SlideShare ist ein Scribd-Unternehmen logo
1 von 4
Curriculum Vitae
PERSONAL DETAILS
Name James Robert Barton
Job Title TBM Operator/Trainee Supervisor
Email barton_james_barton@yahoo.co.uk
Address The Old Post Office
Scotter Road
Susworth
Lincolnshire
DN17 3AR
Telephone 07971541666
D.O.B 11th
February 1958
Non Smoker
Nationality British
Marital Status Common Law Partner
Driving Licence Full/Clean
USA VISA B1/B2 until June 2016
PERSONAL PROFILE
A skilled TBM Operator with a wealth of experience on various machines and working in
challenging ground. I have worked home and abroad in tunnelling since my working life began
over 30 years ago. I am able to adapt to different machines and way of life easily. I have a CPCS
and CSCS qualifications along with the usual training associated with the Tunnelling industry
which is listed below.
I have the proven ability to supervise and train up TBM Operators. To date I have trained
operators in London, China, Russia, America, Netherlands, Doha, Serbia, Spain, Egypt, Scotland
and Northern Ireland for Herrenknecht.
FULLYTRAINED IN:
Excavator 360 below 10 tonnes - Tracked
Excavator 360 above 10 tonnes – Tracked
Tunneller – NATM Miner Industry Accreditation A
Pipejacking/Micro Tunneller Industry Accreditation A
Tunneller - Hand Miner Industry Accreditation A
Tunneller - Shaft Miner Industry Accreditation A
Tunneller - Machine Miner Industry Accreditation A
Valid Shot Fire Ticket
Confined Space Certificate
Crossrail Safety Card valid until 2018
EMPLOMENT HISTORY
Aug 2015 – Dec 2015 London/Crossrail
Lovatt TBM
Apr 2015 – Aug 2015 Doha/Gold Line
Herrenknecht EPB 6 metre diagmeter segmental tunnel
Sep 2012 – Apr 2015 London/Dragados Crossrail
Herrenknecht EPB 7 metre diameter segmental tunnel
Oct 2010 – Sep 2012 Preston/Sewarage Treatmet Works
Lovatt TBM
July 2010 – Sept 2010 Montec/Belgrade
Worth EPB 4.5 segmental tunnel
Sept 2008 – Dec 2009 Morgan Est/Belfast Sewage Works
Lovatt Pipejack
Apr 2008 – Sep 2008 Morgan Est/ Ross on Wye
Lovatt 2.5 metre segmental tunnel
Mar 2008 – Apr 2008 Herrenknecht/Spain
Herrenknecht EPB shield 9.7 metre diameter segmental tunnel.
June 2007 – Mar 2008 Byzak/Exeter Uk
AVN Operator on Exeter river crossing.
Dec 2006 – May 2007 IPS/Nanjing & Chengdu Metro Line China
T.B.M operator on Herrenknecht E.P.B 6 metre diameter
segmental tunnel.
May 2006 – Nov 2006 IPS/Los Angeles Metro Gold Line
T.B.M operator on Herrenknecht E.P.B 6 metre diameter
segmental tunnel.
May 2004 – May 2006 Mowlems Johnson
Miner, Shaft Sinking.
June 2003 – May 2004 J Gallagher/London Channel Tunnel Rail Link
T.B.M operator on Worth E.P.B Machine. 8 metre diameter
segmental tunnel.
Jun 2002 – Jun 2003 AMCO/Dumfermline
T.B.M operator on Lovat full face Machine. 2 metre segmental
tunnel.
Apr 2001 – Jun 2002 Byzak/Glasgow
T.B.M operator on Herrenknecht E.P.B Machine. 3 metre
diameter segmental tunnel.
Jun 1999 – Feb 2000 Amey/Fife
T.B.M operator on Lovat full face Machine. 2 metre
diameter segmental tunnel.
May 1998 – May 1999 Byzak/Cardiff
T.B.M operator on Herrenknecht E.P.B Machine. 3 metre
diameter segmental tunnel.
Dec 1997 – May 1998 Amey/Essex
T.B.M operator on Lovat full face Machine. 2 metre segmental
tunnel.
Jan 1997 – Dec 1997 Tarmac/Swansea
T.B.M operator on Basack full face Machine. 3.7 metre
segmental tunnel.
Jul 1996 – Dec 1996 Johnstons/Keighley Yorkshire
T.B.M operator on Herrenknecht Roadheader. 2 metre diameter
segmental tunnel.
Aug 1994 – Jul 1996 Donelon/Bradford
T.B.M operator on Doscoe Roadheader. 3.7 metre diameter
segmental tunnel.
Jun 1994 – Aug 1994 D.C.T/Mansfield
T.B.M operator on Herrenknecht Roadheader. 2 metre
diameter segmental tunnel.
Sep 1993 – Jun 1994 Johnstons/Seaham County Durham
T.B.M operator on Herrenknecht S.M.I Roadheader. 3.7 metre
diameter segmental tunnel.
May 1993 – Sep 1993 Johnstons/Glasgow
T.B.M operator on Herrenknecht Roadheader. 2 metre diameter
pipe jack.
Feb 1993 – Mar 1993 Swanson/Sunderland
Miner
Aug 1992 – Jan 1993 Johnstons/Bradford
T.B.M operator on Herrenknecht S.M.I Roadheader. 3.7 metre
diameter segmental tunnel.
Apr 1992 – Aug 1992 D.C.T/Birmingham
T.B.M operator on Herrenknecht backo. 2 metre diameter
segmental tunnel.
Feb 1992 – Apr 1992 D.C.T/Gateshead
T.B.M operator on Herrenknecht backo pipe jack. 2 metre
diameter segmental tunnel.
Mar 1991 – Feb 1992 D.C.T/Glasgow
T.B.M operator on Herrenknecht Roadheader. 1.5 metre
diameter segmental tunnel.
Apr 1988 – Mar 1991 Norwest Holst/Liverpool
Miner
Mar 1988 – Apr 1988 Nutall/London
Leading Miner
Oct 1986 – Dec 1987 C.W.C/Cairo Egypt
Miner

