Project formulation slstl-iesl - 25th oct 2018 - to be published
Ibrahim Abousaud (Parsons) (51115)
1. IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 1 of 11
EDUCATION
B.S. Civil Engineering,Universityof
Arizona, 1982
REGISTRATIONS:
Qatar Eng. Reg. No # 9869
ProfessionalEngineerLic.In
States of, GA, AL, FL,TN,LA, AZ
andTX.
Level II Erosion& Sedimentation
CertificationGSWCC
#0000064687
Worksite Erosion Control
Supervisor Certification
TRAININGS:
GDOT’sROWPlanReview
PrequalificationCertification(Exp.
11/1/2015)
GDOT’sPlanDevelopment
Process(PDP) 2011Certification,
GDOT’sLocalAdministered
Project(LAP), 2011Certification
NEPA and TransportationDecision
makingProcessbyFHWA,
INROADS monthlyTraining
Sessionsby InRoadsUser Group
LANGUAGES:
Arabic and English
COMPUTER SKILLS:
InRoads design software
Microstation CADD
Microsoft Applications XLS,
Word Document,
PowerPoint
EXPERIENCE PROFILE
Mr. Abousaudhas 31 years of hands-onexperienceinengineeringand
constructionmanagementofhighwayandbridgeprojects.Hehas been
responsibleforpreparingconstructionplansforurbanand ruralfreeway
arterialroadways. Hehas provided engineeringservicesfordesign,project
management,constructionmanagement,projectengineer,andprogram
managementservicesforstate, county, and localtransportationagencies.
Forthe last 18years he hadmanagedalltransportationprojectsforclients
suchas GDOT,CobbDOT,GwinnettDOT,Cityof Atlanta, andCity of
SandySprings. UsingGDOT’sPlanPresentationGuide(PPG),andPlan
DevelopmentProcess(PDP) he has performeddesign/review&approval of
roadwayconstructionplansincludingplansandprofiles,drainagedesign,
maintenanceoftraffic plans, erosioncontrolplans,signingandmarking,
R/W plans,and quantityand costestimatesspecifications.He alsoserved
as the proposalmanagerforalltransportationprojectsinGeorgiaexample
of this is the TransportationInvestmentAct (TIA) proposalwherehewas
assignedto be the ProjectDeliveryManager.
PROJECT EXPERIENCE
PARSONS INTERNATIONAL LIMITED Doha, Qatar
August 29, 2015 - Present
Project: Duhail Interchange(P007 C7 P1), and Landmark Al Bustan
Interchange North (P007 C7 P2)
Client: Ashghal
Project Cost: (QAR 6 billion)
Project Role: Team Leader
Served as a team leaderto completeTechnicalTenderEvaluationReport
for very complexsixurbaninterchangesusingKBR’sTenderEvaluation
Plan, the scopeof workincludes developingaassignmentplanand
schedule for26 professionalsofdepartmentandprojectmanagerslevelto
evaluate five submittalsin8 weeks, leadpost tender meetingwith
contractorsandmakepresentationtoAshghal on the findingof the
evaluation. Theprojectsscopeofwork includescompleteDesignand
Constructionofa new expressway, including sixgrade-separated
interchangeswithcrossroads,frontageroads, overpass and underpass
structures, retainingwalls,pedestrianandbicyclepaths,traffic signs,
signalsandITS, landscapeandhardscapeandartscape,street lighting,
surfacewater micro-tunnelandallrelatedinfrastructure.
Project: Construction of Khalifa Street& TV RoundaboutUpgrade
(P007 C6)
Client: Ashghal
Project Cost: (QAR 6 million)
Project Role: Team Leader
2. IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 2 of 11
Mr. Abousaud served as a team leader to complete Technical Tender
Evaluation Report using KBR’s Tender Evaluation Plan, the scope of work
includes evaluating seven submittals, lead post tender meeting with
contractors and make presentation to Ashghal on the finding of the
evaluation. The project scope includes widening of Khalifa Street from 3 to
4-Lanes,constructionof a two level interchange,andconstructionof500 m
surface water micro tunnel 2.4m diameter.
