SlideShare ist ein Scribd-Unternehmen logo
1 von 7
Jawad Ali Khan
Flat No. 3, Hayal Rabeia al sharkhe, Riyadh, KSA
Mobile: 00966 593 835 862/ 550 138 354.
E- Mail: jawad_khan4786@yahoo.co.in
Currently seeking assignments with a growth oriented organization as Engineering
Manager/MEP Coordinator/Estimation Manager in Engineering Clients, Consultants or
Contracting.
Objective: To obtain a challenging and responsible position in professionally managed organization
active in my field of interest, where I can utilize my skills in contributing effectively to the success of
the organization and also to further enhance my personal skills.
Academic Credentials
Bachelor of Engineering (Electrical Power) University of Mysore, India 1978
Professional Certifications
• ISO 9001:2000 Awareness Course, Dec. 2005, BVQI
• OHSAS 18001:1999 Awareness Course, Jan. 2007, BVQI
Professional Summary
• An astute professional with 30+ years of experience in Building Services (Design, Estimation,
Installation, Equipment Sizing & System Design).
• Currently associated with DAR AL RIYADH CONSULTANTS as Asst. Resident Engineer.
• Handling projects of multiple facilities in electromechanical field.
• Experience of MEP works: Electrical, Low current systems and Mechanical works.
• Good understanding of overall construction sequence and related MEP aspects of builders works
in connection with structural and architectural elements.
• Good all round experience in pre-commissioning & commissioning and production of O&M
manuals.
• Attends and organize all site meeting within the engineer / Consultant / Client to resolve MEP
activities.
• Knowledge of NEC codes, IEE regulations, NFPA standards and British standards.
• Familiar with Building Management System and SCADA based controls.
• Attaining adequate engineering management skills such as organizing & planning of activities,
staff allocation & appraisal
• Expertise in quality standards such as ISO-9001:2000.
• Exhaustive exposure to implement quality tools such as QFD, Benchmarking, Taguchi’s quality
engineering, FMEA, and SPC.
Technical
Software’s : Microsoft Word, Excel and Microsoft PowerPoint
Special Courses : Project Management.
Work Experience
August’2010 – Till Date with Dar Al Riyadh, Riyadh, Saudi Arabia (KSA).
Designation: Assistant Resident Engineer (ARE).
Project: King Abdullah Financial District (KAFD) – PPA30 (Zone-3), Riyadh, Saudi Arabia.
King Abdullah Financial District is one of the largest scale commercial developments, set to
become the leading financial centre in the Middle East, comprising of 3.5 million square
meters of over 40 high-specification towers for offices, residential, and five star hotels with
integrated Monorail and Skywalk systems.Dar Al Riyadh’s role is Project Management and
Site Supervision although DAR has assumed a large role as the Program Manager with
overall liability of Design, Design Coordination, Design Completeness, US and British Code
Compliance, Material and Sub-Contractor Review and Approval, Review Interim Payment
Certificates, LEED Compliance, Inspections, Quality Assurance and Quality Control, Safety,
Schedule and all Site Coordination up to final handover. KAFD’s Master Plan compiles
several phases Infrastructure (tunnels, bridges, utilities, roads and final hard and soft
scapes). Coordination with multiple Contractors, Consultants and Designers to ensure all
disciplines are meeting the Clients needs.
• Parcel: 5.06 (Five Star Hotel):- 4B+G+17 (Which Includes Four Levels below Grade
Parking and Five Star Hotel).
• Parcel: 3.09:- 4B+G+32 (Includes Four Levels below Grade Parking, Retail, Offices and
Residential Apartments).
• Parcel: 3.10:- 4B+G+30 (Includes Four Levels below Grade Parking, Retail, Offices and
Residential Apartments).
• Parcel: 5.01:- 5B+G+18 (Which Includes Four Levels below Grade Parking, Retail, Offices
and Residential Apartments).
• Parcel: 5.02:- 5B+G+12 (Which Includes Four Levels below Grade Parking, Retail, Offices
and Residential Apartments).
• Parcel: 5.03:- 5B+G+23 (Which Includes Four Levels below Grade Parking, Retail, Offices
and Residential Apartments).
• Parcel: 5.04:- 5B+G+14 (Which Includes Four Levels below Grade Parking, Retail, Offices
