Property and Supply Management w/ introduction to R.A. 9184 Government Procurement Reform Act
1. Holy Name UniversityHoly Name University
cor. Gallares & Lessage sts, Tagbilaran Citycor. Gallares & Lessage sts, Tagbilaran City
The only catholic university in the Province of Bohol
LOCAL GOVERNMENT ADMINISTRATIONLOCAL GOVERNMENT ADMINISTRATION
JUAN PAOLO S. ARANAS
Master in Public Administration
RESOURCE UTILIZATION AND ACCOUNTABILITY
Property & Supply Management
(w/ introduction to R.A. 9184)
2.
3. BASIC PRINCIPLES
Public office is a Public Trust (Sec. 1 Art. 11 of
the 1987 Philippine Constitution; RA 6713).
Public officials and employees must be at all
times accountable to the people, serve them with
utmost honesty, responsibility, integrity, loyalty,
and efficiently, act with patriotism and lead
modest lives.
4. BASIC PRINCIPLES
Section 2 of the PD no. 1445 otherwise known as
the State Auditing of the Philippines states that
“all resources of the government shall be
managed, expended or utilized in accordance with
laws, rules, regulations, and safeguarded against
loss or wastage through illegal or improper
disposition with the view of ensuring economy,
efficiency, and effectiveness in the operation of the
government.
5. References:
• Republic Act No. 7160 Book II Title 6
• Revised Implementing Rules and
Regulations of Republic Act No. 9184,
otherwise known as the “Government
Procurement Reform Act.”
6. Course Objectives:
• To know and discuss Supply & Property
Management; and to
• Appreciate Provisions under Republic
Act. No. 9184 and its Implementing Rules
and Regulations
8. *SECTION 356 – GENERAL RULE IN
PROCUREMENT AND DISPOSAL
Except as otherwise provided herein,
acquisition of supplies by local
government units shall be through
COMPETITIVE PUBLIC BIDDING.
Supplies which become unserviceable or
no longer needed shall be SOLD,
whenever applicable, at PUBLIC
AUCTION, subject to applicable rules
and regulations
10. DEFINITION OF TERMS (R.A. 7160 & 9184)
Lowest Complying and Responsible Bid
1. proposal of one who offers the lowest price;
2. meets all the technical specifications and
requirements of the supplies desired;
3. as a leader in the line of supplies involved;
4. maintains a regular establishment; and
5. has complied consistently with previous
commitments;
11. Suitable Substitute – refers to the kind of
article which would serve substantially the
same purpose or produce substantially the
same results as the brand, type, or make of
article originally desired or requisitioned.
Supplies – include everything, except real
property
Terms & Conditions – refers to other
requirements not affecting the technical
specifications and requirements of the
required supplies desired
12. Approved Budget for the Contract –
budget for the contract duly approved by
the HOPE.
Fund Instrumentality
National Government
Agencies (NGAs)
General Appropriations Act
(GAA)
GOCCs, GFIs, SUCs Corporate budget for the
contract approved by the
governing board
Local Government Units
(LGUs)
Budget Approved by
Sanggunian
Foreign – Funded
Procurement
Treaty, International or
Executive Agreement
13. Bid – equivalent to “Proposal” and “Tender”
Bidder – eligible contractor, manufacturer,
supplier, distributor and or consultant
Bidding Documents – documents issued by
the P.E. as basis for bids, furnishing all
information necessary for a prospective
bidder to prepare a bid.
Common-Use supplies – goods, materials
and equipment that are used in the day-to-day
operations of the PE in the performance of
their duty
14. Competitive Bidding – method of
procurement which is open to participation
by an interested party which consists of
processes.
Expendable Supplies – articles which are
normally consumed in use within one (1)
year or more than a year but which shall have
decreased substantially in value after only
one year in use
15. Goods – all items except consulting services
and infrastructure projects which may be
needed in the transaction of public businesses
including related or analogous services.
Head of the Procuring Entity (HOPE) –the
head of the Agency.
Infrastructure Projects – “civil works”
Non-Expendable Supplies - articles which
retain their identity during the period of use
whose serviceable life is more than one year.
16. PhilGEPS – Philippine Government
Electronic Procurement System
Portal – website
Procurement – acquisition by the PE
Procuring Entity (PE) – refers to branch,
offices, agencies, bureau of the GOP, incl.
GOCC, GFI, SUC, LGU.
17. SECTION I – SHORT TITLE AND PURPOSE
OF RA 9184
Purpose of the IRR of R.A. 9184:
• Modernization
• Standardization
• Regulation of the procurement
activities of the GOP
19. SECTION 3 – GOVERNING PRINCIPLES
• Transparency
• Competitiveness
• Streamlined procurement
process
• System of Accountability
• Public monitoring
20. SECTION 4 – SCOPE AND APPLICATION
• Branch, agency, department, bureau,
office or instrumentality of GOP, incl.
GOCCs, GFIs, SUCs, & LGUs
• Any Treaty or International or
Executive Agreement to which the
GOP is signatory
21. • Procurement funded by foreign grants
• Acquisition of real property
This IRR shall not apply to the following:
• Public – Private sector infra or
development projects and other
procurement covered by R.A 6957
23. Duties of the PMO/End-user(s)
1. To provide the technical specifications of the goods it
will procure
2. To conduct a market survey that will include a
study of the available products or services, industry
developments
3. To recommend the ABC
4. To provide technical advice
5. To assist in the preparation of bidding documents
24. Duties of the PMO/End-user(s)
6. To attend all stages of the procurement
7. To determine the period of contract implementation
during the procurement planning stage, and include it in
the PPMP.
8. To ensure that the Chief Accountant of the procuring
entity issues a CAF for the project.
Only with a CAF can the contract be valid.Only with a CAF can the contract be valid.
The Chief Accountant must also sign the contract as a witness. (Sec. 5 GPM)The Chief Accountant must also sign the contract as a witness. (Sec. 5 GPM)
Fund availability isFund availability is an indispensable prerequisite to the execution of anyan indispensable prerequisite to the execution of any
government contract involving the expenditure of public funds by allgovernment contract involving the expenditure of public funds by all
government agencies at all levels.government agencies at all levels.
25. Duties of the PMO/End-user(s)
9. To determine the existence of condition/s that require
an amendment to order.
10. To determine the existence of a force majeure or
fortuitous event that will be the basis for the issuance of
a suspension order.
11. To either approve or disapprove the request for
extension.
27. What is Planning?
• The act or process of making or carrying out plans.
• The establishment of goals, policies, and procedures for a social or
economic unit.
• It involves resource allocation and scheduling.
• Through plans, a PE is able to effectively manage and track
procurement all the way to contract performance.
• Allows managers to determine how to allocate limited cash and
other appropriate resources under a given time line, identify choke-
points, weaknesses, and delays in the entire activity that can be
addressed or eliminated.
28. Planning & budgeting linkages
PE – Agency Budget Proposal by considering the budget
framework
PMO/End-User – prepares their respective WFP for their
different PPA’s as annex to Budget call.
Procuring Entity’s Budget Proposal embodies the agency
thrusts and the resources needed to produce the key services it
delivers to the public.
Procurement planning should be done within this budgetary
context, reflecting the Procuring Entity’s priorities and
objectives for the budget period.
29. Planning & budgeting linkages
The WFP or the Work and Financial Plan
Contains the initial list of projects/requirements of each PMO/End-User unit
and the corresponding estimated budgetary requirement.
Submitted by the PMOs or end-user units to the PE’s Budget Office on or
about May of each year, to coincide with the submission of their respective
budget proposals. This will be evaluated and included in the PE’s Budget
Proposal .
This will support the Budget Proposal submitted to DBM and becomes the
basis for the proposed PPMP.
The Budget Office shall furnish a copy of the WFP’s and proposed PPMP to
the BAC Sec for the consolidation of the initial list of items/projects for
procurement into the proposed APP.
30. Planning & budgeting linkages
When GAA becomes final (Nov. - Dec.), PMO’s/End-User must refine the
proposed PPMP.
Within 15 days from issuance of the Agency Budget Matrix (ABM) during the
1st
quarter of the fiscal year, PMO’s/End-User shall finalize the PPMP’s to reflect
the budgetary allocation for their respective PPAs as provided in the ABM.
The final PPMPs shall be submitted to the BAC Sec for the finalization of the
proposed Procuring Entity’s APP to be submitted to the HOPE for confirmation
or approval.
31. Preparation of the Project Procurement Management Plan
(PPMP)
What is a Project Procurement Management Plan (PPMP)?
A Project Procurement Management Plan or PPMP, which is a component of
the Project Management Plan, deals primarily with:
a.planning for the procurement of project requirements;
b.bidding or procurement strategy;
c.source selection;
d.delivery and payment schedules;
e.contract administration;
f.contract termination; and
g.other major milestones; in an effort to obtain goods, infrastructure and services
from suppliers, contractors and consultants.
32. Preparation of the Project Procurement Management Plan
(PPMP)
The PPMP serves as a guide document in the procurement and
contract implementation process, as well as a vital reference in
procurement monitoring.
It serves as an important tool in resource and financial
management, allowing the Procuring Entity the flexibility to
optimize the utilization of scarce resources.
Well-planned procurement will significantly minimize the
practice of doing short-cuts to ensure that the Procuring Entity is
able to purchase its requirements for the delivery of public services.
33. Preparation of the Project Procurement Management Plan
(PPMP)
Developing the Project Requirements:
The development of the project requirements should be done
during the preparation of the proposed PPMP. At this stage of
the procurement planning process, the PMO or end-user unit
must:
a. Identify the need of the PMO or end-user unit
What is the purpose of the procurement?
What are the problem/s or needs that the project or
procurement aims to address?
34. Preparation of the Project Procurement Management Plan
(PPMP)
Developing the Project Requirements:
b. Identify the alternative solutions, products, and services.
What alternative solutions to the problem/s or need/s are
available in the market?
What is the profile of the supply market?
Are they easily obtainable?
How much is the cost of each alternative?
The PMO or end-user unit should conduct the market research at this point, and
gather as much information about the Goods, Services or expertise required. At
the end of this activity, it should know the market or the industry well enough to
make an informed choice.
35. Preparation of the Project Procurement Management Plan
(PPMP)
Developing the Project Requirements:
c. Compare the alternatives (consider qualitative and
quantitative factors)
Consider how the PMO or end-user unit would rate the various
alternatives in terms of the following:
i. Value for money
The concept of value for money is not restricted to price alone. In addition to
costs, other considerations are non cost factors like suitability or fitness to the
purpose, quality, among others. In comparing costs, all relevant costs should be
considered, e.g., acquisition costs, life-cycle costs (including maintenance and
operating costs for goods and infrastructure, spare parts of goods, etc.).