CB&I/SHAW GROUP INC./STONE&WEBSTER USA
June 1997 - August 2014
Project: SR-20 Forsyth/Cherokee County, GA, Georgia DOT
Client: Georgia DOT
Project Cost: ($120 million)
Project Role: Projectmanager
Served as projectmanagerforturnkey projectto prepareconstructionplans
for 7.5 milesof 4-lanedivided urbanandrural highway. Theproject
involved public hearing,preliminaryplans,andfinal constructionplans
includingplan/profiles,roadwayhydraulicscalculation/design,signingand
marking,maintenanceoftraffic plans,erosioncontrol plans,quantities,right
of way plans, detailcostestimates,and specialprevisions.Thisprojectwas
canceledduringtheconceptdevelopmentduelackof funding
Project: US-19 Sumter County, GA, Georgia DOT.
Client: Georgia DOT
Project Cost: ($25 million)
Project Role: Projectmanager
Served as projectmanagertoprepareconstructionplansfor5.5 milesof 4-
lanedivided with44-ft median,andthreebridges. Theprojectinvolved
public hearing,preliminaryplans,and finalconstructionplansincluding
plan/profiles,roadwayand bridgehydraulicscalculation/design,signing&
marking,maintenanceoftraffic plans,erosioncontrolplans,quantities,R/W
plansusingGDOT’schecklistfor r/w plans,detailcost estimates,and
specialprevisions.Thisprojectwascompletedincludingconstruction.
Project: Sandy SpringsCapitalProjects.
Client: Sandy SpringsRevitalization, Inc
Project Cost: ($12 million)
Project Role: Program Manager
Mr. Abousaudserved as the program managerforSandy Springs
Revitalization, Inc. Responsibilitiesincludingmanagingsevenstreetscape
designprojects,completedconstructionmanagementoffour
streetscape/traffic calmingprojects,reviewconsultantsplans,prepare
Invitation for Bid, selectionofcontractor,constructionmanagement.
Preparemonthlyreportsto monitorschedule,budget,andprogressfor
3. IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 3 of 11
SSRI Board of Directors,and FultonCountyPublic Works. RepresentSSRI
duringmeetingwithGDOT andFultonCounty.
Project: SR-20, Floyd/Bartow Counties,GA, GeorgiaDOT.
Client: Georgia DOT
Project Cost: ($ 8 million)
Project Role: ProjectManager
Served as projectmanagertoprepareconstructionplansfor40
intersectionsimprovementsalongSR-20. Thefinalconstructionplans
included,highwayhydraulicscalculation/design,signing&marking,erosion
controlplans,signalplans,quantities,detailcost estimates,and special
previsions. Thisprojectwascompletedincludingconstruction.
Project: SR-365, Hall/Habersham Counties, GA, Georgia DOT..
Client: Georgia DOT
Project Cost: ($ 8 million)
Project Role: ProjectManager
Served as projectmanagertoprepareconstructionplansfor40
intersectionsimprovementsalongSR-365. Thefinal constructionplans
included,highwayhydraulicscalculation/design,signing&marking,erosion
controlplans,signalplans,quantities,detailcost estimates,and special
previsions. Thisprojectwascompletedincludingconstruction.
Project: SR-96 Reynolds, Taylor County, GA, Georgia DOT.
Client: Georgia DOT
Project Cost: ($25 million)
Project Role: ProjectManager
Served as projectmanagertoprepareconstructionplansfor14km of 4-
lanedivided with44-ft, and 20-ft medianthroughthecityof Reynolds,
Georgia. Theprojectinvolvedpublic hearing,revisingpreliminaryplans,
andcompletingfinalconstructionplans including,plan/profiles,roadway
hydraulicscalculation/design,signingandmarking,maintenanceoftraffic
plans,erosioncontrolplans,quantities,R/W plansusingGDOT’schecklist
for r/w plans,detailcost estimates,andspecialprevisions.Thisprojectwas
completedincludingconstruction.
Project: US-341/SR-27 Wayne County, GA, Georgia DOT.