and Residential Apartments).
• Parcel: 5.05:- 5B+G+4P+33(Residential Tower-1)+27(Commercial Tower-2), (Includes Four
Levels below Grade Parking, Retail, Offices and Residential Apartments).
Client: Rayadah Investment Company.
MEP Consultant: Buro Happold and Environmental System Design Inc.
Main Contractor: Saudi Binladin Group (SBG).
District Cooling: Rayadah Investment Company
Total Project Cost: SAR: 14.5 Billion.
Job Responsibilities:
• Study of tender documents; identify scope of works and review of material specs & all other
technical/commercial requirements.
• Dar Al Riyadh representation during the General Meetings organized by the Client.
• Keeping informed on the project general progress development, mainly by the means of
constant reporting.
• Follow-up of site statement of accounts incoming, outgoing financial transfers and directives.
• Appointment of sub-Consultants with the Client Representative approval.
• Coordination with project managers/resident engineer.
• Ultimately responsible for the project, supported by the strategic management team.
• Ensure that the project gives value for money, ensuring a cost-conscious approach to the
project, balancing the demands of business, contractor and client.
• Ensure that the project is focused throughout life cycle on achieving its objectives and
delivering a product that will achieve the projected benefits.
• Monitor and control the progress of the project at a strategic level, in particular reviewing the
business case continually.
• Ensure any proposed changes of scope, cost or time scale are checked against the possible
effects on the Project Business case.
• Monitoring project finance on behalf of the Client.
• Monitoring changes to the project plan to see whether there is any impact on the needs of
Project business case.
• Approval of material, shop drawings, method statements.
• Attending progress meeting, technical co-ordination meetings and prepare minutes of
meetings.
• Liaison with authorities such as SEC (Saudi electricity company), Saudi Civil Defense and STC
for inspection & approvals.
• Verification of payment certificates and variations claims, testing and commissioning,
Snagging and de-snagging. Review of As-Built drawings and O+M manuals, Guarantees /
Warrantees and Project taking over documents.
• Factory visits of Electrical Equipment and Mechanical equipment and witnessed Factory test
of the Equipments.
Dec’05 – June’10 with M/s MAPCO Inc W.L.L, Doha, Qatar.
Designation: Senior Electrical Engineer/ Project Engineer.
Successfully Completed Projects:
• Al-Udeid Project, Package 4, Addendum # 1 & 2. American Airbase (Electro-Mechanical
Works (Design Build Contract)
• Doha Beach Villa Complex- Sheikha Moaza palace (MEP Works Electrical, Plumbing,
Drainage, Water Supply, HVAC, Building Management system, Chiller Plant Manager and Fire
Fighting)
• Pearl Qatar Porto Arabia Parcel 11A Tower (Electro-Mechanical Works (Design Build
Contract).
• Installed 13,8 Kv High Voltage Switchgears and carried out the following tests:
1. Mechanical Operation Tests.
2. Electrical Tests.
3. C.T Primary injection Tests.
4. Insulation Megger test
5. H.V Die electric Test
6. Phase Continuity Test.
7. Test of auxillary Control Circuits.
Responsibilities / Duties:
• General design, project execution, procurement, materials submittals and Electrical QA/QC
activities. Coordination with site engineers and review of technical submittals of suppliers.
Preparing materials submittals to the consultants, review of the consultant comments and re
submittals. Materials and supplies control, Purchase orders of materials, supplies, equipments
intended for site projects.
• Follow up with suppliers for materials deliveries. Control nonconforming product to prevent
its unintended use or delivery and to take immediate action to control cause and effect of
nonconformance and ensure that corrective actions are carried out to rectify the
nonconformity as approved.
• Responsible to recognize the OH&S hazards and associated risks, perform Hazard
identification and risk assessments; according to OHSAS 18001:1999 requirements among
Mapco Inc. site activities and the assessment of risks and control measures.
