1. Name: Jose F. Manahan
Nationality: Filipino
Birth Date: Sept. 2, 1963
Position:
Control system Designer Engineer
Control Systems –Senior Designer
Education:
University of the East – Manila, Philippines
Bachelor of Science in Electrical Engineering
Mar 1985
Summary of Work Experience:
Oil & Gas Power Plant Offshore Onshore
Electrical & Instrumentation, Design Engineer EPC for 16 years.
Develop FEED Package P&ID, Specs, C&E, Index, BOM, Installation Details etc.
Proficient in various software for Engineering Design such as
Microstation, AutoCad, Raster Design, Navisworld, Smart Plant Instrumentation
Plant Design Management System (PDMS 12)
Experienced Record:
Fluor Daniel Inc. Phils
Feb 1, 2016 up to Present
CSE
FS-40 (Central Process Facility), Calgary Canada
Develop FEED Package such as P&ID Index BOM, System diagram, Inst Installaton
Details Etc. Engage in P&ID Review.
CB&I Singapore Pte. Ltd.-3A International Business Park12-01/05 ICON @ IBP
Singapore 609935
Oct 1, 2009 - August 31, 2015
Senior Instrumentation & Control Designer
SPAR Platform (Floating Installation with Conventional Topsides and Processing
Facilities), Aasta Hasteen, Norway.
FPSO (Floating Process Storage and Offloading) Petrobras Cidade de Angra dos Reis
MV22, Brazil.
FPSO (Floating Process Storage and Offloading) Petrobras Cidade de Angra dos Reis
MV23, Brazil
FPSO (Floating Process Storage and Offloading) Petrobras Mangaritaba MV24, Brazil
FPSO (Floating Process Storage and Offloading) Petrobras Itaguiao MV26, Brazil.
Page 1
2. Prepare Drawing in compliance with the Technical and Professional Requirement
TR3023 Version 1, TR2381 Version 2, NORSOK (Norwegian) Standard I-001 Field
Instrumentation, NORSOK Standard S-002 Working Environment and LCI Requirements.
Involved from conceptual design through Engineering fabrication and Detail Design
activities for Instrument & Telecom. Prepared Instrument cable tray layout , Instrument
location layout, JB Location, fire and gas location layout in 3D using PDMS 12.
Prepared instrumentation 2D drawings such as Field Instruments layout, Telecom layout,
Typical Installation Details, Cable Tray Instrument Layout, Cable Block Diagram for
Instrument, Packages, Telecom , CCTV, WLAN, PAGA, Fiber Optic Networks System,
Wiring layout, etc. Preparation of Cable tray layout drawing. Preparation of Cable Routing
and Penetration Layout drawing. Cable tray and MCT Penetration sizing. Preparation of
2D drawings using PDMS Draft. Perform 3D modeling of Cable Tray and Cable Tray
support and Instrument Stand Location in PDMS. Prepared and develop Cable block
Diagram for easy reference Based on Vendor Schematic Diagram. Check and review
Instrument drawings to ensure was done as per the Client Specification. Evaluate
Material Project Specification. Material take-off (MTO)
Noble Drilling International PTE LTD
Jurong Shipyard 29 Tanjong Kling Road Singapore 628054
Oct 27, 2008 - Feb 27 , 2009
Electrical Designer
Noble Danny Adkins Project
Semi Submersible Drilling Rig
Noble Jim Day Project
Semi Submersible Drilling Rig
Design and detailing of the electrical systems such as Riser Tilt Frame/ Crane System,
Riser Handling Crane, Riser fingerboard, Oil in water separator, N2 Generation High
Compression skid, Welding Distribution System, BOP system. MCC, HV MV Switchgear,
LV Distribution Board, Short Circuit Grounding Protection System, Fire and Gas
Detection System, RCU Communication System, PMS, Data and Fiber Optic Cable
layout, Cable tray and ladder Layout, Busbar layout, Multi-cable transit layout. Conducted
site visit and identified areas of concern and recommended course of actions. Control
schematic diagram. Develop Drawings based on Vendor Drawings.
Develop drawing such as System Block Diagram, Interconnection Wiring Diagram Cable
Schedule as well as the schematics diagram. Calculation, Cable Sizing, Required
Illumminance for lighting MTO etc.
MMHE Malaysian Marine & Heavy Engineering Sdn. Bhd.
81700 Pasir Gudang, Johor, Malaysia
July 8, 2007 - October 30, 2008
Electrical Engineer
B11 Redevelopment Project
Shell Compression Offshore Platform, Malaysia, (Project No.: 2008632P)
PC4-Gas Development Project
Petronas Gas Production Offshore Platform, Malaysia, Project No.: PCSB-A-1313
Prepared MTO for Preliminary Purchase Request (PPR). Prepared Shop Drawing for
Fabrication and Site use. Coordinated to Project Management Team (PMT) for
construction activities. Review Project Material Specification. Review Vendor Schematic
Page 2
3. Diagram. Supervised and check generation of drawings for fabrication. Checked and
incorporated updated vendor documents. Prepared schedule of deliverables documents
for EPC projects.Performed technical bid evaluation (TBE) of various electrical packages
and materials including vendor data review and incorporations. Conducted site visit and
identified areas of concern and recommended course of actions. Preparation of Cable
and Telecom Tray Layout.Preparation of Cable Routing Layout and Penetration
Drawings. Preparation of Electrical Equipment layout such as MCC Panel, Switchgear
Panel, Distribution Panel, Transformer, Control Panel, Marshalling Cabinet, I/O Panel.