36. Preparation of the Project Procurement Management Plan
(PPMP)
Developing the Project Requirements:
ii. Risk assessment and management
Some risks that may be identified are: obsolescence of
equipment, availability of support services, capacity of contractors
to implement the project. It is recommended, especially for high-
technology, complex, or high value procurement, that the PMO or
end-user unit identifies the risks involved and come up with its own
risk management plan. Or the bidders could be required to submit,
as part of their technical document, a risk assessment and risk
management plan.
37. Preparation of the Project Procurement Management Plan
(PPMP)
Developing the Project Requirements:
iii. Government policies that have an impact on the project or
procurement
Are there any restrictions on the procurement contemplated?
What relevant government policies should be considered in
determining the goods or services that will be purchased?
iv. Other relevant factors that may be identified by the PMO
or end-user unit.
38. Preparation of the Project Procurement Management Plan
(PPMP)
Developing the Project Requirements:
iii. Government policies that have an impact on the project or
procurement
Are there any restrictions on the procurement contemplated?
What relevant government policies should be considered in
determining the goods or services that will be purchased?
iv. Other relevant factors that may be identified by the PMO
or end-user unit.
39. Preparation of the Project Procurement Management Plan
(PPMP)
Writing the Technical Specifications, Scope of Work
(SOW) and Terms of Reference (TOR):
The Technical Specifications (for Procurement of
Goods), Scope of Work (for Services and Infrastructure
Projects) or Terms of Reference (for Consulting Services)
is the document that provides the detailed description of
the deliverables of the Supplier, Contractor or Consultant.
40. Preparation of the Project Procurement Management Plan
(PPMP)
Writing the Technical Specifications, Scope of Work
(SOW) and Terms of Reference (TOR):
The following guidelines are, considered helpful in writing the
TS/SOW/TOR:
Quality Assurance actually starts at this stage of the procurement cycle,
considering that the deliverables are decided at this time. It is therefore
important that all stakeholders are consulted, and the actual requirements of
the PMO or end-user unit are determined and put in writing.
If the procurement is complex, highly technical, or high value, and the
Procuring Entity does not have sufficient technical proficiency, it would be
prudent to engage the services of technical experts who will serve as
consultants in the preparation of the TS/SOW/TOR.
41. Preparation of the Project Procurement Management Plan
(PPMP)
Writing the Technical Specifications, Scope of Work
(SOW) and Terms of Reference (TOR):
The following guidelines are, considered helpful in writing the
TS/SOW/TOR:
In engaging these consultants, the Procuring Entity shall follow the
procedures for procurement of consulting services. Moreover, care should be
taken that possible conflict of interest is avoided; that is, the consultant/s
engaged should not be connected with the prospective bidders/contractors,
and are barred from being engaged by the latter for any purpose related to
the procurement at hand.
42. Preparation of the Project Procurement Management Plan
(PPMP)
Writing the Technical Specifications, Scope of Work
(SOW) and Terms of Reference (TOR):
The following guidelines are, considered helpful in writing the
TS/SOW/TOR:
The description should be generic and flexible, not product-specific or
seemingly tailored for a particular brand, product, contractor or consultant,
unless the procurement involves products or services that have intellectual
property rights attached to it, or are exclusively offered by a single source,
and there are no suitable substitute products or services.
43. Preparation of the Project Procurement Management Plan
(PPMP)
Writing the Technical Specifications, Scope of Work
(SOW) and Terms of Reference (TOR):
The following guidelines are, considered helpful in writing the
TS/SOW/TOR:
If the procurement involves products or services that have intellectual
property rights attached, or are exclusively offered by a single source
without any suitable substitute, then the PMO or end-user unit must be able
to satisfactorily justify the need for such a product or service.
The description should be clear and unambiguous, to avoid confusion and to
facilitate the evaluation process. It is noted that the TS/SOW/TOR is also the
basis of the evaluation or, when applicable, the testing parameters.
44. Preparation of the Project Procurement Management Plan
(PPMP)
Writing the Technical Specifications, Scope of Work
(SOW) and Terms of Reference (TOR):
The following guidelines are, considered helpful in writing the
TS/SOW/TOR:
Considering that planning is done sometime before actual procurement
and even farther from the date of actual delivery or project implementation,
changes in technology or changes in the concerned industry or field of
expertise should already be taken into account in writing the TS/SOW/TOR.
This will allow the Procuring Entity to procure the latest products and/or
services available in the market.
45. What is an ABC?
The ABC refers to the budget for the contract duly approved
by the Head of the Procuring Entity, as provided for in the GAA
and/or continuing appropriations, in the case of NGAs; the
corporate budget for the contract approved by the governing board,
pursuant to E.O. No. 518 series of 1979 in the case of GOCCs and
GFIs, and R.A. 8292 in the case of SUCs; and the budget approved
by the Sanggunian in the case of LGUs. (IRR-A Section 5)
46. What is an ABC?
The ABC, insofar as National Government Agencies are
concerned, refers to the budget for the contract duly approved by
the Head of the Procuring Entity which is contained in the Agency
Budget as reflected in the GAA or to be proposed in succeeding
GAAs. Thus, the ABC referred to in the R.A. 9184 and its IRR-A
basically refers to the proposed budget for the project approved by
the Head of the Procuring Entity based on the APP as consolidated
from various PPMPs. (GPPB Resolution 011- 2005 dated 26 May
2005)
47. Determining the Approved Budget for the
Contract (ABC):
In determining the ABC, the PMO or end-user unit has to consider
several factors, namely:
a. the appropriation for the project or procurement (whether
taken from the current year’s appropriations or continuing
appropriations),
b. the market price of the goods and/or services being
procured, inflation and cost of money which are directly
related to the procurement time table.
48. FORMAT OF THE PPMP
The PPMP shall contain the following information:
a.The name of the project/procurement;
b.General description of the project/procurement;
c.The extent/size of contract scopes/packages;
(This refers to the general description of the lot to be included in a
particular contract, i.e. the goods, infrastructure project or services, or
a combination of any two or three of these types of procurement,
including quantities where applicable.)
49. FORMAT OF THE PPMP
The PPMP shall contain the following information:
d.The procurement methods to be adopted, and indicating if the
procurement tasks are to be outsourced as provided in Section 53(e)
of the IRR-A;
e.The time schedule for each procurement activity; and
f.The ABC.
50. Preparation of the Annual Procurement
Plan (APP)
The APP is the document that consolidates the various PPMPs
submitted by the various PMOs and end-user units within the
Procuring Entity.
It reflects the entirety of the procurement activities that will be
undertaken by the Procuring Entity within the calendar year.
The APP is prepared by the BAC through the BAC Secretariat
upon submission by the PMOs and end-user units of their respective
PPMPs and finalized after the ABM has been approved by the
DBM.
51. Preparation of the Annual Procurement
Plan (APP)
The APP shall subsequently be re-submitted by the BAC for
approval to the Head of the Procuring Entity or a second-ranking
official designated by the Head of the Procuring Entity to act on his
behalf.
In preparing the APP, the BAC shall take into consideration the
following factors:
a. The APP should include all procurement activities planned for the year.
The approved APP shall be the basis for the Procuring Entity’s procurement,
and only those projects / procurement included therein shall be undertaken.
52. Preparation of the Annual Procurement
Plan (APP)
b. The APP shall include only those procurements that are considered crucial
to the efficient discharge of governmental functions. The IRR-A considers a
procurement crucial to the efficient discharge of governmental functions if:
i. it is required for the day-to-day operations of the Procuring Entity; or
ii. it is in pursuit of the principal mandate of the Procuring Entity
concerned.
c. The APP shall include provisions for foreseeable emergencies based on
historical records. The BAC, through the BAC Secretariat, shall include
therein a lump sum to cover for these emergencies or contingencies, which
amount shall not be more than four percent (4%) of the Procuring Entity’s
total appropriations for MOOE.
d. Scheduling of procurement activities should be done in such a manner that
the BAC and the other offices/units in the Procuring Entity that are involved
in the procurement process are able to efficiently manage the conduct of
procurement.
53. What is a Procurement Strategy?
The procurement strategy refers to the approach that will be adopted by
the BAC in the procurement of the goods, infrastructure projects and
consulting services included in the APP.
It reflects the entirety of the procurement activities that will be
undertaken by the Procuring Entity within the calendar year.
In the review and consolidation of the PPMPs, the BAC will be able to
determine the extent of diversity, quantities, quality, cost, the supply
market, and other characteristics of the Procuring Entity’s requirements
for the year.
The profile of the procurement is a major determinant in the choice of
procurement strategy to be employed, as well as in the scheduling of
procurement activities.
54. What is a Procurement Strategy?
There may be common requirements for the various PPMPs. For
example, three projects require the purchase of five (5) units of laptop
computers for each project office, or a total of fifteen (15) laptop
computers. Obviously, it will be more cost effective and efficient if the
BAC will procure the 15 laptop computers in one bidding exercise and as
one bid lot.
The individual PPMPs sometimes reflect a mix of procurement types,
for example, an ICT project might involve the procurement of goods (e.g.,
workstations, network equipment and peripherals), procurement of civil
works (e.g., the installation of cables might involve the repair of some
offices and other related civil works) and procurement of consulting
services (e.g., design and development of information systems).
55. What is a Procurement Strategy?
In similar cases, the BAC will have to exercise judgment in
determining the bid lots and contract package.
There are two approaches to this case:
1. the project could be bid out as one package, or
2. it could be divided into several bid lots (i.e. supply of
hardware, supply and installation of cables, design and development of
information systems, and repair of facilities).
There are advantages and disadvantages to both approach, and the
BAC, through the help of the TWG and the Secretariat, shall determine
which is the best option for the Procuring Entity.
56. What is a Procurement Strategy?
In IRR-A, Section 5(p), in case of projects involving mixed
procurements, the nature of the procurement, i.e. goods, infrastructure
projects, or consulting services, shall be determined based on the primary
purpose of the project.
This is helpful in determining which type of procurement procedure to
apply. However, there may be instances when the PMO, end-user unit or
the Procuring Entity itself may have difficulty determining or agreeing
upon the primary purpose. In these cases, ascertaining the component with
the highest price may be useful as an indicator of purpose, though not
necessarily as a determining factor.
57. Format of the APP
The BAC may prepare three APPs, one each for Goods, Infrastructure Projects, and
Consulting Services or a consolidated APP for all procurement activities.
The APP shall contain the following information:
a. Name of the project/procurement;
b. PMO or end-user unit;
c. General description of the project/procurement (general description of
requirements and quantities, where applicable);
d. The procurement methods to be adopted, and indicating if the procurement
tasks are to be outsourced as provided in Section 53(e) of the IRR-A;
e. The time schedule for each procurement activity; and
f. The ABC.
