rationelle og humanistiske forandringsmodeller
Forandringsledelse, rationelle og humanistiske forandringsmodeller
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 
Leading Change Workshop
Leading Change WorkshopLeading Change Workshop
Leading Change Workshop
 
The Resilient Organization: Adapting to Change in a Challenging World
The Resilient Organization: Adapting to Change in a Challenging WorldThe Resilient Organization: Adapting to Change in a Challenging World
The Resilient Organization: Adapting to Change in a Challenging World
 
Agatha操作ガイド 基本編
Agatha操作ガイド 基本編Agatha操作ガイド 基本編
Agatha操作ガイド 基本編
 
Vision Mission - Statement English
Vision Mission - Statement EnglishVision Mission - Statement English
Vision Mission - Statement English
 
Appreciative Inquiry For Strategic Planning
Appreciative Inquiry For Strategic Planning Appreciative Inquiry For Strategic Planning
Appreciative Inquiry For Strategic Planning
 
How to Build Organizational Change Capabilities - Prosci Webinar
How to Build Organizational Change Capabilities - Prosci WebinarHow to Build Organizational Change Capabilities - Prosci Webinar
How to Build Organizational Change Capabilities - Prosci Webinar
 
Strategic Thinking and Planning to Sustain Successful Operations
Strategic Thinking and Planning to Sustain Successful OperationsStrategic Thinking and Planning to Sustain Successful Operations
Strategic Thinking and Planning to Sustain Successful Operations
 
Prosci Webinar: Auditing Change Management Maturity
Prosci Webinar: Auditing Change Management MaturityProsci Webinar: Auditing Change Management Maturity
Prosci Webinar: Auditing Change Management Maturity
 
Strategic planning model
Strategic planning modelStrategic planning model
Strategic planning model
 
TOTAL CHANGE MANAGEMENT
TOTAL CHANGE MANAGEMENTTOTAL CHANGE MANAGEMENT
TOTAL CHANGE MANAGEMENT
 
Effective Change Management
Effective Change ManagementEffective Change Management
Effective Change Management
 
Henry Mintzberg's Ten Schools of Thought on Strategic Management
Henry Mintzberg's Ten Schools of Thought on Strategic ManagementHenry Mintzberg's Ten Schools of Thought on Strategic Management
Henry Mintzberg's Ten Schools of Thought on Strategic Management
 
Strategic thinking (slides)
Strategic thinking (slides)Strategic thinking (slides)
Strategic thinking (slides)
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 

Andere mochten auch

Critique on ''translating Vision into Practice'' articles
 Critique on ''translating Vision into Practice'' articles Critique on ''translating Vision into Practice'' articles
Critique on ''translating Vision into Practice'' articlesAmbika Rai
 
Stakeholder expectations
Stakeholder expectationsStakeholder expectations
Stakeholder expectationssanddrap
 
Simplifying managing stakeholder expectations using the 9 systems 4
Simplifying managing stakeholder expectations using the 9 systems  4Simplifying managing stakeholder expectations using the 9 systems  4
Simplifying managing stakeholder expectations using the 9 systems 4Joseph KAsser
 
Demand Planning Leadership Exchange: SAP APO DP Statistical Forecast Optimiza...
Demand Planning Leadership Exchange: SAP APO DP Statistical Forecast Optimiza...Demand Planning Leadership Exchange: SAP APO DP Statistical Forecast Optimiza...
Demand Planning Leadership Exchange: SAP APO DP Statistical Forecast Optimiza...Plan4Demand
 
BUSINESS PLANS FOR A NEW ERP IN THE MARKET
BUSINESS PLANS FOR A NEW ERP IN THE MARKETBUSINESS PLANS FOR A NEW ERP IN THE MARKET
BUSINESS PLANS FOR A NEW ERP IN THE MARKETVen Nat
 
Oh! Session on Managing Stakeholders Effectively
Oh! Session on Managing Stakeholders EffectivelyOh! Session on Managing Stakeholders Effectively
Oh! Session on Managing Stakeholders EffectivelyPrakalp Agarwal
 