• Responsible for identifying the need to source out personnel, facilities and supporting
services to be able to meet the project requirements and the effective implementation and
control of the QMS and OH&S MS. Implementation of the emergency preparedness and
response plans, and to identify areas of improvements.
• Responsible for reporting any observed non-conformity to the Section Heads/managers, or to
the QA/QC Engineer, or to the Quality Manager.
• Carry out the safety and professional health instructions prescribed in the establishment. And
shall cooperate in the prevention of the occurrence of accidents in the place of work or in
the alleviation of the results thereof.
June’90 – Dec’05 with HAIF Company, Riyadh, KSA
Designation: Senior Electrical Engineer.
• Madina Hilton for Hilton Group
• Jeddah Hilton and complex for Hilton Group
• Palaces and Farm Houses for the Royal families
• ABV Rock group & SSSP -Housing compound
• King Khalid Air Base Khamis Mushayath-Facilities
• Gosi-Head Quarters at Abha & Gizan
Responsibilities / Duties:
•Responsible for Electrical Design, prepares Manual Procedures/ Construction Methodology
relative to Electrical Works of the above mentioned Projects. Leading a group of Electrical
Engineers.
•Evaluate activities involving the preparation of Shop drawings in line with Electrical design
Drawings and Technical Specifications of the Projects.
•Complete detailing requirement of the Electrical Works of the above-mentioned project i.e.
Lighting System (internal and external), Power Distribution System, Structured Cabling
System, Fire Alarm System, Surveillance Security System, Building Management System,
Hotel Management System, CATV/MATV and CCTV System, Conference and Interpretation
System and other type of Low Current System.
•Electrical design, load computations, suggesting capacities of electrical equipment,
transformers, Generator sets, and cable sizes with application of National Electrical Code,
ISO and IEC, EIA/TIA Standards relative to Electrical System Design and installation in the
project. Also prepares requirements and Manual Procedures / Construction Methodology
relative to Electrical Works.
• Installed 13,8 Kv and 33 Kv High Voltage Switchgears and carried out the following tests:
1. Mechanical Operation Tests.
2. Electrical Tests.
3. C.T Primary injection Tests.
4. Insulation Megger test
5. H.V Die electric Test
6. Phase Continuity Test.
7. Test of Auxlliary Control Circuits.
Nov’86 – May’90 with Al Buraidi Trading and Contracting Establishment
Designation: Senior Electrical Engineer
Successfully Completed Projects:
• Ministry of Education – Mentally Handicapped School for Boys & Girls, Abha, KSA (SR
240Million)
• Mosadiah Plaze Shopping Center – Phase 1 Jeddah, KSA
• GMA Center (General Motor Agency Center Comlex) Jeddah, KSA
• Abbar Gas Station
• Al Raiji Commercial Complex, Jeddah, KSA
Responsibilities / Duties:
Responsible for every aspect of Electrical Works of the Projects. The duties involve supervising and
directing workforce, keep check on quality of work and timely completion. Other duties include
preparation of material submittal, progress billing, and selection of materials as per specifications
within the budget. Besides managing the site, my responsibility also includes preparing shop
drawings and bidding for all new projects for the company.
PERSONAL DETAILS
 DATE OF BIRTH: 3rd
August 1952.
 DRIVING LICENSE: VALID SAUDI DRIVING LICENSE
 SEX: MALE
 MARITAL STATUS: MARRIED
REFERENCES
Available on request
• Abbar Gas Station
• Al Raiji Commercial Complex, Jeddah, KSA
Responsibilities / Duties:
Responsible for every aspect of Electrical Works of the Projects. The duties involve supervising and
directing workforce, keep check on quality of work and timely completion. Other duties include
preparation of material submittal, progress billing, and selection of materials as per specifications
within the budget. Besides managing the site, my responsibility also includes preparing shop
drawings and bidding for all new projects for the company.
PERSONAL DETAILS
 DATE OF BIRTH: 3rd
August 1952.
 DRIVING LICENSE: VALID SAUDI DRIVING LICENSE
 SEX: MALE
 MARITAL STATUS: MARRIED
REFERENCES
Available on request