58. PE shall prepare its proposed budget
for the succeeding calendar year
The end-user units of the PE shall
prepared their respective PPMP
The PPMP shall be submitted to PE
budget office for evaluation, if
warranted, include it in the PE budget
proposal for approval by the HOPE
PE budget office shall furnish the PE
budget proposal as well as the PPMP
to the BAC Secretariat for its review
and consolidation into proposed APP
Final GAA, corporate budget, or
appropriation ordinance
The End-user units shall revise and
adjust the PPMP to reflect the
budgetary allocation for their
respective PAP’s. The revised
PPMP shall be submitted to the
BAC, for finalization and mode of
procurement under the proposed
APP. (The APP shall bear the
approval of the HOPE or its
designated representative)
Updating of individual PPMP and
the consolidated APP for each PE
shall be undertaken every 6 months
or as often as may be required by
the HOPE.
59. SECTION 7 – PROCUREMENT PLANNING
& BUDGETING
• All procurement shall be within the
Approved Budget of the PE
• No procurement shall be undertaken
unless it is in accordance with the
approved APP of the PE
61. Major Functions of the Property & Supply Div.
Prepares Agency Procurement Request (APR) for all items to be
procured from the DBM-PS
Accept deliveries of supplies, materials, and equipment based on
the APR, Purchase Order (P.O), Contract, and request for the
conduct of the inspection
Issues and distributes available supplies, materials, and
equipment to requesting offices of the Procuring Entity.
Prepares and maintains Inventory Custodian Slip (ICS) for all
inventory items, Report of Supplies and Materials Issued
(RSMI), Stock Cards for supplies and materials and Property
Card for all Property, Plant and Equipment (PPE)
62. Major Functions of the Property & Supply Div.
Prepares Acknowledgement Receipt of Equipment (ARE) for all
(PPE)
Conduct physical inventory for all PPE and consolidate the same
for the preparation of Annual Inventory Report
Disposes waste materials and all unserviceable equipment in
accordance with applicable laws, rules, and regulations.
Issues clearance from property accountability of all officials and
employees
Maintains and updates master lists of inventories of all PPE and
inventory items
64. The PhilGEPS (Philippine Government
Electronic Procurement Systems)
A central Portal that serve as
the primary source of
information on all government
procurement.
65. Main features of PhilGEPS
• The Electronic Bulletin Board
Centralized electronic bulletin board for posting
procurement opportunities, awards, results of bidding
and other related information.
• Registry of Manufacturers, Suppliers,
Distributors, Contractors, and Consultants
• The Electronic Catalogue
PE shall procure common – use goods, supplies,
materials and equipment from the Electronic Catalogue
of PhilGEPS
66. *Section 364 – The Committee on Awards
There shall be in every province, city
or municipality a Committee on
Awards to decide the winning bids and
questions on awards on procurement
and disposal of property
67. BAC Composition
The Head of the Procuring
Entity shall designate at least
five (5) but not more than
seven (7) members to the
BAC
68. BAC Composition for NGAs, departments, bureaus, offices, judicial
and legislative branches, commissions, SUCs, GOCCs, & GFIs
Regular Members:
Chairman, who is at least a third ranking permanent officials
of the PE
An officer, who is at least a fifth ranking permanent officials
who shall represents the legal / admin. Area of PE. (bureaus,
offices, BAC members shall be at least third ranking
permanent personnel)
An officer, who is at least a fifth ranking permanent officials
who shall represents the finance area. (bureaus, offices, BAC
members shall be at least third ranking permanent personnel)
69. BAC Composition for NGAs, departments, bureaus, offices, judicial
and legislative branches, commissions, SUCs, GOCCs, & GFIs
Provisional Members:
An officer who has technical expertise relevant to the
procurement at hand
A representative from the end user unit who has knowledge
of procurement laws and procedures
The Chairman and the Vice-Chairman shall also be
designated by the HOPE. Moreover, the Vice-Chairman shall
be a regular member of the BAC.
70. BAC Composition for Local Government Units
(LGU)
• One representative each from the
regular offices under the Office of the
Local Chief Executive; and
• A representative from the end-user unit
The HOPE may designate alternate members to the BAC
whenever their principals are absent
TERMS OF OFFICE – 1 YEAR (RENEWABLE)
71. Sec. 354 (RA 7160) The
Committee on Awards shall be
composed of the Local Chief
Executive as Chairman; Sec.11.2.5
(RA 9184) In no case shall the
HOPE and/or the approving
authority be the Chairman or a
member of the BAC
72. FUNCTIONS OF THE BAC
1. Advertise the invitation to bid/request for exp. Of interest;
2. Conduct pre-proc. and pre-bid conferences;
3. Determine the eligibility of bidders;
4. Receive bids and conduct evaluation of bids;
5. Undertake post-qualification proceedings;
6. Receive motion for reconsideration;
7. Recommend awards of contract to the HOPE ;
8. Creation of Technical Working Group (TWG);
9. Responsible for ensuring that the PE abides by the standard
set forth by the Act and this IRR;
73. Section 13 - Observers
1. Commission on Audit (COA) Representative
2. At least one (1) shall come from a duly recognized
private group in a sector relevant to the procurement at
hand, for example:
a) For Infrastructure projects, national associations of
constructors duly recognized by the Construction
Industry of the Philippines (CIAP), such as but not
limited to the following:
• Philippine Constructors Associations, Inc.;
• Nat’l Constructors Assoc. of the Phil., Inc.; &
• Phil. Institute of Civil Engineers(PICE)
74. Section 13 - Observers
c) For consulting services, a project-related professional
organization accredited or duly recognized by the
Professional Regulation Commission or the Supreme
Court, such as but not limited to:
• PICE;
• Phil. Inst. Of Certified Public Accountants;
• Confederation of Filipino Consulting
Organizations; and
b) For goods, a specific relevant chamber-member of the
Philippine Chamber of Commerce and Industry.
3. Non-government organization (NGO)
75. FUNCTIONS & RESPONSIBILITIES OF
THE BAC SECRETARIAT
1. Provide administrative support to the BAC;
2. Organize and make all arrangement for the BAC meetings;
3. Prepare minutes of meetings and resolutions of the BAC;
4. Take custody of procurement documents and records;
5. Distribution of BidDocs to the interested bidders;
6. Advertise opportunities, incl. BidDoc,and notice of awards;
7. Managing the procurement processes;
8. Consolidate PPMPs
9. Act as the central of communications for the BAC with end
users, PMOs, other units, and providers of services & public
76. The HOPE shall ensure that the
members of the BAC and TWG
shall give UTMOST PRIORITY
to BAC assignments over all other
duties and responsibilities, until the
requirements for the said
assignments at hand are completed.
77. AVAILABILITY OF BIDDING DOCUMENTS
For the procurement of goods and infrastructure projects
From the time the Invitation to Bid (ITB) is first
advertised or posted until the deadline for the
submission and receipt of bids.
For the procurement of consulting services
From the time the Request for Expression of Interest is
first advertised until the deadline for the eligibility
check, and the Bidding Documents, from the
determination of the short list until the deadline for the
submission and receipt of bids.
78. Bidders may be asked to
pay for the Bidding
Documents to recover the
cost of its preparation and
development
79. • Agency’s website
• PhilGEPS
Bidding Documents shall be posted at:
Prospective bidders may download the Bidding
Documents from any of the said websites; provided
that, bidders shall pay the fees for the Bidding
Documents upon submission of their bids.
• Conspicuous places
• Newspaper; if applicable
80. • (Purchase Request) Reference to brand names
shall not be allowed
• No aspects of the Bidding Documents shall be
divulged or released to any prospective bidder
or person having direct or indirect interest in the
project to be procured, or to any party, except
those officially authorized in the handling of the
documents
Points to Remember
81. SECTION 20 - Pre-Procurement Activities
1. Confirm the description and scope of the contract, the
ABC, and contract duration.
2. Ensure that the procurement is in accordance with the
project and annual procurement plans;
3. Determine the readiness of the procurement at hand
4. Review, modify, and agree on the criteria for eligibility,
screening, evaluation and post-qualification
5. Review and adopt the procurement schedule, incl.
deadlines, and timeframes for the different activities; and
6. Reiterate and emphasize the importance of confidentiality
82. The holding of a pre-procurement
conference may not be required for:
Procurement of Goods
costing Two Million Pesos (Php2, 000,000.00) and below
Infrastructure Projects
costing Five Million Pesos (Php5, 000,000.00) and below
Consulting Services
costing One Million (Php1, 000,000.00) and below
83. SECTION 2 – Pre-bid Conference
For contracts to be bid with an ABC of One Million Pesos (P1,
000, 000.00) or more, the BAC SHALL CONVENE at least (1)
pre-bid conference to clarify, and/or explain any of the
requirements, terms, conditions, and specifications stipulated in the
Bidding Documents.
P1M
Pre-bid Conference is
required
At the discretion of the BAC
84. SECTION 2 – Pre-bid Conference
Pre-bid Conference Opening & submission of bidsAt least 12 cd.
The minutes of the pre-bid conference shall be recorded and made
available to all participants not later than (3) calendar days after the
pre-bid conference.
Warning!
Statement made at the pre-bid
conference shall not modify the terms
of the BidDocs, unless such statement
is specifically identified in writing as
an amendments thereto and issued as a
Supplemental / Bid Bulletin.
85. Receipt and Opening of Bids
Class “A” documents
Legal Documents
1. Registration Certificate from SEC, Department of Trade and
Industry (DTI) for sole proprietorship, 3. Cooperative
Development Authority (CDA) for cooperatives
Technical Documents
2. Mayor’s permit where the principal place of business of the
prospective bidder is located.
1. Statement of the pros. Bidder of all its ongoing and completed
government and private contracts, incl. Contracts awarded but
not yet started.