SCM-APO-PP/DS-Production Planning and Detailed Scheduling
SCM-APO-PP/DS-Production Planning and Detailed SchedulingSCM-APO-PP/DS-Production Planning and Detailed Scheduling
SCM-APO-PP/DS-Production Planning and Detailed SchedulingAJAY
 
Prosci Change Scorecard - TCB Change Management 2015
Prosci Change Scorecard - TCB Change Management 2015Prosci Change Scorecard - TCB Change Management 2015
Prosci Change Scorecard - TCB Change Management 2015Tim Creasey
 
A Questionnaire for Identify Failures in Business Analysis Phase of ERP Projects
A Questionnaire for Identify Failures in Business Analysis Phase of ERP ProjectsA Questionnaire for Identify Failures in Business Analysis Phase of ERP Projects
A Questionnaire for Identify Failures in Business Analysis Phase of ERP ProjectsVaruna Harshana
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder AnalysisMurhaf Ashi
 
Change Management Models, Stakeholder Analysis & Capacity Building in Corpora...
Change Management Models, Stakeholder Analysis & Capacity Building in Corpora...Change Management Models, Stakeholder Analysis & Capacity Building in Corpora...
Change Management Models, Stakeholder Analysis & Capacity Building in Corpora...Elijah Ezendu
 
Introduction to Stakeholder Analysis
Introduction to Stakeholder AnalysisIntroduction to Stakeholder Analysis
Introduction to Stakeholder AnalysisEndeavor Management
 
Four Keys to Managing Stakeholder Expectations and Delivering Value
Four Keys to Managing Stakeholder Expectations and Delivering ValueFour Keys to Managing Stakeholder Expectations and Delivering Value
Four Keys to Managing Stakeholder Expectations and Delivering ValueWorkfront
 
Business Plan for a Company Assignment Sample
Business Plan for a Company Assignment SampleBusiness Plan for a Company Assignment Sample
Business Plan for a Company Assignment SampleGlobal Assignment Help
 
Pmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsPmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsAnand Bobade
 

Andere mochten auch (18)

Critique on ''translating Vision into Practice'' articles
 Critique on ''translating Vision into Practice'' articles Critique on ''translating Vision into Practice'' articles
Critique on ''translating Vision into Practice'' articles
 
Stakeholder expectations
Stakeholder expectationsStakeholder expectations
Stakeholder expectations
 
Simplifying managing stakeholder expectations using the 9 systems 4
Simplifying managing stakeholder expectations using the 9 systems  4Simplifying managing stakeholder expectations using the 9 systems  4
Simplifying managing stakeholder expectations using the 9 systems 4
 
Does APO Really Work? - An APO Case Study
Does APO Really Work? - An APO Case StudyDoes APO Really Work? - An APO Case Study
Does APO Really Work? - An APO Case Study
 
Demand Planning Leadership Exchange: SAP APO DP Statistical Forecast Optimiza...
Demand Planning Leadership Exchange: SAP APO DP Statistical Forecast Optimiza...Demand Planning Leadership Exchange: SAP APO DP Statistical Forecast Optimiza...
Demand Planning Leadership Exchange: SAP APO DP Statistical Forecast Optimiza...
 
BUSINESS PLANS FOR A NEW ERP IN THE MARKET
BUSINESS PLANS FOR A NEW ERP IN THE MARKETBUSINESS PLANS FOR A NEW ERP IN THE MARKET
BUSINESS PLANS FOR A NEW ERP IN THE MARKET
 
Oh! Session on Managing Stakeholders Effectively
Oh! Session on Managing Stakeholders EffectivelyOh! Session on Managing Stakeholders Effectively
Oh! Session on Managing Stakeholders Effectively
 
SCM-APO-PP/DS-Production Planning and Detailed Scheduling
SCM-APO-PP/DS-Production Planning and Detailed SchedulingSCM-APO-PP/DS-Production Planning and Detailed Scheduling
SCM-APO-PP/DS-Production Planning and Detailed Scheduling
 
sap-apo overview
sap-apo overviewsap-apo overview
sap-apo overview
 
Prosci Change Scorecard - TCB Change Management 2015
Prosci Change Scorecard - TCB Change Management 2015Prosci Change Scorecard - TCB Change Management 2015
Prosci Change Scorecard - TCB Change Management 2015
 