Weitere ähnliche Inhalte

Was ist angesagt?

CV Khaled-JULY 2014 Latest
CV Khaled-JULY 2014 LatestCV Khaled-JULY 2014 Latest
CV Khaled-JULY 2014 Latest
Khaled Al-Doghry
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
Ahmed Mishrif
 
Hossam Samir (Senior infrastructure Engineer) C (002)
Hossam Samir (Senior infrastructure Engineer) C (002)Hossam Samir (Senior infrastructure Engineer) C (002)
Hossam Samir (Senior infrastructure Engineer) C (002)
Hossam Samir
 
CALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CVCALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CV
Caleb Bercero
 
Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire Fighting
Hazem Mahdy
 
Peter Dally Aquenta CV
Peter Dally Aquenta CVPeter Dally Aquenta CV
Peter Dally Aquenta CV
Peter Dally
 

Was ist angesagt? (20)

M. Darwish CV 30-11-2015
M. Darwish CV 30-11-2015M. Darwish CV 30-11-2015
M. Darwish CV 30-11-2015
 
M.elsayed CV
M.elsayed CVM.elsayed CV
M.elsayed CV
 
CV Khaled-JULY 2014 Latest
CV Khaled-JULY 2014 LatestCV Khaled-JULY 2014 Latest
CV Khaled-JULY 2014 Latest
 
Amr Moneim CV March 2016
Amr Moneim CV March 2016Amr Moneim CV March 2016
Amr Moneim CV March 2016
 
Mohamed Hassan CV ..
Mohamed Hassan CV ..Mohamed Hassan CV ..
Mohamed Hassan CV ..
 
Curriculum vita mohamed nabil
Curriculum vita  mohamed nabilCurriculum vita  mohamed nabil
Curriculum vita mohamed nabil
 
Mohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Nabil Omar - CV
Mohamed Nabil Omar - CV
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
 
ALAA ABBAS
ALAA ABBASALAA ABBAS
ALAA ABBAS
 
Leslie Lopena_CV
Leslie Lopena_CVLeslie Lopena_CV
Leslie Lopena_CV
 
Shakir CV
Shakir CV Shakir CV
Shakir CV
 
Hossam Samir (Senior infrastructure Engineer) C (002)
Hossam Samir (Senior infrastructure Engineer) C (002)Hossam Samir (Senior infrastructure Engineer) C (002)
Hossam Samir (Senior infrastructure Engineer) C (002)
 
Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project Manager
 
CALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CVCALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CV
 
CV
CVCV
CV
 
Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire Fighting
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 
Nizar Mukahal CV 2015
Nizar Mukahal CV 2015Nizar Mukahal CV 2015
Nizar Mukahal CV 2015
 
Peter Dally Aquenta CV
Peter Dally Aquenta CVPeter Dally Aquenta CV
Peter Dally Aquenta CV
 
Tauseef_CV PP_Rev2
Tauseef_CV PP_Rev2Tauseef_CV PP_Rev2
Tauseef_CV PP_Rev2
 

Andere mochten auch

Tourisem accomodation talal al harigi
Tourisem accomodation talal al harigiTourisem accomodation talal al harigi
Tourisem accomodation talal al harigi
Dr. Talal Al-Harigi
 
Yaghmour pre qualification profile
Yaghmour pre qualification profileYaghmour pre qualification profile
Yaghmour pre qualification profile
Ali M. Azahrani
 

Andere mochten auch (20)

Day01 design final
Day01 design finalDay01 design final
Day01 design final
 
The Message Of The Messengers
The Message Of The MessengersThe Message Of The Messengers
The Message Of The Messengers
 
Activity 10 Team Cadmium
Activity 10 Team CadmiumActivity 10 Team Cadmium
Activity 10 Team Cadmium
 
Inspections Details
Inspections DetailsInspections Details
Inspections Details
 
Resume
ResumeResume
Resume
 
Eng. tarek ali cv - 29 oct 2015
Eng. tarek ali   cv - 29 oct 2015Eng. tarek ali   cv - 29 oct 2015
Eng. tarek ali cv - 29 oct 2015
 
samer_CV
samer_CVsamer_CV
samer_CV
 
Obaidullah_Oracle_DBA
Obaidullah_Oracle_DBAObaidullah_Oracle_DBA
Obaidullah_Oracle_DBA
 