2. Philippine Contractors Accreditation Board (PCAB) for
Infrastructure projects
Class “B” documents
86. Receipt and Opening of Bids
Financial Documents
1. Audit Financial Statement showing total current assets and
liabilities. Stamped “RECEIVED” by the BIR
2. NFCC or a commitment from a Universal or commercial bank to
extend a credit line. (CLC)
3. Bill of Quantities/ Materials and Bid Form
87. Eligibility Criteria
Goods Infrastructure/civil works Consulting services
Duly licensed Filipino Duly licensed Filipino Duly licensed Filipino
Duly organized partnership (60%) Duly organized partnership (75%) Duly organized partnership (60%)
Duly organized corporation
(60% Outstanding Capital Stock)
Joint venture (75%) /(ownership of the
Filipino shall not be less than25%)
Duly organized corporation
(60% Outstanding Capital Stock)
Duly organized cooperatives (60%) Project is under Treaty or International
Agreement
Duly organized cooperatives (60%)
Joint venture (60%) Licensed by PCAB Joint venture (60%)
The bidder have completed at least two (2)
similar contracts and the aggregate contract
shall be equivalent to at least the percentage
of the ABC as required. (50% / 25 % for
expendable supplies)
Constructors Performance Evaluation
Summary rating and or certificate of
completion and owner’s acceptance of the
contract must be satisfactory
The largest of these similar contract must be
equivalent to atleast half of the percentage of
ABC
The bidder must have an experience of
having completed 10 years from the date of
submission and receipt of bids
If, NFCC atleast equal to the ABC to be bid; or If, NFCC atleast equal to the ABC to be bid; or
If, CLC must be atleast equal to 10% of the
ABC to be bid
If, CLC must be atleast equal to 10% of the
ABC to be bid
NFCC = [(current assets minus current liabilities) (K)] minus the value of all going outstanding or uncompleted portions of the project
under ongoing projects, including awarded contracts to be started .
Where; K=
One year or less More than one year – 2 years More than 2 years
10 15 20
88. Submission and Receipt of BidsFirstenvelope
Eligibility requirements
And technical components
Secondenvelope
Financial Component
Don’t open before the
scheduled opening date &
time
SEALED
BAC
89. For the procurement
of GOODS
Submission and Receipt of Bids
Firstenvelope
Eligibility requirements
And technical components
Eligibility requirements
The bid security in the prescribed form, amount and validity
Technical specifications
• production/delivery schedule
• manpower requirements; and/or
• after-sales services/parts, if applicable
Sworn statement
• It is not “blacklisted”
• all copies submitted are authentic, original,
complete and are true and correct
• authorizing the HOPE to verify all the documents
submitted;
• the signatory is the duly authorized representatives
• It complies with the responsibilities of a prospective
or eligible bidder provided in the PBD; and
•It complies with existing laws and standards, in the
case of procurement of services
For the procurement
of CIVIL WORKS
For the procurement
of CONSULTING
SERVICES
90. For the procurement
of GOODS
Submission and Receipt of Bids
Firstenvelope
Eligibility requirements
And technical components
Eligibility requirements
The bid security in the prescribed form, amount and validity
Project Requirements
• Organizational chart for the contract to be bid;
• List of contractor’s personnel, to be assigned to the contract to be bid,
with their complete qualification experience data;
•List of contractor’s equipment units, which are owned, leased, and / or
under purchase agreements supported by certification of availability of
equipment from the equipment lessor/vendor for the duration of the
project; and
For the procurement
of CIVIL WORKS
For the procurement
of CONSULTING
SERVICES
Sworn statement
• It is not “blacklisted”
• all copies submitted are authentic, original, complete and are true and
correct
• authorizing the HOPE to verify all the documents submitted;
• the signatory is the duly authorized representatives
• It complies with the responsibilities of a prospective or eligible bidder
provided in the PBD; and
•It complies with existing laws and standards, in the case of
procurement of services
91. For the procurement
of GOODS
Submission and Receipt of Bids
Firstenvelope
Eligibility requirements
And technical components
The bid security in the prescribed form, amount, and validity period;
Organizational chart for the contract to be bid;
List of completed and on-going projects;
For the procurement
of CIVIL WORKS
For the procurement
of CONSULTING
SERVICES
Approach, work plan, and schedule
List of key personnel to be assigned to the contract to be bid, with
their complete qualification and experience data; and
Sworn statement
• It is not “blacklisted”
• all copies submitted are authentic, original, complete and
are true and correct
• authorizing the HOPE to verify all the documents
submitted;
• the signatory is the duly authorized representatives
• It complies with the responsibilities of a prospective or
eligible bidder provided in the PBD; and
•It complies with existing laws and standards
93. Submission and Receipt of Bids
Bids shall be received by the BAC
on the date, time, and place
specified in the ITB/RFEI.
Bids incl. eligibility requirements
submitted after the deadline
SHALL NOT BE ACCEPTED by
the BAC.
94. Bid Security
All bids shall be accompanied by a bid security
Bid security shall be in an amount equal to a percentage of the ABC in
accordance with the following:
FORM OF BID SECURITY AMOUNT OF BID SECURITY
(Equal to Percentage of the ABC)
a) Cash or cashier’s/manager’s check issued
by a Universal or Commercial Bank
Two per cent (2%)
b) Bank draft/ guarantee or irrevocable letter
of credit issued by a Universal or Commercial
Bank; provided, however, that it shall be
confirmed or authenticated by a Universal or
commercial Bank, if issued by a foreign bank.
c) Surety bond callable upon demand issued by
a surety or insurance company duly certified by
the Insurance Commission as authorized to
issue such security
Five per cent (5%)
d) Any combination of the foregoing Proportionate to share of form w/ respect to total
amount of security
95. When the Bid Security shall be returned?
After the bidder with the LCRB or HCRB
has signed the contract and furnish
performance security
Bidders declared by the BAC as failed or
post-disqualified and upon submission of a
written waiver of their right to file a motion
for reconsideration and / or protest.
96. Bid Validity
Shall in no case exceed
the period of one hundred
twenty (120) c.d. from the
date of opening of bids.
97. Bid Opening
The BAC shall open the bids at the;
Time,
Date,
Place specified in the BidDocs
98. The BAC shall adopt a procedure ensuring the;
Integrity,
Security,
confidentiality
99. Preliminary Examination of Bids
The BAC shall check the
submitted documents of each
bidder against a checklist
required documents to ascertain
if they are all present
Using a non-discretionary
“PASS/FAIL” criterion
Firstenvelope
Eligibility requirements
And technical components
100. Preliminary Examination of Bids
The BAC shall check the
submitted documents of each
bidder against a checklist
required documents to ascertain
if they are all present
Using a non-discretionary
“PASS/FAIL” criterion
SecondEnvelope
Financial Component
SAMPLE CHECKLIST
101. Ceiling of Bid Prices
The ABC shall be
the upper limit or
ceiling for acceptable
bid prices
102. Bid Evaluation for goods/Infrastructure
The BAC shall immediately conduct a detailed evaluation of bids
using non discretionary criteria in considering the following:
Completeness of the bid.
Responsive bill of Quantities/Materials
Non-responsive bill of Quantities/Materials
Responsive bill of Quantities/Materials (free)
Arithmetical corrections
103. The BAC shall evaluate on an equal footing to ensure fair and
competitive bid comparison. For this purpose, all bidders shall be
required to include the cost of all taxes.
In case of discrepancies between:
AREAS OF DISCREPANCIES PREVAILING AREA
Bid price in figures Bid price in words Bid price in words
Total price per item Unit price for the item as
extended or multiplied by
the quantity of that item
Unit price for the
item as extended or
multiplied by the
quantity of that item
Stated total price Actual sum of prices of
component items
Actual sum of prices
of component items
Unit cost in the detailed
estimate
Unit cost in the bill of
quantities
Unit cost in the bill
of quantities
104. Bids shall be ranked in the ascending order of their total calculated bid
prices, as evaluated and corrected for computational errors. WARNING! total
calculated bid prices, as evaluated and corrected for computational errors and
other modifications, which exceed the ABC shall be disqualified.
After all bids have been received, opened, examined, evaluated, and
ranked, the BAC shall prepare the corresponding abstract of bids. All
members of the BAC shall sign the AoB and attach thereto all the bids with
the corresponding bid securities and the minutes of the proceedings of the
bidding. The Abstract shall contain the following:
Name of the contract and its location, if applicable
Time, date, and place of bid opening; and
Names of bidders and their corresponding bid prices
arranged from lowest to highest, the amount of bid security
and the name of the issuing entity
105. REMEMBER!
From submission and receipt of bids until the approval by
the HOPE of the ranking of short listed bidders, those that
have submitted their bids are PROHIBITED from
making any communication with any BAC member,
including its staff and personnel, as well as its BAC
secretariat and TWG, regarding matters connected to their
bids. However, the BAC, through its Secretariat, may ask
in writing the bidder for clarification of its bid. All
responses to requests for clarification shall be in writing.
106. Bid Evaluation of short listed bidders for consulting services
The purpose of bid evaluation is to determine the Highest Rated Bid (HRB)
using the following steps:
Quality-Based Evaluation Procedure
1. A two-stage procedure shall be adopted whereby each
consultant shall be required to submit his technical and
financial proposals simultaneously in separate sealed
envelopes.
2. After receipt of bids, the technical proposals shall first be
opened and evaluated. The BAC shall rank the consultants
in descending order based on the numerical ratings of their
technical proposals and identify the HRB. Provided,
however, that the HRB shall pass the minimum score
indicated in the Bidding Documents.
107. Bid Evaluation of short listed bidders for consulting services
3. The HOPE shall approve or disapprove the
recommendations of the BAC within two (2) calendar days
after receipt of the results of the evaluation from the BAC.
4. After approval by the HOPE of the HRB, its financial
proposal shall then be opened. The BAC shall, within three
(3) cd. Notify and invite the consultant with the HRB for
the opening of financial proposal for the purpose of
conducting negotiations with the said consultants. In the
letter of notification, the BAC shall inform the consultant of
the issues in the technical proposal the BAC may wish to
clarify during the negotiations.
5. The total contract amount shall not exceed the ABC as
stated in the BidDocs.
108. Bid Evaluation of short listed bidders for consulting services
(Graphic Presentation)
Consultant A
Consultant B
Consultant C
Technical
Proposal
Technical
Proposal
Financial
Proposal
Financial
Proposal
Technical
Proposal
Technical
Proposal
Financial
Proposal
Financial
Proposal
Technical
Proposal
Technical
Proposal
Financial
Proposal
Financial
Proposal
BAC
THE BAC shall
open the
Technical
Proposals
Technical
Proposal
of
Consultant
A
Technical
Proposal
of
Consultant
A
Technical
Proposal
of
Consultant
B
Technical
Proposal
of
Consultant
B
Technical
Proposal
of
Consultant
B
Technical
Proposal
of
Consultant
B
Arranged in
Descending order
based on numerical
rating
Consultant
A
– 85%
Consultant
A
– 85%
Consultant
B– 97.50%
Consultant
B– 97.50%
Consultant
C – 80 %
Consultant
C – 80 %
109. Bid Evaluation of short listed bidders for consulting services
(Graphical Presentation)
Arranged in
Descending order
based on numerical
rating
Consultant
A
– 85%
Consultant
A
– 85%
Consultant
B– 97.50%
Consultant
B– 97.50%
Consultant
C – 80 %
Consultant
C – 80 %
HRB
HEAD OF THE PROCURING ENTITY
Within two (2) days:
APPROVE
DISAPPROVE
The recommendations of the BAC
BIDS & AWARDS COMMITTEE
After 3 days, the BAC shall notify
and invite the consultant with HRB
for the opening of the
And for the NEGOTIATION
Financial
proposal of
Consultant
B
Financial
proposal of
Consultant
B
110. Bid Evaluation of short listed bidders for consulting services
(Graphical Presentation)
FINANCIAL
PROPOSALS
BB
Opened by the BAC
AA
CC
Return to the
respective
consultants
UNOPENED
111. Bid Evaluation of short listed bidders for consulting services
The purpose of bid evaluation is to determine the Highest Rated Bid (HRB)
using the following steps:
Quality-Cost Based Evaluation Procedure
1. The technical proposal together with the financial proposal
shall be considered in the evaluation of consultants. The
technical proposals shall be evaluated first. The financial
proposal of the consultants WHO MEET THE
MINIMUM TECHNICAL SCORE shall then be opened.
