JBA Consulting Guide to Environmental Assessment for Renewable Projects
1. A guide to environmental
assessment and regulation
for renewable energy projects
RENEWABLEENERGY
2. The only way forward, if we are going to
improve the quality of the environment,
is to get everybody involved.
– Richard Rogers, British Architect
3. Regulation, based on conservation and sustainability is aimed at reducing air,
water and land pollution, carbon emissions and energy use.
Various pieces of legislation exist to protect our environment and promote
sustainable development.
These may be applied at various stages of your development and can become
complex and difficult to manage.
This guide covers the approach we take to several key aspects of the
environmental assessment process in order to help your development meet
legislative requirements and minimise any risk to your project.
For more information, or to discuss environmental regulation, please contact our
environmental assessment team:
Steve Maslen, Head of Environment (steve.maslen@jbaconsulting.com)
David Revill, Principal Environmental Consultant (david.revill@jbaconsulting.com)
4. 4 | JBA Consulting
ENVIRONMENTAL ASSESSMENT FOR
RENEWABLE ENERGY DEVELOPMENTS
Environmental assessment is a key decision making tool. It is a technique that
helps developers and regulators understand the potential environmental impacts
of a development proposal. An information gathering exercise is carried out,
which is often supplemented by information obtained through a range of site
surveys. The development proposals are then appraised against this baseline
environmental information to identify whether they could harm or disturb any
sensitive environmental features. Where necessary, mitigation measures are
proposed, that if implemented through the development, would help avoid or
minimise these potential environmental impacts. Environmental assessment
should lead to better standards of development and can help demonstrate the
sustainability of a project.
5. Guide to environmental assessment and regulation for renewable energy projects | 5
Environmental assessment can apply to all forms of development. However,
for some types of development, an Environmental Impact Assessment (EIA)
is required by EU and UK law. The Town and Country Planning (Environmental
Impact Assessment) Regulations (generally known as the EIA Regulations)
define two schedules of developments. For Schedule 1 projects an EIA must
always be carried out. For Schedule 2 projects an EIA must be carried out if the
development is likely to have a significant impact on the environment by virtue
of its nature, size or location.
All Schedule 2 developments are based on thresholds. A proposed development
only becomes a Schedule 2 development where it exceeds the threshold.
However, just because a project falls within one of the categories set out in
Schedule 2 and exceeds the threshold does not mean that EIA is required. The
question is still whether the proposed development is likely to have a significant
effect on the environment.
Wind farms and hydropower developments are included within Schedule 2
of the EIA Regulations. For wind farms, the applicable thresholds are if ‘The
development involves the installation of more than 2 turbines; or the hub
height of any turbine or height of any other structure exceeds 15 metres’. For
hydropower schemes, the threshold is if ‘The installation is designed to produce
more than 0.5 megawatts.’
Solar parks are not expressly listed in Schedule 2 to the EIA Regulations. Some
authorities consider that solar developments appear similar to greenhouses
and therefore follow Annex A to the EIA Circular 02/99, which states that
‘Development (such as greenhouses, farm buildings etc.) on previously
uncultivated land is unlikely to require EIA unless it covers more than five
hectares’. Other authorities consider solar parks to be included under the
general provisions of Schedule 2 relating to ‘Industrial installations for the
production of electricity, steam and hot water ‘ and apply a much smaller
geographic threshold of 0.5 hectares. This means that the requirement for EIA is
determined on a site-by-site basis.
Environmental impact assessment is a systematic process, which leads to a final
product, the Environmental Statement (ES). A developer can decide to submit
an EIA voluntarily for a large scale development. Normally, however, it is the
local planning authority who decides if an EIA is required in consultation with the
applicant and other regulators and stakeholders. A developer can formally ask
6. 6 | JBA Consulting
the local planning authority to decide whether
an EIA is required. The authority will consider
the development proposals and the potential
environmental risks associated with the project
and then issues its formal Screening Opinion.
Should an EIA be necessary, the developer can
then prepare a Scoping Report, which sets
out the issues the EIA will investigate. This is
an important step as it enables the applicant
to establish the baseline conditions at the
development site and the standards against
which the development may be judged. As well
as consulting the local planning authority on the
Scoping report, anyone conducting an EIA is obliged to consult a set of statutory
consultees. These include the Environment Agency, Natural England and English
Heritage, or Natural Resources Wales and Cadw with respect to Wales. The
applicant may also choose to consult other local organisations with a specific
interest in the project.