Bitumat welding dv112006_usa-a
Bitumat welding dv112006_usa-aBitumat welding dv112006_usa-a
Bitumat welding dv112006_usa-a
 
Tourisem accomodation talal al harigi
Tourisem accomodation talal al harigiTourisem accomodation talal al harigi
Tourisem accomodation talal al harigi
 
Week 5 case 2 al bassami
Week 5 case 2 al bassamiWeek 5 case 2 al bassami
Week 5 case 2 al bassami
 
ABV Rock Group
ABV Rock GroupABV Rock Group
ABV Rock Group
 
MASH PROFILE
MASH PROFILEMASH PROFILE
MASH PROFILE
 
Agriculture Ukraine: Special Services related to Agricultural Companies
Agriculture Ukraine: Special Services related to Agricultural CompaniesAgriculture Ukraine: Special Services related to Agricultural Companies
Agriculture Ukraine: Special Services related to Agricultural Companies
 
Injaz 2011 2012
Injaz 2011 2012Injaz 2011 2012
Injaz 2011 2012
 
MB Holding Newsletter
MB  Holding NewsletterMB  Holding Newsletter
MB Holding Newsletter
 
Smartco profile
Smartco profileSmartco profile
Smartco profile
 
Yaghmour pre qualification profile
Yaghmour pre qualification profileYaghmour pre qualification profile
Yaghmour pre qualification profile
 
Activity 9 Team Cadmium
Activity 9 Team CadmiumActivity 9 Team Cadmium
Activity 9 Team Cadmium
 
Eng. Tarek Ali cv - 29 oct 2015
Eng. Tarek Ali   cv - 29 oct 2015Eng. Tarek Ali   cv - 29 oct 2015
Eng. Tarek Ali cv - 29 oct 2015
 

Ähnlich wie Jawad Ali Khan ARE-2

CV - Sr Manager- Mowafaq Al-Braim
CV - Sr Manager- Mowafaq Al-BraimCV - Sr Manager- Mowafaq Al-Braim
CV - Sr Manager- Mowafaq Al-Braim
Mowafaq Al Braim
 
CV - Sr Manager- Mowafaq Al-Braim
CV - Sr Manager- Mowafaq Al-BraimCV - Sr Manager- Mowafaq Al-Braim
CV - Sr Manager- Mowafaq Al-Braim
Mowafaq Al Braim
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP Engineer
Baneshwar Pai
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
Mohamed Hassan
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
Mohamed Hassan
 
Sadiq new Resume
Sadiq new ResumeSadiq new Resume
Sadiq new Resume
sadiq rizan
 
CURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPCURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEP
sureshrenu1996
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1
Bashir Albitar
 

Ähnlich wie Jawad Ali Khan ARE-2 (20)

Kodi CV( EM )
Kodi CV( EM )Kodi CV( EM )
Kodi CV( EM )
 
Resume 2016 nadeem siddiqui
Resume   2016 nadeem siddiquiResume   2016 nadeem siddiqui
Resume 2016 nadeem siddiqui
 
CV - Sr Manager- Mowafaq Al-Braim
CV - Sr Manager- Mowafaq Al-BraimCV - Sr Manager- Mowafaq Al-Braim
CV - Sr Manager- Mowafaq Al-Braim
 
CV - Sr Manager- Mowafaq Al-Braim
CV - Sr Manager- Mowafaq Al-BraimCV - Sr Manager- Mowafaq Al-Braim
CV - Sr Manager- Mowafaq Al-Braim
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Banesh Pai _ MEP Engineer
Banesh Pai _ MEP EngineerBanesh Pai _ MEP Engineer
Banesh Pai _ MEP Engineer
 
Resume
ResumeResume
Resume
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
Cv 2019
Cv  2019Cv  2019
Cv 2019
 
Sadiq new Resume
Sadiq new ResumeSadiq new Resume
Sadiq new Resume
 
Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016
 
CV-MIB-CM (QS)
CV-MIB-CM (QS)CV-MIB-CM (QS)
CV-MIB-CM (QS)
 