2. The financial and technical proposal shall be given
corresponding weights with the financial proposal given a
minimum weight of fifteen percent (15%) up to a maximum
of forty percent (40%). The weight of the technical criteria
shall be adjusted accordingly such that their total weight in
percent together with the weight given to the financial
proposal shall add to one hundred percent (100%).
112. Bid Evaluation of short listed bidders for consulting services
The exact weight SHALL BE APPROVED BY THE HOPE
upon the recommendation of the BAC and indicated in the
BidDocs. The BAC shall rank the consultants in descending
order based on the combined numerical ratings of their technical
and financial proposals and identify the HRB.
3.The HOPE shall approve and disapprove the
recommendations of the BAC within two (2) cd after receipt of
the results of the evaluation from the BAC.
4.After approval by the HOPE of the HRB, the BAC shall
within three (3) cd, notify and invite the consultant with the
HRB for negotiation.
113. Bid Evaluation of short listed bidders for consulting services
(Graphic Presentation)
Consultant A
Consultant B
Consultant C
Technical
Proposal
Technical
Proposal
Financial
Proposal
Financial
Proposal
Technical
Proposal
Technical
Proposal
Financial
Proposal
Financial
Proposal
Technical
Proposal
Technical
Proposal
Financial
Proposal
Financial
Proposal
BAC
THE BAC shall
open the
Technical
Proposals
Technical
Proposal
of
Consultant
A
Technical
Proposal
of
Consultant
A
Technical
Proposal
of
Consultant
B
Technical
Proposal
of
Consultant
B
Technical
Proposal
of
Consultant
C
Technical
Proposal
of
Consultant
C
Afterwhich, the BAC
shall open the
Financial Proposals
Financial
Proposal
of
Consultant
A
Financial
Proposal
of
Consultant
A
Financial
Proposal
of
Consultant
B
Financial
Proposal
of
Consultant
B
Financial
Proposal
of
Consultant
C
Financial
Proposal
of
Consultant
C
114. Bid Evaluation of short listed bidders for consulting services
(Graphic Presentation)
THE BAC shall
open the
Technical
Proposals
Technical
Proposal
of
Consultant
A
Technical
Proposal
of
Consultant
A
Technical
Proposal
of
Consultant
B
Technical
Proposal
of
Consultant
B
Technical
Proposal
of
Consultant
C
Technical
Proposal
of
Consultant
C
Afterwhich, the BAC
shall open the
Financial Proposals
Financial
Proposal
of
Consultant
A
Financial
Proposal
of
Consultant
A
Financial
Proposal
of
Consultant
B
Financial
Proposal
of
Consultant
B
Financial
Proposal
of
Consultant
C
Financial
Proposal
of
Consultant
C
+
+
+
WEIGHTS
Technical
(dependent to
the weight of
the Financial)
?
Financial
weights is
within 15 % -
40 %
15 % - 40 %
TOTAL
WEIGHT
100%
The highest rating after adding
the scores of Technical and
Financial proposals shall be
recommended to the HOPE for
HRB.
115. Bid Evaluation of short listed bidders for consulting services
(Graphical Presentation)
Rating
(Technical +
Financial)
Consultant
A
– 85%
Consultant
A
– 85%
Consultant
B– 97.50%
Consultant
B– 97.50%
Consultant
C – 80 %
Consultant
C – 80 %
HRB
HEAD OF THE PROCURING ENTITY
Within two (2) days:
APPROVE
DISAPPROVE
The recommendations of the BAC
BIDS & AWARDS COMMITTEE
After 3 days, the BAC shall notify
and invite the consultant with HRB
for NEGOTIATION
116. Criteria in evaluating technical proposals of consultants
• Quality of personnel to be assigned to the project which covers suitability of
key staff to perform the duties of the particular assignments and general
qualifications and competence including education and training of the key staff
• Experience and capability of the consultant which include records of previous
engagement and quality of performance in similar and in other projects;
relationship with previous and current clients; and overall work commitments,
geographical distribution of current/impending projects and attention to be
given by the consultant
• Plan of approach and methodology with emphasis to clarity, feasibility,
innovativeness, and comprehensiveness of the plan approach, and the quality of
interpretation of project problems, risks and suggested solutions
117. REMEMBER!
All participating short listed consultants
shall be furnished the results (ranking
and total scores only) of the evaluation
after the approval of the HOPE of the
ranking. Said results shall be posted in
the PhilGEPS and the website of the PE
118. What should be discussed in the Negotiation stage?
• Discussion and clarification of the TOR and Scope of Services;
• Discussion and finalization of the methodology and work program proposed by
the consultant;
• Consideration of appropriateness of qualifications and pertinent compensation,
number of man-months and the personnel to be assigned to the job, taking note
of over-qualified personnel, to be commensurate with the compensation of
personnel with the appropriate qualifications, and schedule of activities;
• Discussion on the services, facilities and data, if any, to be provided by the PE
concerned;
• Discussion of financial proposal submitted by the consultant; and
• Provisions of the contract
Shall be completed within ten (10) calendar days. There should be no replacement
of key personnel before the awarding of contract.
119. Objective and process of Post-qualification
• The LCB/HRB shall undergo post-qualification in order to determine whether
the bidder concerned complies with and is responsive to all the
requirements and conditions as specified in the BidDocs.
• Within three (3) cd from receipt by the bidder of the notice from the BAC that
the bidder has the LCB or HRB, the bidder shall submit the following
requirements to the BAC:
1. Tax clearance;
2. Latest income and business tax returns;
3. Certificate of PhilGEPS registration; and
4. Other appropriate license and permits required by law and stated in the
BidDocs.
120. Objective and process of Post-qualification
• The post qualification shall verify, validate, and ascertain all statements
made and documents submitted by the bidder with the LCB/HRB, using non-
discretionary criteria. This criteria shall not be limited to, the following:
A. Legal Requirements. To verify, validate, and ascertain licenses,
certificates, permits, and agreements submitted by the bidder, and
the fact it is not included in any “blacklisted”.
B. Technical Requirements. To determine compliance of the goods,
infrastructure projects, or consulting services offered with the
requirements specified in the BidDocs, including:
i. Verification and validation of the bidder’s stated competence and
experience, and the competence and experience of the bidder’s key
personnel to be assigned to the project, for the procurement of
infrastructure projects and consulting services;
121. Objective and process of Post-qualification
ii. Verification of availability and commitment, and / or inspection and
testing for the required capacities and operating conditions, of
equipment to be owned/leased;
iii. Verification and/or inspection and testing of the goods/product, after-
sales and / or maintenance capabilities, and;
iv. Ascertainment of the sufficiency of the bid security as to type,
amount, form and wording, and validity period;
C. Financial Requirements. To verify, validate and ascertain the bid
price proposal of the bidder and, whenever applicable, the required
CLC in the amount specified and over the period stipulated in the
BidDocs, or the bidder’s NFCC to ensure that the bidder can sustain
the operating cash flow of the transaction.
122. If the BAC determines that the bidder with the LCB/HRB passes all the
criteria for post-qualification, it shall declare the said bid as the LCRB/HRRB, and
recommend to the HOPE the award of contract, however, if the BAC determines
that the bidder with the LCB/HRB fails the criteria for post-qualification, it shall
immediately notify the said bidder in writing of its post-qualification and the
grounds for it. Immediately after the BAC has notify the first bidder of its post-
qualification, and notwithstanding any pending request for reconsideration thereof,
the BAC shall initiate and complete the same post-qualification process on the
bidder with the second lowest LCB/HRB. If the second passes the post-
qualification, and provided that the request for reconsideration of the first bidder
has been denied, the second bidder shall be post-qualified as the bidder with the
LCRB/HRRB. If the second bidder, however, fails the post-qualification, the
procedure for post-qualification shall be repeated for the bidder with the next
LCB/HRB, and so until the LCRB/HRRB, as the case maybe, is determined for
award.
The post-qualification process shall be completed in not more than
seven (7) cd from the determination of LCB/HRB. In exceptional cases, the post-
qualification period may be extended by the HOPE, but in no case shall aggregate
period exceed thirty (30) cd.
123. FAILURE OF BIDDING
The BAC shall declare the bidding of failure when:
• No bids are received;
• All Prospective bidders are declared ineligible;
• All bids fail to comply with all the bid requirements or fail-
post qualification, or, in the case of consulting services,
there is no successful negotiations; or
• The bidder with the LCRB/HRRB refuses, without
justifiable cause, to accept contract, and no award is made
in accordance with Section 40 (failure to enter into
contract and post – security ) of the act and this IRR
124. In order to determine the reason for the failed bidding, the BAC
shall conduct a mandatory review and evaluation of the terms, conditions,
and specifications in the BidDocs, including its cost estimates. Based on its
findings, the BAC shall revise the terms, conditions, and specifications, and
if necessary, adjust the ABC, subject to the required approvals, and conduct
a re-bidding with re-advertisement and/or posting.
All bidders who have initially responded to the Invitation to
Bid/Request for Expression of Interest and have been declared eligible or
shortlisted in the previous biddings shall be allowed to submit new bids.
The BAC shall observe the same process and set the new periods
according to the same rules followed during the previous bidding(s).
Should there occur a second failure of bidding, the procuring
entity may resort to negotiated procurement.
125. SINGLE CALCULATED/RATED AND RESPONSIVE BID
A single calculated/responsive bid shall be considered for award if it falls under any
of the following circumstances:
• Only one prospective bidder submit a LOI and/or applies for eligibility check,
and it meets the eligibility requirements of the criteria, after which it submits a
bid which is found to be responsive to the bidding requirements;
• More than one prospective bidder submits LOI and/or applies for eligibility
check, but only one bidder meets the eligibility requirements of the criteria,
after which it submits a bid which is found to be responsive to the bidding
requirements; or
• If after the eligibility check, more than one bidder meets the eligibility
requirements, but only one bidder submits a bid, and its bid is found to be
responsive to the bidding requirements.