TER Telecom Equipment Room layout. Preparation of Cable Block Wiring Diagram.
Preparation of Typical Wiring Diagram. Preparation of Control Schematic diagram.
Material Take-off
CME Technology Philippines. Inc.
112 V.A. Rufino St. Legaspi Village, Makati City, Philippines
August 15, 2005 - May 15, 2007
Electrical Designer
Coal mill Inertization Project – Solid Cement Plant Teresa Rizal Phils.
Pre-Heater Project – Holcim Davao Cement Plant, Philippines
Prepared and develop electrical Instrument detail design drawing. General Arrangement
of MCC panel, Switchgear panel, distribution panel. Transformer, control panel,
marshalling cabinet, I/O Panel.Telecom Panel layout, Lighting Layout, Power, grounding,
cable tray and conduit layout. Control schematic diagram. Material Take-off
Lummuz Alireza Ltd. Co.
P.O.Box 31682 Al-khobar-31952, kingdom of Saudi Arabia
August 18, 2002 - September 20, 2003
Electrical Designer
Hook-up of 6 well – Abu Safah Oil Producing Plant (offshore)
Hook-up of 8 well – Marjan Oil Producing Plant (offshore)
Responsible in the preparation and development of electrical drawings plans/ layouts.
(lighting, power and auxiliary layout). Perform quality checking for Electrical drawings with
the responsibility to ensure was done in accordance with the Saudi Aramco standard
(SACS). Generate hybrid file with the Microstation and (IRAS/B) program. Develop
Electrical details and section drawings for easy reference
Bechtel Company
P. O. Box 5963 Jeddah-21432 Kingdom of Saudi Arabia
March 12, 2001 - July 31, 2001
E&I Designer
Shoiaba Phase 2 Combined Cycle Steam and Gas Power Plant (lot 1a) – Shoiaba
Jeddah Kingdom Of Saudi Arabia
Prepared shop drawings for Electrical and Instrument for site Construction use. Prepared
drawing such as hook-up, piping and Instrument loop diagram, Isometric and section
drawing for easy reference.Visit and survey refinery to gather data.
UTS KENT Engineers and Contractors
P. O. Box 277 Abu Dhabi, United Arab Emirates
April 5, 1996 - December 15, 1998
Page 3
4. Electrical Designer
Bourouge Petrochemical – Ruwais Abu Dhabi UAE
Taweelah Combined Cycle Power Plant – Al taweelah Abu Dhabi UAE
Creating electrical and instrument drawings using the latest Cad program (Autocad 2000
and Microstation SE). Responsible for the generation and development of Electrical and
Instrumentation Drawings.Material take off
Consolidated Contractor W.L.L.
P. O. Box 11836 Jubail-31961Kingdom of Saudi Arabia
July 5, 1990 - November 15, 1995
Electrical Designer
SAFCO Saudi Arabian Fertilizer Company – JubailKingdom of Saudi Arabia
SHARQ Petrochemical Project – Jubail Kingdom of Saudi Arabia.
Preparation of shop drawing for site use (Lighting, Power, Earthing, Cable Tray and
auxiliary layout). Estimated necessary materials for site use. Modification of electrical and
Instrument drawings as to site condition. Assisting in the supervision of site works.
Preparation of as built drawing for submission. Calculation of illumination level and fixture
selection. Estimate necessary materials for site use. Modification of electrical drawings as
to site condition. Supervision of site works such as cable pulling, termination, etc. Site
checking for punch out and further modification.Termination checking as to cable
connection list and wire tagging for easy maintenance. As built drawing preparation for
submission. Coordination with other engineers for easy work
Training & Seminar Attended:
Electrical Estimating - January 21 ~ February 8, 1986.
Autocad Rel. 12- January 4 ~ February 8, 1993.
Medium Voltage (5 - 35KV) Cable Splicing & Termination - RAYCHEM Westrade
International Co. Inc. Cainta City, Rizal February 18, 2006.
Permit to Work, H2S Acid Gas Safety Seminar, PPE Seminar (Personal Protective
Equipment) - CCC Jubail Kingdom of Saudi Arabia .
( NIOSH ) National Institute Organization Safety and health- MMHE Malaysian Marine
Heavy Engineering.
NOSP NIOSH - OSFAM SAFETY PASSPORT #W009155J0 August 24, 2007 ~ August
24, 2009.
CMS - CB&I Company management System - CB&I Chicago Bridge & Iron Singapore
Pte Ltd July 24, 2014.
HSE Health Safety and Environment Pte Ltd Key Ergonomics, Code of Conduct - CB&I
Chicago Bridge & Iron Singapore.
Contact Info:
Email: JoseManahan92@gmail.com
Cell # +63 909743091
Page 4