CV-MIB-CM (QS)
CV-MIB-CM (QS)CV-MIB-CM (QS)
CV-MIB-CM (QS)
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineer
 
CV-MIB-CM (QS)
CV-MIB-CM (QS)CV-MIB-CM (QS)
CV-MIB-CM (QS)
 
CURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPCURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEP
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1
 
CV- Abdullah Reddy Baddam
CV- Abdullah Reddy BaddamCV- Abdullah Reddy Baddam
CV- Abdullah Reddy Baddam
 
Abdelmagid Abdel Aziz
Abdelmagid Abdel AzizAbdelmagid Abdel Aziz
Abdelmagid Abdel Aziz
 

Jawad Ali Khan ARE-2

  • 1. Jawad Ali Khan Flat No. 3, Hayal Rabeia al sharkhe, Riyadh, KSA Mobile: 00966 593 835 862/ 550 138 354. E- Mail: jawad_khan4786@yahoo.co.in Currently seeking assignments with a growth oriented organization as Engineering Manager/MEP Coordinator/Estimation Manager in Engineering Clients, Consultants or Contracting. Objective: To obtain a challenging and responsible position in professionally managed organization active in my field of interest, where I can utilize my skills in contributing effectively to the success of the organization and also to further enhance my personal skills. Academic Credentials Bachelor of Engineering (Electrical Power) University of Mysore, India 1978 Professional Certifications • ISO 9001:2000 Awareness Course, Dec. 2005, BVQI • OHSAS 18001:1999 Awareness Course, Jan. 2007, BVQI Professional Summary • An astute professional with 30+ years of experience in Building Services (Design, Estimation, Installation, Equipment Sizing & System Design). • Currently associated with DAR AL RIYADH CONSULTANTS as Asst. Resident Engineer. • Handling projects of multiple facilities in electromechanical field. • Experience of MEP works: Electrical, Low current systems and Mechanical works. • Good understanding of overall construction sequence and related MEP aspects of builders works in connection with structural and architectural elements. • Good all round experience in pre-commissioning & commissioning and production of O&M manuals. • Attends and organize all site meeting within the engineer / Consultant / Client to resolve MEP activities. • Knowledge of NEC codes, IEE regulations, NFPA standards and British standards. • Familiar with Building Management System and SCADA based controls. • Attaining adequate engineering management skills such as organizing & planning of activities, staff allocation & appraisal • Expertise in quality standards such as ISO-9001:2000. • Exhaustive exposure to implement quality tools such as QFD, Benchmarking, Taguchi’s quality engineering, FMEA, and SPC.
  • 2. Technical Software’s : Microsoft Word, Excel and Microsoft PowerPoint Special Courses : Project Management. Work Experience August’2010 – Till Date with Dar Al Riyadh, Riyadh, Saudi Arabia (KSA). Designation: Assistant Resident Engineer (ARE). Project: King Abdullah Financial District (KAFD) – PPA30 (Zone-3), Riyadh, Saudi Arabia. King Abdullah Financial District is one of the largest scale commercial developments, set to become the leading financial centre in the Middle East, comprising of 3.5 million square meters of over 40 high-specification towers for offices, residential, and five star hotels with integrated Monorail and Skywalk systems.Dar Al Riyadh’s role is Project Management and Site Supervision although DAR has assumed a large role as the Program Manager with overall liability of Design, Design Coordination, Design Completeness, US and British Code Compliance, Material and Sub-Contractor Review and Approval, Review Interim Payment Certificates, LEED Compliance, Inspections, Quality Assurance and Quality Control, Safety, Schedule and all Site Coordination up to final handover. KAFD’s Master Plan compiles several phases Infrastructure (tunnels, bridges, utilities, roads and final hard and soft scapes). Coordination with multiple Contractors, Consultants and Designers to ensure all disciplines are meeting the Clients needs. • Parcel: 5.06 (Five Star Hotel):- 4B+G+17 (Which Includes Four Levels below Grade Parking and Five Star Hotel). • Parcel: 3.09:- 4B+G+32 (Includes Four Levels below Grade Parking, Retail, Offices and Residential Apartments). • Parcel: 3.10:- 4B+G+30 (Includes Four Levels below Grade Parking, Retail, Offices and Residential Apartments). • Parcel: 5.01:- 5B+G+18 (Which Includes Four Levels below Grade Parking, Retail, Offices and Residential