The EIA is then carried out to assess the issues set out in the Scoping Report and
the Environmental Statement is then produced. The EIA Regulations specify the
information the ES must contain, which includes a description of the proposed
development and a description of the aspects of the environment likely to be
significantly affected by the proposed development, including in particular,
population, fauna, flora, soil, water, air, climatic factors, material assets,
including the architectural and archaeological heritage, landscape and the inter-
relationship between the above factors.
The ES can then be used to support the planning application for the
development, setting out how environmental impacts will be managed and
the mitigation measures needed to enable the development to proceed. By
making the information on the likely significant effects available, EIA can help
allay fears created by a lack of information. The local authority will take these
environmental effects into consideration in making its decision.
7. ECOLOGICAL OPPORTUNITIES AND
RISKS FOR SOLAR PARKS
The ecological impacts of solar parks are not yet well understood. Evidence
suggests there may be a risk to a range of wildlife who mistake ground-based
solar panels for water. In addition, there is the risk of disturbance associated
with the construction of the solar park, particularly in rural locations where
development pressures are low and wildlife can often be abundant, and
potentially issues associated with habitat loss.
Solar parks can be developed in a manner that has no serious detrimental
effects on local ecology. However, that’s not to say that there are no ecological
risks associated with such a development. It is essential to apply best
practice guidance from the Chartered Institute of Ecology and Environmental
Management whilst carrying out surveys for proposed sites to ensure ecological
risks are quickly identified and appropriate mitigation strategies are developed.
We normally begin with a Preliminary Ecological Assessment (PEA) that
includes the following:
• A desk study assessment including a data request to local biodiversity
record centres to identify any records of protected and/or notable habitats
and species and designated nature conservation sites in the vicinity of the
proposed works;
• Liaison with the relevant authority with regards to any relevant data they
may hold; and
• A site survey comprising an Extended Phase I Habitat Survey following joint
standard methodology and including the recording of any evidence of the
presence of protected and notable species.
8. 8 | JBA Consulting
Often the PEA is all that is needed to understand the ecological constraints
at the site. However, where evidence of the presence of protected species is
encountered, such as bats, great crested newts or dormouse, we can undertake
more detailed surveys to determine whether they could be affected by the
development proposals.
Guidance produced by Natural England on the development of solar parks
highlights the potential to create sites of local or regional ecological interest
as part of the development, especially on sites of lower existing biodiversity
value. Potential options to provide biodiversity benefits and potentially offset
ecological impacts include:
• Maintaining and enhancing field margins, such as hedgerows, hedge trees
and drainage ditches by allowing them to re-wild — this means reducing any
existing maintenance activities, such as hedge trimming or ditch clearance,
so that the vegetation grows and provides more cover for a range of
sensitive species (this also provides landscape benefits by increasing the
screening between the site and surrounding areas).
Where evidence of the presence of protected species is encountered,
such as bats, great crested newts or dormouse, we can undertake
more detailed surveys to determine whether they could be affected
by the development proposals.
9. Guide to environmental assessment and regulation for renewable energy projects | 9
• Planting of new trees along site boundaries to create additional screening
has the potential to offer new feeding, nesting and roosting habitats for birds
and bats. Some quick-growing native trees species, such as downy birch,
silver birch, willow and small-leaved lime can provide a home to hundreds of
insect species.
• Setting back solar panels away from the field margins and creating vegetated
buffer strips around the edge of the site. Ideally 10m wide buffer strips should
be allowed for, or 5m as a minimum. This new habitat is beneficial to a wide
range of invertebrate species, particularly bees, which in turn can benefit
other species including birds, bats and other small mammals.
• Designing and adapting built structures, such as control buildings, to
encourage and promote access by nesting, roosting or hibernating animals
such as bats.
• Creating ponds or scrapes, where conditions are appropriate, in buffer areas
or close to access tracks, which benefit a huge range of species.
• Sowing wild grass seed mixtures to benefit invertebrates or birds, and nectar
and pollen rich mixtures for bees and butterflies.
10. Landscape and Visual Impact Assessments (LVIA) are the process of evaluating
the impact of a proposal, such as wind turbines and solar farms, upon the
landscape and visual character of the area it affects. A number of elements
are required as part of the LVIA process with a number of other aspects worth
considering when carrying out an LVIA.