Client: Georgia DOT
Project Cost: ($24 million)
Project Role: ProjectManager
Served as projectmanagertoprepareconstructionplansfor9 milesof 4-
lanedivided with44-ft median,and20-ft medianthroughthecityof Jessup
Georgia,this alsoincludesfourbridges. Thescopeofprojectincludes
public hearing,preliminaryplans,and finalconstructionplansincluding
plan/profiles,roadwayand bridgehydraulicscalculation/design,signing&
4. IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 4 of 11
marking,maintenanceoftraffic plans,erosioncontrolplans,quantities,R/W
plansusingGDOT’schecklistfor r/w plans,detailcost estimates,and
specialprevisions.Thisprojectwascompletedincludingconstruction.
Project: Peachtree Dunwoody Road, Fulton County, GA
Client: Fulton County, GA
Project Cost: ($3 million)
Project Role: ProjectManager
Served as projectmanagertoprepare constructionplansfor1.5 miles
urbanroadway. Thisprojectincludedplan/profiles,roadwayhydraulics
calculation/design,signing&marking,maintenanceoftraffic plans, erosion
controlplans,quantities,right of way plans,detail costestimates,and
specialprevisions.Thisprojectwascompletedincludingconstruct
Project: Spalding County DOT, Chuli Rd., Mimosa Rd., and Hickory
Rd., Spalding County, GA.
Client: Spalding County DOT
Project Cost: ($6 million)
Project Role: ProjectManager
Preparedconstructionplansforthree unpavedroad projects. Preparation
of preliminaryplansincludinghydraulics,right-of-wayplans,andfinal
constructionplans.Thisprojectwascompletedincludingconstruction.
Project: Georgia DOT, U.S. 341 (GIP 36 & 37), Jesup, GA.
Client: Georgia DOT
Project Cost: ($22 million)
Project Role: ProjectManager
Overseeingthe designandprojectmanagementfor15km of U.S. 341
south of Jesup, Georgia. Projectinvolved public hearing,revising
preliminaryplansincludinghydraulics,andcompletingfinalconstruction
plans.Thisprojectwascompletedincludingconstruction.
Project: Gwinnett DOT, SR-20/SR-84, Gwinnett County, GA.
Client: Gwinnett DOT
Project Cost: ($2 million)
Project Role: ProjectManager
Preparingpreliminaryandfinal constructionplansforSR-20/SR-84
intersectionimprovements.Thisprojectwascompletedincluding
construction.
Project: Cobb County DOT, Old Villa Rica Bridge Replacement.
Client: Cobb County DOT
Project Cost: ($ 1.8 million)
5. IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 5 of 11
Project Role: ProjectManager
PreparedfinalconstructionplansforOldVilla RicaRoad. Thisproject
includedbridgereplacementoverWildhorseCreek inCobbCounty. This
projectwascompletedincludingconstruction.
Project: Cobb County DOT, New Salem Bridge Replacement.
Client: Cobb County DOT
Project Cost: ($1.2 million)
Project Role: ProjectManager
Preparedfinalconstructionplansandbridgeover NoondayCreek inCobb
County. Thisprojectwascompletedincludingconstruction.
Project: Montgomery Outer Loop Value Engineering Study,
Montgomery, Alabama DOT.
Client: Alabama DOT
Project Cost: ($50 million)
Project Role: ProjectManager
Served as team member to complete a value engineering studyfor 8 miles
(from US-231 to SR-110) of freeway, this study including review of design
plans, interview the designers, prepare a report , and make oral
presentation to the DOT staff and other interested parties of findings and
recommendation. The duration of this studywas four days.
Project: Tuscaloosa EastBypass Value Engineering Study,
Montgomery, Alabama DOT.
Client: Alabama DOT
Project Cost: ($38 million)
Project Role: ProjectManager
Served as team member to complete a value engineering study for 7.4
miles (from Crescent Ridge Road to Jack Warner Parkway) of freeway, this
study including review of design plans, interview the designers, prepare a
report , and make oral presentation to the DOT staff and other interested
partiesof findingsandrecommendation. Thedurationof this study was four
days.