Apartments). • Parcel: 5.02:- 5B+G+12 (Which Includes Four Levels below Grade Parking, Retail, Offices and Residential Apartments). • Parcel: 5.03:- 5B+G+23 (Which Includes Four Levels below Grade Parking, Retail, Offices and Residential Apartments). • Parcel: 5.04:- 5B+G+14 (Which Includes Four Levels below Grade Parking, Retail, Offices and Residential Apartments). • Parcel: 5.05:- 5B+G+4P+33(Residential Tower-1)+27(Commercial Tower-2), (Includes Four Levels below Grade Parking, Retail, Offices and Residential Apartments). Client: Rayadah Investment Company. MEP Consultant: Buro Happold and Environmental System Design Inc. Main Contractor: Saudi Binladin Group (SBG). District Cooling: Rayadah Investment Company
  • 3. Total Project Cost: SAR: 14.5 Billion. Job Responsibilities: • Study of tender documents; identify scope of works and review of material specs & all other technical/commercial requirements. • Dar Al Riyadh representation during the General Meetings organized by the Client. • Keeping informed on the project general progress development, mainly by the means of constant reporting. • Follow-up of site statement of accounts incoming, outgoing financial transfers and directives. • Appointment of sub-Consultants with the Client Representative approval. • Coordination with project managers/resident engineer. • Ultimately responsible for the project, supported by the strategic management team. • Ensure that the project gives value for money, ensuring a cost-conscious approach to the project, balancing the demands of business, contractor and client. • Ensure that the project is focused throughout life cycle on achieving its objectives and delivering a product that will achieve the projected benefits. • Monitor and control the progress of the project at a strategic level, in particular reviewing the business case continually. • Ensure any proposed changes of scope, cost or time scale are checked against the possible effects on the Project Business case. • Monitoring project finance on behalf of the Client. • Monitoring changes to the project plan to see whether there is any impact on the needs of Project business case. • Approval of material, shop drawings, method statements. • Attending progress meeting, technical co-ordination meetings and prepare minutes of meetings. • Liaison with authorities such as SEC (Saudi electricity company), Saudi Civil Defense and STC for inspection & approvals. • Verification of payment certificates and variations claims, testing and commissioning, Snagging and de-snagging. Review of As-Built drawings and O+M manuals, Guarantees / Warrantees and Project taking over documents. • Factory visits of Electrical Equipment and Mechanical equipment and witnessed Factory test of the Equipments. Dec’05 – June’10 with M/s MAPCO Inc W.L.L, Doha, Qatar. Designation: Senior Electrical Engineer/ Project Engineer. Successfully Completed Projects: • Al-Udeid Project, Package 4, Addendum # 1 & 2. American Airbase (Electro-Mechanical Works (Design Build Contract)
  • 4. • Doha Beach Villa Complex- Sheikha Moaza palace (MEP Works Electrical, Plumbing, Drainage, Water Supply, HVAC, Building Management system, Chiller Plant Manager and Fire Fighting) • Pearl Qatar Porto Arabia Parcel 11A Tower (Electro-Mechanical Works (Design Build Contract). • Installed 13,8 Kv High Voltage Switchgears and carried out the following tests: 1. Mechanical Operation Tests. 2. Electrical Tests. 3. C.T Primary injection Tests. 4. Insulation Megger test 5. H.V Die electric Test 6. Phase Continuity Test. 7. Test of auxillary Control Circuits. Responsibilities / Duties: • General design, project execution, procurement, materials submittals and Electrical QA/QC activities. Coordination with site engineers and review of technical submittals of suppliers. Preparing materials submittals to the consultants, review of the consultant comments and re submittals. Materials and supplies control, Purchase orders of materials, supplies, equipments intended for site projects. • Follow up with suppliers for materials deliveries. Control nonconforming product to prevent its unintended use or delivery and to take immediate action to control cause and effect of nonconformance and ensure that corrective actions are carried out to rectify the nonconformity as approved. • Responsible to recognize the OH&S hazards and associated risks, perform Hazard