Consultation
It is important to consult with the local planning authority at an early stage of
a project to agree the scope of works required, whether a full LVIA is required
with photomontages or whether a shorter assessment will suffice. It provides
an opportunity to discuss potential viewpoints before a site visit and to find out
whether there are any local landscape designations that you should be aware of
when carrying out the assessment. This can be done through a request to the
local authority for a screening opinion.
JBA’s landscape architects have extensive experience in consulting with local
planning officers to agree the scope of assessment.
Desk study
Research into national and local planning policy identifies relevant policies and
guidance specific to the type of development in question. Wind turbines and
farms are a controversial topic and local policy and guidance on renewable
energy will be set out in the authorities Local Development Plan. Desk study
research can also identify whether the development falls within or near to any
locally designated landscape areas such as areas of high landscape value or
conservation areas.
Theoretically ‘seeing’
A Zone of Theoretical Visibility (ZTV) is an important tool used to indicate the
extent to which a development may be visible. This in turn helps to determine
the size of the study area for the visual impact assessment which can be verified
during a site visit.
LANDSCAPE AND VISUAL IMPACT
ASSESSMENTS FOR WIND FARMS
AND SOLAR PARKS
11. Timing of site visits
Depending on the size of the development it can be necessary to provide
photomontages at different times of the year; a development can look very
different in summer months with increased screening from vegetation compared to
the same view in winter months when screening from vegetation is at a minimum.
Weather permitting
It is important that photographs are taken in good weather when visibility is
at its highest. This is especially important for large wind farm schemes where
long distance viewpoints are required as part of the assessment. Poor visibility
in photographs can result in planning authorities requesting photographs are
taken again.
Sequence of viewpoints
Planning the sequence in which viewpoint photography is taken should be
considered before the site visit. Start from viewpoints in the east, working your
way round to the south and west, keeping the sun behind you throughout the day.
This prevents glare from the sun and dark silhouetted photographs.
Snap happy
Always take photographs from more viewpoints than required. This can help in
instances where additional viewpoints and photomontages are requested by the
planning authority at a later stage in the project. This also saves time and keeps
costs down for both client and consultant.
12. 12 | JBA Consulting
Photomontages
Photomontages are an essential part of a LVIA helping to simulate the expected
visual changes and providing a more realistic illustration of a proposal from
a particular viewpoint. They help to determine the magnitude of change and
illustrate effects at key locations within the study area.
JBA produce wireframes of proposed wind turbines located in a digital terrain
model using specialist software to accurately place them within a photograph. We
also include other application, consented and operational or constructed turbines
to inform a cumulative effects assessment of the proposal within the wider
landscape setting.
Photography
There is increasing pressure from local planning authorities on the requirements
and accuracy of photographs and photomontages. The Landscape Institute (LI) in
conjunction with Scottish Natural Heritage (SNH) guidance recommend photographs
are taken using a 50mm equivalent lens and where possible a fixed focal length
lens used to ensure accuracy. It is important to display the image correctly, detailing
the Field of View (FOV) and the viewing distance that the printed out version of the
photomontage should be viewed at. SNH recommend a viewing distance of between
300-500mm which when held up from the same view in the field will, as far as
possible, match the perspective and detail that can be seen when in the field.
JBA produce two images from the same viewpoint with different FOVs. The first
illustrates a panoramic view with a wider FOV providing context of the viewpoint.
The second image illustrates the proposed wind turbines within a smaller 50°
FOV which equates to a realistic portrayal of the location when the image is held
at 400mm from the viewer, as recommended by SNH guidance.
13. Guide to environmental assessment and regulation for renewable energy projects | 13
Hydropower is the largest and most proven renewable energy technology
available today. With several centuries of experience and produced in at least 150
countries worldwide, hydropower also offers the most efficient form of energy
generation. With ever-increasing development and recreational pressure on our
waterways, and the competing demands of the Water Framework Directive (WFD)
driving forward improvements in their ecology and hydromorphology, delivering
new, sustainable and economic hydropower schemes is a significant challenge.
The potential environmental impact of a hydropower development is a key
planning consideration. Hydropower schemes can lead to changes in the flow
regime of the watercourse, which can affect sediment dynamics, change bed
and bank morphology and alter physio-chemical conditions downstream. The
hydropower structure can create a barrier to movement of aquatic animals and
cause fish entrapment. In addition, new structures can result in changes to the
river or estuary landscape and can adversely affect important historic remains.