ARCADIS/ PIEDMONT OLSEN HENSELY USA
June 1996 – June 1997
Project: Georgia DOT, US 27 Widening and Construction, Troup
County, GA
Client: Georgia DOT
Project Cost: ($21 million)
Project Role: RoadwayDepartmentManager/MemberofProjectDesign
Team
Prepared preliminary, final construction plans and right-of-wayplans for 8
6. IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 6 of 11
kilometersof wideningandnewconstruction. Thisprojectincludedgrading,
drainage, paving, bridges, erosion control, and cost estimate.
Project: Cobb County DOT, Atlanta Road Widening and
Improvements, Marietta, GA
Client: Cobb County DOT
Project Cost: ($13 million)
Project Role: RoadwayDepartmentManager/MemberofProjectDesign
Team
Roadway Department Manager and Member of Project Design Team -
Preparedconcept,preliminarydesign, final construction plans, and right-of-
way plans for 2.6 miles of widening and road improvements. This project
includedsurvey, traffic analysis, grading, drainage, paving, bridges, erosion
control, cost estimate, and public hearing.
Project: Georgia DOT, I-520/Old Savannah Road Interchange,
Richmond County, GA
Client: Georgia DOT
Project Cost: ($18 million)
Project Role: RoadwayDepartmentManager/MemberofProjectDesign
Team
Roadway Department Manager and Member of Project Design Team -
Evaluated Georgia DOT’s concept, prepared preliminary and final
construction plans for interchange improvements. This project included
survey, traffic analysis, grading, paving, bridge, cost estimate, and public
hearing.
DAVID VOLKERT & ASSOCIATES USA
June 1993 – June 1996
Project: Alabama DOT, I-565/US 72 Interchange, Huntsville, AL.
Client: Alabama, DOT
Project Cost: ($8 million)
Project Role: ProjectManager
As Project Manager, prepared construction plans using metric units. This
projectincludedapproximately6 miles of roadway, two bridges, hydraulics,
includingtwodetentionponds,threetraffic signals,signingandstriping,cost
estimates, and traffic control plans.
Project: Alabama, DOT, US 78/Corridor “X”, Graysville, AL.
Client: Alabama, DOT
Project Cost: ($120 million)
Project Role: ProjectManager
As Project Manager, prepared construction plans for 2.5 miles of 8-lane
7. IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 7 of 11
section of freeway and interchange. This project included grade drain on
the mainline and grade drain base and pave on bridges and crossroads.
Project: Alabama DOT, Corridor “X”, Birmingham, AL.
Client:
Project Cost: ($ 6 million)
Project Role: ProjectManager
Prepareda preliminarydesignplanfor10.5 milesof an 8-lanecross section
of freeway, including six interchanges. A detailed traffic analysis was
performed to evaluate interchanges spacing, the required number of lanes
and the level of service of mainline and crossroads intersection. This
project also included the development/ evaluation of a number of
alternatives from which a preferred design was used for the public hearing.
Project: Birmingham Regional – Commission, Birmingham Traffic
Evaluation, Birmingham, AL.
Client:
Project Cost: ($2 million)
Project Role: ProjectManager
Evaluated traffic circulation,parking,andothermodesof transportation
(pedestrian,bicycle,etc.). Thisprojectinvolvedevaluatingexisting
conditions,providingshortand longterm alternates, andcoordinatingwith
state, county, city, andlocalorganizations,includingdeveloping
TRANPLAN for BirminghamRegionalCommission. Theprojectboundaries
covereddowntownBirmingham.
Project: Birmingham Regional – City of Birmingham, Carver Avenue
Street Improvement, Birmingham, AL
Client:
Project Cost: ($ 1.8 million)
Project Role: ProjectManager
ProjectManagertoPrepareconstructionplansfor½ mileof existing
residentialstreets. Thisprojectincludedplan/profile,drainage,cost
estimate,and representationto neighborhoodassociation.
Project: Birmingham Regional – City of Birmingham, Oxmoor Road,
Birmingham, AL.
Client: City of Birmingham
Project Cost: ($1.2 million)
Project Role: ProjectManager.
Preparedpreliminaryplansfor ½ mileof roadway. Thisprojectincluded
the developmentandevaluationof a numberof alternatives and
presentationto the OxmoorSteeringCommittee.