A Questionnaire for Identify Failures in Business Analysis Phase of ERP Projects
A Questionnaire for Identify Failures in Business Analysis Phase of ERP ProjectsA Questionnaire for Identify Failures in Business Analysis Phase of ERP Projects
A Questionnaire for Identify Failures in Business Analysis Phase of ERP Projects
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Erp final proj report slideshare
Erp final proj report slideshareErp final proj report slideshare
Erp final proj report slideshare
 
Change Management Models, Stakeholder Analysis & Capacity Building in Corpora...
Change Management Models, Stakeholder Analysis & Capacity Building in Corpora...Change Management Models, Stakeholder Analysis & Capacity Building in Corpora...
Change Management Models, Stakeholder Analysis & Capacity Building in Corpora...
 
Introduction to Stakeholder Analysis
Introduction to Stakeholder AnalysisIntroduction to Stakeholder Analysis
Introduction to Stakeholder Analysis
 
Four Keys to Managing Stakeholder Expectations and Delivering Value
Four Keys to Managing Stakeholder Expectations and Delivering ValueFour Keys to Managing Stakeholder Expectations and Delivering Value
Four Keys to Managing Stakeholder Expectations and Delivering Value
 
Business Plan for a Company Assignment Sample
Business Plan for a Company Assignment SampleBusiness Plan for a Company Assignment Sample
Business Plan for a Company Assignment Sample
 
Pmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsPmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management details
 

Ähnlich wie Best practice ERP stakeholder analysis strategy and approach

Ale edi i_doc.sapdb.info
Ale edi i_doc.sapdb.infoAle edi i_doc.sapdb.info
Ale edi i_doc.sapdb.infoIvs Naresh
 
Ale edi i_doc.sapdb.info
Ale edi i_doc.sapdb.infoAle edi i_doc.sapdb.info
Ale edi i_doc.sapdb.infoSharma Joshi
 
Ale edi i_doc.sapdb.info
Ale edi i_doc.sapdb.infoAle edi i_doc.sapdb.info
Ale edi i_doc.sapdb.infoPrem Kumar
 
Ice Cream Dreams - Bussiness Plan Sample
Ice Cream Dreams - Bussiness Plan SampleIce Cream Dreams - Bussiness Plan Sample
Ice Cream Dreams - Bussiness Plan SamplePradeep Subedi
 
about start up for you 9
about start up for you 9about start up for you 9
about start up for you 9aliaalistartup
 
SAP HANA Rapid Implementation – Financial Performance Management
SAP HANA Rapid Implementation – Financial Performance ManagementSAP HANA Rapid Implementation – Financial Performance Management
SAP HANA Rapid Implementation – Financial Performance ManagementJothi Periasamy
 
Sample biz plan
Sample biz planSample biz plan
Sample biz planAmri Aby
 
PostgreSQL 11 New Features With Examples (English)
PostgreSQL 11 New Features With Examples (English)PostgreSQL 11 New Features With Examples (English)
PostgreSQL 11 New Features With Examples (English)Noriyoshi Shinoda
 
Enerit ISO 50001 User Guide
Enerit ISO 50001 User GuideEnerit ISO 50001 User Guide
Enerit ISO 50001 User GuideArantico Ltd
 
Fdi in tradable_services___8211__final_report
Fdi in tradable_services___8211__final_reportFdi in tradable_services___8211__final_report
Fdi in tradable_services___8211__final_reportKrishna Murari
 
arya whole project.doc
arya whole project.docarya whole project.doc
arya whole project.docAvinashSahu71
 
Learn PHP MySQL Smarty - Online Guide
Learn PHP MySQL Smarty - Online GuideLearn PHP MySQL Smarty - Online Guide
Learn PHP MySQL Smarty - Online Guidebigspire
 
WebIT2 Consultants Proposal
WebIT2 Consultants ProposalWebIT2 Consultants Proposal
WebIT2 Consultants ProposalSarah Killey
 
