1. Day 3
Wednesday, July 10th – Maersk and APM Terminals
Daan Jumelet – PIANC YPCom Delegate NL – DEME
1
Challenge the future
2. Shipping and Container Operations
in the Canal
Presentation 1: Mr. Buitrago, Business Performance and Communication
Presentation 2: Mr. Cumberbatch, Panama Canal & Husbandry Manager
2
Challenge the future
3. Transit Facts
•1,040,000 transitions since august 15, 1914
•Maersk holds the highest ranking in the TRS
•The fastest transit: 2 hours and 41 minutes in June 1979
•The highest toll is paid by M.V. Maersk Danbury on
September 17, 2012: $470,720 USD
3
Challenge the future
4. Comparison between sailing around or
using Panama Locks
Using
Panama locks
Around
South America
Costs toll
$470,720.-
$0,-
Fuel costs for
sailing
$1,900,000,-
$4,550,000,-
Total costs
$2,370,720,-
$4,550,000
Days of travel
16 days
37 days
4
Challenge the future
5. Toll vs Investment
Toll statistics existing locks
Toll new Panama locks
Year
2010-2012
Year
2015 -
Number of
transits
38,441
Extra transits
>6,000
Tolls
(billions)
$4.9
Extra toll
(billions)
+/-$0.85
Total budget for the Third Set of Locks Project is 5,25 million USD
The investment will be payed back in 2020!!
5
Challenge the future
6. Panama Canal – engine of the economy
6
Challenge the future
7. Day 4
Thursday, July 11th – Design and Construction of new
Atlantic Locks
7
Challenge the future
9. Design and Construction of new
Atlantic Locks
Presentation 1: Mr. Martin, Electro Mechanical Planning (GUPC/Sacyr)
Presentation 2: Mr. Serneels, Plant and Equipment Department (GUPC/JDN)
9
Challenge the future
14. Dredging works
Dredging volumes
Canal maintainance 1915- present
480 Mm3
Total dredging volume for building the 3th locks
150 Mm3
Future dredging works
70 Mm3
Total
600 Mm3
14
Challenge the future
15. Dredging Pacific entrance canal
Total of 9.1 Mm³, with 1.5 Mm3 of very hard
rock is drilled and blasted
Special Equipment:
CSD D’Artagnan
BHD Samsom
Drilling vessel Yuang Dong 007
TSHD Breydel
15
Challenge the future
16. Dry excavation for the new locks
Total of 37.3 Mm3 dry excavation
Special Equipment
• Excavators Hit EX1900 with a 11m3 bucket
• Dumpers with capacity of 50m3
16
Challenge the future