Project: Jefferson County Commission/Board ofEducation, Clay
Chalkville School Access Route, Birmingham, AL.
8. IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 8 of 11
Client: Jefferson County Commission/Board ofEducation
Project Cost: ($1.5 million)
Project Role: ProjectManager.
Preparedconstructionplansfor½ milesofaccessroadfor a middleand
highschool. Thisprojectincludedplan/profile,drainage,signingand
striping,and costestimate.
Project: City of Birmingham, North Frankfort Road, Birmingham, AL
Client: City of Birmingham
Project Cost: ($2.3 million)
Project Role: ProjectManager.
Preparedpreliminaryandconstructionplansfor1 mileof roadway. This
projectincludedplan/profile,typicalsection,hydraulics,signingandstriping,
utility coordination,and presentationtoa steering committee.
Project: Vulcan Material, Highway 261 Bridge, Helena, AL.
Client: Vulcan Material
Project Cost: ($1.7 million)
Project Role: ProjectManager.
Preparedpreliminary/constructionplansfora 175-foot bridgeover Highway
261and a detourroad as requiredbyAlabamaDOT standardsandspecs,
includingplan/profile,typicalsection,hydraulics,traffic controlplans,cost
estimates,biddingdocuments,selectingcontractor,andconstruction
managementservicesasper AlabamaDOT constructionmanual.
Project: City of Birmingham, Evergreen 21stAvenue, Birmingham,
AL.
Client: City of Birmingham
Project Cost: ($2 million)
Project Role: ProjectManager.
Preparedconstructionplansandright-of-wayplansfor 2 milesof residential
roadwayfor street improvements. Thisprojectincludedplan/profile,
drainageutilitycoordination,andpresentationtoneighborhoodassociation.
JHK & ASSOCIATES USA
January 1988 – January 1993
Project: City of Yuma, 4th Street Intersection Sight Distance, Yuma,
AZ.
Client: City of Yuma
Project Cost: ($ 500K)
Project Role: ProjectManager.
IndependentContractor, ProjectManager/Engineer -investigated
intersection'ssightdistanceproblemsalong14thStreet. Thisproject
9. IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 9 of 11
includeddata collection,intersectionanalysis,intersectionsightdistance
triangles,intersectionimprovements,andsigningandmarkingplans. The
finalresults includedareportdescribinganumberofalternatives to solve
the existingproblem.
Project: City of Commerce, Atlantic Boulevard Undrpass,
Commerce, CA
Client:
Project Cost: ($8.2 million)
Project Role: LeadEngineer
LeadEngineer/AssistingManager -Preliminaryandfinal designof an
arterialroadwayimprovement. Thisprojectincludedpreparing horizontal
andvertical alignmentoverSanta Anna FreewayandunderUnionPacific
Railroad,pavementdesignsection,intersectionsanalysis,travel timeand
delaystudy, traffic signaldesignandretiming,andsigningandstriping.
Project: Arizona DOT, I-10 Corridor Improvements, Tuscon, AZ
Client:
Project Cost: ($20 million)
Project Role: LeadDesignEngineer
Served as a LeadDesignEngineerforthe preliminarydesignof a 28-mile
sectionof freewayimprovements. Thisprojectincluded preparingageneral
plandocumentforthe 8-miledowntownsectionandadesignconcept
documentforthe 20-milesectionnorthofthe city of Tucson. Work included
traffic modeling,traffic analysis,environmentalimpactassessment,and
preliminarydesign planspreparation.
Project: Arizona DOT, I-10 Corridor Improvements, Tuscon, AZ
Client:
Project Cost: ($12 million)
Project Role: ProjectManager
Prepareda traffic report, intersectionanalysis,androadwayconstruction
plans. Theprojectinvolved designandlayout of two interchangesandone
directionalrampforthreemilesof a new8-laneroadway.
Project: City of San Diego, Fletcher Parkway Improvements, San
Diego, CA
Client: City of San Diego
Project Cost: ($4 million)
Project Role: leaddesignengineers
Served as oneof the lead designengineerstopreparea costestimate,
pavementsectiondesign,andtraffic signalplansfor an arterialroadway.