Weitere ähnliche Inhalte

Andere mochten auch (6)

7 Ways to Socialize Your Marketing Event
7 Ways to Socialize Your Marketing Event7 Ways to Socialize Your Marketing Event
7 Ways to Socialize Your Marketing Event
 
IBM PureData System
IBM  PureData SystemIBM  PureData System
IBM PureData System
 
Ms word
Ms wordMs word
Ms word
 
State cuts are filling local jails
State cuts are filling local jailsState cuts are filling local jails
State cuts are filling local jails
 
Tableau-Salesforce_Topic4_Dynamic Link
Tableau-Salesforce_Topic4_Dynamic LinkTableau-Salesforce_Topic4_Dynamic Link
Tableau-Salesforce_Topic4_Dynamic Link
 
Restriction Ligation Course
Restriction Ligation CourseRestriction Ligation Course
Restriction Ligation Course
 

Ähnlich wie cv2015 jrb word 2003

Ähnlich wie cv2015 jrb word 2003 (9)

CV
CVCV
CV
 
djprydelinkedin - Copy
djprydelinkedin - Copydjprydelinkedin - Copy
djprydelinkedin - Copy
 
David M Fleming Cv
David M Fleming CvDavid M Fleming Cv
David M Fleming Cv
 
A CLARK 16
A CLARK 16A CLARK 16
A CLARK 16
 
Arthur (lancelot) bonner plunkett
Arthur (lancelot) bonner plunkettArthur (lancelot) bonner plunkett
Arthur (lancelot) bonner plunkett
 
Billy`s CV
Billy`s CVBilly`s CV
Billy`s CV
 
Dimapur-Kohima Rail Project Site Visit Report (1).docx
Dimapur-Kohima Rail Project Site Visit Report (1).docxDimapur-Kohima Rail Project Site Visit Report (1).docx
Dimapur-Kohima Rail Project Site Visit Report (1).docx
 
CV Template for GAM Applicants-LL (1)
CV Template for GAM Applicants-LL (1)CV Template for GAM Applicants-LL (1)
CV Template for GAM Applicants-LL (1)
 
BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATION
 

cv2015 jrb word 2003

  • 1. Curriculum Vitae PERSONAL DETAILS Name James Robert Barton Job Title TBM Operator/Trainee Supervisor Email barton_james_barton@yahoo.co.uk Address The Old Post Office Scotter Road Susworth Lincolnshire DN17 3AR Telephone 07971541666 D.O.B 11th February 1958 Non Smoker Nationality British Marital Status Common Law Partner Driving Licence Full/Clean USA VISA B1/B2 until June 2016 PERSONAL PROFILE A skilled TBM Operator with a wealth of experience on various machines and working in challenging ground. I have worked home and abroad in tunnelling since my working life began over 30 years ago. I am able to adapt to different machines and way of life easily. I have a CPCS and CSCS qualifications along with the usual training associated with the Tunnelling industry which is listed below. I have the proven ability to supervise and train up TBM Operators. To date I have trained operators in London, China, Russia, America, Netherlands, Doha, Serbia, Spain, Egypt, Scotland and Northern Ireland for Herrenknecht. FULLYTRAINED IN: Excavator 360 below 10 tonnes - Tracked Excavator 360 above 10 tonnes – Tracked Tunneller – NATM Miner Industry Accreditation A Pipejacking/Micro Tunneller Industry Accreditation A Tunneller - Hand Miner Industry Accreditation A Tunneller - Shaft Miner Industry Accreditation A Tunneller - Machine Miner Industry Accreditation A
  • 2. Valid Shot Fire Ticket Confined Space Certificate Crossrail Safety Card valid until 2018 EMPLOMENT HISTORY Aug 2015 – Dec 2015 London/Crossrail Lovatt TBM Apr 2015 – Aug 2015 Doha/Gold Line Herrenknecht EPB 6 metre diagmeter segmental tunnel Sep 2012 – Apr 2015 London/Dragados Crossrail Herrenknecht EPB 7 metre diameter segmental tunnel Oct 2010 – Sep 2012 Preston/Sewarage Treatmet Works Lovatt TBM July 2010 – Sept 2010 Montec/Belgrade Worth EPB 4.5 segmental tunnel Sept 2008 – Dec 2009 Morgan Est/Belfast Sewage Works Lovatt Pipejack Apr 2008 – Sep 2008 Morgan Est/ Ross on Wye Lovatt 2.5 metre segmental tunnel Mar 2008 – Apr 2008 Herrenknecht/Spain Herrenknecht EPB shield 9.7 metre diameter segmental tunnel. June 2007 – Mar 2008 Byzak/Exeter Uk AVN Operator on Exeter river crossing. Dec 2006 – May 2007 IPS/Nanjing & Chengdu Metro Line China T.B.M operator on Herrenknecht E.P.B 6 metre diameter segmental tunnel. May 2006 – Nov 2006 IPS/Los Angeles Metro Gold Line T.B.M operator on Herrenknecht E.P.B 6 metre diameter segmental tunnel. May 2004 – May 2006 Mowlems Johnson Miner, Shaft Sinking. June 2003 – May 2004 J Gallagher/London Channel Tunnel Rail Link
  • 3. T.B.M operator on Worth E.P.B Machine. 8 metre diameter segmental tunnel. Jun 2002 – Jun 2003 AMCO/Dumfermline T.B.M operator on Lovat full face Machine. 2 metre segmental tunnel. Apr 2001 – Jun 2002 Byzak/Glasgow T.B.M operator on Herrenknecht E.P.B Machine. 3 metre diameter segmental tunnel. Jun 1999 – Feb 2000 Amey/Fife T.B.M operator on Lovat full face Machine. 2 metre diameter segmental tunnel. May 1998 – May 1999 Byzak/Cardiff T.B.M operator on Herrenknecht E.P.B Machine. 3 metre diameter segmental tunnel. Dec 1997 – May 1998 Amey/Essex T.B.M operator on Lovat full face Machine. 2 metre segmental tunnel. Jan 1997 – Dec 1997 Tarmac/Swansea T.B.M operator on Basack full face Machine. 3.7 metre segmental tunnel. Jul 1996 – Dec 1996 Johnstons/Keighley Yorkshire T.B.M operator on Herrenknecht Roadheader. 2 metre diameter segmental tunnel. Aug 1994 – Jul 1996 Donelon/Bradford T.B.M operator on Doscoe Roadheader. 3.7 metre diameter segmental tunnel. Jun 1994 – Aug 1994 D.C.T/Mansfield T.B.M operator on Herrenknecht Roadheader. 2 metre diameter segmental tunnel. Sep 1993 – Jun 1994 Johnstons/Seaham County Durham T.B.M operator on Herrenknecht S.M.I Roadheader. 3.7 metre diameter segmental tunnel. May 1993 – Sep 1993 Johnstons/Glasgow T.B.M operator on Herrenknecht Roadheader. 2 metre diameter pipe jack. Feb 1993 – Mar 1993 Swanson/Sunderland Miner
  • 4. Aug 1992 – Jan 1993 Johnstons/Bradford T.B.M operator on Herrenknecht S.M.I Roadheader. 3.7 metre diameter segmental tunnel. Apr 1992 – Aug 1992 D.C.T/Birmingham T.B.M operator on Herrenknecht backo. 2 metre diameter segmental tunnel. Feb 1992 – Apr 1992 D.C.T/Gateshead T.B.M operator on Herrenknecht backo pipe jack. 2 metre diameter segmental tunnel. Mar 1991 – Feb 1992 D.C.T/Glasgow T.B.M operator on Herrenknecht Roadheader. 1.5 metre diameter segmental tunnel. Apr 1988 – Mar 1991 Norwest Holst/Liverpool Miner Mar 1988 – Apr 1988 Nutall/London Leading Miner Oct 1986 – Dec 1987 C.W.C/Cairo Egypt Miner