PostgreSQL 12 Beta 1 New Features with Examples (English)
PostgreSQL 12 Beta 1 New Features with Examples (English)PostgreSQL 12 Beta 1 New Features with Examples (English)
PostgreSQL 12 Beta 1 New Features with Examples (English)Noriyoshi Shinoda
 
PostgreSQL 11 New Features English version (Beta 1)
PostgreSQL 11 New Features English version (Beta 1)PostgreSQL 11 New Features English version (Beta 1)
PostgreSQL 11 New Features English version (Beta 1)Noriyoshi Shinoda
 

Ähnlich wie Best practice ERP stakeholder analysis strategy and approach (20)

Ale edi i_doc.sapdb.info
Ale edi i_doc.sapdb.infoAle edi i_doc.sapdb.info
Ale edi i_doc.sapdb.info
 
Ale edi i_doc.sapdb.info
Ale edi i_doc.sapdb.infoAle edi i_doc.sapdb.info
Ale edi i_doc.sapdb.info
 
Ale edi i_doc.sapdb.info
Ale edi i_doc.sapdb.infoAle edi i_doc.sapdb.info
Ale edi i_doc.sapdb.info
 
Ale edi i_doc.sapdb.info
Ale edi i_doc.sapdb.infoAle edi i_doc.sapdb.info
Ale edi i_doc.sapdb.info
 
Ice Cream Dreams - Bussiness Plan Sample
Ice Cream Dreams - Bussiness Plan SampleIce Cream Dreams - Bussiness Plan Sample
Ice Cream Dreams - Bussiness Plan Sample
 
about start up for you 9
about start up for you 9about start up for you 9
about start up for you 9
 
SAP HANA Rapid Implementation – Financial Performance Management
SAP HANA Rapid Implementation – Financial Performance ManagementSAP HANA Rapid Implementation – Financial Performance Management
SAP HANA Rapid Implementation – Financial Performance Management
 
Sample biz plan
Sample biz planSample biz plan
Sample biz plan
 
Watertowercafe live
Watertowercafe liveWatertowercafe live
Watertowercafe live
 
Hat app document
Hat app documentHat app document
Hat app document
 
Docin pdf
Docin pdfDocin pdf
Docin pdf
 
PostgreSQL 11 New Features With Examples (English)
PostgreSQL 11 New Features With Examples (English)PostgreSQL 11 New Features With Examples (English)
PostgreSQL 11 New Features With Examples (English)
 
Enerit ISO 50001 User Guide
Enerit ISO 50001 User GuideEnerit ISO 50001 User Guide
Enerit ISO 50001 User Guide
 
Fdi in tradable_services___8211__final_report
Fdi in tradable_services___8211__final_reportFdi in tradable_services___8211__final_report
Fdi in tradable_services___8211__final_report
 
Coinaid earth pilot
Coinaid earth pilotCoinaid earth pilot
Coinaid earth pilot
 
arya whole project.doc
arya whole project.docarya whole project.doc
arya whole project.doc
 
Learn PHP MySQL Smarty - Online Guide
Learn PHP MySQL Smarty - Online GuideLearn PHP MySQL Smarty - Online Guide
Learn PHP MySQL Smarty - Online Guide
 
WebIT2 Consultants Proposal
WebIT2 Consultants ProposalWebIT2 Consultants Proposal
WebIT2 Consultants Proposal
 
PostgreSQL 12 Beta 1 New Features with Examples (English)
PostgreSQL 12 Beta 1 New Features with Examples (English)PostgreSQL 12 Beta 1 New Features with Examples (English)
PostgreSQL 12 Beta 1 New Features with Examples (English)
 
PostgreSQL 11 New Features English version (Beta 1)
PostgreSQL 11 New Features English version (Beta 1)PostgreSQL 11 New Features English version (Beta 1)
PostgreSQL 11 New Features English version (Beta 1)
 

Kürzlich hochgeladen

Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxRemote DBA Services
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Victor Rentea
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...apidays
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKJago de Vreede
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 

Kürzlich hochgeladen (20)

Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 

Best practice ERP stakeholder analysis strategy and approach