Project: Arizona DOT, Outer Loop Freeway, Phoenix, AZ -
10. IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 10 of 11
Client: Arizona DOT
Project Cost:
Project Role: ProjectEngineer
Preparedthe signingandstripingplansandsign structureplanfor 20miles
of I-10 freeway.
JERRY JONES & ASSOCIATES USA
April 1984 – April 1988
Project: Arizona DOT, US 89 Traffic and Capacity Analysis Report,
Tucson, AZ -
Client: Arizona DOT
Project Cost:
Project Role: ProjectEngineer
Preparedreport that includedthecollectionandanalysisofexisting traffic
andphysicaldata relatingto 16 milesof roadwayandfive signalized
intersections. Theanalysisincludedtraffic counts,signalinventories,
intersection/collisiondiagrams,roadway/intersectioncapacity,travel time
anddelay, signalwarrant,and signal/marking. Thisprojectincludedthe
constructionplansforwidening the16milesof roadwayfrom two lanes to a
divided4-lanehighway.
Project: Arizona DOT, Westmore Road Improvements, Tuscon, AZ -
Client: Arizona DOT
Project Cost:
Project Role: ProjectEngineer-
Prepareda traffic andlevel of serviceanalysis report. Thisreportincluded
assemblingtheexistingtraffic and physicaldatarelatingto the roadwayand
signalizedintersectioncapacity,estimatingdesignyeartraffic, and
performingcapacityandlevel of service analysis. Report recommendation
includedlocationsformedianopenings,left-turnbay storagelengths, and
numberof lanesrequiredat eachintersection.
Project: Price Club Center, Community Shopping Center, Glendale,
AZ
Client: Glendale, AZ
Project Cost:
Project Role: ProjectEngineer
In chargeof preparingatraffic study report to assess the impactofa
proposedcommunityshoppingcenteronthe adjacentarterialstreetsand
the majorintersectionswithinamileofthe proposedproject. Thisproject
includeddatacollectionandtraffic counts,intersection/collisiondiagrams,
intersectionanalysis,design/retimingtraffic signal,intersectionsigning,and
marking.
11. IBRAHIM ABOUSAUD, P.E.
Program Manager
Email; becisa@yahoo.com
Mobile;974-50458194(Doha), +1 678-427-7432(USA)
PARSONS INTERNATIONAL LIMITED Page 11 of 11
Project: City of Tucson, MDB Square Development, Tucson, AZ
Client: Glendale, AZ
Project Cost:
Project Role: ProjectEngineer
-Thedevelopmentencompassedapproximately61 acreswithresidential,
commercial,andoffice. Projectengineertopreparea traffic report that
includedtraffic countsforthe existingconditionanddevelopedfuturetrip
generationdistributionandassignmentusingT-Model. Prepared
intersectioncapacityanalysisusingMcTransHighwayCapacitySoftware
and1985 CapacityManualanddesignedtraffic signalplans.
Project: City of Tucson,Tucson Auto Mall, Tucson, AZ
Client: City of Tucson
Project Cost:
Project Role: ProjectEngineer
In chargeof preparingasite impactreportto evaluate the traffic impacton
adjacentstreetsystems. Thisprojectincludedthetraffic counts,
intersection/collisiondiagrams,intersectionanalysis,travel timeand delay
study, traffic signalretiming,andsigningandmarking.
Project: Pima County, La Canada Drive/Orange Grove, Tucson, AZ -
Client: Pima County,
Project Cost:
Project Role: ProjectEngineer
Prepareda traffic engineeringreportthatincludedinvestigatingand
analyzing the existingcapacityandlevel of serviceof the existing
intersection. Therecommendationsincludedadjustinglanegeometryand
signalphasing.
Project: City of Tucson, Kino/Irvington Traffic Study, Tucson, AZ -
Client: City of Tucson
Project Cost:
Project Role: ProjectEngineer-
Prepareda site impactstudyof 18.5 acresof proposedcommercial project
with retailand service. Thepurposeofthe traffic study was to determine
the traffic volumegeneratedby this projectandto analyze the impactonthe
majorstreets.