Appropriate site selection and a robust and sympathetic design holds the key to
successfully getting a scheme through planning.
Hydromorphological pressures and impacts are one of the most important risks
behind a hydropower scheme failing to meet the WFD objectives. It is crucial that a
hydropower scheme demonstrates compliance with the WFD by demonstrating that
the scheme would not cause deterioration of status of the affected waterbody.
WATER FRAMEWORK DIRECTIVE
COMPLIANCE AND HYDROPOWER
Hydropower is the largest and most
proven renewable energy technology
available today.
14. 14 | JBA Consulting
A WFD Preliminary Assessment is typically the first step needed to demonstrate
WFD compliance. The assessment considers whether the proposed scheme is
likely to adversely affect the status of the waterbody. It screens the proposed
scheme against the relevant Ecological and Chemical Status objectives, together
with their quality elements. The aim of this process is to determine whether the
scheme could have an impact upon any of these criteria.
To aid this assessment, for all Artificial or Heavily Modified Water Bodies, the
scheme is also assessed against their relevant mitigation measures. These
mitigation measures are necessary to reduce the existing hydromorphological
impacts on the water body and all measures need to be in place in order for the
water body to achieve Good Ecological Status or Potential.
Consideration is then given to whether the proposed scheme could cause
deterioration in the status of the water body or inhibit the achievement of actions
required to improve the status of the water body.
The results of the assessment are typically presented in tabular form. A full and
detailed WFD assessment will be required should the assessment identify that the
works could cause deterioration in the status of the water body or prevent it from
achieving its status objectives.
The Environment Agency has produced detailed guidance to assist hydropower
developers meet the challenges of WFD compliance. It outlines the potential
conflicts a development could have with the legislation, such as adverse effects
on hydrogeomorphology, changes in water flow and impacts on fish passage,
and sets out a standard process to be followed to aid the consenting process.
Our considerable experience in hydromorphic studies and audits, and our
expertise in the design if fish pass structures can assist with meeting these sorts
of issues. Our fish pass designs comply with a range of best-practice guidance,
including most notably the Environment Agency Fish Pass Manual (2010), whilst
our experience throughout the fish pass design process, from feasibility to
installation means that we are often able to design innovative solutions with
significantly lower costs than typical designs.
15. Prevention of pollution is often a key environmental concern during the
construction phase of a development. Our experienced environmental team
is able to advise on good environmental management during construction to
minimise the risk of a pollution incident and help development adhere to good
practice guidance. We can produce both Environmental Action Plans (EAPs) and
Pollution Prevention Method Statements to satisfy planning conditions relating to
good environmental management.
The Environmental Action Plan (EAP) is an important tool for managing
environmental risk. It sets out the actions required to implement the project in
accordance with the findings of the project environmental impact assessment as
well as other wider project objectives.
The EAP contains a series of objectives and actions covering all relevant
environmental aspects, which together aim to ensure that the project is delivered
in a manner that minimises risks to the environment. The EAP links these
actions to environmental and site management processes to further integrate
the findings of the environmental assessment across all construction activities.
The contractor then undertakes all environmental protection, mitigation and
enhancement works in accordance with the actions defined by the EAP.
POLLUTION PREVENTION
15 | JBA Consulting’s guide to environmental assessment and regulation
16. 16 | JBA Consulting
The EAP also defines the environmental roles and responsibilities of those
involved in the project and assigns specific actions to individual members of the
project team. It outlines the project environmental audit and incident reporting
procedures, together with the responsibilities of team members, to ensure these
procedures are applied effectively.
A concise and focused document, the EAP should only contain project-specific
actions required to deliver the scheme. It should not incorporate internal
environmental management system measures, standard regulatory requirements,
generic standards and good practice measures, and should not contain a
summary of the environment assessment. Inclusion of such aspects often creates
a lack of clarity or uncertainty regarding key project-specific environmental
issues and fails to deliver effective environmental risk management.
A Pollution Prevention Method Statement sets out the approach to dealing with
the risk of pollution during the construction of a development. The statement
describes the potential sources of pollution during construction, the pathways
through which contaminated materials could enter the environment and the
mechanisms to be put in place to minimise the risk of pollution occurring. It
specifically identifies measures to prevent pollution of the watercourses located
within and in close proximity to the development site.