126. NOTICE AND EXECUTION OF AWARD
The BAC shall recommend to the HOPE the award contract to the bidder with
the LCRB/HRRB or the SCRB/SRRB after the post-qualification process has
been completed.
• Resolution of the BAC recommending award;
To facilitate the approval of the award, the BAC shall submit the following
supporting documents to the HOPE:
• Abstract of bids;
• Duly approved program of work or delivery schedule and cost estimates;
• Document issued by appropriated entity authorizing the procuring entity to
incur obligation for a specified contract; and
• Other pertinent documents required by existing laws, rules, and/or the
procuring entity concerned
127. If the award is approved, the HOPE shall immediately
issue the Notice of Award to the bidder with LCRB/HRRB. In
the event that the HOPE shall disapprove such
recommendation, such disapproval shall be based only on
valid, reasonable, and justifiable grounds to be expressed
in writing, copy furnished by the BAC.
Contract award shall be made within the bid security
period provided in Section 28 (bid validity – shall not exceed
120 cd. – the PE can request for extension but the bidder can
deny it without forfeiting their bid security).
The BAC, through the Secretariat, shall post, within,
three (3) cd from the issuance, the Notice of Award in the
PhilGEPS, the website of the procuring entity, if any, and any
conspicuous place in the premise of the procuring entity
128. CONTRACT SIGNING
The winning bidder shall post the REQUIRED PERFORMANCE
SECURITY and enter into contract with the procuring entity within (10) cd
from the receipt by the winning bidder of the NoA. The procuring entity shall
enter into contract within the same period provided that all documentary
requirements are complied with, to wit:
• Contract Agreement;
• Bidding Documents;
• Winning bidder’s bid, including proposals submitted;
• Notice of Award of Contract;
129. Procedural Steps for the Public Bidding of
Goods and Services ( Revised IRR, GPPB Res.
03-2009 )
Pre-Procurement
Conf.
Advertise/Post ITB
Call/Hold Pre-Bid
Conference
Open Technical (with
eligibility documents)
Envelope
Open
Financial
Envelope
Receive the
Two (2)
Envelopes
Submission of
Additional Req.
Post-qualify
LCB
Issue
Notice to
Proceed
Pre-Bid C. at least 12 c.d. before bid opening
1 c.d.
1 c.d.
7 c.d.
Within 30 c.d.
.Posting – 7 c.d.
within 3 c.d.
Prepare &
Sign Contract
7 c.d.
GOCC/GFIs- 15cd
Within 10 c.d.
Approve Resolution
/ Issue Notice
of Award - LCRB
Issue Bidding
Documents
Evaluate &
Rank Bid/s
Within 3 c.d.
130. PERIOD OF ACTION ON PROCUREMENT ACTIVITIES
Opening
of Bids
Opening
of Bids
Award of
Contract
This procurement process shall not exceed
three (3) months
All members of the BAC shall be on a
“jury duty” type of assignment until
the NoA is issued by the HOPE in order to
complete the entire procurement process at the
earliest possible time.
131. To guarantee the faithful
performance by the winning bidder
of its obligations under the contract
in accordance with the BidDocs, it
shall post performance security
prior to the signing of contract.
PERFORMANCE SECURITY
132. PERFORMANCE SECURITY
The performance security shall be in an amount equal to a percentage of the
total contract price in accordance with the following schedule:
Form of Performance Security Amount of Performance Security
(Equal to percentage of the total
contract price)
a) Cash or cashier’s/manager’s check issued by a
Universal or Commercial Bank Goods and Consulting Services – Five percent
(5%)
Infrastructure Projects – Ten percent (10%)
b) Bank draft/guarantee or irrevocable letter of
credit issued by a Universal or Commercial bank;
provided however, that it shall be confirmed or
authenticated by a foreign bank.
c) Surety bond callable upon demand issued by a
surety / insurance company duly certified by the
Insurance commission as authorized to issue such
security.
Thirty percent(30%)
d) Any combination of the foregoing Proportionate to share of form with respect to total
amount of security
133. The performance security shall be denominated in Philippine
pesos and posted in favor of the procuring entity, which shall be forfeited
in the event it is established that the winning bidder is in default in any
of its obligations under the contract.
The performance security shall remain valid until issuance by the
procuring entity of the final Certificate of Acceptance.
The performance security may be released by the PE after the
issuance of CA, subject to the following conditions:
• PE has no claims filed against the contract awardee or the
surety company;
• It has no claims for labor and materials filed against the
contractor; and
• Other terms of the contract
134. If the bidder with LCRB/HRRB or the bidder with Single
Calculated/Rated Responsive Bid, fails, refuses or is unable to submit
documents required or make good its bid by entering into a contract with the
procuring entity or post the required Performance Security within the period
of 10 cd, the bid security shall be forfeited and with appropriate sanctions,
except where such failure, refusal, or inability is through no fault of the said
bidder.
In case of failure, the BAC shall disqualify the said bidder and shall
initiate and complete post-qualification process on the bidder with the second
LCB/HRB. This procedure shall be repeated until LCRB/HRRB is
determined for award.
FAILURE TO ENTER INTO CONTRACT AND POST PERFORMANCE
SECURITY
135. The HOPE reserves the right to reject any and all bids, declares a
failure to bidding, or not award the contract in the following situations:
RESERVATION CLAUSE
• If there is prima facie evidence of collusion between:
Appropriate public officers or employees of the procuring entity;
BAC and any of the bidders;
Among the bidders themselves;
Bidder and a third party, including any act which restricts,
suppresses, or nullifies or tends to restrict, suppress or nullify
competition;
• If the BAC is found to have failed in following the prescribed bidding procedures; or
136. • For any justifiable and reasonable grounds where the award of the contract will not
redound to the benefits of the GOP, as follows:
If the physical and economic conditions have significantly changed
so as to render the project no longer economically, financially, or
technically feasible, as determined by the HOPE;
If the project is no longer necessary as determined by the HOPE;
If the source of funds for the project has been withheld or reduced
through no fault of the PE.
RESERVATION CLAUSE
137. All bid shall be accompanied by a SWORN STATEMENT of the bidder that it
is not related to the HOPE, members of the BAC, the TWG, and the BAC secretariat,
the head of the PMO or the end-user unit, and the project consultants, by consanguinity
or affinity up to the THIRD CIVIL DEGREE.
For this reason, relation to the aforementioned persons shall automatically
disqualify the bidder from participating in the procurement of contracts of the PE.
This apply to thefollowing persons:
If the bidder is an individual or a sole proprietorship, to the bidder himself;
If the bidder is a partnership, to all its officers and members;
If the bidder is a corporation, to all its officers, directors, and controlling
stockholders; and
DISCLOSURE OF RELATIONS
138. The method of procurement to be used shall be indicated in the approved
APP. If the original mode of procurement recommended in the APP was public bidding
but cannot be ultimately pursued, the BAC, through a resolution, shall justify and
recommend the change in the mode of procurement to be approved by the HOPE.
ALTERNATIVE METHODS OF PROCUREMENT
• LIMITED SOURCE BIDDING
-Otherwise known as “selective bidding”, is a method of procurement of
goods and consulting services that involves direct invitation to bid by the
procuring entity from the list of pre-selected suppliers or consultants with
known experience and proven capability on the requirements of the particular
contract. This alternative mode of procurement may be employed under any
of the following conditions:
Procurement of highly specialized types of goods and consulting
services whereby only a few suppliers or consultant are known to be
available; or
Procurement of major plant components
139. ALTERNATIVE METHODS OF PROCUREMENT
• DIRECT CONTRACTING
- is also known as “single source procurement”. Is a method of procurement
of goods that does not require elaborate bidding documents. The supplier is
simply asked to submit a price quotation or a pro-forma invoice together with
the conditions of sales.
Direct contracting may be resorted to under any of the following conditions:
Procurement of goods of proprietary nature which can be obtained only
from the proprietary source;
When the procurement of critical plant components from a specific
supplier ;
Those sold by an exclusive dealer or manufacturer.
140. ALTERNATIVE METHODS OF PROCUREMENT
• REPEAT ORDER
- repeat order, when provided for in the APP, is a method of procurement of
goods from the previous winning bidder, whenever there is a need to
replenish goods procured under a contract previously awarded through
Competitive bidding.
Repeat order may be resorted to under any of the following conditions:
Unit prices of the repeat order must be the same as or lower that those in
the original contract;
will not result to splitting of contracts, requisitions, or purchase orders;
shall be availed of only within six (6) months from the contract effectivity
date stated in the NTP arising from the original contract; and
shall not exceed twenty-five percent (25%) of the quantity of each item in
the original contract.
141. ALTERNATIVE METHODS OF PROCUREMENT
• SHOPPING
- is a method of procurement of goods whereby the PE simply requests for
the submission of price quotations for readily available off-the-shelf goods or
ordinary/regular equipment to be procured directly from suppliers of known
qualifications.
Shopping may be employed in any of the following cases:
a) when there is an unforeseen contingency requiring immediate purchase:
Provided however that the amount shall not exceed the thresholds prescribed.
b) Procurement of ordinary or regular office supplies and equipment not
available in the procurement service involving an amount not exceeding the
thresholds prescribed.
142. TAKE NOTE!
“Ordinary or regular office supplies” shall be understood to
include those supplies, commodities, or materials, which,
depending on the procuring entity’s mandate and nature of
operations, are necessary in the transaction of its official
businesses, and consumed in the day-to-day operations.
However, office supplies shall not include services such as
repair, and maintenance of equipment and furniture, as well as
trucking, hauling, janitorial, security, and related or analogous
services.