identification and risk assessments; according to OHSAS 18001:1999 requirements among Mapco Inc. site activities and the assessment of risks and control measures. • Responsible for identifying the need to source out personnel, facilities and supporting services to be able to meet the project requirements and the effective implementation and control of the QMS and OH&S MS. Implementation of the emergency preparedness and response plans, and to identify areas of improvements. • Responsible for reporting any observed non-conformity to the Section Heads/managers, or to the QA/QC Engineer, or to the Quality Manager. • Carry out the safety and professional health instructions prescribed in the establishment. And shall cooperate in the prevention of the occurrence of accidents in the place of work or in the alleviation of the results thereof. June’90 – Dec’05 with HAIF Company, Riyadh, KSA Designation: Senior Electrical Engineer.
  • 5. • Madina Hilton for Hilton Group • Jeddah Hilton and complex for Hilton Group • Palaces and Farm Houses for the Royal families • ABV Rock group & SSSP -Housing compound • King Khalid Air Base Khamis Mushayath-Facilities • Gosi-Head Quarters at Abha & Gizan Responsibilities / Duties: •Responsible for Electrical Design, prepares Manual Procedures/ Construction Methodology relative to Electrical Works of the above mentioned Projects. Leading a group of Electrical Engineers. •Evaluate activities involving the preparation of Shop drawings in line with Electrical design Drawings and Technical Specifications of the Projects. •Complete detailing requirement of the Electrical Works of the above-mentioned project i.e. Lighting System (internal and external), Power Distribution System, Structured Cabling System, Fire Alarm System, Surveillance Security System, Building Management System, Hotel Management System, CATV/MATV and CCTV System, Conference and Interpretation System and other type of Low Current System. •Electrical design, load computations, suggesting capacities of electrical equipment, transformers, Generator sets, and cable sizes with application of National Electrical Code, ISO and IEC, EIA/TIA Standards relative to Electrical System Design and installation in the project. Also prepares requirements and Manual Procedures / Construction Methodology relative to Electrical Works. • Installed 13,8 Kv and 33 Kv High Voltage Switchgears and carried out the following tests: 1. Mechanical Operation Tests. 2. Electrical Tests. 3. C.T Primary injection Tests. 4. Insulation Megger test 5. H.V Die electric Test 6. Phase Continuity Test. 7. Test of Auxlliary Control Circuits. Nov’86 – May’90 with Al Buraidi Trading and Contracting Establishment Designation: Senior Electrical Engineer Successfully Completed Projects: • Ministry of Education – Mentally Handicapped School for Boys & Girls, Abha, KSA (SR 240Million) • Mosadiah Plaze Shopping Center – Phase 1 Jeddah, KSA • GMA Center (General Motor Agency Center Comlex) Jeddah, KSA
  • 6. • Abbar Gas Station • Al Raiji Commercial Complex, Jeddah, KSA Responsibilities / Duties: Responsible for every aspect of Electrical Works of the Projects. The duties involve supervising and directing workforce, keep check on quality of work and timely completion. Other duties include preparation of material submittal, progress billing, and selection of materials as per specifications within the budget. Besides managing the site, my responsibility also includes preparing shop drawings and bidding for all new projects for the company. PERSONAL DETAILS  DATE OF BIRTH: 3rd August 1952.  DRIVING LICENSE: VALID SAUDI DRIVING LICENSE  SEX: MALE  MARITAL STATUS: MARRIED REFERENCES Available on request
  • 7. • Abbar Gas Station • Al Raiji Commercial Complex, Jeddah, KSA Responsibilities / Duties: Responsible for every aspect of Electrical Works of the Projects. The duties involve supervising and directing workforce, keep check on quality of work and timely completion. Other duties include preparation of material submittal, progress billing, and selection of materials as per specifications within the budget. Besides managing the site, my responsibility also includes preparing shop drawings and bidding for all new projects for the company. PERSONAL DETAILS  DATE OF BIRTH: 3rd August 1952.  DRIVING LICENSE: VALID SAUDI DRIVING LICENSE  SEX: MALE  MARITAL STATUS: MARRIED REFERENCES Available on request