In addition, the Method Statement describes the management measures to be
adopted to control and safeguard potentially polluting materials, including oil,
fuel and chemicals, and the approach to be adopted to manage the storage and
disposal of waste materials generated during construction.
The Method Statement also identifies the approach to emergency response
planning to be adopted in the event of a pollution incident to minimise the
likelihood and significance of any subsequent environmental impacts.
Prepared following a range of site working best practice methodology and guidance,
including Environment Agency Pollution Prevention Guidance, the method statement
provides confidence to a local planning authority that the development can proceed
in a robust and controlled manner that minimises risks to the environment and helps
meet their legal duty to protect and improve the environment.
17. Guide to environmental assessment and regulation for renewable energy projects | 17
Significant progress has been made in developing flood protection devices and
retrofit solutions for existing properties but how can we ensure that buildings of
the future do not suffer the same fate?
A Flood Risk Assessment (FRA) will help you to understand the risk of flooding
to your site but the level and type of information available can make the
process more complex than it needs to be. To make things simpler, we use three
categories of Flood Risk Assessment (FRA) depending upon the risk of flooding to
your site and the stage of your development.
If you have no firm development plans, but are looking into the feasibility of
developing a site, a Level 1 FRA Screening Study is recommended. If you already
have development proposals and are looking to submit a planning application, it
is usually recommended that you go straight to a Level 2 FRA Scoping Study or a
Level 3 FRA Detailed Study.
Flood risk guidance in England and Wales differs a little in the information
requirements and terminology used. However, our experienced team of
hydrologists and flood modellers fully understand the intricacies within both
English and Welsh guidance and are able to tailor a flood risk assessment to meet
fully the particular requirements of either guidance.
FLOOD RISK
Significant progress has been
made in flood protection …
but how can we ensure that
buildings of the future do not
suffer the same fate?
18. FRA Level 1 — Screening Study
This will provide a general indication of the potential flood risk to the site and
identify whether there are any flooding or surface water management issues
that may warrant further investigation. The purpose of a Level 1 Screening Study
is to identify all sources of flood risk and whether any further work in the form of
a Level 2 FRA (Scoping Study) or Level 3 FRA (Detailed Study) is required.
Typically included items
• Assessment of readily available existing flood risk information
• Initial comments on the feasibility of developing the site with reference to
existing flood risk information
• Comment upon the feasibility of developing the site with respect to NPPF
including advice on the requirements of the Sequential and Exceptions Tests
• Review of existing drainage information
• Recommendations for further work/investigations
FRA Level 2 — Scoping Study
Qualitative appraisal to develop understanding of the risk of flooding to the site
and the potential impacts the development will have on flood risk elsewhere.
Production of a FRA report in accordance with national policy.
Typically included items in addition to Level 1 items
• Contacting the Environment Agency, Local Planning Authority
and Sewerage Undertaker to obtain advice on flood risk
and drainage issues at the site (including obtaining
predicted flood levels and copy of the statutory sewer
map if available)
19. Guide to environmental assessment and regulation for renewable energy projects | 19
• Comparison of site levels with predicted
flood levels
• Assessment of the impact of water level
increase due to climate change
• Recommend finished floor levels
• Assess access and escape routes in times
of flood
• Give preliminary advice on flood warning
and evacuation procedures
• If required, recommend appropriate
mitigation measures e.g. flood resilient
construction techniques
• Preliminary assessment of the existing
and proposed surface water drainage arrangements
FRA Level 3 — Detailed Study
Undertaken if the Environment Agency require further quantitative analysis
to assess flood risk issues relating to the development site. For example,
flood modelling may be required to establish flood levels at a site where the
Environment Agency do not hold this data.
Typically included items in addition to Levels 1 and 2 items
• Detailed assessment of flood risk to the site from all sources (including the
assessment of the potential impacts of climate change)
• Hydraulic calculations and modelling to quantify the flood risk to the site and
any offsite flood risk impacts
• Detailed assessment of existing and proposed surface water drainage
arrangements (including the feasibility of Sustainable Drainage Systems
(SuDS) and surface water attenuation facilities if required)
20. South Barn
Broughton Hall
Skipton
North Yorkshire
BD23 3AE
UNITED KINGDOM
www.jbaconsulting.com
JBA Consulting can advise on a range of environmental services including:
climate change adaptation | EIA consultancy | environmental planning
ecology | flood risk management | geomorphology | hydrology
hydrogeology | landscape design | sustainable urban drainage