143. DOF Classification of
LGU’s
Maximum Amount (in Philippine Peso)
Province City Municipality
1st
class 100,000 100,000 50, 000
2nd
class 100,000 100,000 50, 000
3rd
class 100,000 80, 000 50, 000
4th
class 80, 000 60, 000 50, 000
5th
class 60, 000 50, 000 50, 000
6th
class 50, 000 50, 000 50, 000
THRESHOLDS FOR SHOPPING – (a)
a. For NGAs, GOCCs, GFIs, and SUCs - One Hundred Thousand Pesos (P100, 000.00)
b. For LGUs, in accordance with the following schedule:
In case of barangays - Fifty Thousand Pesos (P50, 000.00)
144. DOF Classification of
LGU’s
Maximum Amount (in Philippine Peso)
Province City Municipality
1st
class 500,000 500,000 100, 000
2nd
class 500,000 500,000 100, 000
3rd
class 500,000 400, 000 100, 000
4th
class 400, 000 300, 000 50, 000
5th
class 300, 000 200, 000 50, 000
6th
class 200, 000 100, 000 50, 000
THRESHOLDS FOR SHOPPING & SVP– (b)
a. For NGAs, GOCCs, GFIs, and SUCs - Five Hundred Thousand Pesos (P500, 000.00)
b. For LGUs, in accordance with the following schedule:
In case of barangays - Fifty Thousand Pesos (P50, 000.00)
145. ALTERNATIVE METHODS OF PROCUREMENT
• NEGOTIATED PROCUREMENT
- After conduct of mandatory review, the BAC shall revise and
agree on the minimum technical specifications, and if necessary,
adjust the ABC. However, the ABC cannot be increased by more
than twenty percent (20%) of the ABC for the last failed
bidding.
- The BAC shall invite and engage in negotiations with a sufficient
number of suppliers, contractors, or consultants to ensure effective
competition.
1. Two – Failed Biddings
- is a method of procurement of goods, infrastructures, and consulting
services, whereby the PE directly negotiates a contract with a technically,
legally, and financially capable supplier, contractor or consultant in any of
the following cases.
146. ALTERNATIVE METHODS OF PROCUREMENT
- Any requirements, guidelines, documents, clarifications, and
other information shall be communicated by the PE to suppliers,
etc. On an equal basis.
- Following the completion of the negotiations, the PE shall request
all suppliers, etc to submit, on a specified date, a best and final
offer with respect to all aspects of their proposals.
-The procuring entity shall select the successful offer on the basis
of such best and final offers.
-In all stages of the negotiations, observers shall be invited.
2. Emergency Cases.
- In case of imminent danger to life or property during a state of
calamity, or when time is of the essence of arising from natural or
man – made calamities or other causes where immediate action is
necessary to prevent damage to or loss of life or property, or to
restore vital public service and public utilities.
147. ALTERNATIVE METHODS OF PROCUREMENT
3. Agency – to - Agency
- Procurement of infrastructure projects, consulting services, and
goods from another agency of the GOP, such as the PS – DBM,
which is tasked with a centralized procurement of Common-Use
supplies for the GOP.
4. Procurement Agent
- Procuring entities which may not have the proficiency or
capability to undertake a particular procurement, as determined by
the HOPE, may request other GOP agencies to undertake such
procurement for them, or at their option, result and hire consultants
to assist them directly and/or train their staff in the management of
the procurement functions.
148. ALTERNATIVE METHODS OF PROCUREMENT
5. Highly Technical Consultants.
- Individual consultants hired to do work that is (i) highly technical (ii)
primarily confidential where trust and confidence are the primary
consideration for the hiring of consultant. Provided, however, shall, at the
most, be on six month basis, renewable at the option of the HOPE, but in no
case shall exceed the term of 6 months.
6. Defense Cooperation Agreement.
- Upon approval by the President of the Philipines, and when the
procurement for use by the AFP involves major defense equipment or
materials and/or defense-related consultancy services, when expertise
required is not available locally, and the Secretary of National Defense has
determined that the interests of the country shall be protected by negotiating
directly with an agency or instrumentality of another country with which the
Philippines has entered into a defense cooperation agreement or otherwise
maintains diplomatic relations: Provided, however, that the performance by
the supplier of its obligations under the procurement of contract shall be
covered by a performance security.
149. ALTERNATIVE METHODS OF PROCUREMENT
7. Small Value Procurement.
- Where the procurement does not fall under shopping and the
amount does not exceed the thresholds prescribed.
The procuring entity shall draw up a list of at least three (3)
suppliers, contractors, or consultants, of known qualifications
which will be invited to submit proposals, in the case of goods and
infrastructure projects, or curriculum vitae, in the case of
consulting services.
8. Lease of Real Property
9. NGO Participation.
- When an appropriation law or ordinance earmarks an amount to
be specifically contracted out to NGO, the PE may enter into a
Memorandum of Agreement with an NGO.
150. ALTERNATIVE METHODS OF PROCUREMENT
10. Community Participation.
11. United Nations Agencies.
- Procurement from specialized agencies of the United Nations of
any of the following:
Small quantities of-the-shelf goods, primarily in the fields of
education and health; and
Specialized product where the number of suppliers is limited,
such as vaccines or drugs.
151. TERMS AND CONDITIONS FOR THE USE OF ALTERNATIVE
METHODS
• Except for Limited Source Bidding under section 49 of this IRR,
submission of bid securities may be dispensed with.
• Performance and warranty security shall be submitted for
contract acquired through the alternative methods of procurement
except for:
Shopping
Negotiated Procurement: emergency cases, SVP, lease of real
property and UN agencies.
153. DELIVERIES
Deliveries of supplies must be made by the
Supplier/Manufacturer/Contractor within the stipulated period and
at the place/s indicated in the purchase order of the contract.
In all cases, delivery shall be made within office hours and
during working days.
Failure to deliver within the prescribed period, the
supplier/manufacturer/contractor shall be liable for penalty,
usually in the form of liquidated damages specified in the
Contract/Purchase Order.
154. LIQUIDATED DAMAGES
1 % of the undelivered
items/delays
Liquidated damages
of the undelivered
items in the contract deducted
for each day of delay
155. DELIVERIES
All supplies shall be adequately contained, packed,
crated, cased, bundled, wrapped, or sealed to prevent
damage, spoilage, and loss.
They must be properly labelled and marked in
accordance with the minimum requirements of RA 7394
otherwise known as Consumer Act of the Philippines.
Responsibility in case of damage, spoilage, or loss
shall be governed by existing laws on the matter unless
the purchase order or contract provides otherwise.
156. DELIVERIES
Deliveries shall be made within seven(7) calendar
days upon receipt of the order unless otherwise provided
in the Purchase Order or contract.
All items delivered SHALL BE RECEIVED BY
THE SUPPLY OFFICER/DESIGNATED
PROPERTY CUSTODIAN as the case may be.
Receiving and signing of the DR and temporary
recording of the deliveries shall be subjected to
inspection by the Inspectorate Team.
158. INSPECTION
Inspection is the process of examining and testing
the procured supplies, materials, equipment, and services
including raw materials and components to determine
their conformity with the contract requirements including
all applicable drawings, specifications, and purchase
description.
What is Inspection?
159. INSPECTION
The inspection of items SHALL BE DONE BY
THE INSPECTORATE TEAM, whose members shall
be determined and designated by the HOPE.
Inspection shall be done in accordance with the
standards and specifications and be conducted in the
presence of the suppliers and end-user’s representatives.
The Inspectorate Team and the Supply
Officer/Designated Property Custodian SHALL
PREPARE AND SIGN the Inspection and Acceptance
Report (IAR).
160. TECHNIQUES OF INSPECTION
• Inspection by Item
- Individual item is checked in conformity with the
requirement stated in the specification. This method
of inspection is applicable, but not limited to
deliveries of equipment and fixed assets.
• Inspection by Sampling
- Sampling is a process of obtaining information
about a group of data having similar purpose or
function, usually ten percent (10%) of the total or lot
delivery.
161. General Procedures in Conducting Inspection
1. Upon receipt of the request for inspection, check the
following documents as their completeness and
authenticity.
A. Purchase Order & Contract
Date;
PO Number
Name and Address of the Supplier
Supplier’s Acknowledgement or Receipt (date of receipt)
Specifications
Quantity
Unit/Total Price
Availability of fund
Approval of the HOPE or his duly authorized representative
162. General Procedures in Conducting Inspection
B. Supplier’s Invoice Delivery Receipt
Pre-numbered and not just typed stamped or hand-written
Date checked against the delivery date stated in the P.O or
contract
“RECEIVED” portion Receipt and date of item delivered
acknowledged by the supply officer/designated property
custodian.
C. Conduct inspection and testing procedure when applicable.
D. Prepare inspection report immediately and give to the
Inspectorate Team and supply officer/designated property
custodian for signature.
163. Inspection Procedures for Equipment
1. Examine the equipment as to the physical condition: brand new, second
hand, rebuild, or reconditioned. See to it that no defective or old worn out
parts are used/attached to the equipment.
2. Take hold of the manual, catalogue or handbook for equipment delivered
for reference. All date/information contained thereon should conform with
the delivery of the serial number, point of origin, color, and the accessories
or tools that go with the equipment.
3. Make a physical count and inspect the unit piece-by-piece or unit-by-unit.
Random sampling is not applicable for this type of delivery because you
have to request the supplier or his representative to demonstrate the
operation of the equipment (test run) in your presence and that of the end-
user. Observes the actual performance thereof.
4. Get the warranty card and note down the warranty card number in the
original invoice. Check if the serial indicated thereon is the same as that of
the delivery.
164. Inspection & Acceptance of Infra Projects
1. The Head/End-user/Implementing Office/Property Officer/etc. must secure
copy of the Program of Works prior to the start of the construction.
2. The End-user must seek assistance from the technical person (TWG for the
project) to check the materials that are being used during the construction if
they are in accordance with the required specifications.
3. The End-user (usually the Head) shall sign the Certificate of Acceptance
(CA)/Certificate of Turnover only after the issuance of the 100%
completion report by the project engineer. The same certificate shall also be
signed by the Division Physical Facilities Officer.
4. The End-user (usually the Head) shall issue a Certificate of Non-
compliance if the works are not in accordance with the specifications or
standards.
165. Documentary Requirements for Inspection
1. General Requirements for Inspection of
deliveries/fabrication/installation
Original copy of approved contract/PO
Original Invoice/ Delivery Receipt
Performance/Quality Test Result (if applicable)
Other documents specified in the contract necessary to
determine conformance with specifications (e.g. Approved
plans/samples, standard specifications, etc. )
166. Documentary Requirements for Inspection
1. Inspection of Infrastructure Project for construction, repairs and
rehabilitation
Statement of Work Accomplishment (SWA)
Certificate of completion for final payment
Certificate of Final Acceptance (CFA) for release of retention money
Approved original contract
Approved Program of Works
2. Post-repair Inspection for repairs
Approved job order/work order/contract
Certificate of Acceptance
Waste Materials reports, if applicable
167. Acceptance or Rejection of Deliveries of Goods
The Inspectorate Team may recommend a REJECTION /
REDUCTION OF PRICE when their is a SHORTAGE IN QUANTITY,
DEFICIENCY, OR DEFECTIVENESS IN QUALITY.
After consideration of 10% tolerable allowance based on standards,
the following shall be observed by the Inspectorate Team in the evaluation
of the result of the inspection:
Supplies or property tested and found to be in accordance with the
approved PO/Contract and with the required specifications SHALL BE
ACCEPTED;
Supplies or property whose quality analysis shows deficiency of
less than ten percent (10%) may be accepted, provided that they shall serve
the purpose for which they were purchased. The defect is minor and the
contract price is reduced according to the deficiency noted;
168. Acceptance or Rejection of Deliveries of Goods
Supplies or property whose quantity is short by volume, weight,
actual count, etc. Shall be subjected to reduction on contract price at an
amount equivalent to the shortage, provided that the said deliveries are
acceptable to the agency or unit; and
Damaged items that are not disclose or incorrectly marked as such
shall be subjected to corresponding reduction in the contract.
Acceptance of deliveries maybe made only if the supplies and
materials delivered CONFORM TO THE STANDARDS AND
SPECIFICATIONS STATED IN THE CONTRACT/PO
169. Acceptance or Rejection of Deliveries of Goods
If the supplier failed to comply with the requirements, the
property/supply officer shall submit a report to the HOPE for
appropriate actions. The HOPE may forfeit the contractor’s
performance bond, if any, and may also institute civil actions
against the contractors for breach of contract.
The supply officer/ designated property custodian shall be
responsible for accepting deliveries of procured items and should
notify the Auditor within five (5) days upon receipt of the
approved contract/PO.
171. PROPERTY CUSTODIANSHIP
Property custodianship refers to the guardianship of
government property by the accountable person.
This includes the receipt, safekeeping, issuance, repair, and
maintenance of supplies, materials, and equipment.
The designated property custodian/officer is responsible,
accountable and liable for any loss, misuse, damage, or
deterioration of government property due to fault or negligence in
safekeeping which may be physical or destructive
What is custodianship?
172. Storage / Warehousing
Storage/ Warehousing refers to the scientific and
economical warehousing of materials for their best safekeeping
and availability.
Best safekeeping means protecting the materials against
theft, fire, and deterioration but easily accessible when needed.
The method or systems include factors and procedures in
the manner of undertaking due care and maintenance of good
condition of the property.
What is warehousing?
173. Factors to be considered in Storage and Warehousing:
1. Site Location and size of storage/stockroom to use
Generally, selection of site location, type and size of
storage of stockroom to be used, play a major role for an
effective storage and Warehousing management. It is
important factor for the following purposes:
To be able to figure out the amount of materials that can be
stored;
For determination of access for efficient and proper transport
of supplies and materials;
For provision of large size of doorways and entrances;
For installation of proper lightings and ventilation.
174. Factors to be considered in Storage and Warehousing:
1. Special layout planning for materials to be stored.
For easy facilitation, space layout for materials to be stored
should be planned. Specifically the layout should contain the
placement of supplies by category, type, similarity, popularity,
sizes, shapes, characteristics and to include perishability.
It is important that materials be stored and placed in its
proper places to avoid accidents and wastage.
175. Factors to be considered in Storage and Warehousing:
1. Types of stacking suitable for each type of property
In like manner as in space layout planning, types of
stacking for each type of materials should be given careful
planning. It may be classified into:
i. Bulk storage
ii. Medium Lot Storage; and
iii. Small Lot Storage
176. Procedures in Storage / Warehousing
1. Receipt of Materials and Equipment and Other Property
- Supplies, materials, and equipment delivered by the
supplier must be accompanied by Delivery Receipts (DRs)
and/or Sales Invoice (SI), which were pre-inspected by the
supply officer / designated property custodian before the items
are received.
2. Arrangement of Materials
- The storekeeper arranges the materials inside the
warehouse/ stockroom in accordance with the prepared
storage plan.
177. Procedures in Storage / Warehousing
3. Recording of Receipts/ Deliveries
- The storekeeper properly posts and updates the
information (receipts, issuances and balance on hand)
taken from the IAR.
- Reconciliation of entries of bin cards with
stock/property cards and with the physical count of stock
on hand should be currently and properly updated.
178. Issuance and Utilization
Issuance and Utilization of supplies and materials and
equipment is among the activities of property custodianship.
The custodianship of supplies and equipment is transferred
from the Supply Officer/ Designated Property Custodian and
Storekeeper/Warehouseman to the end-user who is responsible and
accountable for the utilization and / or safekeeping.
180. Start of Procedure
Concerned Office, Requesting Personnel
Prepares the Supplies Availability Inquiry
(SAI) in 2 copies. Accomplishes the form
For item description, unit, and quantity.
Fills up the “Inquired by” portion of SAI
And forwards the same to Accounting
Units for processing.
Accounting Unit, Accounting Staff
Receives SAI from Requesting Personnel.
Review and verifies the completeness
Of Information.
Accounting Staff, retrieves from file the
SLC and determines availability/status
Of stocks. Fills up the number, stock number,
Status of stock and “Status provided by”
Portion of SAI. Returns the original to the
Requesting Personnel and files the
Copy 2 of the SAI
Requesting Personnel, receives the
Original SAI from the Acctg. Staff
Stock
Available?
No
A
Requesting Personnel, prepares Requisition
Issuance Slip (RIS) in 3 copies. Fills up all
The necessary information except for the
Issuance portion and signs “Requested By”
Portion of the RIS. Forwards the RIS to
Authorized Official for approval.
Authorized Official, signs the
“Approved By” Portion of the RIS
Requesting Personnel receives
Signed RIS and forwards to the Property
Division together with the original
SAI for withdrawal of Inventory items
requested
Property Officer reviews and verifies
RIS as to completeness of Information.
Fills up RIS # date, quantity, remarks
And initials “Approved by” portion of the
RIS and records RIS in the logbook
Head of the Property, signs the
“Approved by” portion of RIS and
Returns to the Supply Officer for
Issuance of the Stock
Supply officer fills up
the and signs
The “Issuance” portion
of the RIS and issue
inventory items
Requested to the
Requesting Personnel
Requesting Personnel,
Receives supplies
requested
And sign in the
“Received by” portion
Of the RIS files
Permanently in num.
Order copy 2 of RIS
And files temporarily
The RIS and SAI for the
Preparation of
Report of Supplies
And Materials Issued
(RMSI)
End – of
Procedure
B
A
Requesting Personnel,
Prepares PR for the
Items requested and
Forwards the same to
Property Division for
Processing of request
B
182. GETTING TO KNOW WITH IMPORTANT DOCUMENTS
1. Supplies Availability Inquiry (SAI)
- is a document prepared by the requisitioning officer as a basis for
the preparation of RIS and PR if the supplies/equipment are available or not
available on stock.
2. Requisition and Issuance Slip (RIS)
- is used if the goods/supplies carried in stock based on the SAI received
from the Accounting Unit.
It must be numbered in the following manner as prescribed by COA.
183. GETTING TO KNOW WITH IMPORTANT DOCUMENTS
3. Purchase Request (PR)
- is accomplished if the goods/supplies/properties are not carried in stock
based on the SAI received from the Accounting Unit.
4. Acknowledgement Receipt for Equipment (ARE)
- is used for PPE accounts when issued to officials and employees other
than the regular property officer. It shall be signed and dated by the
Property officer under “Received from” portion and the recipient shall
acknowledge by signing the documents.
184. Recording for the Receipt, Issuance and Utilization of
Supplies, Materials & Equipment
The issuance of supplies/materials/equipment SHALL BE
PROPERLY ACCOUNTED FOR.
The Warehouseman/Storekeeper shall maintain bin cards and record the
receipt and issuance of each class of item kept in stock. He/She is likewise
monitor the status of the stock on hand. He shall post the quantity requested
immediately upon withdrawal of the supplies/materials from the stockpile.
The Supply Officer/Stock clerk shall maintain the stock cards for each class
of articles kept in stock. All receipt and issuance of supplies, and the balance on
hand shall be updated.
The bases of recording the receipts and issuance shall be the DR and the RIS
respectively.
The stock card serves as guide in preparing the estimates of the quantity and
description of the articles needed for the year.
185. Recording for the Receipt, Issuance and Utilization of
Supplies, Materials & Equipment
The stock card will be at the same time serves as guards against overstocking
of supplies and materials.
The Supply Officer shall maintain the Property Card for each class of PPE
reflecting the date of acquisition, description, custody, estimated life
expectancy, depreciation, disposal, and other information about the PPE based
on the source of documents.
The basis of recording the issuance of PPE is the ARE
186. Reconciliation of Property and Accounting Records
The accounting of issuance is not complete without the proper
reconciliation of property and accounting records.
Before the property records can be reconciled with the accounting records,
the Property/Supply Office shall see to it that the existing property records
are reconciled with the actual inventory count.
The warehouseman/storekeeper may at any time conduct a test count of his
stock to determine whether it tallies with the balance per bid cards.
Any discrepancies should be noted for further investigation and if necessary,
coordinate with the stock/property clerk to settle the differences.
188. Repair and Maintenance
The repair and maintenance program is
necessary for the purpose of attaining and/or
extending the established economical and
useful life of an equipment/property and
serves as a sound basis for scheduling its
replacement.
189. Repair Equipment (major / minor)
Repair is the process/act of restoring a property /equipment to its
original state or to its working condition. Unserviceable equipment may at once
be restored to its normal state of efficiency by making repairs.
Minor repair merely keeps a building of equipment in fit
condition for use without increasing its capacity or otherwise
adding to its normal value as an asset.
i. Fair wear and tear is the condition of equipment worn
out or otherwise rendered unserviceable through use
without apparent fault.
What is repair?
Editor's Notes
- 4-wheeled mobile requiring approval from the DBM
- 4-wheeled mobile requiring approval from the DBM
- 4-wheeled mobile requiring approval from the DBM
Alternative mode of procurement- to promote economy and efficiency. In all instances, the procuring entity shall ensure that the most advantageous price for the government is obtained. Specialized type of goods – sophisticated defense equipment, complex air navigation systems, coal
Proprietary source – patents, trade secrets, copyrights that prohibits others from manufacturing the same item;
Proprietary source – patents, trade secrets, copyrights that prohibits others from manufacturing the same item;
Proprietary source – patents, trade secrets, copyrights that prohibits others from manufacturing the same item;
Proprietary source – patents, trade secrets, copyrights that prohibits others from manufacturing the same item;
Proprietary source – patents, trade secrets, copyrights that prohibits others from manufacturing the same item;
Proprietary source – patents, trade secrets, copyrights that prohibits others from manufacturing the same item;
Proprietary source – patents, trade secrets, copyrights that prohibits others from manufacturing the same item;
Proprietary source – patents, trade secrets, copyrights that prohibits others from manufacturing the same item;
Proprietary source – patents, trade secrets, copyrights that prohibits others from manufacturing the same item;
Proprietary source – patents, trade secrets, copyrights that prohibits others from manufacturing the same item;